Similar Documents at Hatch |
---|
Category:Code Relief or Alternative
MONTHYEARML20143A2332020-06-0303 June 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19)) ML20034E8942020-02-11011 February 2020 Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML19361A0562020-01-0909 January 2020 Proposed Alternative HNP-ISI-ALT-05-10 for the Implementation of BWRVIP 38 and -76 in Lieu of B-N-2 Examinations for Core Support Structures NL-19-1336, Implementation of BWRVIP-38 and -76 in Lieu of B-N-2 Examinations for Core Support Structures2019-11-0404 November 2019 Implementation of BWRVIP-38 and -76 in Lieu of B-N-2 Examinations for Core Support Structures ML18320A0572018-11-30030 November 2018 Plant, Units 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2017-03, Code Case N-513-4 for Moderate Pressure NL-18-0713, Request for Alternative HNP-ISI-ALT-05-08 to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping for Hatch Unit 1 Plant Service Water2018-05-17017 May 2018 Request for Alternative HNP-ISI-ALT-05-08 to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping for Hatch Unit 1 Plant Service Water NL-18-0408, Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing2018-04-0909 April 2018 Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing NL-18-0428, Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-12018-04-0909 April 2018 Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1 ML17279A0452017-10-26026 October 2017 Relief Requests ISI-RR-13, -14, -18, -19, -23, and -24 for Relief from Inservice Inspection Requirements ML17268A0442017-10-20020 October 2017 Relief Requests ISI RR 16, ISI-RR-17, ISI-44-21, and ISI-RR-22 for Relief from Inservice Inspection Requirements ML17205A3452017-08-10010 August 2017 Relief Request HNP-ISI-RR- 05-01 Regarding Reactor Pressure Vessel Head Stud Inservice Inspection Requirements ML17062A8322017-03-29029 March 2017 Relief Request ISI RR-15 Regarding Control Rod Drive Housing Welds Inservice Inspection Requirements ML16314A1322016-11-23023 November 2016 Request for Alternative HNP-ISI-ALT-05-03, Version 1.0, Regarding Reactor Pressure Vessel Flange Leak-Off Piping ML15310A4062015-12-30030 December 2015 Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval ML15352A2942015-12-28028 December 2015 Relief from the Requirements of the ASME Code ML15349A9732015-12-18018 December 2015 Relief from the Requirements of the ASME Code NL-15-1221, Withdrawal of RR-V-2 and Response to Request for Additional Information on RR-V-12015-07-16016 July 2015 Withdrawal of RR-V-2 and Response to Request for Additional Information on RR-V-1 NL-15-1265, E.I Hatch, Units 1 and 2 - 10CFR 50.55a Request No. HNP-ISI-ALT-5-01, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Maintaining Isi/Cii Related Activities on the 2001 E/2003A ASME Section XI Code2015-07-16016 July 2015 E.I Hatch, Units 1 and 2 - 10CFR 50.55a Request No. HNP-ISI-ALT-5-01, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Maintaining Isi/Cii Related Activities on the 2001 E/2003A ASME Section XI Code NL-15-1096, Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval2015-06-18018 June 2015 Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval NL-11-0162, Submittal of Revision to Relief Request RR-V-4 Fourth 10-Year Interval Inservice Testing Program2011-01-26026 January 2011 Submittal of Revision to Relief Request RR-V-4 Fourth 10-Year Interval Inservice Testing Program ML1100504942011-01-14014 January 2011 Safety Evaluation of Relief Request HNP-ISI-ALT-10, Version 1, for the Fourth 10-Year Inservice Inspection Interval Temporary Non-Code Repair of Service Water Piping, TAC ME4253 ML1020304442010-07-22022 July 2010 E-mail from Robert Martin, Regarding Verbal Authorixation of Relief - Note to File ML1020304522010-07-21021 July 2010 Verbal Authorization for Relief Request HNP-ISI-ALT-10 Temporary Non-code Repair of Service Water Piping ML1009802142010-04-0808 April 2010 Safety Evaluation of Relief Request HNP-ISI-ALT-09, Version 2.0, for the Fourth 10-year Inservice Inspection Interval ML0731301882007-12-0606 December 2007 Safety Evaluation for Alternative ISI-ALT-08 ML0713602972007-06-0505 June 2007 Relief, Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Request to Relief Nos. RR-42 Through RR-45, RR- 51, RR-58, RR-59, RR-60, & RR-62 ML0604502862006-02-14014 February 2006 Request for Relief from the Requirements of the American Society of Mechanical Engineered Boiler and Vessel Code (ASME Code) ML0534700912006-01-0303 January 2006 Relief, Boiler and Pressure Vessel Code, MC6528 and MC6529 ML0533303392005-12-22022 December 2005 Request for Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) ML0529700082005-11-0909 November 2005 Relief, Proposed Alternative RR-41 for Third and Fourth 10-Year Inservice Inspection Interval NL-05-1372, Third and Fourth 10-Year Interval Inservice Inspection Programs, Submittal of Revised Exemption Request2005-08-0202 August 2005 Third and Fourth 10-Year Interval Inservice Inspection Programs, Submittal of Revised Exemption Request ML0510301992005-04-25025 April 2005 RR, ISI Program Intervals for Alternative Alignment of Iwe/Iwl Inspection Program (Tac No. MC4870, MC4871, MC4872, MC4873, MC4874, MC4875) NL-05-0726, Fourth 10-Year Interval IST Program Update2005-04-20020 April 2005 Fourth 10-Year Interval IST Program Update ML0501303172005-01-28028 January 2005 Ltr, RR No. 38 NL-04-1764, Third 10-Year Interval Inservice Inspection Program Submittal of Revised Relief Request RR-382004-09-13013 September 2004 Third 10-Year Interval Inservice Inspection Program Submittal of Revised Relief Request RR-38 ML0332800372003-11-21021 November 2003 Safety Evaluation Re. Request to Use ASME Code Case N-661 NL-03-1744, Third 10-Year Interval Inservice Testing Program Submittal of Revised Relief Request RR-V-18 and Response to Request for Additional Information (RAI)2003-09-12012 September 2003 Third 10-Year Interval Inservice Testing Program Submittal of Revised Relief Request RR-V-18 and Response to Request for Additional Information (RAI) ML0304100732003-02-10010 February 2003 Relief Request, Third 10-year Inservice Inspection Program ML0301404462003-01-14014 January 2003 Relief Request, Third 10-Year Inservice Inspection Program ML0230903232002-10-30030 October 2002 Third 10-Year Interval Inservice Testing Program, Revision to Existing Relief Request RR-V-11 ML0218305772002-07-0202 July 2002 Relief Requests for the Second 10-Year Inservice Inspection (ISI) Interval 2020-06-03
[Table view] Category:Letter
MONTHYEARIR 05000321/20240102024-11-0606 November 2024 NRC Inspection Report 05000321/2024010 and 05000366/2024010 ML24299A2222024-10-31031 October 2024 Audit Summary for License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components IR 05000321/20240032024-10-30030 October 2024 Edwin I Hatch, Units 1 and 2 - Integrated Inspection Report 05000321/2024003 and 05000366/2024003 NL-24-0357, Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines2024-10-30030 October 2024 Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines ML24292A1602024-10-22022 October 2024 Request for Withholding Information from Public Disclosure License Amendment Request to Revise Technical Specification Surveillance Requirements to Increase Safety/Relief Valve Setpoints ML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24303A4102024-10-17017 October 2024 Dir Results Letter to NRC - Hatch - Hurricane Helene IR 05000321/20244012024-10-10010 October 2024 Security Baseline Inspection Report 05000321-2024401 and 05000366-2024401 ML24256A0282024-09-12012 September 2024 2024 Hatch Requal Inspection Corporate Notification Letter NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc IR 05000321/20240912024-08-27027 August 2024 NRC Investigation Report 2-2023-003 and NOV - NRC Inspection Report 05000321/2024091 and 05000366/2024091 IR 05000321/20240052024-08-26026 August 2024 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Report 05000321/2024005 and 05000366/2024005 NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information IR 05000321/20240022024-08-0808 August 2024 Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002 NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24198A1252024-07-16016 July 2024 Edwin I Hatch Nuclear Plant Units 1 - 2 Notification of Conduct of Title 10 of the Code of Federal Regulations 50 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 05000321/LER-2024-002-01, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications 05000321/LER-2024-003, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 ML24163A0532024-06-14014 June 2024 Audit Plan - Alternative Seismic Method LAR NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations IR 05000321/20240902024-05-15015 May 2024 NRC Inspection Report 05000321-2024090 and 05000366-2024090, Investigation Report 2-2023-003; and Apparent Violation NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 05000321/LER-2024-002, Manual Reactor Trip Due to Loss of Feedwater2024-05-0909 May 2024 Manual Reactor Trip Due to Loss of Feedwater NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 IR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 05000366/LER-2024-002, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications2024-04-24024 April 2024 Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications IR 05000321/20240012024-04-22022 April 2024 Integrated Inspection Report 05000321/2024001 and 05000366/2024001 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint 05000321/LER-2024-001, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2024-04-0909 April 2024 Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML24069A0012024-03-0909 March 2024 – Correction of Amendment No. 266 Regarding License Amendment Request Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program (TSTF-425, Revision 3) NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission ML24047A0362024-03-0404 March 2024 Response to Hatch and Vogtle FOF Dates Change Request (2025) NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 IR 05000321/20230062024-02-28028 February 2024 Annual Assessment Letter Edwin I. Hatch Nuclear Plant Units 1 and 2 - Nrc Inspection Report 05000321/2023006 and 05000366/2023006 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report 2024-09-09
[Table view] Category:Safety Evaluation
MONTHYEARML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 ML22297A1462022-12-22022 December 2022 Issuance of Amendments Nos. 319 and 264, Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITS ML22293A0302022-11-0707 November 2022 Amendments 318 & 263 Issuance, Regarding LAR to Adopt TSTF-227, Revision to EOC-RPT Pump Actions, and TSTF-297, ATWS-RPT (EPID L-2021-LLA- 0227) ML22192A1172022-09-0202 September 2022 Issuance of Amendments Nos. 317 & 262, Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-207-A, Completion Time for Restoration of Various Excessive Leakage Rates ML22192A1992022-08-19019 August 2022 Issuance of Amendments Nos. 316 and 261, Regarding Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22101A0942022-05-20020 May 2022 Issuance of Amendments Nos. 315 and 260, Regarding Request to Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21264A6442021-09-24024 September 2021 Issuance of Amendment to Revise Technical Specification 3.7.2, Plant Service Water (Psw) System and Ultimate Heat Sink (UHS) (EPID L-2021-LLA-0164) (Emergency Circumstances) ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21161A2012021-06-22022 June 2021 Associated Independent Spent Fuel Storage Facilities - Reduction in Commitment to the Quality ML21109A3592021-04-22022 April 2021 Issuance of Amendment No. 254, Regarding Revision to Technical Specifications for One-Time Extension of Completion Times Related to Residual Heat Removal System (Emergency Circumstances) ML20294A0762020-12-0707 December 2020 Issuance of Amendments Nos. 308 and 253, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements ML20254A0752020-09-18018 September 2020 Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Amendment No. 307 to Facility Operating License No. DPR-57 and Amendment No. 252 to Facility Operating License No. NPF-5 ML20202A0052020-09-15015 September 2020 Issuance of Amendments Nos. 306 and 251, Regarding the Application to Revise Technical Specifications to Adopt TSTF-568, Revise Appliciability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20077J7042020-06-26026 June 2020 Issuance of Amendment Nos. 305 and 250, Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML20066F5922020-06-11011 June 2020 Issuance of Amendments Nos. 304 and 249, Regarding License Amendment Request to Adopt NFPA-805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) ML20143A2332020-06-0303 June 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19)) ML20034E8942020-02-11011 February 2020 Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19239A2442019-11-19019 November 2019 Issuance of Amendments Regarding Revision to Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations ML19267A0232019-11-13013 November 2019 Issuance of Amendments the Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable (Residual Heat Removal) RHR Shutdown Cooling Subsystems, Using Consolidated Line Item Improvement Process ML19212A0542019-09-20020 September 2019 Issuance of Amendments 299 and 244 Regarding Revision to Technical Specifications to Adopt Tstf-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML19198A1042019-09-0404 September 2019 Issuance of Amendments Regarding Revision to Technical Specification 3.6.4.1 - Secondary Containment ML19177A1662019-07-0808 July 2019 Edwin Hatch Unit Nos. 1 and 2, Issuance of Amendments Regarding License Amendment Request to Correct Non-Conservative Technical Specification Allowable Values for the Condensate Storage Tank Low Level Transfer Function ML19091A2912019-04-30030 April 2019 Issuance of Amendments 296 and 241 to Revise Technical Specifications 3.6.2.5, Condition C, Residual Heat Removal Drywell Spray End State ML19064A7742019-04-26026 April 2019 Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff Tables ML19044A5552019-04-0303 April 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 ML19064A0872019-03-0808 March 2019 Proposed Inservice Inspection Alternative HNP-ISI-ALT-05-08 ML19053A0932019-02-22022 February 2019 Issuance of Amendments to Revise Technical Specification 3.8.1, AC Sources - Operating (EPID L-2019-LLA-0026) (Emergency Circumstances) ML19035A5502019-02-0606 February 2019 Relief Request HNP ISI RR 05-02 Regarding Reactor Pressure Vessel Head Stud Inservice Inspection Requirements ML19010A0092019-01-28028 January 2019 Issuance of Amendments to Revise Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation ML19011A0102019-01-22022 January 2019 Proposed Alternative HNP-ISI-ALT-05-04 for the Implementation of BWRVIP Guidelines ML18320A0572018-11-30030 November 2018 Plant, Units 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2017-03, Code Case N-513-4 for Moderate Pressure ML18289A6192018-10-18018 October 2018 Proposed Inservice Inspection Alternative HNP-ISI-ALT-05-07 ML18222A2962018-08-29029 August 2018 Issuance of Amendments to Revise Technical Specification 3.7.7, ECCS - Operating (CAC Nos. MF9997 and MF9998; EPID L-2017-LLA-0263) ML18183A0732018-07-26026 July 2018 Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293) ML18163A1602018-06-15015 June 2018 Proposed Alternative RR-V-11, Extension of Main Steam Safety Relief Valve Test Interval ML18123A3682018-05-31031 May 2018 Issuance of Amendments to Adopt TSTF-542, RPV Water Inventory Control (CAC Nos. MF9662 and MF9663; EPID L-2017-LLA-0215) ML18102B0162018-04-16016 April 2018 Proposed Inservice Inspection Alternative HNP-ISI-ALT-05-05 (CAC Nos. MF9812 and MF9813; EPID L-2017-LLR-0053) ML18022A1072018-01-25025 January 2018 Inservice Inspection Alternative GEN-ISI-ALT-2017-02, Version 1.0, Regarding the Use of ASME Code Case N-789-1 (CAC Nos. MF9942, MF9943, MF9944, and MF9945; EPID L-2017-LLR-0059) ML17355A4402018-01-22022 January 2018 Issuance of Amendments to Revise TS 3.6.4.1, Secondary Containment (CAC Nos. MF9590 and MF9591; EPID L-2017-LLA-0216) ML17271A3072017-11-30030 November 2017 Issuance of Amendments to Revise Actions of TS 5.5.12, Primary Containment Leakage Rate Testing Program ML17279A0452017-10-26026 October 2017 Relief Requests ISI-RR-13, -14, -18, -19, -23, and -24 for Relief from Inservice Inspection Requirements ML17268A0442017-10-20020 October 2017 Relief Requests ISI RR 16, ISI-RR-17, ISI-44-21, and ISI-RR-22 for Relief from Inservice Inspection Requirements ML17208A2312017-08-29029 August 2017 Issuance of Amendments Regarding the Adoption of TSTF 500, DC Electrical Rewrite - Update to TSTF 360 2023-08-02
[Table view] |
Text
Mr. James J. Hutto Regulatory Affairs Director UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 29, 2017 Southern Nuclear Operating Company, Inc. P.O. Box 1295 I Bin -038 Birmingham, AL 35201-1295
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1AND2 -RELIEF REQUEST ISl-RR-15 REGARDING CONTROL ROD DRIVE HOUSING WELD INSERVICE INSPECTION REQUIREMENTS (CAC NOS. MF9024 AND MF9025)
Dear Mr. Hutto:
By letter dated December 27, 2016, Southern Nuclear Operating Company (SNC, the licensee) submitted 11 requests for relief from certain inservice inspection (ISi) requirements of Section IX of the 2001 Edition through the 2003 Addenda of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPV Code) for the Edwin I. Hatch Nuclear Plant (HNP), Units 1 and 2. For one of the eleven requests, ISl-RR-15, the licensee requested relief from specified BPV Code requirements pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a(g)(5)(iii), on the basis that the code requirements are impractical.
Specifically, the licensee requested relief from the ASME BPV Code requirements for inspection of 10 percent of the peripheral control rod drive housing welds with either a surface or volumetric examination.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the subject request, and concludes that SNC has adequately addressed all of the regulatory requirements and that the ASME BPV Code requirements are impractical for the subject welds. Therefore, the NRC staff grants relief in accordance with 10 CFR 50.55a(g)(6)(i) for the fourth 10-year ISi program interval, which began on January 1, 2006, and ended on December 31, 2015. The NRC staff's safety evaluation is enclosed.
All other ASME Code requirements for which relief was not specifically requested and authorized herein by the NRC staff remain applicable.
J. Hutto If you have any questions, please contact the Project Manager, Randy Hall, at 301-415-4032 or by e-mail at Randy.Hall@nrc.gov.
Docket Nos. 50-321 and 50-366
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv Sincerely, Michael T. Markley, Chief Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST ISl-RR-15 REGARDING INSERVICE INSPECTION OF CONTROL ROD DRIVE HOUSING WELDS EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 SOUTHERN NUCLEAR OPERATING COMPANY DOCKET NOS. 50-321AND50-366
1.0 INTRODUCTION
By letter dated December 27, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML 16362A273), Southern Nuclear Operating Company (SNC, the licensee) submitted 11 requests for relief from certain inservice inspection (ISi) requirements of Section IX of the 2001 Edition through the 2003 Addenda of the of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPV Code) for the Edwin I. Hatch Nuclear Plant (HNP), Units 1 and 2. For one of the eleven requests, ISl-RR-15, the licensee requested relief and proposed to use alternative examination methods for ISi inspection items, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(5)(iii), on the basis that the code requirements are impractical.
Specifically, the licensee requested relief from the requirements of the ASME BPV Code for inspection of 10 percent of the peripheral control rod drive (CRD) housing welds with either a surface or volumetric examination, for the fourth 10-year ISi interval at HNP, Units 1 and 2.
2.0 REGULATORY EVALUATION
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1 components shall meet the requirements, except design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components.
The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME BPV Code incorporated by reference in 10 CFR 50.55a(a) twelve months prior to the start of the 120-month interval, subject to the conditions listed in 10 CFR 50.55a(b).
The Code of Record for the fourth 10-year interval ISi program, which began on January 1, 2006 and ended on December 31, 2015, is the 2001 Edition through the 2003 Addenda of Section XI of the ASME BPV Code. The regulation in 10 CFR 50.55a(g)(5)(iii) states, in part, that licensees may determine that conformance with certain ASME BPV Code requirements is impractical and that the licensee shall notify the U.S. Nuclear Regulatory Commission (NRC) and submit information in support of the determination.
Determination of impracticality in accordance with this section must be based on the demonstrated limitations experienced when attempting to comply with the code requirements during the ISi interval for which the request is being submitted.
Requests for relief made in accordance with this section must be submitted to the NRC no later than 12 months after the expiration of the initial 120-month inspection interval or subsequent 120-month inspection interval for which relief is sought. The regulation in 10 CFR 50.55a(g)(6)(i), states that the NRC will evaluate determinations under paragraph (g)(5) of this section that code requirements are impractical.
The NRC may grant such relief and may impose such alternative requirements as it determines are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the NRC to grant the relief requested by the licensee.
3.0 TECHNICAL
EVALUATION
3.1 Applicable
ASME Code Requirements ASME BPV Code,Section XI, Table IWB-2500-1, "Examination Categories", Examination Category 8-0, Item 814.10, states that either a volumetric or service examination of the pressure retaining welds, as defined by Figure IWB-2500-18, must be performed for 10 percent of the peripheral CRD housings.
HNP, Units 1 and 2, both have 36 peripheral CRD housings, thus,Section XI of the ASME BPV Code requires that the applicable welds on four peripheral CRD housings from each unit be examined.
Each CRD housing has a housing-to-flange weld and a housing-to-housing weld outside the reactor pressure vessel (RPV) lower head. Thus, for each unit, a total of eight CRD housing welds require examination, which would consist of four CRD housing-to-flange welds and four CRD housing-to-housing welds. ASME BPV Code,Section XI, Table IWB-2500-1, Category 8-P, Item 15.10, required a VT-2 examination in conjunction with the Class 1 system leakage test each refueling outage. The acceptance standards for the VT-2 examination are contained in Article IWB-3522 and the system leakage test is performed in accordance with Article IWB-5220.
3.2 Requested
Relief The licensee stated that the 36 peripheral CRD housing-to-flange welds on both units are not accessible for the required inspections due to the close proximity of adjacent CRD housing flanges, neutron monitoring instrumentation and associated cabling, and the horizontal beams supporting the CRD piping in the Subpile room. The licensee stated that the CRD housing welds are located near the RPV bottom head inside the RPV support skirt. The HNP, Unit 1, RPV was designed prior to the development of the ASME BPV Code,Section XI, requirements and access through the support skirt was not provided.
However, the HNP, Unit 2 vessel design addressed ASME BPV Code Section XI requirements and an access port was included, which provides access into the vessel support skirt. Due to accessibility issues for HNP, Unit 1, the licensee stated that no CRD housing-to-housing welds and no CRD to-flange welds were examined.
For HNP, Unit 2, eight CRD housing-to-housing welds were examined; however, no CRD housing-to-flange welds were examined, also due to the lack of accessi bi I ity. The licensee explained that to appreciably increase the examinations of the CRD housing welds for HNP, Unit 1, and the CRD housing-to-flange welds at both units, a redesign of the RPV bottom head would be required, which would be an undue burden. Therefore, the licensee concluded that the ASME BPV Code requirements are impractical.
3.3 Licensee's
Proposed Alternative and Basis for Use For HNP, Unit 1, in lieu of the required examination, the licensee stated that performing a VT-2 examination, in conjunction with the Class 1 system leakage test following each refueling outage, would provide adequate assurance that any flaws that might have propagated through the subject welds are identified and repaired prior to returning the plant to power operation.
In addition, the licensee explained that leakage can be determined during plant operation by the leak detection system located in the drywell, as described in the HNP, Unit 1, Final Safety Analysis Report (FSAR), Section 4.10 (ADAMS Accession No. ML 1701 OA336). For HNP, Unit 2, surface examinations for four CRD housing-to-housing welds were performed as required by the ASME BPV Code,Section XI. Furthermore, an additional four CRD to-housing welds were selected for surface examinations.
In summary, a total of eight CRD housing-to-housing welds from eight different peripheral CRD housings were examined, as identified in Table RR-15-1. The licensee confirmed that no limitations were observed nor were any surface indications recorded.
Thus, for HNP, Unit 2, in lieu of the required examination, the licensee stated that the surface examination of the eight CRD housing-to-housing welds and the VT-2 examination, performed in conjunction with the Class 1 system leakage test following each refueling outage, provides adequate assurance that any flaws that might have propagated through the subject welds are identified and repaired prior to returning the plant to power operation.
Furthermore, leakage can be determined during plant operation by the leak detection system located in the drywell, as described in the HNP, Unit 2, FSAR, Section 5.2.7 (ADAMS Accession No. ML 17010A357).
3.4 NRC Staff Evaluation The licensee stated that the general configuration of the CRD housing-to-housing and to-flange welds are similar for HNP, Units 1 and 2. Specifically, the bottom head of the RPV has a penetration for each CRD location, and outside of the RPV, there is a housing-to-flange weld (located in the Subpile room under the RPV) and an intermediate housing-to-housing weld (located inside the RPV support skirt). The licensee provided diagrams in its submittal for the configuration of the CRD housings for each unit, including the subject housing-to-housing and housing-to-flange welds. The NRC staff noted that these figures, and Section 4.2.3.2.3.1 of the HNP, Unit 2, FSAR, indicate that, for both units, the CRD housings are fabricated of Type 304 austenitic stainless steel and the flange material is forged Type 304 stainless steel. The NRC staff reviewed the photos provided in the submittal that illustrate the configuration of the CRDs from the Subpile room floor and provide views of a specific CRD housing flange (i.e., pictures RR-15-1, RR-15-2 and RR-15-3).
These photos illustrate the close proximity of adjacent CRD housing flanges, the neutron monitoring instrumentation and associated cabling, and the horizontal beams supporting the CRD piping in the Subpile room. Based on the these photos and the licensee's discussion, the NRC staff finds that physical limitations and lack of accessibility would prevent the licensee from performing the required inspections of the CRD housing-to-flange welds at HNP, Units 1 and 2. The licensee stated that access to the CRD housing-to-housing welds at HNP, Unit 1, through the RPV support skirt was not provided in the plant's design; thus, the NRC staff finds that examination of these welds in HNP, Unit 1, is not possible unless the RPV support skirt is modified.
However, the design of the RPV support skirt at HNP, Unit 2, included an access port that provides the ability to examine the CRD housing-to-housing welds. Table RR-15-1 of the submittal identifies eight CRD housing-to-housing welds that were examined at HNP, Unit 2. The licensee stated that 100 percent examination coverage was obtainable with no limitations, and no surface indications were recorded during the examinations at HNP, Unit 2. The NRC staff finds the examination of the eight CRD housing-to-housing welds at HNP, Unit 2, provides reassurance that any generic degradation mechanisms occurring in the CRD to-housing welds and CRD housing-to-flange welds would have been detected in the examined surfaces.
Additionally, based on the similarity in plant operation and material fabrication of the CRD housings for HNP, Units 1 and 2, the NRC staff finds it acceptable to assume that any generic degradation mechanisms and the associated manifestation would be applicable to both units. In accordance with the ASME BPV Code,Section XI, Table IWB-2500-1, Category B-P, Item 15.10, the licensee is required to perform a VT-2 examination in conjunction with the Class 1 system leakage test each refueling outage. The NRC staff finds that performing this VT-2 examination during the Class 1 system leakage test would identify any leakage from the CRD housing-to-housing and housing-to-flange welds each refueling outage prior to returning the plant to power operation.
Based on the photos of the CRDs and the additional discussion in the licensee's submittal, the NRC staff finds that physical limitations exist that prevent the licensee from performing 100 percent of the ASME Code-required surface examinations on 10 percent of peripheral CRD housing-to-flange welds for HNP, Units 1 and 2. Furthermore, imposing the inspection requirement would be a burden on the licensee that would require the redesign and modification of the RPV bottom head; therefore, the NRC staff concludes performing the required flange weld inspection is impractical.
In addition, access to the HNP, Unit 1, CRD housing-to-housing welds through the RPV support skirt is not available due to the RPV design, thereby preventing the licensee from performing 100 percent of the ASME Code-required surface examinations on 1 O percent of peripheral CRD housing-to-housing welds. Imposing the inspection requirement would be a burden on the licensee that would require the redesign and modification of the RPV support skirt; therefore, the NRC staff concludes that performing the required housing-to-housing weld inspections for HNP, Unit, 1, is impractical.
Finally, the NRC staff finds that the required VT-2 examination in conjunction with the Class 1 system leakage test each refueling outage, along with the capability of the leakage detection system, provide reasonable assurance of the leak tightness of the HNP, Units 1 and 2, CRD housing-to-housing welds and CRD housing-to-flange welds, prior to returning the plant to power operation and during plant operation, respectively.
4.0 CONCLUSION
As set forth above, the NRC staff concludes that the ASME BPV Code,Section XI, ISi requirements are impractical for the housing-to-housing and housing-to-flange welds described in relief request ISl-RR-15 for the HNP, Units 1 and 2, for the fourth 10-year ISi interval.
Additionally, the NRC staff concludes that the required VT-2 visual examinations performed for each unit during the Class 1 system leakage test each refueling outage, the surface examinations performed on the HNP, Unit 2, CRD housing-to-housing welds, and the capability provided by each unit's leak detection system, provide reasonable assurance of the leak tightness of the CRD housing-to-housing welds and CRD housing-to-flange welds. Therefore, pursuant to 10 CFR 50.55a(g)(6)(i), the NRC staff grants relief request ISl-RR-15 for HNP, Units 1 and 2, for the fourth 10-year ISi interval, which began on January 1, 2006, and ended on December 31, 2015. The NRC staff has determined that granting relief pursuant to 10 CFR 50.55a(g)(6)(i) for relief request ISl-RR-15 is authorized by law and will not endanger life or property, or the common defense and security, and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
All other ASME BPV Code,Section XI, requirements for which relief was not specifically requested and approved in the subject relief request remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
Principle Contributor:
On Yee Date:
J. Hutto
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 -RELIEF REQUEST ISl-RR-15 REGARDING CONTROL ROD DRIVE HOUSING WELDS INSERVICE INSPECTION REQUIREMENTS (CAC NOS. MF9024 AND MF9025) DATED: MARCH 29, 2017. cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-1 R/F RidsNrrLAKGoldstein Resource RidsACRS_MailCTR Resource RidsRgn2MailCenter Resource RidsNrrDorllpl2-1 Resource RidsNrrDeEpnb Resource OYee, NRR RidsNrrPMHatch Resource ADAMS Accession No.: ML 17062A832
- by e-mail OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DE/EPNB/BC*
NRR/DORL/LPL2-1
/BC NAME RH all KGoldstein DRudland MMarkley DATE 03/16/17 03/15/17 02/23/17 03/29/17 OFFICIAL RECORD COPY