ML16145A326: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 05/24/2016 | | issue date = 05/24/2016 | ||
| title = Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 - Annual Radioactive Effluent Release Report 58, January 1, 2015 Through December 31, 2015 | | title = Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 - Annual Radioactive Effluent Release Report 58, January 1, 2015 Through December 31, 2015 | ||
| author name = Navin P | | author name = Navin P | ||
| author affiliation = Exelon Generation Co, LLC | | author affiliation = Exelon Generation Co, LLC | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Exelon Generation May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 | {{#Wiki_filter:Exelon Generation 10CFR 50.4 May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) | ||
Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 | |||
==Subject:== | ==Subject:== | ||
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'. Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. This oversight has been entered into the Exelon Corrective Action Program. Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator -Region I NRC Senior Resident Inspector -Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves) | Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'. | ||
Exelon Generation May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 | Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. The PCP should not have included the | ||
'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. This oversight has been entered into the Exelon Corrective Action Program. | |||
Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator - Region I NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves) | |||
Exelon Generation 10CFR 50.4 May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) | |||
Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 | |||
==Subject:== | ==Subject:== | ||
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'. Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. This oversight has been entered into the Exelon Corrective Action Program. Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator -Region I NRC Senior Resident Inspector -Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)}} | Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'. | ||
Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. The PCP should not have included the | |||
'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. This oversight has been entered into the Exelon Corrective Action Program. | |||
Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator - Region I NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)}} |
Latest revision as of 18:42, 30 October 2019
ML16145A326 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 05/24/2016 |
From: | Pat Navin Exelon Generation Co |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of New Reactors |
References | |
CCN: 16-51 | |
Download: ML16145A326 (1) | |
Text
Exelon Generation 10CFR 50.4 May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI)
Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29
Subject:
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.
Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. The PCP should not have included the
'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. This oversight has been entered into the Exelon Corrective Action Program.
Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator - Region I NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)
Exelon Generation 10CFR 50.4 May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI)
Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29
Subject:
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.
Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. The PCP should not have included the
'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. This oversight has been entered into the Exelon Corrective Action Program.
Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator - Region I NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)