Issue date | Title | Topic | |
---|---|---|---|
ML20143A233 | 3 June 2020 | Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19)) | Incorporated by reference Coronavirus |
ML20034E894 | 11 February 2020 | Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 | Incorporated by reference |
ML19361A056 | 9 January 2020 | Proposed Alternative HNP-ISI-ALT-05-10 for the Implementation of BWRVIP 38 and -76 in Lieu of B-N-2 Examinations for Core Support Structures | Incorporated by reference Aging Management EVT-1 |
NL-19-1336, Implementation of BWRVIP-38 and -76 in Lieu of B-N-2 Examinations for Core Support Structures | 4 November 2019 | Implementation of BWRVIP-38 and -76 in Lieu of B-N-2 Examinations for Core Support Structures | EVT-1 |
ML18320A057 | 30 November 2018 | Plant, Units 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2017-03, Code Case N-513-4 for Moderate Pressure | Incorporated by reference Through-Wall Leak |
NL-18-0713, Request for Alternative HNP-ISI-ALT-05-08 to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping for Hatch Unit 1 Plant Service Water | 17 May 2018 | Request for Alternative HNP-ISI-ALT-05-08 to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping for Hatch Unit 1 Plant Service Water | Through-Wall Leak Through Wall Leak |
NL-18-0408, Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing | 9 April 2018 | Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing | Grace period |
NL-18-0428, Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1 | 9 April 2018 | Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1 | |
ML17279A045 | 26 October 2017 | Relief Requests ISI-RR-13, -14, -18, -19, -23, and -24 for Relief from Inservice Inspection Requirements | Weld Overlay VT-2 |
ML17268A044 | 20 October 2017 | Relief Requests ISI RR 16, ISI-RR-17, ISI-44-21, and ISI-RR-22 for Relief from Inservice Inspection Requirements | VT-2 |
ML17205A345 | 10 August 2017 | Relief Request HNP-ISI-RR- 05-01 Regarding Reactor Pressure Vessel Head Stud Inservice Inspection Requirements | VT-2 Finite Element Analysis |
ML17062A832 | 29 March 2017 | Relief Request ISI RR-15 Regarding Control Rod Drive Housing Welds Inservice Inspection Requirements | VT-2 Incorporated by reference |
ML16314A132 | 23 November 2016 | Request for Alternative HNP-ISI-ALT-05-03, Version 1.0, Regarding Reactor Pressure Vessel Flange Leak-Off Piping | VT-2 Incorporated by reference |
ML15310A406 | 30 December 2015 | Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval | Stroke time Incorporated by reference Surveillance Frequency Control Program Scram Discharge Volume Power-Operated Valves Scaffolding Grace period |
ML15352A294 | 28 December 2015 | Relief from the Requirements of the ASME Code | Weld Overlay Nondestructive Examination Incorporated by reference |
ML15349A973 | 18 December 2015 | Relief from the Requirements of the ASME Code | Weld Overlay Nondestructive Examination Liquid penetrant Through-Wall Leak Dissimilar Metal Weld |
NL-15-1221, Withdrawal of RR-V-2 and Response to Request for Additional Information on RR-V-1 | 16 July 2015 | Withdrawal of RR-V-2 and Response to Request for Additional Information on RR-V-1 | Stroke time |
NL-15-1265, E.I Hatch, Units 1 and 2 - 10CFR 50.55a Request No. HNP-ISI-ALT-5-01, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Maintaining Isi/Cii Related Activities on the 2001 E/2003A ASME Section XI Code | 16 July 2015 | E.I Hatch, Units 1 and 2 - 10CFR 50.55a Request No. HNP-ISI-ALT-5-01, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Maintaining Isi/Cii Related Activities on the 2001 E/2003A ASME Section XI Code | Weld Overlay Nondestructive Examination Incorporated by reference |
NL-15-1096, Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval | 18 June 2015 | Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval | |
NL-11-0162, Submittal of Revision to Relief Request RR-V-4 Fourth 10-Year Interval Inservice Testing Program | 26 January 2011 | Submittal of Revision to Relief Request RR-V-4 Fourth 10-Year Interval Inservice Testing Program | Stroke time |
ML110050494 | 14 January 2011 | Safety Evaluation of Relief Request HNP-ISI-ALT-10, Version 1, for the Fourth 10-Year Inservice Inspection Interval Temporary Non-Code Repair of Service Water Piping, TAC ME4253 | Nondestructive Examination VT-2 Functionality Assessment Liquid penetrant Through-Wall Leak |
ML102030444 | 22 July 2010 | E-mail from Robert Martin, Regarding Verbal Authorixation of Relief - Note to File | |
ML102030452 | 21 July 2010 | Verbal Authorization for Relief Request HNP-ISI-ALT-10 Temporary Non-code Repair of Service Water Piping | VT-2 |
ML100980214 | 8 April 2010 | Safety Evaluation of Relief Request HNP-ISI-ALT-09, Version 2.0, for the Fourth 10-year Inservice Inspection Interval | Hydrostatic VT-2 Incorporated by reference |
ML073130188 | 6 December 2007 | Safety Evaluation for Alternative ISI-ALT-08 | |
ML071360297 | 5 June 2007 | Relief, Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Request to Relief Nos. RR-42 Through RR-45, RR- 51, RR-58, RR-59, RR-60, & RR-62 | VT-2 Incorporated by reference |
ML060450286 | 14 February 2006 | Request for Relief from the Requirements of the American Society of Mechanical Engineered Boiler and Vessel Code (ASME Code) | Stroke time Probabilistic Risk Assessment Squib Incorporated by reference Scram Discharge Volume Power Operated Valves Scaffolding |
ML053470091 | 3 January 2006 | Relief, Boiler and Pressure Vessel Code, MC6528 and MC6529 | Incorporated by reference |
ML053330339 | 22 December 2005 | Request for Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) | Incorporated by reference |
ML052970008 | 9 November 2005 | Relief, Proposed Alternative RR-41 for Third and Fourth 10-Year Inservice Inspection Interval | High Radiation Area Weld Overlay Hydrostatic Nondestructive Examination Incorporated by reference |
NL-05-1372, Third and Fourth 10-Year Interval Inservice Inspection Programs, Submittal of Revised Exemption Request | 2 August 2005 | Third and Fourth 10-Year Interval Inservice Inspection Programs, Submittal of Revised Exemption Request | Coatings Exemption Request |
ML051030199 | 25 April 2005 | RR, ISI Program Intervals for Alternative Alignment of Iwe/Iwl Inspection Program (Tac No. MC4870, MC4871, MC4872, MC4873, MC4874, MC4875) | Incorporated by reference |
NL-05-0726, Fourth 10-Year Interval IST Program Update | 20 April 2005 | Fourth 10-Year Interval IST Program Update | |
ML050130317 | 28 January 2005 | Ltr, RR No. 38 | Incorporated by reference |
NL-04-1764, Third 10-Year Interval Inservice Inspection Program Submittal of Revised Relief Request RR-38 | 13 September 2004 | Third 10-Year Interval Inservice Inspection Program Submittal of Revised Relief Request RR-38 | |
ML033280037 | 21 November 2003 | Safety Evaluation Re. Request to Use ASME Code Case N-661 | Weld Overlay |
NL-03-1744, Third 10-Year Interval Inservice Testing Program Submittal of Revised Relief Request RR-V-18 and Response to Request for Additional Information (RAI) | 12 September 2003 | Third 10-Year Interval Inservice Testing Program Submittal of Revised Relief Request RR-V-18 and Response to Request for Additional Information (RAI) | Probabilistic Risk Assessment Large early release frequency Power Operated Valves |
ML030410073 | 10 February 2003 | Relief Request, Third 10-year Inservice Inspection Program | Nondestructive Examination Incorporated by reference |
ML030140446 | 14 January 2003 | Relief Request, Third 10-Year Inservice Inspection Program | Weld Overlay Nondestructive Examination Incorporated by reference |
ML023090323 | 30 October 2002 | Third 10-Year Interval Inservice Testing Program, Revision to Existing Relief Request RR-V-11 | Stroke time |
ML021830577 | 2 July 2002 | Relief Requests for the Second 10-Year Inservice Inspection (ISI) Interval | Nondestructive Examination Incorporated by reference |