Line 2: |
| | number = ML17037C410 | | | number = ML17037C410 |
| | issue date = 10/26/1977 | | | issue date = 10/26/1977 |
| | title = Nine Mile Point Unit 1 - Letter Transmitting Application for Amendment to Operating License and Proposed Changes to Facility Operating License Concerning Sample Collection and Analysis Site Radiological Environmental Monitoring Program | | | title = Letter Transmitting Application for Amendment to Operating License and Proposed Changes to Facility Operating License Concerning Sample Collection and Analysis Site Radiological Environmental Monitoring Program |
| | author name = Thomas E B | | | author name = Thomas E |
| | author affiliation = LeBoeuf, Lamb, Leiby & MacRae, Niagara Mohawk Power Corp | | | author affiliation = LeBoeuf, Lamb, Leiby & MacRae, Niagara Mohawk Power Corp |
| | addressee name = Case E G | | | addressee name = Case E |
| | addressee affiliation = NRC/NRR | | | addressee affiliation = NRC/NRR |
| | docket = 05000220 | | | docket = 05000220 |
Line 12: |
Line 12: |
| | document type = Legal-Correspondence, Letter, License-Application for Facility Operating License (Amend/Renewal) DKT 50 | | | document type = Legal-Correspondence, Letter, License-Application for Facility Operating License (Amend/Renewal) DKT 50 |
| | page count = 16 | | | page count = 16 |
| | | project = |
| | | stage = Request |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:NRC FORM 195 I2-78)~i<- t NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL U.S. NUCLEAR REGULATORY COM SSION DOCKET NUMBER FILE NUMBER TO FROM: DATE OF DOCUMENT Mr. EdsonM ~ Case 10/26/77 LeBoeuf, Lamb, Leiby & MacRae Nashington, D. C. 20036 DATE RECEIVED 10/27/77 ETTER J&fOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED ZfORIGINAL RON C LASS I F I E D Clcopv DESCRIPTION ENCLOSURE License No. DPR-63 Appl for Amend: |
| | tech specs proposed change concerning tables 3.2 |
| | & 5.3 of the Environmental Tech Specs, set forth in Appendix B, be amended...Notorized 10/25/77... |
| | w/att supporti,ng information... |
| | 1p 6p PLANT NAME NINE MILE POINT UNIT g gem 10/27/'R7 FOR ACTION/INFORMATION ENHRHAKNTAi ASSIGNED AD: V>>. MOORE LTR BRANCH CHIEF: |
| | CT MANAGER: PROJECT MA%AGER: |
| | CENSING ASSISTANT: LICENSING ASSISTANT: |
| | Be HARLESS INTERNALOISTRI BUTION STFMS SAFETY PLANT SYSTEMS SITE SAFETY & |
| | TTSON TEDESCO ENVIRON ANALYSIS EDER BENAROYA DENTON & MUI'ER ENGINEERING IPPOLITO ENVIRO TECH ERNST OPERATING REACTORS BALLARD GBLOOD B ER GAMMILL 2 G IME SITE ANALYSIS AT I J>> COLLINS EXTERNAL OISTRIBUTION CONTROL NUMBER TIC NSIC |
| | '73OOO13y IV J HANCHETT 16 CYS ACRS SENT CA |
| | |
| | f l, LEBOEUFI LAMB, LEIBY 8L MAC RAE l757 N STREET, N.W. |
| | WASHINGTON, D. C. 20036 TELEPNDNE tct 457 7500 CABLE ADDRESS LEON A. ALLEN, JR. |
| | JOSEPH E. BACHCLOCR.1IE CAMKRON F. MACRAC CAMKRON F. M*cRAE,XK4 i L BWIN, WAS HIKBT RANDALL J. LcBDEUF,JR. IQ2Q IQ75 ERNEST S. BALLARD JR. OERARD A.MAHER ADRIAN C. LEIBY IQSt IQ75 O. S. PETCR SERGEII 4 SHEILA H. MARSHALL TCLEX: 4 OEOFFRY D.C. BEST JAMES O. MCKLROY 'I DAVID P. DICKS JAMES P. McORANERY, JRP4 TAYLOR R. BRIGOS PHILIP PALMER MCGUIGAN I OI'OUNSEL CHARLES N.BURGER JAMES O'MALLEYoJR.a THOMAS E BURKK |
| | ~ |
| | J. MICHAEL PARISH ARVIH C. UPTON ROGER D.FCLDMAN+ JOHN A. RUDY CUGCNC R. FIDCLLi4 PAUL O. RUSSELL JACOB FR ICDLAHDKR HAROLD M SCIDEL I |
| | ai, DONALD J.GREENE CHARLES P. SIFTON |
| | ~ |
| | i I4D BROADWAY JAMES A.OREERiIE4 HALCYON O SKINHKR JOHN L.OROSE A NEW YORK, N.Y. IDDDS DOUGLAS W.HAWES JOSEPH S.STRAUSS CARL O. HOBELMAH SAMUEL M.SUDDEN TELEPHONE tl2 tBQ IIOD MICHALL IOVCHKO KUGENC B.THOMASe JR PL JAMES F. JOHNSON, 4' LEONARD M. TROSTKNi4 CABLE ADDRESS |
| | , RONALD D. JONES HARRY H. VOIOT + 4 LKX K.LARSON+4 H RICHARD WACHTCI. |
| | LEBWINe NEW YORK ORANT S. LCWIS OKRARD P. WATSON TELEX: 423%IS Og PRESIDENT PARTNERS WASHINGTON OFFICE |
| | @ADMITTED TO THE DISTRICT OF COLUMBIA BAR October 26, 1977 Mr. Edson G. Case Acting Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 8 '~uS~EC Washington, D.C. 20555 |
| | ~g@77 > 1 Re: Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station, p~~~ a Unit No. 1 Docket No. 50-'220'' |
| | |
| | ==Dear Mr. Case:== |
| | |
| | As counsel for Niagara Mohawk, I enclose the following: |
| | (1) Three (3) originals and nineteen (19) copies of an Application for Amendment to Operating License; and (2), Forty (40) copies each of two (2) documents entitled Attachments A and B whi:ch 'set, forth the'equested change in the Technical Specifications along with its technical basis. |
| | Very truly yours, LeBOEUF, LAMB,'EIBY 6 MacRAE By Eug e B. Thomas, Jr. |
| | EBT/bg Enclosures 773OOOIBS |
| | |
| | c' "gal.~ ~ |
| | ) |
| | I A |
| | J w,'I I> I C J 1I E |
| | "4 \ |
| | I'I 8 g a |
| | |
| | UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of ) |
| | ) |
| | ) |
| | NIAGARA MOHAWK POWER CORPORATION ) Docket No. 50-220 (Nine Mile Point Nuclear Station ) |
| | Unit No. l) ) |
| | APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the Nuclear Regulatory Commission, Niagara Mohawk Power Cor-poration, holder of Facility Operating License No. DPR-63, hereby requests that Tables 3.2 and 5.3 of the Environmental Technical Specifications, set forth in Appendix B to that License be amended. These proposed changes have been re-viewed by the Site Operations Review Committee and Safety Review and Audit Board. |
| | The proposed Environmental A |
| | Technical Specification changes are set forth in Attachment A to this application. |
| | Supporting Information, which demonstrates that the proposed changes do not involve a significant environmental impact consideration, is set forth in Attachment B. The proposed changes would not. authorize any change in the types or any increase in the amounts of effluents or any change in the authorized power level of the facility. |
| | |
| | WHEREFORE, Applicant respectfully requests that Appendix B to Facility Operating License No. DPR-63 be amended in the form attached hereto as Attachment A. |
| | NIAGARA MOHAWK POWER CORPORATION By P8-- |
| | Donald P. Disc Vice President - Engineering Subscribed and sworn to before me this Am~ day of October, 1977. |
| | NO ARY PUBLIC HAZEL'. CARRICK Noterv Public in tho State of New York Qualified in Onon. Co. No. 4524460 Atr Comndsslun bpires March 30,19'P'~ |
| | |
| | I l l |
| | |
| | ATTACHMENT A Niagara Mohawk Power Corporation License No. DPR-63 Docket No. 50-220 Pro osed Chan es to Facilit 0 eratin License Attached are revisions to Pages 77 and 86 of Appendix B to Facility Operating License DPR-63. |
| | These pages have been retyped in their entirety. |
| | The marginal markings indicate the specific changes to the text. |
| | |
| | Table 3.2 Cont'd) |
| | SAMPLE COLLECTION AND ANALYSIS SITE RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM B. -LAND PROGRAM MEDIA ANALYSIS ~FRE UENCY . NO. OF LOCATIONS LOCATIONS |
| | : 1. Air Particulates GB W At least 10 9 onsite 6 offsite GSA H Comp.(6) |
| | : 2. Soil GSA, Sr Every 3 years 9 onsite 6 offsite |
| | : 3. TLD Gamma Dose Qtr. 20 14 onsite 6 offsite |
| | : 4. Radiation Monitors Gamma Dose 10 9 onsite 1 offsite |
| | : 5. Airborne - I GSA W At least 10 9 onsite 6 offsite |
| | : 6. Milk I H 4(7) (8) g0 GSA, Sr M Comp. |
| | : 7. Human Food Crops GSA I A (8) |
| | : 8. Meat, Poultry, Eggs GSA Edible Portions SA (8) |
| | Notes: (Continued) |
| | (6) Onsite samples counted as two composites; offsite samples counted as two composites; any .high gross beta count samples counted separately (not included in composite). |
| | (7) Frequency applied only during grazing season. |
| | (8) Samples to be collected from farms within a 10-mile radius having the highest potential concentrations of radionuclides. |
| | Abbreviations: |
| | H Comp. Month)y composite of weekly or bi-weekly samples BW - Bi-weekly (alternate wks.) |
| | GB Gross beta analysis W - Weekly Qtr.- Quarterly GeLi Gamma spectral analysis on a GeLi system (quantitative) M SA - Semiannually GSA Gamma spectral analysis on a NaI system (quantitative) |
| | |
| | 0 Table 5.3 Continued Vice President-Engineering Site 0 erations Review Committee Safet Review and Audit Board Vice President-Electric 0 erations Investigate all reported violations Review violations of environmental of environmental technical specifications and 'echnical specifications. Where the submit an analysis to the Vice investigation indicates, prepare President-Engineering and the Vice and forward a report covering their President-Electric Operations. |
| | evaluation and recommendation to prevent recurrence, to the General Superintendent Nuclear Generation, and the Chairman of the Safety Review and Audit Board. |
| | AUTHORITY Advisory to the General Superintendent The Board shall report to and advise |
| | - Nuclear Generation. the Vice President-Engineering and the Vice President-Electric Operations in all matters relating to environmental impact. |
| | Hake tentative determinations as to whether or not proposals submitted to the committee involve a change in the station's environmental impact. This determination subject to review by the Safety Review and Audit Board. |
| | |
| | ATTACHMENT B Niagara Mohawk Power Corporation License No. DPR-63 Docket No. 50-220 Su ortin Information Following is information for each of the proposed Environ-mental Technical Specifications changes: |
| | Table 3.2 The change of footnote 6 described in Attachment A will |
| | 'rovide for more meaningful comparison between onsite and offsite composite analysis. The current Environmental Technical Speci-fications are not conducive to this type of comparison. By |
| | ..separating these composites into four groups, comparison between onsite and corresponding offsite stations can be made by sector and correlated to current meteorological conditions. Additionally, using gross beta activity to flag possible high counts will provide checks on a weekly basis instead of monthly, and will also prevent the need to recount each particulate filter in the event that a high count was obtained. |
| | Table 5.3 Paragraph 6.5.1.8 Records of Appendix A to the Facility Operating License No. DPR-63, specifies that the Site Operations Review Committee shall maintain written minutes of each meeting. |
| | Since environmental matters are reviewed along with other agenda items, it is not practical to maintain separate minutes for environmental matters. The same information would be available in general minutes as would be available in separate minutes. |
| | |
| | ' g |
| | ~ ~}} |
|
---|
Category:Legal-Correspondence
MONTHYEARML17033B2092017-02-0202 February 2017 Certificate of Service for Updated Copies of the Application for Licenses, as Amended, Eliminating All Superseded Information ML0617700322006-06-16016 June 2006 Letter from David R. Lewis Requesting That the International Brotherhood of Electrical Workers, Local 97's Motion for Hearing and Right to Intervene and Protest, Dated June 6, 2006, Be Dismissed for Lack of Standing ML0214803692002-05-14014 May 2002 Licensee'S Supplemental Answer to February 25, 2002 Commission Order to Modify License for Interim Safeguards & Security Measures ML17037C4101977-10-26026 October 1977 Letter Transmitting Application for Amendment to Operating License and Proposed Changes to Facility Operating License Concerning Sample Collection and Analysis Site Radiological Environmental Monitoring Program ML17037C4941975-10-31031 October 1975 Transmits Original of Document Entitled, Request for Exemption Together with Attachments a and B in Regards to Technical Specifications to Appendix J to 10 CFR Part 50 of the Commissions' Regulations ML17037C1331972-04-18018 April 1972 Letter Submitted on Behalf of Niagara Mohawk Power Corp. Concerning the 1971 Annual Report ML17037C3701971-01-26026 January 1971 Letter Transmitting Copies of Amendment No. 5 to Petition Requesting Amendment of License Containing Answers to Questions from the AEC Regulatory Staff in Connection with the ECCS ML17037C3771970-10-12012 October 1970 Letter Transmitting Amendment No. 1 to Petition Requesting Amendment of License Containing Answers to Questions Raised in the August 27, 1970 Letter ML17037C3821970-04-20020 April 1970 Letter Transmitting Petition Requesting Amendment of License and Technical Supplement to Petition to Increase Power Level. ML17037C3891969-03-19019 March 1969 Letter Transmitting Petition Requesting Extension of Completion Date. ML17037C3981968-06-26026 June 1968 Letter Transmitting a Petition Requesting Extension of Completion Date 2017-02-02
[Table view] Category:Letter
MONTHYEARIR 05000220/20244022024-11-20020 November 2024 Material Control and Accounting Program Inspection Report 05000220/2024402 and 05000410/2024402 (Cover Letter Only) IR 05000410/20240032024-11-0808 November 2024 Integrated Inspection Report 05000220/1014003 and 05000410/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations 2024-09-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NMP1L3484, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-15015 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.2022-08-12012 August 2022 License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. NMP1L3467, License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage2022-06-29029 June 2022 License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage NMP2L2799, License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators2022-05-24024 May 2022 License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-30030 September 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position NMP2L2762, License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2021-05-26026 May 2021 License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments NMP1L3369, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-12-18018 December 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process2020-04-30030 April 2020 License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process NMP2L2716, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-12-26026 December 2019 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors NMP2L2706, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.2019-10-31031 October 2019 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability NMP1L3278, License Amendment Request - Administrative Changes to the Technical Specifications2019-06-26026 June 2019 License Amendment Request - Administrative Changes to the Technical Specifications RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NMP2L2699, License Amendment Request to Revise Technical Specifications Main Steam Isolation Valve Leak Rate2019-05-31031 May 2019 License Amendment Request to Revise Technical Specifications Main Steam Isolation Valve Leak Rate RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. NMP2L2694, Emergency License Amendment Request: One Time Extension to the High Pressure Core Spray Completion Time and Associated Surveillances2018-12-0606 December 2018 Emergency License Amendment Request: One Time Extension to the High Pressure Core Spray Completion Time and Associated Surveillances NMP1L3192, License Amendment Request - Revise Technical Specification 3.3.1 for Primary Containment Oxygen Concentration2018-06-26026 June 2018 License Amendment Request - Revise Technical Specification 3.3.1 for Primary Containment Oxygen Concentration RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) NMP1L3188, License Amendment Request - Proposed Change to Remove Boraflex Credit from Spent Fuel Racks2018-02-0909 February 2018 License Amendment Request - Proposed Change to Remove Boraflex Credit from Spent Fuel Racks NMP1L3142, License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-12-15015 December 2017 License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 RS-17-137, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-11-0808 November 2017 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NMP2L2660, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change2017-11-0303 November 2017 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change NMP2L2652, License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note2017-08-22022 August 2017 License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note ML17164A1542017-05-31031 May 2017 Enclosure 4C - EAL Basis Document for Nine Mile Point Nuclear Station, Unit 1 ML17164A1552017-05-31031 May 2017 Enclosure 4D - EAL Front Matter for Nine Mile Point Nuclear Station, Unit 1 ML17164A1532017-05-31031 May 2017 Enclosure 4B - EAL Red-Line Basis Document for Nine Mile Point Nuclear Station, Unit 1 NMP1L3158, Enclosure 4E - Procedure Matrix for Nine Mile Point Nuclear Station, Unit 12017-05-31031 May 2017 Enclosure 4E - Procedure Matrix for Nine Mile Point Nuclear Station, Unit 1 NMP2L2641, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 02017-05-31031 May 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 JAFP-17-0050, Exigent License Amendment Request to Revise Emergency Action Level HU1.52017-05-19019 May 2017 Exigent License Amendment Request to Revise Emergency Action Level HU1.5 ML17037C4192017-05-11011 May 2017 Amendment to Operating License/Change to Appendix a of Technical Specification Concerning Certain Repairs at Facility and Concomitantly to Allow a Continuation of a Slightly Lower Water Level in the Reactor... NMP2L2643, License Amendment Request-Adoption of TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes2017-04-0505 April 2017 License Amendment Request-Adoption of TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-02-28028 February 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP2L2639, Supplement to License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy- Nuclear 10 CFR Part 21 Safety Communication SC05-032017-02-17017 February 2017 Supplement to License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy- Nuclear 10 CFR Part 21 Safety Communication SC05-03 2024-09-26
[Table view] |
Text
NRC FORM 195 I2-78)~i<- t NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL U.S. NUCLEAR REGULATORY COM SSION DOCKET NUMBER FILE NUMBER TO FROM: DATE OF DOCUMENT Mr. EdsonM ~ Case 10/26/77 LeBoeuf, Lamb, Leiby & MacRae Nashington, D. C. 20036 DATE RECEIVED 10/27/77 ETTER J&fOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED ZfORIGINAL RON C LASS I F I E D Clcopv DESCRIPTION ENCLOSURE License No. DPR-63 Appl for Amend:
tech specs proposed change concerning tables 3.2
& 5.3 of the Environmental Tech Specs, set forth in Appendix B, be amended...Notorized 10/25/77...
w/att supporti,ng information...
1p 6p PLANT NAME NINE MILE POINT UNIT g gem 10/27/'R7 FOR ACTION/INFORMATION ENHRHAKNTAi ASSIGNED AD: V>>. MOORE LTR BRANCH CHIEF:
CT MANAGER: PROJECT MA%AGER:
CENSING ASSISTANT: LICENSING ASSISTANT:
Be HARLESS INTERNALOISTRI BUTION STFMS SAFETY PLANT SYSTEMS SITE SAFETY &
TTSON TEDESCO ENVIRON ANALYSIS EDER BENAROYA DENTON & MUI'ER ENGINEERING IPPOLITO ENVIRO TECH ERNST OPERATING REACTORS BALLARD GBLOOD B ER GAMMILL 2 G IME SITE ANALYSIS AT I J>> COLLINS EXTERNAL OISTRIBUTION CONTROL NUMBER TIC NSIC
'73OOO13y IV J HANCHETT 16 CYS ACRS SENT CA
f l, LEBOEUFI LAMB, LEIBY 8L MAC RAE l757 N STREET, N.W.
WASHINGTON, D. C. 20036 TELEPNDNE tct 457 7500 CABLE ADDRESS LEON A. ALLEN, JR.
JOSEPH E. BACHCLOCR.1IE CAMKRON F. MACRAC CAMKRON F. M*cRAE,XK4 i L BWIN, WAS HIKBT RANDALL J. LcBDEUF,JR. IQ2Q IQ75 ERNEST S. BALLARD JR. OERARD A.MAHER ADRIAN C. LEIBY IQSt IQ75 O. S. PETCR SERGEII 4 SHEILA H. MARSHALL TCLEX: 4 OEOFFRY D.C. BEST JAMES O. MCKLROY 'I DAVID P. DICKS JAMES P. McORANERY, JRP4 TAYLOR R. BRIGOS PHILIP PALMER MCGUIGAN I OI'OUNSEL CHARLES N.BURGER JAMES O'MALLEYoJR.a THOMAS E BURKK
~
J. MICHAEL PARISH ARVIH C. UPTON ROGER D.FCLDMAN+ JOHN A. RUDY CUGCNC R. FIDCLLi4 PAUL O. RUSSELL JACOB FR ICDLAHDKR HAROLD M SCIDEL I
ai, DONALD J.GREENE CHARLES P. SIFTON
~
i I4D BROADWAY JAMES A.OREERiIE4 HALCYON O SKINHKR JOHN L.OROSE A NEW YORK, N.Y. IDDDS DOUGLAS W.HAWES JOSEPH S.STRAUSS CARL O. HOBELMAH SAMUEL M.SUDDEN TELEPHONE tl2 tBQ IIOD MICHALL IOVCHKO KUGENC B.THOMASe JR PL JAMES F. JOHNSON, 4' LEONARD M. TROSTKNi4 CABLE ADDRESS
, RONALD D. JONES HARRY H. VOIOT + 4 LKX K.LARSON+4 H RICHARD WACHTCI.
LEBWINe NEW YORK ORANT S. LCWIS OKRARD P. WATSON TELEX: 423%IS Og PRESIDENT PARTNERS WASHINGTON OFFICE
@ADMITTED TO THE DISTRICT OF COLUMBIA BAR October 26, 1977 Mr. Edson G. Case Acting Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 8 '~uS~EC Washington, D.C. 20555
~g@77 > 1 Re: Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station, p~~~ a Unit No. 1 Docket No. 50-'220
Dear Mr. Case:
As counsel for Niagara Mohawk, I enclose the following:
(1) Three (3) originals and nineteen (19) copies of an Application for Amendment to Operating License; and (2), Forty (40) copies each of two (2) documents entitled Attachments A and B whi:ch 'set, forth the'equested change in the Technical Specifications along with its technical basis.
Very truly yours, LeBOEUF, LAMB,'EIBY 6 MacRAE By Eug e B. Thomas, Jr.
EBT/bg Enclosures 773OOOIBS
c' "gal.~ ~
)
I A
J w,'I I> I C J 1I E
"4 \
I'I 8 g a
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
)
NIAGARA MOHAWK POWER CORPORATION ) Docket No. 50-220 (Nine Mile Point Nuclear Station )
Unit No. l) )
APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the Nuclear Regulatory Commission, Niagara Mohawk Power Cor-poration, holder of Facility Operating License No. DPR-63, hereby requests that Tables 3.2 and 5.3 of the Environmental Technical Specifications, set forth in Appendix B to that License be amended. These proposed changes have been re-viewed by the Site Operations Review Committee and Safety Review and Audit Board.
The proposed Environmental A
Technical Specification changes are set forth in Attachment A to this application.
Supporting Information, which demonstrates that the proposed changes do not involve a significant environmental impact consideration, is set forth in Attachment B. The proposed changes would not. authorize any change in the types or any increase in the amounts of effluents or any change in the authorized power level of the facility.
WHEREFORE, Applicant respectfully requests that Appendix B to Facility Operating License No. DPR-63 be amended in the form attached hereto as Attachment A.
NIAGARA MOHAWK POWER CORPORATION By P8--
Donald P. Disc Vice President - Engineering Subscribed and sworn to before me this Am~ day of October, 1977.
NO ARY PUBLIC HAZEL'. CARRICK Noterv Public in tho State of New York Qualified in Onon. Co. No. 4524460 Atr Comndsslun bpires March 30,19'P'~
I l l
ATTACHMENT A Niagara Mohawk Power Corporation License No. DPR-63 Docket No. 50-220 Pro osed Chan es to Facilit 0 eratin License Attached are revisions to Pages 77 and 86 of Appendix B to Facility Operating License DPR-63.
These pages have been retyped in their entirety.
The marginal markings indicate the specific changes to the text.
Table 3.2 Cont'd)
SAMPLE COLLECTION AND ANALYSIS SITE RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM B. -LAND PROGRAM MEDIA ANALYSIS ~FRE UENCY . NO. OF LOCATIONS LOCATIONS
- 1. Air Particulates GB W At least 10 9 onsite 6 offsite GSA H Comp.(6)
- 2. Soil GSA, Sr Every 3 years 9 onsite 6 offsite
- 3. TLD Gamma Dose Qtr. 20 14 onsite 6 offsite
- 4. Radiation Monitors Gamma Dose 10 9 onsite 1 offsite
- 5. Airborne - I GSA W At least 10 9 onsite 6 offsite
- 6. Milk I H 4(7) (8) g0 GSA, Sr M Comp.
- 7. Human Food Crops GSA I A (8)
- 8. Meat, Poultry, Eggs GSA Edible Portions SA (8)
Notes: (Continued)
(6) Onsite samples counted as two composites; offsite samples counted as two composites; any .high gross beta count samples counted separately (not included in composite).
(7) Frequency applied only during grazing season.
(8) Samples to be collected from farms within a 10-mile radius having the highest potential concentrations of radionuclides.
Abbreviations:
H Comp. Month)y composite of weekly or bi-weekly samples BW - Bi-weekly (alternate wks.)
GB Gross beta analysis W - Weekly Qtr.- Quarterly GeLi Gamma spectral analysis on a GeLi system (quantitative) M SA - Semiannually GSA Gamma spectral analysis on a NaI system (quantitative)
0 Table 5.3 Continued Vice President-Engineering Site 0 erations Review Committee Safet Review and Audit Board Vice President-Electric 0 erations Investigate all reported violations Review violations of environmental of environmental technical specifications and 'echnical specifications. Where the submit an analysis to the Vice investigation indicates, prepare President-Engineering and the Vice and forward a report covering their President-Electric Operations.
evaluation and recommendation to prevent recurrence, to the General Superintendent Nuclear Generation, and the Chairman of the Safety Review and Audit Board.
AUTHORITY Advisory to the General Superintendent The Board shall report to and advise
- Nuclear Generation. the Vice President-Engineering and the Vice President-Electric Operations in all matters relating to environmental impact.
Hake tentative determinations as to whether or not proposals submitted to the committee involve a change in the station's environmental impact. This determination subject to review by the Safety Review and Audit Board.
ATTACHMENT B Niagara Mohawk Power Corporation License No. DPR-63 Docket No. 50-220 Su ortin Information Following is information for each of the proposed Environ-mental Technical Specifications changes:
Table 3.2 The change of footnote 6 described in Attachment A will
'rovide for more meaningful comparison between onsite and offsite composite analysis. The current Environmental Technical Speci-fications are not conducive to this type of comparison. By
..separating these composites into four groups, comparison between onsite and corresponding offsite stations can be made by sector and correlated to current meteorological conditions. Additionally, using gross beta activity to flag possible high counts will provide checks on a weekly basis instead of monthly, and will also prevent the need to recount each particulate filter in the event that a high count was obtained.
Table 5.3 Paragraph 6.5.1.8 Records of Appendix A to the Facility Operating License No. DPR-63, specifies that the Site Operations Review Committee shall maintain written minutes of each meeting.
Since environmental matters are reviewed along with other agenda items, it is not practical to maintain separate minutes for environmental matters. The same information would be available in general minutes as would be available in separate minutes.