| number = ML14253A477
| number = ML14253A477
| issue date = 09/10/2014
| issue date = 09/10/2014
| title = 2014/09/10 NRR E-mail Capture - Draft RAI for Mur (Steam Generator Branch)
| title = NRR E-mail Capture - Draft RAI for Mur (Steam Generator Branch)
| author name = Miller E
| author name = Miller E
| author affiliation = NRC/NRR/DORL/LPLII-1
| author affiliation = NRC/NRR/DORL/LPLII-1
| addressee name = Rudy L J
| addressee name = Rudy L
| addressee affiliation = Duke Energy Corp
| addressee affiliation = Duke Energy Corp
| docket = 05000413, 05000414
| docket = 05000413, 05000414
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Miller, EdSent:Wednesday, September 10, 2014 3:29 PMTo:'lawrence.rudy@duke-energy.com'
{{#Wiki_filter:NRR-PMDAPEm Resource From:                     Miller, Ed Sent:                     Wednesday, September 10, 2014 3:29 PM To:                       'lawrence.rudy@duke-energy.com'


==Subject:==
==Subject:==
Draft RAI for MUR (Steam Generator Branch)Attachments:DRAFT Catawba MUR SG Branch RAI.docxLarry, The NRC staff's draft RAI for the subject relief request is attached to this e-mail. The draft RAI is not an official NRC staff request and is being provided to you to facilitate a subsequent conference call to determine: 1) If the questions clearly convey the NRC staff information needs; 2) Whether the regulatory basis for the questions is understood; 3) Whether the information is already available in existing, docketed, correspondence; and 4) To determine an appropriate response time-frame. After you've had a chance to review the draft information request, please contact me to schedule the conference call.  
Draft RAI for MUR (Steam Generator Branch)
Attachments:             DRAFT Catawba MUR SG Branch RAI.docx
: Larry, The NRC staffs draft RAI for the subject relief request is attached to this e-mail. The draft RAI is not an official NRC staff request and is being provided to you to facilitate a subsequent conference call to determine: 1) If the questions clearly convey the NRC staff information needs; 2) Whether the regulatory basis for the questions is understood; 3) Whether the information is already available in existing, docketed, correspondence; and 4) To determine an appropriate response time-frame. After youve had a chance to review the draft information request, please contact me to schedule the conference call.
Given the large number of review branches assigned to the MUR review, Im providing the draft questions as I receive them from the individual branches. Ill combine them into one RAI once we have a complete set.
Ed Miller (301) 415-2481 1


Given the large number of review branches assigned to the MUR review, I'm providing the draft questions as I receive them from the individual branches. I'll combine them into one RAI once we have a complete set. Ed Miller (301) 415-2481
Hearing Identifier:  NRR_PMDA Email Number:        1561 Mail Envelope Properties    (9C2386A0C0BC584684916F7A0482B6CA01016B2CD7AE)


Hearing Identifier: NRR_PMDA  Email Number:  1561  Mail Envelope Properties  (9C2386A0C0BC584684916F7A0482B6CA01016B2CD7AE)  
==Subject:==
Draft RAI for MUR (Steam Generator Branch)
Sent Date:            9/10/2014 3:29:04 PM Received Date:        9/10/2014 3:29:00 PM From:                Miller, Ed Created By:          Ed.Miller@nrc.gov Recipients:
"'lawrence.rudy@duke-energy.com'" <lawrence.rudy@duke-energy.com>
Tracking Status: None Post Office:          HQCLSTR02.nrc.gov Files                          Size                  Date & Time MESSAGE                        895                  9/10/2014 3:29:00 PM DRAFT Catawba MUR SG Branch RAI.docx                        31993 Options Priority:                      Standard Return Notification:          No Reply Requested:              No Sensitivity:                  Normal Expiration Date:
Recipients Received:


==Subject:==
DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING CATAWBA NUCLEAR STATION, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE DOCKET NOS. 50-413 AND 50-414 By letter dated June 23, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14176A108), Duke Energy Carolinas (Duke) submitted a license amendment request (LAR) for the Catawba Nuclear Station, Units 1 and 2. The proposed amendment would implement a 1.7 percent Measurement Uncertainty Recapture (MUR) Power Uprate. In order for the NRC staff to complete its review of the relief request, the following additional information is requested.
Draft RAI for MUR (Steam Generator Branch)  Sent Date:  9/10/2014 3:29:04 PM  Received Date:  9/10/2014 3:29:00 PM  From:    Miller, Ed  Created By:  Ed.Miller@nrc.gov  Recipients:    "'lawrence.rudy@duke-energy.com'" <lawrence.rudy@duke-energy.com>  Tracking Status: None Post Office:  HQCLSTR02.nrc.gov  Files    Size      Date & Time  MESSAGE    895      9/10/2014 3:29:00 PM DRAFT Catawba MUR SG Branch RAI.docx    31993  Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
: 1. Confirm that the steam generator plugging limit is still appropriate for the proposed MUR Power Uprate conditions, given the guidance in Regulatory Guide 1.121.
ENCLOSURE DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING CATAWBA NUCLEAR STATION, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE DOCKET NOS. 50-413 AND 50-414 By letter dated June 23, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14176A108), Duke Energy Carolinas (Duke) submitted a license amendment request (LAR) for the Catawba Nuclear Station, Units 1 and 2. The proposed amendment would implement a 1.7 percent Measurement Uncertainty Recapture (MUR) Power Uprate. In order for the NRC staff to complete its review of the relief request, the following additional information is requested.  
: 2. Page E2-67 of Enclosure 2 of the LAR, provides the predicted wear rates for run definition HS4/D-1st Stg Drain with component name 1HS817E-T196. The information in the table for this component indicates that the post-MUR predicted thickness value is
: 1. Confirm that the steam generator plugging limit is still appropriate for the proposed MUR Power Uprate conditions, given the guidance in Regulatory Guide 1.121.  
        -0.048 inches. Further, the ratio of pre-MUR measured thickness to predicted thickness is -5.13. Please clarify what these values represent and the significance of them being negative numbers.
: 2. Page E2-67 of Enclosure 2 of the LAR, provides the predicted wear rates for run definition 'HS4/D-1st Stg Drain' with component name 1HS817E-T196. The information in the table for this component indicates that the post-MUR predicted thickness value is -0.048 inches. Further, the ratio of pre-MUR measured thickness to predicted thickness is -5.13. Please clarify what these values represent and the significance of them being negative numbers.}}
ENCLOSURE}}

Latest revision as of 05:14, 5 December 2019

NRR E-mail Capture - Draft RAI for Mur (Steam Generator Branch)
ML14253A477
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/10/2014
From: Ed Miller
Plant Licensing Branch II
To: Rudy L
Duke Energy Corp
References
Download: ML14253A477 (3)


Text

NRR-PMDAPEm Resource From: Miller, Ed Sent: Wednesday, September 10, 2014 3:29 PM To: 'lawrence.rudy@duke-energy.com'

Subject:

Draft RAI for MUR (Steam Generator Branch)

Attachments: DRAFT Catawba MUR SG Branch RAI.docx

Larry, The NRC staffs draft RAI for the subject relief request is attached to this e-mail. The draft RAI is not an official NRC staff request and is being provided to you to facilitate a subsequent conference call to determine: 1) If the questions clearly convey the NRC staff information needs; 2) Whether the regulatory basis for the questions is understood; 3) Whether the information is already available in existing, docketed, correspondence; and 4) To determine an appropriate response time-frame. After youve had a chance to review the draft information request, please contact me to schedule the conference call.

Given the large number of review branches assigned to the MUR review, Im providing the draft questions as I receive them from the individual branches. Ill combine them into one RAI once we have a complete set.

Ed Miller (301) 415-2481 1

Hearing Identifier: NRR_PMDA Email Number: 1561 Mail Envelope Properties (9C2386A0C0BC584684916F7A0482B6CA01016B2CD7AE)

Subject:

Draft RAI for MUR (Steam Generator Branch)

Sent Date: 9/10/2014 3:29:04 PM Received Date: 9/10/2014 3:29:00 PM From: Miller, Ed Created By: Ed.Miller@nrc.gov Recipients:

"'lawrence.rudy@duke-energy.com'" <lawrence.rudy@duke-energy.com>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 895 9/10/2014 3:29:00 PM DRAFT Catawba MUR SG Branch RAI.docx 31993 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING CATAWBA NUCLEAR STATION, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE DOCKET NOS. 50-413 AND 50-414 By letter dated June 23, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14176A108), Duke Energy Carolinas (Duke) submitted a license amendment request (LAR) for the Catawba Nuclear Station, Units 1 and 2. The proposed amendment would implement a 1.7 percent Measurement Uncertainty Recapture (MUR) Power Uprate. In order for the NRC staff to complete its review of the relief request, the following additional information is requested.

1. Confirm that the steam generator plugging limit is still appropriate for the proposed MUR Power Uprate conditions, given the guidance in Regulatory Guide 1.121.
2. Page E2-67 of Enclosure 2 of the LAR, provides the predicted wear rates for run definition HS4/D-1st Stg Drain with component name 1HS817E-T196. The information in the table for this component indicates that the post-MUR predicted thickness value is

-0.048 inches. Further, the ratio of pre-MUR measured thickness to predicted thickness is -5.13. Please clarify what these values represent and the significance of them being negative numbers.

ENCLOSURE