MONTHYEARML20143A2332020-06-0303 June 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19)) ML20034E8942020-02-11011 February 2020 Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML19361A0562020-01-0909 January 2020 Proposed Alternative HNP-ISI-ALT-05-10 for the Implementation of BWRVIP 38 and -76 in Lieu of B-N-2 Examinations for Core Support Structures NL-19-1336, Implementation of BWRVIP-38 and -76 in Lieu of B-N-2 Examinations for Core Support Structures2019-11-0404 November 2019 Implementation of BWRVIP-38 and -76 in Lieu of B-N-2 Examinations for Core Support Structures ML18320A0572018-11-30030 November 2018 Plant, Units 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2017-03, Code Case N-513-4 for Moderate Pressure NL-18-0713, Request for Alternative HNP-ISI-ALT-05-08 to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping for Hatch Unit 1 Plant Service Water2018-05-17017 May 2018 Request for Alternative HNP-ISI-ALT-05-08 to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping for Hatch Unit 1 Plant Service Water NL-18-0408, Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing2018-04-0909 April 2018 Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing NL-18-0428, Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-12018-04-0909 April 2018 Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1 ML17279A0452017-10-26026 October 2017 Relief Requests ISI-RR-13, -14, -18, -19, -23, and -24 for Relief from Inservice Inspection Requirements ML17268A0442017-10-20020 October 2017 Relief Requests ISI RR 16, ISI-RR-17, ISI-44-21, and ISI-RR-22 for Relief from Inservice Inspection Requirements ML17205A3452017-08-10010 August 2017 Relief Request HNP-ISI-RR- 05-01 Regarding Reactor Pressure Vessel Head Stud Inservice Inspection Requirements ML17062A8322017-03-29029 March 2017 Relief Request ISI RR-15 Regarding Control Rod Drive Housing Welds Inservice Inspection Requirements ML16314A1322016-11-23023 November 2016 Request for Alternative HNP-ISI-ALT-05-03, Version 1.0, Regarding Reactor Pressure Vessel Flange Leak-Off Piping ML15310A4062015-12-30030 December 2015 Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval ML15352A2942015-12-28028 December 2015 Relief from the Requirements of the ASME Code ML15349A9732015-12-18018 December 2015 Relief from the Requirements of the ASME Code NL-15-1221, Withdrawal of RR-V-2 and Response to Request for Additional Information on RR-V-12015-07-16016 July 2015 Withdrawal of RR-V-2 and Response to Request for Additional Information on RR-V-1 NL-15-1265, E.I Hatch, Units 1 and 2 - 10CFR 50.55a Request No. HNP-ISI-ALT-5-01, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Maintaining Isi/Cii Related Activities on the 2001 E/2003A ASME Section XI Code2015-07-16016 July 2015 E.I Hatch, Units 1 and 2 - 10CFR 50.55a Request No. HNP-ISI-ALT-5-01, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Maintaining Isi/Cii Related Activities on the 2001 E/2003A ASME Section XI Code NL-15-1096, Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval2015-06-18018 June 2015 Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval NL-11-0162, Submittal of Revision to Relief Request RR-V-4 Fourth 10-Year Interval Inservice Testing Program2011-01-26026 January 2011 Submittal of Revision to Relief Request RR-V-4 Fourth 10-Year Interval Inservice Testing Program ML1100504942011-01-14014 January 2011 Safety Evaluation of Relief Request HNP-ISI-ALT-10, Version 1, for the Fourth 10-Year Inservice Inspection Interval Temporary Non-Code Repair of Service Water Piping, TAC ME4253 ML1020304442010-07-22022 July 2010 E-mail from Robert Martin, Regarding Verbal Authorixation of Relief - Note to File ML1020304522010-07-21021 July 2010 Verbal Authorization for Relief Request HNP-ISI-ALT-10 Temporary Non-code Repair of Service Water Piping ML1009802142010-04-0808 April 2010 Safety Evaluation of Relief Request HNP-ISI-ALT-09, Version 2.0, for the Fourth 10-year Inservice Inspection Interval ML0731301882007-12-0606 December 2007 Safety Evaluation for Alternative ISI-ALT-08 ML0713602972007-06-0505 June 2007 Relief, Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Request to Relief Nos. RR-42 Through RR-45, RR- 51, RR-58, RR-59, RR-60, & RR-62 ML0604502862006-02-14014 February 2006 Request for Relief from the Requirements of the American Society of Mechanical Engineered Boiler and Vessel Code (ASME Code) ML0534700912006-01-0303 January 2006 Relief, Boiler and Pressure Vessel Code, MC6528 and MC6529 ML0533303392005-12-22022 December 2005 Request for Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) ML0529700082005-11-0909 November 2005 Relief, Proposed Alternative RR-41 for Third and Fourth 10-Year Inservice Inspection Interval NL-05-1372, Third and Fourth 10-Year Interval Inservice Inspection Programs, Submittal of Revised Exemption Request2005-08-0202 August 2005 Third and Fourth 10-Year Interval Inservice Inspection Programs, Submittal of Revised Exemption Request ML0510301992005-04-25025 April 2005 RR, ISI Program Intervals for Alternative Alignment of Iwe/Iwl Inspection Program (Tac No. MC4870, MC4871, MC4872, MC4873, MC4874, MC4875) NL-05-0726, Fourth 10-Year Interval IST Program Update2005-04-20020 April 2005 Fourth 10-Year Interval IST Program Update ML0501303172005-01-28028 January 2005 Ltr, RR No. 38 NL-04-1764, Third 10-Year Interval Inservice Inspection Program Submittal of Revised Relief Request RR-382004-09-13013 September 2004 Third 10-Year Interval Inservice Inspection Program Submittal of Revised Relief Request RR-38 ML0332800372003-11-21021 November 2003 Safety Evaluation Re. Request to Use ASME Code Case N-661 NL-03-1744, Third 10-Year Interval Inservice Testing Program Submittal of Revised Relief Request RR-V-18 and Response to Request for Additional Information (RAI)2003-09-12012 September 2003 Third 10-Year Interval Inservice Testing Program Submittal of Revised Relief Request RR-V-18 and Response to Request for Additional Information (RAI) ML0304100732003-02-10010 February 2003 Relief Request, Third 10-year Inservice Inspection Program ML0301404462003-01-14014 January 2003 Relief Request, Third 10-Year Inservice Inspection Program ML0230903232002-10-30030 October 2002 Third 10-Year Interval Inservice Testing Program, Revision to Existing Relief Request RR-V-11 ML0218305772002-07-0202 July 2002 Relief Requests for the Second 10-Year Inservice Inspection (ISI) Interval 2020-06-03
[Table view] Category:Letter type:NL
MONTHYEARNL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 NL-23-0003, Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 12023-01-20020 January 2023 Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1 NL-23-0069, Correction of Technical Specification Omission and Typographical Error2023-01-20020 January 2023 Correction of Technical Specification Omission and Typographical Error NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable2022-11-30030 November 2022 Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable NL-22-0850, Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-11-18018 November 2022 Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0832, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF .2022-10-27027 October 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF . NL-22-0800, Supplement to Authorized Relief Request HNP-ISI-RR-05-022022-10-27027 October 2022 Supplement to Authorized Relief Request HNP-ISI-RR-05-02 NL-22-0801, Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of .2022-10-14014 October 2022 Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of . NL-22-0757, Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-09-30030 September 2022 Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NL-22-0687, Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 22022-08-31031 August 2022 Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 2 NL-22-0406, Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes2022-08-19019 August 2022 Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes NL-22-0650, Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-08-19019 August 2022 Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0590, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten2022-08-18018 August 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten NL-22-0672, Registration of Spent Fuel Cask Use2022-08-17017 August 2022 Registration of Spent Fuel Cask Use NL-22-0564, and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use2022-07-21021 July 2022 and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 NL-22-0499, Registration of Spent Fuel Cask Use2022-06-27027 June 2022 Registration of Spent Fuel Cask Use NL-22-0362, Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2022-06-0101 June 2022 Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update NL-22-0365, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R302022-05-31031 May 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R30 NL-22-0335, Supplement to Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 And.2022-05-17017 May 2022 Supplement to Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 And. NL-22-0344, Annual Radiological Environmental Operating Reports for 20212022-05-10010 May 2022 Annual Radiological Environmental Operating Reports for 2021 NL-22-0315, Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report for Drywell Temperature Indicator Inoperable for Greater than 30 Days2022-05-0404 May 2022 Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report for Drywell Temperature Indicator Inoperable for Greater than 30 Days NL-22-0325, Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable2022-05-0303 May 2022 Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable NL-22-0283, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-04-29029 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. NL-22-0271, Changes to the Physical Security Plan2022-04-19019 April 2022 Changes to the Physical Security Plan NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations NL-21-0918, License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 52022-03-31031 March 2022 License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 5 NL-22-0220, Units 1 and 2 - Nuclear Property Insurance Coverage as of April 1, 20222022-03-28028 March 2022 Units 1 and 2 - Nuclear Property Insurance Coverage as of April 1, 2022 NL-22-0221, Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2022-03-28028 March 2022 Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) 2024-01-30
[Table view] |
Text
~ Southern Nuclear Cheryl A. Gayheart 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35242 Regulatory Affairs Director 205 992 5316 tel 205 992 7601 fax MAY 1 7 2018 cagayhea@ southernco.com Docket Nos.: 50-321 NL-18-0713 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant- Unit 1 Request for Alternative HNP-ISI-ALT-05-08 to Implement Code Case N-513-4, "Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping" for Hatch Unit 1 Plant Service Water Ladies and Gentlemen:
In accordance with the provisions of 10 CFR 50.55a(z)(2), Southern Nuclear Operating Company (SNC) hereby requests Nuclear Regulatory Commission (NRC) approval of proposed inservice inspection (lSI) alternative HNP-ISI-ALT-05-08, Version 1. For Hatch Nuclear Plant (HNP) Unit 1, this alternative will allow utilization of Code Case N-513-4 on leak discovered in a 30-inch Class 3 Elbow on "A" Loop of Plant Service Water System.
SNC is requesting approval to apply the evaluation methods of ASME Code Case N-513-4, "Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1,"to this Class 3 component that meets the operational and configuration limitations of Code Case N-513-4, paragraphs 1 (a), 1 (b), 1 (c), and 1 (d) to avoid increased plant risk associated with a plant shutdown to comply with the cited Code requirements.
These proposed alternatives are being submitted in accordance with 10 CFR 50.55a(z)(2),
"hardship without a compensating increase in the level of quality and safety to allow SNC to perform additional extent of condition examinations on the affected systems while allowing time for safe and orderly long-term repair actions if necessary.
SNC requests NRC review and approval of this alternative by May 18, 2018.
This letter contains no NRC commitments. If you have any questions, please contact Jamie Coleman at 205-992-6611.
Respectfully submitted, c~
Regulatory Affairs Director CAG/PDB
U.S. Nuclear Regulatory Commission NL-18-0713 Page2
Enclosure:
HNP-ISI-ALT-05-08 to Implement Code Case N-513-4 Cc: Regional Administrator, Region II NRR Project Manager- Hatch Nuclear Plant Senior Resident Inspector- Hatch Nuclear Plant RTYPE: CFA04.054, CHA02.004
Edwin I. Hatch Nuclear Plant - Unit 1 Request for Alternative HNP-ISI-ALT-05*08 to Implement Code Case N-513*4, "Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping" for Hatch Unit 1 Plant Service Water Enclosure HNP-ISI*ALT-05-08 to Implement Code Case N-513*4
Enclosure to NL-18-0713 HNP-ISI-ALT-05-08 to Implement Code Case N-513-4 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)
Hardship without a Compensating Increase in Quality and Safety
- 1. ASME Code Component(s) Affected Section XI, 30-inch Class 3 Elbow in Plant Service Water System downstream of valve 1P41-F305A
2. Applicable Code Edition and Addenda
ASME Section XI, 2007 Edition through 2008 Addenda
- 3. Applicable Code Requirements The Editions/Addenda of ASME Section XI for which the alternative is requested is the 2007 Edition through the 2008 Addenda. Subsection IWA-4000 of this Edition and Addenda provides requirements for welding, brazing, metal removal, and installation of repair/replacement activities.
4. Reason for Request
On May 14, 2018 a through wall leak was discovered in a 30-inch Class 3 Elbow in the Plant Service Water System. Nominal thickness of the pipe is 0.375 inch. The leak is on Unit 1 "A" Loop, downstream of valve 1P41-F305A on the southside of the strainer pit. The flaw leakage was quantified (by calculating the time it took the water to fill a container of known volume) as three (3) gallons per minute. There are no electrical components in the general area that would be impacted by spray concerns. Water is flowing to the sumps which can handle the additional water. Due to the location of the leak, the leak cannot be isolated without completely isolating the system. The design pressure and temperature are 180 psig and 125°F (respectively), while the actual operating pressure and temperature of the system are approximately 130 psig and less than (<) 97°F.
The area around the flaw was examined using ultrasonic technique. The technique revealed localized wall thinning with a flaw about the size of a quarter to a half dollar. Specifically, the lowest points at radius 1.0 in., 1.5 in., 2.0 in., 2.5 in., and 3.0 in. were documented as 0.123 in.,
0.252 in, 0.318 in., 0.429 in., and 0.403 in. (respectively). Once outside the 1.0 in. radius the data indicated that all other points (beside the previously mentioned low point) meet or exceeded nominal wall thickness of the pipe.
In accordance with 10 CFR 50.55a(z)(2), Southern Nuclear Operating Company (SNC) is requesting an alternative from the requirement to perform a code repair/replacement activity for the degraded Class 3 Piping whose maximum operating temperature does not exceed 200°F and whose maximum operating pressure does not exceed 275 psig. To perform a Code repair, a plant shutdown would be required because the leak is not isolable during normal operation.
Plant shutdown activities would result in additional plant risk that would be inappropriate when a degraded condition can be demonstrated to retain adequate margin to complete the component's. safety function. The use of an acceptable alternative analysis method in lieu of immediate action for the degraded condition will allow SNC to perform additional extent of condition examinations on the affected systems while allowing time for safe and orderly long-term repair actions if necessary. Actions to remove the degraded piping from service could have a detrimental overall risk impact by requiring a plant shutdown, thus requiring use of a system that is in standby during normal operation. Accordingly, compliance with the current code E-1
Enclosure to NL-18-0713 HNP-ISI-ALT-05-08 to Implement Code Case N-513-4 requirements results in a hardship without a compensating increase in the level of quality and safety.
ASME Code Case N-513-3 does not allow evaluation of flaws located away from attaching circumferential piping welds that are in elbows, bent pipe, reducers, expanders, and branch tees. ASME Code Case N-513-4 provides guidance for evaluation of flaws in these locations.
Application of the Code Case assures that the elbow degraded area will retain structural and leakage integrity until a Code compliant repair is completed. Per the requirements of Code Case N-513-4, a Code compliant repair will be implemented no later than the end of the next Hatch Unit 1 Refueling Outage (Spring 2020- 1R29) via work order SNC945822.
- 5. Proposed Alternative and Basis for Use SNC is requesting approval to apply the evaluation methods of ASME Code Case N-513-4, "Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1,"to this Class 3 Component that meets the operational and configuration limitations of Code Case N-513-4, paragraphs 1 (a), 1 (b), 1 (c), and 1 (d) to avoid increased plant risk associated with a plant shutdown to comply with the cited Code requirements.
The NRC issued Generic Letter 90-05 (Reference 1), "Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2, and 3 Piping (Generic Letter 90-05)," to address the acceptability of limited degradation in piping with maximum operating conditions less than or equal to 200°F (93°C) and less than or equal to 275 psig (1.9 MPa). The generic letter defines conditions that would be acceptable to utilize temporary non-code repairs with NRC approval.
ASME recognized that relatively small flaws could remain in service without risk to the structural integrity of a piping system and developed Code Case N-513. The NRC approval of Code Case N-513-3 in Regulatory Guide 1.147 (Reference 2), "lnservice Inspection Code Case Acceptability, ASME Section XI, Division 1,"allows acceptance of partial through-wall or through-wall leaks for an operating cycle provided all conditions of the Code Case and NRC conditions are met. The Code Case also requires the Owner to demonstrate system operability due to leakage.
ASME recognized that the limitations in Code Case N-513-3 were preventing needed use in piping components such as elbows, bent pipe, reducers, expanders, and branch tees and external tubing or piping attached to heat exchangers. Code Case N-513-4 was approved by the ASME to expand use on these locations and to revise several other areas of the Code Case.
Attachment 2 of the Reference 3 letter provides a marked-up N-513-3 version of the Code Case to highlight the changes compared to the NRC approved N-513-3 version. Attachment 3 of the Reference 3 letter provides the ASME approved Code Case N-513-4. The following provides a high-level overview of the Code Case N-513-4 changes:
- 1) Revised the maximum allowed time of use from no longer than 26 months to the next scheduled refueling outage.
- 2) Added applicability to piping elbows, bent pipe, reducers, expanders, and branch tees where the flaw is located more than (R 0 t) 112 from the centerline of the attaching circumferential piping weld.
- 3) Expanded use to external tubing or piping attached to heat exchangers.
- 4) Revised to limit the use to liquid systems.
- 5) Revised to clarify treatment of Service Level load combinations.
- 6) Revised to address treatment of flaws in austenitic pipe flux welds.
- 7) Revised to require minimum wall thickness acceptance criteria to consider longitudinal stress in addition to hoop stress.
E-2
Enclosure to NL-18-0713 HNP-ISI-ALT-05-08 to Implement Code Case N-513-4
- 8) Other minor editorial changes to improve the clarity of the Code Case.
Detailed discussion of significant changes in Code Case N-513-4 when compared to NRC approved Code Case N-513-3 is provided in Attachment 4 of the Reference 31etter.
The design basis is considered for each leak and evaluated using the SNC Operability Evaluation process. The evaluation process must consider requirements or commitments established for the system, continued degradation and potential consequences, operating experience, and engineering judgment. As required by the Code Case, the evaluation process considers but is not limited to system make-up capacity, containment integrity with the leak not isolated, effects on adjacent equipment, and the potential for room flooding.
Leakage rate is not typically a good indicator of overall structural stability in moderate energy systems, where the allowable through-wall flaw sizes are often on the order of inches (ML14240A603, ML14316A167, ML15070A428). The periodic inspection interval defined using paragraph 2{e) of Code Case N-513-4 provides evidence that a leaking flaw continues to meet the flaw acceptance criteria and that the flaw growth rate is such that the flaw will not grow to an unacceptable size.
The effects of leakage may impact the operability determination or the plant flooding analyses specified in paragraph 1 (f). For a leaking flaw, the allowable leakage rate will be determined by dividing the critical leakage rate by a safety factor of four (4). The critical leakage rate is determined as the lowest leakage rate that can be tolerated and may be based on the allowable loss of inventory or the maximum leakage that can be tolerated relative to room flooding, among others. The safety factor of four (4) on leakage is based upon Code Case N-705 (Reference 4),
which is accepted without condition in Regulatory Guide 1.147, Revision 18. Paragraph 2.2(e) of N-705 requires a safety factor of two (2) on flaw size when estimating the flaw size from the leakage rate. This corresponds to a safety factor of four (4) on leakage for nonplanar flaws.
Although the use of a safety factor for determination of an unknown flaw is considered conservative when the actual flaw size is known, this approach is deemed acceptable based upon the precedent of Code Case N-705. Note that the alternative herein does not propose to use any portion of Code Case N-705 and that citation of N-705 is intended only to provide technical basis for the safety factor on leakage.
During the temporary acceptance period, the leaking flaw(s) will be monitored daily as required by paragraph 2{f) of Code Case N-513-4 to confirm the analysis conditions used in the evaluation remain valid. Significant change in the leakage rate is reason to question that the analysis conditions remain valid, and would require re-inspection per paragraph 2(f) of the Code Case. Any re-inspection must be performed in accordance with paragraph 2{a) of the Code Case.
The leakage limit provides quantitative measurable limits which ensure the operability of the system and early identification of issues that could erode defense-in-depth and lead to adverse consequences.
In summary, SNC will apply ASME Code Case N-513-4 to evaluate the leak discovered in a 30-inch Class 3 Elbow on "A" Loop of Plant Service Water System. Code Case N-513-4 utilizes technical evaluation approaches that are based on principals that are accepted in other Code documents already acceptable to the NRC. The application of this code case, in concert with safety factors on leakage limits, will maintain acceptable structural and leakage integrity while minimizing plant risk by minimizing the number of plant transients that could be incurred if degradation is required to be repaired based on ASME Section XI acceptance criteria only.
E-3
Enclosure to NL-18-0713 HNP-ISI-ALT-05-08 to Implement Code Case N-513-4
- 6. Duration of Proposed Alternative This relief will be applicable until a Code compliant repair is complete. The repair will be implemented no later than the end of the next Hatch Unit 1 refueling outage or before exceeding the temporary acceptance criteria of Code Case N-513-4, whichever comes first.
- 7. Precedents There have also been several submittals approved for N-513-4 use in specific applications. The table below lists several Safety Evaluation Reports as precedents for use of Code Case N-513-4.
SER Accession No. Plant Application Additional Requirement ML16230A237 Exelon Fleet Generic N-513-4 Critical leakage determination Leaking ML15070A428 ANO 5 gpm leakage limit Sweepolet ML14316A167 Fort Calhoun Leaking Elbow None ML14335A551 Peach Bottom Leaking Elbow 5 gpm leakage limit
- 8. References
- 1. NRC Generic Letter 90-05, "Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2, and 3 Piping (Generic Letter 90-05)"
- 2. Regulatory Guide 1.147, "lnservice Inspection Code Case Acceptability, ASME Section XI, Division 1," Revision 18, March 2017.
- 3. Letter from D. Gudger (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Proposed Alternative to Utilize Code Case N-513-4, "Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ",dated January 28, 2016 (ML16029A003).
- 4. ASME Boiler and Pressure Vessel Code, Code Case N-705, "Evaluation Criteria for Temporary Acceptance of Degradation in Moderate Energy Class 2 or 3 Vessels and TanksSection XI, Division 1," October 12,2006.