ML13154A374: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML13154A374 | | number = ML13154A374 | ||
| issue date = 05/29/2013 | | issue date = 05/29/2013 | ||
| title = | | title = Response to 10 CFR 50.54(f) Request for Information: Near-Term Task Force Recommendation 2.3, Flooding | ||
| author name = Korsnick M | | author name = Korsnick M | ||
| author affiliation = Constellation Energy Nuclear Group, LLC, Calvert Cliffs Nuclear Power Plant, Inc, EDF Group | | author affiliation = Constellation Energy Nuclear Group, LLC, Calvert Cliffs Nuclear Power Plant, Inc, EDF Group | ||
| addressee name = | | addressee name = | ||
Line 12: | Line 12: | ||
| document type = Letter | | document type = Letter | ||
| page count = 2 | | page count = 2 | ||
| project = | |||
| stage = Request | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:Mary G. Korsnick Office 410-470-5133 Chief Nuclear Officer Fax 443-213-6739 SVP - Chief Operations Officer E-mail: Maria.Korsnick@cengllc.com CENG. | |||
a joint venture of O ewskwi COnatmiatiog- ,'--h | |||
.6 May 29,2013 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 ATTENTION: Document Control Desk | |||
==SUBJECT:== | |||
Calvert Cliffs Nuclear Power Plant, Unit 2 Renewed Facility Operating License No. DPR-69 Docket No. 50-318 Response to 10 CFR 50.54(f) Request for Information: Near-Term Task Force Recommendation 2.3, Flooding | |||
==REFERENCES:== | |||
(a) Letter from E. J. Leeds (NRC) and M. R. Johnson (NRC) to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, dated March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, (ML12073A348) | |||
(b) Letter from S. L. Belcher (CENG) to Document Control Desk (NRC), dated June 8, 2012, Ninety-Day Response to Flooding Recommendations 2.1 and 2.3 of 10 CFR 50.54(f) Request for Information (ML12164A369) | |||
(c) Letter from D. L. Skeen (NRC) to A. P. Heymer (NEI), dated May 31, 2012, Endorsement of Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features" (ML12144A142) | |||
(d) Letter from M. G. Korsnick (CENG) to Document Control Desk (NRC) dated November 27, 2012, Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Flooding (ML12335A029) | |||
On March 12, 2012, the NRC issued Reference (a) to request in Enclosure 4 that licensees perform flood protection walkdowns to identify and address through the corrective action program plant-specific degraded, nonconforming, or unanalyzed conditions and cliff-edge effects and verify the adequacy of monitoring and maintenance programs. | |||
Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 200C, Baltimore, MD 21202 pc)\ | |||
pf_ý- | |||
Document Control Desk May 29, 2013 Page 2 Reference (b) confirmed that Constellation Energy Nuclear Group (CENG) licensees will use the flooding walkdown procedure Nuclear Energy Institute (NEI) 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood ProtectionFeatures, and will respond within 180 days of NRC's endorsement of the flooding walkdown procedure. The NRC endorsed NEI 12-07 in Reference (c). | |||
Reference (d) provided Attachments 1 - 4, the responses for R.E. Ginna Nuclear Power Plant, Nine Mile Point Nuclear Station, and Calvert Cliffs Nuclear Power Plant, to comply with the commitment in Reference (b). Attachment 4 of Reference (d) included a statement that the Calvert Cliffs Unit 2 27-foot West Piping Penetration Room was unable to be inspected due to inaccessibility and the schedule to complete the walkdowns in this room. | |||
For Calvert Cliffs Nuclear Power Plant, Unit 2, CENG completed the scheduled walkdown in the piping penetration room on March 5, 2013. The walkdown was conducted in accordance with NEI 12-07. Parts a through e of the Walkdown Record Form provided in Appendix B to NEI 12-07 were completed and peer reviewed. No deficiencies were encountered. The conclusions outlined in Attachment 4 of Reference (c) remain valid. | |||
There are no regulatory commitments in this letter. | |||
If there are any questions regarding this submittal, please contact Everett (Chip) Perkins everett.perkinsicengllc.com at 410-470-3928. | |||
I declare under penalty of perjury that the foregoing is true and correct. Executed on May 29, 2013. | |||
Sincerely, Mary . Korsnick MGK/CM cc: B. K. Vaidya, NRC Resident Inspector, Calvert Cliffs M. C. Thadani, NRC S. Gray, DNR N. S. Morgan, NRC W. M. Dean, NRC}} |
Latest revision as of 17:24, 4 November 2019
ML13154A374 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 05/29/2013 |
From: | Korsnick M Constellation Energy Nuclear Group, Calvert Cliffs, EDF Group |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML13154A374 (2) | |
Text
Mary G. Korsnick Office 410-470-5133 Chief Nuclear Officer Fax 443-213-6739 SVP - Chief Operations Officer E-mail: Maria.Korsnick@cengllc.com CENG.
a joint venture of O ewskwi COnatmiatiog- ,'--h
.6 May 29,2013 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 ATTENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant, Unit 2 Renewed Facility Operating License No. DPR-69 Docket No. 50-318 Response to 10 CFR 50.54(f) Request for Information: Near-Term Task Force Recommendation 2.3, Flooding
REFERENCES:
(a) Letter from E. J. Leeds (NRC) and M. R. Johnson (NRC) to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, dated March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, (ML12073A348)
(b) Letter from S. L. Belcher (CENG) to Document Control Desk (NRC), dated June 8, 2012, Ninety-Day Response to Flooding Recommendations 2.1 and 2.3 of 10 CFR 50.54(f) Request for Information (ML12164A369)
(c) Letter from D. L. Skeen (NRC) to A. P. Heymer (NEI), dated May 31, 2012, Endorsement of Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features" (ML12144A142)
(d) Letter from M. G. Korsnick (CENG) to Document Control Desk (NRC) dated November 27, 2012, Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Flooding (ML12335A029)
On March 12, 2012, the NRC issued Reference (a) to request in Enclosure 4 that licensees perform flood protection walkdowns to identify and address through the corrective action program plant-specific degraded, nonconforming, or unanalyzed conditions and cliff-edge effects and verify the adequacy of monitoring and maintenance programs.
Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 200C, Baltimore, MD 21202 pc)\
pf_ý-
Document Control Desk May 29, 2013 Page 2 Reference (b) confirmed that Constellation Energy Nuclear Group (CENG) licensees will use the flooding walkdown procedure Nuclear Energy Institute (NEI) 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood ProtectionFeatures, and will respond within 180 days of NRC's endorsement of the flooding walkdown procedure. The NRC endorsed NEI 12-07 in Reference (c).
Reference (d) provided Attachments 1 - 4, the responses for R.E. Ginna Nuclear Power Plant, Nine Mile Point Nuclear Station, and Calvert Cliffs Nuclear Power Plant, to comply with the commitment in Reference (b). Attachment 4 of Reference (d) included a statement that the Calvert Cliffs Unit 2 27-foot West Piping Penetration Room was unable to be inspected due to inaccessibility and the schedule to complete the walkdowns in this room.
For Calvert Cliffs Nuclear Power Plant, Unit 2, CENG completed the scheduled walkdown in the piping penetration room on March 5, 2013. The walkdown was conducted in accordance with NEI 12-07. Parts a through e of the Walkdown Record Form provided in Appendix B to NEI 12-07 were completed and peer reviewed. No deficiencies were encountered. The conclusions outlined in Attachment 4 of Reference (c) remain valid.
There are no regulatory commitments in this letter.
If there are any questions regarding this submittal, please contact Everett (Chip) Perkins everett.perkinsicengllc.com at 410-470-3928.
I declare under penalty of perjury that the foregoing is true and correct. Executed on May 29, 2013.
Sincerely, Mary . Korsnick MGK/CM cc: B. K. Vaidya, NRC Resident Inspector, Calvert Cliffs M. C. Thadani, NRC S. Gray, DNR N. S. Morgan, NRC W. M. Dean, NRC