ML102030444
ML102030444 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 07/22/2010 |
From: | Martin R Plant Licensing Branch II |
To: | Thorpe A Plant Licensing Branch II |
Martin R, NRR/DORL, 415-1493 | |
References | |
Download: ML102030444 (2) | |
Similar Documents at Hatch | |
---|---|
Category:Code Relief or Alternative
MONTHYEARML20143A2332020-06-0303 June 2020
[Table view]Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19)) ML20034E8942020-02-11011 February 2020 Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML19361A0562020-01-0909 January 2020 Proposed Alternative HNP-ISI-ALT-05-10 for the Implementation of BWRVIP 38 and -76 in Lieu of B-N-2 Examinations for Core Support Structures NL-19-1336, Implementation of BWRVIP-38 and -76 in Lieu of B-N-2 Examinations for Core Support Structures2019-11-0404 November 2019 Implementation of BWRVIP-38 and -76 in Lieu of B-N-2 Examinations for Core Support Structures ML18320A0572018-11-30030 November 2018 Plant, Units 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2017-03, Code Case N-513-4 for Moderate Pressure NL-18-0713, Request for Alternative HNP-ISI-ALT-05-08 to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping for Hatch Unit 1 Plant Service Water2018-05-17017 May 2018 Request for Alternative HNP-ISI-ALT-05-08 to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping for Hatch Unit 1 Plant Service Water NL-18-0408, Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing2018-04-0909 April 2018 Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing NL-18-0428, Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-12018-04-0909 April 2018 Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1 ML17279A0452017-10-26026 October 2017 Relief Requests ISI-RR-13, -14, -18, -19, -23, and -24 for Relief from Inservice Inspection Requirements ML17268A0442017-10-20020 October 2017 Relief Requests ISI RR 16, ISI-RR-17, ISI-44-21, and ISI-RR-22 for Relief from Inservice Inspection Requirements ML17205A3452017-08-10010 August 2017 Relief Request HNP-ISI-RR- 05-01 Regarding Reactor Pressure Vessel Head Stud Inservice Inspection Requirements ML17062A8322017-03-29029 March 2017 Relief Request ISI RR-15 Regarding Control Rod Drive Housing Welds Inservice Inspection Requirements ML16314A1322016-11-23023 November 2016 Request for Alternative HNP-ISI-ALT-05-03, Version 1.0, Regarding Reactor Pressure Vessel Flange Leak-Off Piping ML15310A4062015-12-30030 December 2015 Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval ML15352A2942015-12-28028 December 2015 Relief from the Requirements of the ASME Code ML15349A9732015-12-18018 December 2015 Relief from the Requirements of the ASME Code NL-15-1221, Withdrawal of RR-V-2 and Response to Request for Additional Information on RR-V-12015-07-16016 July 2015 Withdrawal of RR-V-2 and Response to Request for Additional Information on RR-V-1 NL-15-1265, E.I Hatch, Units 1 and 2 - 10CFR 50.55a Request No. HNP-ISI-ALT-5-01, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Maintaining Isi/Cii Related Activities on the 2001 E/2003A ASME Section XI Code2015-07-16016 July 2015 E.I Hatch, Units 1 and 2 - 10CFR 50.55a Request No. HNP-ISI-ALT-5-01, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Maintaining Isi/Cii Related Activities on the 2001 E/2003A ASME Section XI Code NL-15-1096, Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval2015-06-18018 June 2015 Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval NL-11-0162, Submittal of Revision to Relief Request RR-V-4 Fourth 10-Year Interval Inservice Testing Program2011-01-26026 January 2011 Submittal of Revision to Relief Request RR-V-4 Fourth 10-Year Interval Inservice Testing Program ML1100504942011-01-14014 January 2011 Safety Evaluation of Relief Request HNP-ISI-ALT-10, Version 1, for the Fourth 10-Year Inservice Inspection Interval Temporary Non-Code Repair of Service Water Piping, TAC ME4253 ML1020304442010-07-22022 July 2010 E-mail from Robert Martin, Regarding Verbal Authorixation of Relief - Note to File ML1020304522010-07-21021 July 2010 Verbal Authorization for Relief Request HNP-ISI-ALT-10 Temporary Non-code Repair of Service Water Piping ML1009802142010-04-0808 April 2010 Safety Evaluation of Relief Request HNP-ISI-ALT-09, Version 2.0, for the Fourth 10-year Inservice Inspection Interval ML0731301882007-12-0606 December 2007 Safety Evaluation for Alternative ISI-ALT-08 ML0713602972007-06-0505 June 2007 Relief, Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Request to Relief Nos. RR-42 Through RR-45, RR- 51, RR-58, RR-59, RR-60, & RR-62 ML0604502862006-02-14014 February 2006 Request for Relief from the Requirements of the American Society of Mechanical Engineered Boiler and Vessel Code (ASME Code) ML0534700912006-01-0303 January 2006 Relief, Boiler and Pressure Vessel Code, MC6528 and MC6529 ML0533303392005-12-22022 December 2005 Request for Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) ML0529700082005-11-0909 November 2005 Relief, Proposed Alternative RR-41 for Third and Fourth 10-Year Inservice Inspection Interval NL-05-1372, Third and Fourth 10-Year Interval Inservice Inspection Programs, Submittal of Revised Exemption Request2005-08-0202 August 2005 Third and Fourth 10-Year Interval Inservice Inspection Programs, Submittal of Revised Exemption Request ML0510301992005-04-25025 April 2005 RR, ISI Program Intervals for Alternative Alignment of Iwe/Iwl Inspection Program (Tac No. MC4870, MC4871, MC4872, MC4873, MC4874, MC4875) NL-05-0726, Fourth 10-Year Interval IST Program Update2005-04-20020 April 2005 Fourth 10-Year Interval IST Program Update ML0501303172005-01-28028 January 2005 Ltr, RR No. 38 NL-04-1764, Third 10-Year Interval Inservice Inspection Program Submittal of Revised Relief Request RR-382004-09-13013 September 2004 Third 10-Year Interval Inservice Inspection Program Submittal of Revised Relief Request RR-38 ML0332800372003-11-21021 November 2003 Safety Evaluation Re. Request to Use ASME Code Case N-661 NL-03-1744, Third 10-Year Interval Inservice Testing Program Submittal of Revised Relief Request RR-V-18 and Response to Request for Additional Information (RAI)2003-09-12012 September 2003 Third 10-Year Interval Inservice Testing Program Submittal of Revised Relief Request RR-V-18 and Response to Request for Additional Information (RAI) ML0304100732003-02-10010 February 2003 Relief Request, Third 10-year Inservice Inspection Program ML0301404462003-01-14014 January 2003 Relief Request, Third 10-Year Inservice Inspection Program ML0230903232002-10-30030 October 2002 Third 10-Year Interval Inservice Testing Program, Revision to Existing Relief Request RR-V-11 ML0218305772002-07-0202 July 2002 Relief Requests for the Second 10-Year Inservice Inspection (ISI) Interval 2020-06-03 Category:E-Mail MONTHYEARML24302A0672024-10-25025 October 2024
[Table view]NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise Technical Specifications to Increase Safety/Relief Valve (S/Rv) Setpoints License Amendment Request (LAR) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24220A2502024-10-15015 October 2024 Email to Ryan Joyce Re Decision on the Hatch Exemption ML24220A2472024-10-11011 October 2024 Email to Ryan Joyce Re Availability of EA-FONSI for Hatch Exemption ML24281A1362024-10-0707 October 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise Technical Specifications to Adopt TSTF-591 LAR (L-2024-LLA-0122) ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24142A4992024-05-21021 May 2024 NRR E-mail Capture - Acceptance Review - Farley and Hatch - LAR to Revise TS 1.1 and Add Online Monitoring (OLM) Program (L-2024-LLA-0058) ML24138A1582024-05-17017 May 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise TS Surveillance Requirements to Increase SRV Setpoints LAR (L-2024-LLA-0054) ML24100A4402024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) RAI - Hatch, Units 1 and 2, Revise Technical Specifications to Adopt Extended RICTs for RHRSW and Psw Systems LAR ML24100A0072024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML24082A1212024-03-21021 March 2024 NRR E-mail Capture - (External_Sender) Re Acceptance Review - Hatchs Adopt Alternative Seismic Method for 50.69 Categorization of SSCs LAR (L-2024-LLA-0017) ML24067A0702024-03-0707 March 2024 NRR E-mail Capture - Change in Estimated Review Completion for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML24009A1112024-01-0909 January 2024 NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23249A2082023-09-0606 September 2023 NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23065A0922023-03-0505 March 2023 NRR E-mail Capture - Revised Estimate Hours and Completion Date - Hatch RPV Head Closure Bolts LAR (L-2022-LLA-0120) ML23033A0952023-02-0202 February 2023 NRR E-mail Capture - (External_Sender) Re for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23033A0282023-01-30030 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23026A0132023-01-19019 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML23006A0662023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise NFPA-805 License Amendment Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel RPV Head Studs LAR ML23006A0252022-12-13013 December 2022 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request ML22341A1212022-12-0606 December 2022 NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022 ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22305A7032022-11-0101 November 2022 NRR E-mail Capture - Potential Audit for Hatchs RPV Head Studs LAR ML22258A1532022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review - Hatch Closure Studs in TS Table 1.1-1 Modes LAR (L-2022-LLA-0120) ML22251A1322022-09-0808 September 2022 NRR E-mail Capture - Fyi - Hatch TSTF-505 LAR ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22207B8532022-07-25025 July 2022 NRR E-mail Capture - RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR ML22157A3552022-06-0606 June 2022 NRR E-mail Capture - Revised Estimates - Hatch TSTF-505 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22138A4122022-05-18018 May 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-208 LAR (L-2022-LLA-0045) ML22140A1182022-05-13013 May 2022 NRR E-mail Capture - for Your Action: Hatch TSTF-505 - Follow Up from Audit Question 12 ML22116A1492022-04-26026 April 2022 NRR E-mail Capture - Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000) ML22055A6652022-02-24024 February 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-580 LAR (L-2022-LLA-0022) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0912021-12-23023 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-207-A LAR (L-2021-LLA-0219) 2024-09-04 |
Text
From: Martin, Robert Sent: Thursday, July 22, 2010 2:50 PM To: Thorpe, April Cc: Kulesa, Gloria; Lupold, Timothy; Tsao, John; Morris, Eddie
Subject:
Verbal Authorization of Relief - Note to File Attachments: Authorization.docx As noted in the attachment, on July 21, 2010, the NRC staff granted a verbal authorization for an alternative under 10 CFR 50.55a(3)(ii). Attendees for the NRC staff included T. Lupold, J.
Tsao, G. Kulesa, P. Boyle, R. Martin and E. Morris. Attendees for the licensee included J.
Stringfellow, P. Hermann, J. Agold, S. Super, et al.
Please place this into ADAMS, pursuant to LIC-102, Relief Request Reviews, for the Hatch Nuclear Plant, Unit No. 1, Docket No.05-321.
E-mail Properties Mail Envelope Properties (A41C2340DAB39B44AD0B9623285CB3331158AA6E36)
Subject:
Verbal Authorization of Relief - Note to File Sent Date: 7/22/2010 2:49:31 PM Received Date: 7/22/2010 2:49:31 PM From: Martin, Robert Created By: Robert.Martin@nrc.gov Recipients:
April.Thorpe@nrc.gov (Thorpe, April)
Tracking Status: None Gloria.Kulesa@nrc.gov (Kulesa, Gloria)
Tracking Status: None Timothy.Lupold@nrc.gov (Lupold, Timothy)
Tracking Status: None John.Tsao@nrc.gov (Tsao, John)
Tracking Status: None Eddie.Morris@nrc.gov (Morris, Eddie)
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 35200 7/22/2010 Authorization.docx 19839 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: