ML14106A669: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14106A669
| number = ML14106A669
| issue date = 04/14/2014
| issue date = 04/14/2014
| title = 2014/04/14 NRR E-mail Capture - Catawba 2.3 Walkdown Call
| title = NRR E-mail Capture - Catawba 2.3 Walkdown Call
| author name = Miller G E
| author name = Miller G
| author affiliation = NRC/NRR/DORL/LPLII-1
| author affiliation = NRC/NRR/DORL/LPLII-1
| addressee name = Barrett P
| addressee name = Barrett P
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm Resource From:Miller, Ed Sent:Monday, April 14, 2014 7:22 AM To:'phil.barrett@duke-energy.com'
{{#Wiki_filter:NRR-PMDAPEm Resource From:                     Miller, Ed Sent:                     Monday, April 14, 2014 7:22 AM To:                       'phil.barrett@duke-energy.com'


==Subject:==
==Subject:==
Catawba 2.3 Walkdown Call Phil, The seismic folks sent me a more detailed write-up of the clarification they are seeking WRT the walkdown report:  
Catawba 2.3 Walkdown Call
: Phil, The seismic folks sent me a more detailed write-up of the clarification they are seeking WRT the walkdown report:
From the limited discussion in Section 3 and Attachment 3A of the seismic walkdown report, the staff was unable to understand the screening process followed that excluded several rapid drain down items (identified in the Rapid Drain Down List) from the final SWEL 2. Please describe the process that was followed to develop the SWEL 2 as it pertains to rapid drain down items and justify meeting the intent of Screening 4 Rapid Drain Down of the walkdown guidance.
Hopefully this will help you better prepare for the call this afternoon.
Ed Miller 415-2481 1


From the limited discussion in Section 3 and Attachment 3A of the seismic walkdown report, the staff was unable to understand the screening process followed that excluded several rapid drain down items (identified in the "Rapid Drain Down List") from the final SWEL 2. Please describe the process that was followed to develop the SWEL 2 as it pertains to rapid drain down items and justify meeting the intent of Screening 4 "Rapid Drain Down"  of the walkdown guidance.
Hearing Identifier:     NRR_PMDA Email Number:           1230 Mail Envelope Properties     (9C2386A0C0BC584684916F7A0482B6CAF9972A4020)
 
Hopefully this will help you better prepare for the call this afternoon. 
 
Ed Miller 415-2481 Hearing Identifier: NRR_PMDA Email Number: 1230   Mail Envelope Properties   (9C2386A0C0BC584684916F7A0482B6CAF9972A4020)


==Subject:==
==Subject:==
Catawba 2.3 Walkdown Call Sent Date:   4/14/2014 7:21:49 AM Received Date: 4/14/2014 7:21:00 AM From:   Miller, Ed Created By:   Ed.Miller@nrc.gov Recipients:     "'phil.barrett@duke-energy.com'" <phil.barrett@duke-energy.com>
Catawba 2.3 Walkdown Call Sent Date:             4/14/2014 7:21:49 AM Received Date:         4/14/2014 7:21:00 AM From:                   Miller, Ed Created By:             Ed.Miller@nrc.gov Recipients:
Tracking Status: None  
"'phil.barrett@duke-energy.com'" <phil.barrett@duke-energy.com>
 
Tracking Status: None Post Office:           HQCLSTR02.nrc.gov Files                           Size                   Date & Time MESSAGE                         716                     4/14/2014 7:21:00 AM Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Post Office:   HQCLSTR02.nrc.gov Files     Size     Date & Time MESSAGE   716     4/14/2014 7:21:00 AM
Recipients Received:}}
 
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}

Latest revision as of 07:51, 5 December 2019

NRR E-mail Capture - Catawba 2.3 Walkdown Call
ML14106A669
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/14/2014
From: Geoffrey Miller
Plant Licensing Branch II
To: Barrett P
Duke Energy Corp
References
Download: ML14106A669 (2)


Text

NRR-PMDAPEm Resource From: Miller, Ed Sent: Monday, April 14, 2014 7:22 AM To: 'phil.barrett@duke-energy.com'

Subject:

Catawba 2.3 Walkdown Call

Phil, The seismic folks sent me a more detailed write-up of the clarification they are seeking WRT the walkdown report:

From the limited discussion in Section 3 and Attachment 3A of the seismic walkdown report, the staff was unable to understand the screening process followed that excluded several rapid drain down items (identified in the Rapid Drain Down List) from the final SWEL 2. Please describe the process that was followed to develop the SWEL 2 as it pertains to rapid drain down items and justify meeting the intent of Screening 4 Rapid Drain Down of the walkdown guidance.

Hopefully this will help you better prepare for the call this afternoon.

Ed Miller 415-2481 1

Hearing Identifier: NRR_PMDA Email Number: 1230 Mail Envelope Properties (9C2386A0C0BC584684916F7A0482B6CAF9972A4020)

Subject:

Catawba 2.3 Walkdown Call Sent Date: 4/14/2014 7:21:49 AM Received Date: 4/14/2014 7:21:00 AM From: Miller, Ed Created By: Ed.Miller@nrc.gov Recipients:

"'phil.barrett@duke-energy.com'" <phil.barrett@duke-energy.com>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 716 4/14/2014 7:21:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: