Line 3: |
Line 3: |
| | issue date = 01/05/2009 | | | issue date = 01/05/2009 |
| | title = Application Accepted - Braidwood Risk-Informed ISI Relief Request I3R-01 (ME0225-26) | | | title = Application Accepted - Braidwood Risk-Informed ISI Relief Request I3R-01 (ME0225-26) |
| | author name = David M J | | | author name = David M |
| | author affiliation = NRC/NRR/DORL/LPLIII-2 | | | author affiliation = NRC/NRR/DORL/LPLIII-2 |
| | addressee name = Simpson P R | | | addressee name = Simpson P |
| | addressee affiliation = Exelon Corp | | | addressee affiliation = Exelon Corp |
| | docket = 05000456, 05000457 | | | docket = 05000456, 05000457 |
Line 14: |
Line 14: |
| | page count = 2 | | | page count = 2 |
| | project = TAC:ME0225, TAC:ME0226 | | | project = TAC:ME0225, TAC:ME0226 |
| | stage = RAI | | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From: Marshall David Sent: Monday, January 05, 2009 3:59 PM To: patrick.simpson@exeloncorp.com Cc: ken.nicely@exeloncorp.com; Lisa.Schofield@exeloncorp.com; Mark Rubin; Terence Chan; Russell Gibbs | | {{#Wiki_filter:From: Marshall David Sent: Monday, January 05, 2009 3:59 PM To: patrick.simpson@exeloncorp.com Cc: ken.nicely@exeloncorp.com; Lisa.Schofield@exeloncorp.com; Mark Rubin; Terence Chan; Russell Gibbs |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Application Accepted - Braidwood Risk-Informed ISI Relief Request I3R-01 (ME0225-26) | | Application Accepted - Braidwood Risk-Informed ISI Relief Request I3R-01 (ME0225-26) |
| | ADAMSAccessionNumber: ml082350241 |
| | : Pat, By letter dated December 10, 2008, Exelon Generation Company, LLC (the licensee) submitted a relief request for Braidwood Station, Units 1 and 2 (ADAMS Accession Number ML083460590). The December 10, 2008 letter requested authorization to use a risk-informed inservice inspection program as an alternative to the examination program of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, 2001 Edition through the 2003 Addenda for examination category B-F, B-J, C-F-1, and C-F-2 pressure retaining piping welds. The purpose of this message is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | Pursuant to Section 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations, the applicant shall demonstrate that the proposed alternative would provide an acceptable level of quality and safety. |
| | The NRC staff has reviewed your request and has concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. |
| | In accordance with our process as described in LIC-109, "ACCEPTANCE REVIEW PROCEDURES," I am placing a copy of this email in ADAMS as a publicly-available, official agency record. |
| | Sincerely, Marshall David Senior Project Manager (301) 415-1547 E-mail Properties |
|
| |
|
| ADAMSAccessionNumber: ml082350241 Pat, By letter dated December 10, 2008, Exelon Generation Company, LLC (the licensee) submitted a relief request for Braidwood Station, Units 1 and 2 (ADAMS Accession Number ML083460590). The December 10, 2008 letter requested authorization to use a risk-informed inservice inspection program as an alternative to the examination program of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, 2001 Edition through the 2003 Addenda for examination category B-F, B-J, C-F-1, and C-F-2 pressure retaining piping welds. The purpose of this message is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Pursuant to Section 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations, the applicant shall demonstrate that the proposed alternative would provide an acceptable level of quality and safety. The NRC staff has reviewed your request and has concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
| | Mail Envelope Properties (01BD2A1885C88F45A12CB413DEF0341082F3E939D5) |
| | |
| In accordance with our process as described in LIC-109, "ACCEPTANCE REVIEW PROCEDURES," I am placing a copy of this email in ADAMS as a publicly-available, official agency record.
| |
| Sincerely, Marshall David Senior Project Manager (301) 415-1547 E-mail Properties Mail Envelope Properties (01BD2A1885C88F45A12CB413DEF0341082F3E939D5)
| |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Application Accepted - Braidwood Risk-Informed ISI Relief Request I3R-01 (ME0225-26) | | Application Accepted - Braidwood Risk-Informed ISI Relief Request I3R-01 (ME0225-26) |
| | | Sent Date: 1/5/2009 3:59:20 PM Received Date: 1/5/2009 3:59:20 PM From: Marshall David Created By: Marshall.David@nrc.gov Recipients: |
| Sent Date: 1/5/2009 3:59:20 PM Received Date: 1/5/2009 3:59:20 PM From: Marshall David | | patrick.simpson@exeloncorp.com (patrick.simpson@exeloncorp.com) |
| | | Tracking Status: None ken.nicely@exeloncorp.com (ken.nicely@exeloncorp.com) |
| Created By: Marshall.David@nrc.gov | | Tracking Status: None Lisa.Schofield@exeloncorp.com (Lisa.Schofield@exeloncorp.com) |
| | | Tracking Status: None (Mark Rubin) |
| Recipients: | |
| patrick.simpson@exeloncorp.com (patrick.simpson@exeloncorp.com) Tracking Status: None ken.nicely@exeloncorp.com (ken.nicely@exeloncorp.com) Tracking Status: None Lisa.Schofield@exeloncorp.com (Lisa.Schofield@exeloncorp.com) Tracking Status: None | |
| | |
| (Mark Rubin)
| |
| Tracking Status: None Terence.Chan@nrc.gov (Terence Chan) | | Tracking Status: None Terence.Chan@nrc.gov (Terence Chan) |
| Tracking Status: None Russell.Gibbs@nrc.gov (Russell Gibbs) | | Tracking Status: None Russell.Gibbs@nrc.gov (Russell Gibbs) |
| Tracking Status: None | | Tracking Status: None Post Office: |
| | | HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 18881 1/5/2009 Options Expiration Date: |
| Post Office: | | Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} |
| HQCLSTR01.nrc.gov | |
| | |
| Files Size Date & Time | |
| | |
| MESSAGE 18881 1/5/2009 | |
| | |
| Options Expiration Date: | |
| Priority: olImportanceNormal ReplyRequested: False Return Notification: False | |
| | |
| Sensitivity: olNormal Recipients received:}} | |
Letter Sequence Other |
---|
|
|
MONTHYEARRS-08-160, Third 10-Year Inservice Inspection Interval, Relief Request 1313-01, Request for Relief for Alternate Risk-Informed Selection and Examination Criteria for Examination Category B-F, B-J, C-F-1, and C-F-2 Pressure .2008-12-10010 December 2008 Third 10-Year Inservice Inspection Interval, Relief Request 1313-01, Request for Relief for Alternate Risk-Informed Selection and Examination Criteria for Examination Category B-F, B-J, C-F-1, and C-F-2 Pressure . Project stage: Request ML0900606062009-01-0505 January 2009 Application Accepted - Braidwood Risk-Informed ISI Relief Request I3R-01 (ME0225-26) Project stage: Other ML0912602422009-05-11011 May 2009 RAI Related to risk-informed Relief Request 13R-01 Project stage: RAI RS-09-081, Additional Information Supporting Risk-Informed Inservice Inspection Relief Request2009-07-0808 July 2009 Additional Information Supporting Risk-Informed Inservice Inspection Relief Request Project stage: Request ML0930702712009-11-0505 November 2009 Risk-Informed Relief Request 13R-01 for Certain Pressure Retaining Piping Welds Project stage: Other 2009-11-05
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARIR 05000456/20210102021-07-19019 July 2021 Triennial Fire Protection Inspection Report 05000456/2021010 and 05000457/2021010 ML21077A1772021-04-0808 April 2021 Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) ML1116804112011-06-17017 June 2011 Acceptance Review for Exelon Threshold Determination Request (TAC ME6269 - ME6287) ML1024204702010-09-0303 September 2010 Acceptance Review of License Amendment Request Low Temperature Overpressure Protection ML1008800852010-07-21021 July 2010 Fleet - Acceptance Review Implementation of Emergency Action Level Schemes Developed from NEI 99-01m Rev. 5 ML1002101352010-01-20020 January 2010 Application Accepted - Braidwood/Byron LAR Re. Astrum Best Estimate LOCA Methodology (ME2941-44) ML0926808512009-09-25025 September 2009 Application Accepted - Braidwood Relief Request I3R-06 Re. Visual Examinations During Appendix J Testing (ME2194-95) ML0926808252009-09-25025 September 2009 Application Accepted - Braidwood Relief Request I3R-05 Re. Testing of H2 Sampling Piping (ME2200-01) ML0926807942009-09-25025 September 2009 Application Accepted - Braidwood Relief Request I3R-03 Re. Qualification Requirements for Examination of Swols (ME2198-99) ML0924700432009-09-0303 September 2009 3 Acceptance Review Results Request to Use Specific Provisions from a Later Edition of the ASME Boiler and Pressure Vessel Code ML0906408762009-03-0606 March 2009 Acceptance of Requested Licensing Action Relief Request 13R-04 ML0900606062009-01-0505 January 2009 Application Accepted - Braidwood Risk-Informed ISI Relief Request I3R-01 (ME0225-26) 2021-07-19
[Table view] Category:E-Mail
MONTHYEARML24298A0202024-10-24024 October 2024 NRR E-mail Capture - Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, Relief Request I4R-19 and I4-26, Associated with the Fourth and Fifth Inservice Inspection Intervals ML24282A7042024-10-0808 October 2024 NRR E-mail Capture - Acceptance Reviews of Relief Requests Associated with the Fifth Inservice Inspection Interval at Byron and Braidwood Stations ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24180A0042024-06-28028 June 2024 NRR E-mail Capture - Acceptance Review for Braidwood and Byron - Request for Exemption from 10 CFR 50.46 and Appendix K (L-2024-LLE-0019) ML24180A0032024-06-28028 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment for Transition to Framatome Gaia Fuel (L-2024-LLA-0072) ML24176A0182024-06-20020 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Remove Extraneous Detail Related to Beacon ML24170A3912024-06-18018 June 2024 NRR E-mail Capture - Revision of Estimated Hours to Complete Review of Byron/Braidwood Amendment to Revise TS 3.7.15, 3.7.16, and 4.3.1 (L-2023-LLA-0136) ML24141A2452024-05-20020 May 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Delete Technical Specification 5.6.5.b.5 (L-2024-LLA-0055) ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24053A3382024-02-22022 February 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML24039A0412024-01-30030 January 2024 NRR E-mail Capture - Request for Additional Information Regarding Braidwood Request for Alternative (I4R-18) ML24030A0022024-01-30030 January 2024 NRR E-mail Capture - NRC Acceptance Review for Braidwood Station, Units 1 and 2, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request – ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23304A0222023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030) ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23103A4692023-04-12012 April 2023 NRR E-mail Capture - NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0172022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0172021-09-0303 September 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood - License Amendment to Revise Technical Specification 3.7.9, Ultimate Heat Sink ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21154A0162021-06-0202 June 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application 2024-09-06
[Table view] |
Text
From: Marshall David Sent: Monday, January 05, 2009 3:59 PM To: patrick.simpson@exeloncorp.com Cc: ken.nicely@exeloncorp.com; Lisa.Schofield@exeloncorp.com; Mark Rubin; Terence Chan; Russell Gibbs
Subject:
Application Accepted - Braidwood Risk-Informed ISI Relief Request I3R-01 (ME0225-26)
ADAMSAccessionNumber: ml082350241
- Pat, By letter dated December 10, 2008, Exelon Generation Company, LLC (the licensee) submitted a relief request for Braidwood Station, Units 1 and 2 (ADAMS Accession Number ML083460590). The December 10, 2008 letter requested authorization to use a risk-informed inservice inspection program as an alternative to the examination program of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, 2001 Edition through the 2003 Addenda for examination category B-F, B-J, C-F-1, and C-F-2 pressure retaining piping welds. The purpose of this message is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Section 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations, the applicant shall demonstrate that the proposed alternative would provide an acceptable level of quality and safety.
The NRC staff has reviewed your request and has concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
In accordance with our process as described in LIC-109, "ACCEPTANCE REVIEW PROCEDURES," I am placing a copy of this email in ADAMS as a publicly-available, official agency record.
Sincerely, Marshall David Senior Project Manager (301) 415-1547 E-mail Properties
Mail Envelope Properties (01BD2A1885C88F45A12CB413DEF0341082F3E939D5)
Subject:
Application Accepted - Braidwood Risk-Informed ISI Relief Request I3R-01 (ME0225-26)
Sent Date: 1/5/2009 3:59:20 PM Received Date: 1/5/2009 3:59:20 PM From: Marshall David Created By: Marshall.David@nrc.gov Recipients:
patrick.simpson@exeloncorp.com (patrick.simpson@exeloncorp.com)
Tracking Status: None ken.nicely@exeloncorp.com (ken.nicely@exeloncorp.com)
Tracking Status: None Lisa.Schofield@exeloncorp.com (Lisa.Schofield@exeloncorp.com)
Tracking Status: None (Mark Rubin)
Tracking Status: None Terence.Chan@nrc.gov (Terence Chan)
Tracking Status: None Russell.Gibbs@nrc.gov (Russell Gibbs)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 18881 1/5/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: