ML17340A906: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:6.13 ENVIRONMENTAL UALIFICATIONS 6.13.1'y no later than June 30, 1982 all safety-related electrical equipment in the facility shall be qualified in accordance with the provisions of: Division of Operating Reactors"Guidelines for Evaluating Environmental Qualification of Class lE Electrical Equipment in Operating Reactors" (DOR Guidelines):
or, NUREG-0588"Interim Staff Position on Environmental Qualifcation of Safety-Related Electrical Equipment," December 1979.Copies of these documents are attached to the Order of Modification of License Nos.DPR-31 and DPR-41 dated October 24, 1980.6.13.2 By no later than December 1, 1980, complete and auditible records must be available and maintained at a central location which describe the environmental qualification methods used for all safety-related electrical equipment in sufficient detail to document the degree of compliance with the DOR Guidelines or NUREG-0588.
Thereafter, such records should be updated and maintained current as equipment is replaced, further tested, or otherwise further qualified.
6.14 SYSTEMS INTEGRITY The licensee shall implement a program to reduce leakage from systems outside containment that would or could contain highly radioactive fluids during a serious transient or accident to as low as practical levels.This program shall include the following:
1.Provisions establishing preventative maintenance and periodic visual inspection requirements, and 2.Integrated leak test requirements for each system at a frequency not to exceed refueling cycle intervals.
6.15 IODINE MONITORING The licensee shall implement a program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions.
This program shall include the following:
6.16 1.Training of personnel 2.Procedures for monitoring, and 3.Provisions for maintenance of sampling and analysis equipment.
BACKUP METHODS FOR DETERMINING SUBCOOLING MARGIN The licensee shall implement a program which will ensure the capability to accurately monitor the Reactor Coolant System subcooling margin.This program shall include the following:
1.Training of personnel, and 2.Procedures for monitoring.
>108~y 0 P~6-30 3/10/81}}

Revision as of 11:30, 4 October 2018

Proposed Tech Specs 6.13 Re Environ Qualifications,Sys Integrity,Iodine Monitoring & Backup Methods for Determining Subcooling Margin
ML17340A906
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/10/1981
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17340A905 List:
References
NUDOCS 8103310380
Download: ML17340A906 (2)


Text

6.13 ENVIRONMENTAL UALIFICATIONS 6.13.1'y no later than June 30, 1982 all safety-related electrical equipment in the facility shall be qualified in accordance with the provisions of: Division of Operating Reactors"Guidelines for Evaluating Environmental Qualification of Class lE Electrical Equipment in Operating Reactors" (DOR Guidelines):

or, NUREG-0588"Interim Staff Position on Environmental Qualifcation of Safety-Related Electrical Equipment," December 1979.Copies of these documents are attached to the Order of Modification of License Nos.DPR-31 and DPR-41 dated October 24, 1980.6.13.2 By no later than December 1, 1980, complete and auditible records must be available and maintained at a central location which describe the environmental qualification methods used for all safety-related electrical equipment in sufficient detail to document the degree of compliance with the DOR Guidelines or NUREG-0588.

Thereafter, such records should be updated and maintained current as equipment is replaced, further tested, or otherwise further qualified.

6.14 SYSTEMS INTEGRITY The licensee shall implement a program to reduce leakage from systems outside containment that would or could contain highly radioactive fluids during a serious transient or accident to as low as practical levels.This program shall include the following:

1.Provisions establishing preventative maintenance and periodic visual inspection requirements, and 2.Integrated leak test requirements for each system at a frequency not to exceed refueling cycle intervals.

6.15 IODINE MONITORING The licensee shall implement a program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions.

This program shall include the following:

6.16 1.Training of personnel 2.Procedures for monitoring, and 3.Provisions for maintenance of sampling and analysis equipment.

BACKUP METHODS FOR DETERMINING SUBCOOLING MARGIN The licensee shall implement a program which will ensure the capability to accurately monitor the Reactor Coolant System subcooling margin.This program shall include the following:

1.Training of personnel, and 2.Procedures for monitoring.

>108~y 0 P~6-30 3/10/81