ML18046A613: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:TABLE 1 Summary Comparison of Current and Proposed Tech Spec Requirements (Section 4.14) Requirement ET Inspection Frequency Maximum period for reinspection of unplugged tubes with ET indications greater than or' equal to 30% Inspection sample for unplugged tubes containing ET indications equal to or greater than 45% using ET techniques qualified for producing interpretable results Inspection sample for unplugged tubes with ET indications greater than or equal to 30% but less than 45% Random sample using pull-through technique for tubes with ET indication less than 30% Operating allowance for multiple ET indications Operating allowance for ET indications other than multiple *ET indications Plugging criteria for denting Interval between completion of inspection and repair and sub-* mission of inspection report Current Tech Spec Every 12-24 months One inspection (Two is allowed if significant crease. in radiation exposure results) 100% 100% hot leg 1% cold leg 35% 6% for inspection after 1976 10% for tubes last inspected in 1976 20% for tubes last inspected in 1975 Failure to pass 0.540" probe 30 days 8 Proposed Tech Spec Every 12-24 months Three inspections 100% 33-1/3% NOTE: Chas.en so 100% tubes ted within three inspections 2% hot leg 1% cold leg 35% 6% Failure to pass 0.540" probe 90 days NOTE: Sleeve inspection frequency and acceptance criteria unchanged.
{{#Wiki_filter:8 TABLE 1 Summary Comparison of Current and Proposed Tech Spec Requirements (Section 4.14)
Requirement                 Current Tech Spec  Proposed Tech Spec ET Inspection Frequency                 Every 12-24 months  Every 12-24 months Maximum period for reinspection         One inspection      Three inspections of unplugged tubes with ET             (Two is allowed if indications greater than               significant in-or' equal to 30%                       crease. in radiation exposure results)
Inspection sample for unplugged         100%                100%
tubes containing ET indications equal to or greater than 45% using ET techniques qualified for producing interpretable results Inspection sample for unplugged         100%                33-1/3%
tubes with ET indications greater                           NOTE: Chas.en so than or equal to 30% but less than                           100% tubes inspec-45%                                                         ted within three inspections Random sample using pull-through       2~~ hot leg          2% hot leg technique for tubes with ET             1% cold leg          1% cold leg indication less than 30%
Operating allowance for multiple       35%                  35%
ET indications Operating allowance for ET             6% for inspection    6%
indications other than multiple         after 1976
    *ET indications 10% for tubes last inspected in 1976 20% for tubes last inspected in 1975 Plugging criteria for denting          Failure to pass      Failure to pass 0.540" probe         0.540" probe Interval between completion of          30 days              90 days inspection and repair and sub-
* mission of inspection report NOTE:   Sleeve inspection frequency and acceptance criteria unchanged.
nu0481-0220b-43 s1 o s os o lt:ta
nu0481-0220b-43 s1 o s os o lt:ta
* TABLE 2 Effect on Tubes To Be Inspected of Revised Technical Specifications 9 (Based on Latest Inspection Results From 1979) Inspection Sample Number of unplugged tubes/ indications with previous ET results equal to or greater than 45% to be inspected Number/percent of unplugged ET indications equal to or greater than 45% which are expected to be given interpretable inspection Number of unplugged tubes/ indications with ET results equal to'or greater than 30% but less than 45% to
* 9 TABLE 2 Effect on Tubes To Be Inspected of Revised Technical Specifications (Based on Latest Inspection Results From 1979)
* be inspected Number/percent of unplugged ET indications equal to or greater than 30% but less than 45% which are expected to be given an interpretable inspection Tubes included in random sample nu0481-0220c-43 Current Tech Spec SG-A SG-B 283/296 214/247 296/100% . 247/100% (Using previous ET techniques) 987/1601 720/1251 1102/68.8%
Inspection Sample           Current Tech Spec        Proposed Tech Spec SG-A          SG-B        SG-A        SG-B Number of unplugged tubes/       283/296      214/247    283/296      214/247 indications with previous ET results equal to or greater than 45% to be inspected Number/percent of unplugged     296/100%    . 247/100%  296/100%    247/100%
716/57.2% (Using previous ET techniques) 132 hot leg 136 hot leg 53 cold leg 69 cold leg Proposed Tech Spec SG-A SG-B 283/296 214/247 296/100% 247/100% (Using new ET techniques) 329/534 240/417 (1/3 (1/3 sample) sample) >'<534/ 100% *417/100% (Using new techniques)  
ET indications equal to or greater than 45% which       (Using previous ET      (Using new ET are expected to be given         techniques)              techniques) interpretable inspection Number of unplugged tubes/       987/1601      720/1251  329/534      240/417 indications with ET results equal to'or greater than                                 (1/3        (1/3 30% but less than 45% to
*1601 over 3 tions *1251 over 3 tions 132 hot leg 136 hot leg 53 cold leg 69 cold leg}}
* sample)      sample) be inspected Number/percent of unplugged     1102/68.8%   716/57.2% >'<534/ 100% *417/100%
ET indications equal to or greater than 30% but less    (Using previous ET      (Using new techniques) than 45% which are expected      techniques) to be given an interpretable                              *1601 over   *1251 over inspection                                                3 inspec-    3 inspec-tions       tions Tubes included in random        132 hot leg 136 hot leg 132 hot leg 136 hot leg sample                          53 cold leg 69 cold leg 53 cold leg 69 cold leg nu0481-0220c-43}}

Latest revision as of 21:34, 21 October 2019

Proposed Revisions to Tech Spec Tables 1 & 2 Re Steam Generator Insp
ML18046A613
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/05/1981
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18046A611 List:
References
NUDOCS 8105080192
Download: ML18046A613 (2)


Text

8 TABLE 1 Summary Comparison of Current and Proposed Tech Spec Requirements (Section 4.14)

Requirement Current Tech Spec Proposed Tech Spec ET Inspection Frequency Every 12-24 months Every 12-24 months Maximum period for reinspection One inspection Three inspections of unplugged tubes with ET (Two is allowed if indications greater than significant in-or' equal to 30% crease. in radiation exposure results)

Inspection sample for unplugged 100% 100%

tubes containing ET indications equal to or greater than 45% using ET techniques qualified for producing interpretable results Inspection sample for unplugged 100% 33-1/3%

tubes with ET indications greater NOTE: Chas.en so than or equal to 30% but less than 100% tubes inspec-45% ted within three inspections Random sample using pull-through 2~~ hot leg 2% hot leg technique for tubes with ET 1% cold leg 1% cold leg indication less than 30%

Operating allowance for multiple 35% 35%

ET indications Operating allowance for ET 6% for inspection 6%

indications other than multiple after 1976

  • ET indications 10% for tubes last inspected in 1976 20% for tubes last inspected in 1975 Plugging criteria for denting Failure to pass Failure to pass 0.540" probe 0.540" probe Interval between completion of 30 days 90 days inspection and repair and sub-
  • mission of inspection report NOTE: Sleeve inspection frequency and acceptance criteria unchanged.

nu0481-0220b-43 s1 o s os o lt:ta

  • 9 TABLE 2 Effect on Tubes To Be Inspected of Revised Technical Specifications (Based on Latest Inspection Results From 1979)

Inspection Sample Current Tech Spec Proposed Tech Spec SG-A SG-B SG-A SG-B Number of unplugged tubes/ 283/296 214/247 283/296 214/247 indications with previous ET results equal to or greater than 45% to be inspected Number/percent of unplugged 296/100% . 247/100% 296/100% 247/100%

ET indications equal to or greater than 45% which (Using previous ET (Using new ET are expected to be given techniques) techniques) interpretable inspection Number of unplugged tubes/ 987/1601 720/1251 329/534 240/417 indications with ET results equal to'or greater than (1/3 (1/3 30% but less than 45% to

  • sample) sample) be inspected Number/percent of unplugged 1102/68.8% 716/57.2% >'<534/ 100% *417/100%

ET indications equal to or greater than 30% but less (Using previous ET (Using new techniques) than 45% which are expected techniques) to be given an interpretable *1601 over *1251 over inspection 3 inspec- 3 inspec-tions tions Tubes included in random 132 hot leg 136 hot leg 132 hot leg 136 hot leg sample 53 cold leg 69 cold leg 53 cold leg 69 cold leg nu0481-0220c-43