ML14080A046: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14080A046
| number = ML14080A046
| issue date = 03/21/2014
| issue date = 03/21/2014
| title = Sequoyah Initial Exam 2013-302 Final Sim In-Plant Jpms
| title = Initial Exam 2013-302 Final Sim In-Plant Jpms
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 15: Line 15:
| page count = 146
| page count = 146
}}
}}
=Text=
{{#Wiki_filter:SEQUOYAH NUCLEAR PLANT 1311 NRC PLANT JPM J
PLANT JPM J Page 2 of 15 RO/SRO JOB PERFORMANCE MEASURE Task:            Local Alignment of 2-RM-90-112 to Lower Containment Task #:            0730990101 Task Standard:    The Examinee manually starts a sample pump and aligns 2-RM-90-112 to Lower Containment.
Alternate Path:            YES:            NO:        X Time Critical Task:        YES:            NO:        X K/A Reference/Ratings:      002 A3.01 (3.7/3.9)
Method of Testing:
Simulated Performance:          X        Actual Performance:
Evaluation Method:
Simulator              In-Plant      X      Classroom Main Control Room                            Mock-up Performer:
Trainee Name Evaluator:                                    /
Name / Signature                                DATE Performance Rating:    SAT:                UNSAT:
Validation Time:          15 min                        Total Time:
Performance Time:          Start Time:                  Finish Time:
COMMENTS
PLANT JPM J Page 3 of 15 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
: 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
: 1.      2-SO-90-2, Sections 5.1 and 8.3
==References:==
Reference                                      Title                      Rev No.
2-SO-90-2                            Gaseous Process Radiation Monitoring                37 System
====================================================================================
READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1. Unit 2 is in MODE 1.
: 2. 2-RM-90-112 had been isolated and tagged electrically for maintenance. The Hold Order has been picked up from the breaker, Checklist 2-90-2.03 attachment 3 is complete, but the pumps are off.
: 3. 2-RM-90-106 has just tripped and neither of its associated pumps can be started.
: 4. Section 3 and 4 of 2-SO-90-2 Gaseous Process Radiation Monitoring System, is complete.
: 5. I&C is available for support as required.
INITIATING CUES:
: 1. The Control Room has directed you to start a sample pump and align monitor 2-RM-90-112 to sample lower containment using 2-SO-90-2, Section 8.3 steps 1 through 4.
: 2. Inform the Control Room when complete.
PLANT JPM J Page 4 of 15 Start Time STEP    1  :                                                                                SAT Obtain a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System.                                                                        UNSAT Standard:  Examinee obtains a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System.
Cue      Provide a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System section 8.3.
Comment STEP    2  :                                                                                SAT UNSAT Standard:  The Examinee addresses the procedure step as being complete in the initial conditions.
Comment
PLANT JPM J Page 5 of 15 STEP  3  :                                                                          SAT UNSAT The Examinee determines a sample pump for 2-RM-90-112 is not Standard:
running and goes to section 5.1.
Provide the following cue, No noise in coming from the area of the Cue:
pump.
Cue:      Provide a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System section 5.1.
Comment STEP  4  :                                                                          SAT UNSAT Standard:  The Examinee selects 2-RM-90-112 based on the initiating cue.
Comment
PLANT JPM J Page 6 of 15 STEP    5  :                                                                            SAT UNSAT The Examinee determines the valve checklist is complete for 2-RM  Standard:
112 based on the initial conditions.
Comment STEP    6  :                                                                            SAT UNSAT The Examinee determines the step is N/A based on the initial Standard:
conditions.
Comment
PLANT JPM J Page 7 of 15 STEP    7  :                                                                            SAT UNSAT The Examinee simulates placing 2-HS-90-112, Heat Trace for 2-RM-Standard:                                                                          CRITICAL 90-112 to ON (LEFT).
Provide the following cue, 2-HS-90-112, Heat Trace for 2-RM-90-112 Cue 1:
to the right. (OFF)
If asked provide the following cue, Amber light for RM-90-112 on Cue 2:
Heat Trace Control Panel [2-JBOX-90-3919] is ON.
Comment STEP    8  :                                                                          SAT UNSAT Standard:    The Examinee addresses the step as N/A.
Cue:      Provide the following cue, Testing is not required Comment
PLANT JPM J Page 8 of 15 STEP    9  :                                                                          SAT UNSAT Standard:    The Examinee addresses the procedure step.
Provide the following cue, The Unit 2 Control Room has contacted Cue:
I&C.
Comment STEP    10  :                                                                        SAT UNSAT The Examinee simulates depressing 2-HS-90-112A or 2-HS-90-112B, Standard:                                                                        CRITICAL Sample pump for 2-RM-90-112 to ON.
Provide the following cue, 2-HS-90-112A (2-HS-90-112B) BLACK Cue 1:
switch is recessed.
If asked provide the following cue, You hear a rotational Cue 2:
mechanical sound from the vicinity of the sample pump.
Comment
PLANT JPM J Page 9 of 15 STEP    11  :                                                                    SAT UNSAT Standard:  The Examinee addresses the step as N/A.
Comment STEP    12  :                                                                    SAT UNSAT Standard:  The Examinee addresses the procedure step.
Cue:      If asked provide the following cue, I&C has been informed.
Comment
PLANT JPM J Page 10 of 15 STEP    13  :                                                                              SAT UNSAT Standard:  The Examinee addresses the procedure step.
Cue:      If asked provide the following cue, Flow has been established.
Comment STEP    14  :                                                                              SAT UNSAT The Examinee simulates resetting local low flow seal-in by turning [2-Standard:                                                                            CRITICAL HS-90-112F] to the right to RESET.
Comment
PLANT JPM J Page 11 of 15 STEP    15  :                                                                        SAT UNSAT Standard:  The Examinee addresses the procedure step.
If asked provide the following cue, Alarms on Panel 0-XA-55-12D Cue:
Windows A-2 and A-3 are dark.
Comment STEP    16  :                                                                        SAT UNSAT Standard:  The Examinee addresses the step as N/A.
Comment
PLANT JPM J Page 12 of 15 STEP    17  :                                                                          SAT UNSAT Standard:    The Examinee addresses the step as N/A.
Provide the following cue, Background count rate is greater than Cue:
9,000 cpm.
Examiner The Examinee returns to section 8.3 step 1[c].
Note:
Comment STEP    18  :                                                                        SAT UNSAT Standard:      The Examinee addresses the procedure step Examiner Note:      The heat tracing was placed in service in JPM step 7.
Comment
PLANT JPM J Page 13 of 15 STEP  19  :                                                                            SAT UNSAT Standard:    The Examinee addresses the procedure step.
Cue:      If asked provide the following cue, Testing of the heat trace is not required.
Comment STEP  20  :                                                                            SAT UNSAT Standard:  The Examinee addresses the procedure step.
Provide the following cue, Background count rate is greater than Cue:
9,000 cpm.
Comment Examiner Note
PLANT JPM J Page 14 of 15 STEP  21  :                                                                            SAT UNSAT Standard:    The Examinee simulates opening 1-ISIV-90-283G by indicating CRITICAL handwheel turned as far left (counter-clockwise) as possible.
Cue:      If asked provide the following cue, The valve HW turns several turns CCW and movement has stopped.
Comment Terminating  The task is complete when the Examinee returns the cue sheet to Cue:                                                                                STOP the Examiner.
Stop Time
JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1. Unit 2 is in MODE 1.
: 2. 2-RM-90-112 had been isolated and tagged electrically for maintenance. The Hold Order has been picked up from the breaker, Checklist 2-90-2.03 attachment 3 is complete, but the pumps are off.
: 3. 2-RM-90-106 has just tripped and neither of its associated pumps can be started.
: 4. Section 3 and 4 of 2-SO-90-2 Gaseous Process Radiation Monitoring System, is complete.
: 5. I&C is available for support as required.
INITIATING CUES:
: 1. The Control Room has directed you to start a sample pump and align monitor 2-RM-90-112 to sample lower containment using 2-SO-90-2, Section 8.3 steps 1 through 4.
: 2. Inform the Control Room when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM B
SIM JPM B Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task:              Vent an unisolable Cold Leg Accumulator.
Task #:            0060060101 Task Standard:      The examinee vents the #4 Cold Leg Accumulator using EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.
Alternate Path:            YES:      X      NO:
Time Critical Task:        YES:              NO:        X K/A Reference/Ratings:      006 A4.02 (4.0/3.8)
Method of Testing:
Simulated Performance:                      Actual Performance:          X Evaluation Method:
Simulator        X      In-Plant                Classroom Main Control Room                                Mock-up Performer:
Trainee Name Evaluator:                                        /
Name / Signature                                DATE Performance Rating:      SAT:                  UNSAT:
Validation Time:            8 min                            Total Time:
Performance Time:          Start Time:                      Finish Time:
COMMENTS
SIM JPM B Page 3 of 14 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 350
: 3. If IC 350 is not available perform the following.
Reset to IC 24 Complete ES-1.3 Transfer to RHR Containment Sump.
IOR ZDIHS6367A f:0 IRF IAR06 f:2 IRF SIR01 f:1
: 4. PLACE SIMULATOR IN RUN
: 5. Place MODE 1 sign on the simulator.
: 6. Place an in-progress copy of E-1 on the operators desk.
: 7. An extra operator will be required to acknowledge alarms.
: 8. ACKNOWLEDGE ALARMS
: 9. FREEZE SIMULATOR.
: 10. Save as a temporary IC, if repeat runs of JPM will be desired.
: 11. PLACE SIMULATOR IN RUN
: 12. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
: 13. When directed enter IRF IAR06 f:2 to supply non-essential air to the containment.
Tools/Equipment/Procedures Needed:
==References:==
Reference                                      Title                                Rev No.
: 1. EA-63-1                VENTING UNISOLATED COLD LEG ACCUMULATOR.                              0 2.
SIM JPM B Page 4 of 14 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.      Unit 1 was in MODE 1 prior to an event.
: 2.      The event is still in progress.
: 3.      E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16.
INITIATING CUES:
: 1.      You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17.
: 2.      Inform the SRO when complete.
SIM JPM B Page 5 of 14 Start Time STEP  1  :                                                                              SAT Obtain a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.                                                                      UNSAT Standard:  Examinee obtains a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.
Cue:      Provide an in progress copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.
Comment STEP  2  :                                                                              SAT UNSAT Standard:  The examinee determines RHR Spray will not be placed in service and proceeds to step 18.
Cue:      If asked provide the following cue, It has been greater than one hour since shutdown.
Comment
SIM JPM B Page 6 of 14 STEP  3  :                                                                          SAT UNSAT Standard:  The examinee determines RCS pressure is less than 100 psig by observing installed instrumentation.
Comment STEP  4  :                                                                          SAT UNSAT Standard:  The examinee determines dispatches personnel to restore power to the CLA Isolation valves.
Cue:      Provide the following cue, Time has been compressed, power has been restored to the CLA Isolation valves.
Comment STEP  5  :                                                                          SAT UNSAT Standard:  Examinee depresses HS-63-134A and HS-63-134B SIS RESET TRAIN 1A and 1B.
Comment
SIM JPM B Page 7 of 14 STEP  6  :                                                                    SAT UNSAT Standard:  The examinee places HS-63-118A, 63-98A, 63-80A and HS-63-67A NO CRITICAL 1, 2, and 3 CL ACCUM OUTLET ISOL to CLOSE.
Comment ALTERNATE PATH STEP  7  :                                                                    SAT UNSAT Standard:  The examinee places HS-63-67A NO 4 CL ACCUM OUTLET ISOL to CLOSE, observes RED light above HS and proceeds to the RNO.
Comment
SIM JPM B Page 8 of 14 STEP  8  :                                                                        SAT UNSAT Standard:  The examinee places HS-63-67A NO 4 CL ACCUM OUTLET ISOL to CLOSE, observes RED light above HS and proceeds to the RNO.
Cue:      Booth operator when asked provide the following cue, Time has been compressed, FCV-63-67 cannot be closed electrically.
Cue:      When asked provide the following cue, TSC has determined CLA #4 should be vented.
Comment
SIM JPM B Page 9 of 14 STEP    9  : ALTERNATE PATH                                                              SAT UNSAT Standard:    The examinee depresses HS-30-64D and HS-30-64D PHASE B ISOL CRITICAL RESET TR-A and TR-B.
Comment STEP    10  :                                                                              SAT UNSAT Standard:  The examinee addresses the procedure step.
Cue:      Direct the simulator operator to align Non-Essential Control Air to the Containment.
Cue:      Booth operator when directed enter IRF IAR06 f:2 to supply non-essential air to the containment.
Booth operator when asked provide the following cue, Time has been Cue:      compressed, Non-Essential Air has been supplied to the Containment.
Comment
SIM JPM B Page 10 of 14 STEP  11  :                                                                  SAT UNSAT Standard:  The examinee goes to EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.
Comment STEP  12  :                                                                  SAT Obtain a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.                                                    UNSAT Standard:  Examinee obtains a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.
Comment STEP  13  :                                                                  SAT UNSAT Standard:  The examinee addresses the procedure step.
Comment
SIM JPM B Page 11 of 14 STEP  14  :                                                                          SAT UNSAT Standard:  The examinee simultaneously depresses HS-30-64D and HS-30-64D PHASE B ISOL RESET TR-A and TR-B.
Examiner Note    The examinee reset Containment Isolation Phase B in JPM Step 9.
Comment STEP  15  :                                                                          SAT UNSAT Standard:  The examinee addresses the procedure step.
Cue:    Provide the following cue, Time has been compressed, Non-Essential Air has been supplied to the Containment.
Examiner Note    The examinee reset Containment Isolation Phase B in JPM Step 10.
Comment
SIM JPM B Page 12 of 14 STEP  16  :                                                                          SAT UNSAT Standard:  The examinee verifies valves closed by observing green lights above valve handswitches ON.
Comment STEP  17  :                                                                          SAT UNSAT Standard:  The examinee rotates HIC-63-65 CL ACCUM N2 HDR VENT FLOW CRITICAL CONTROL fully CCW.
Comment STEP  18  :                                                                          SAT UNSAT Standard:  The examinee places HS-63-63A NO 4 CL ACCUM N2 SUPPLY ISOL CRITICAL to OPEN.
Comment
SIM JPM B Page 13 of 14 Terminating Provide the following cue, Another operator will address the Cue:                                                                          STOP remaining steps of this procedure.
Stop Time
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 was in MODE 1 prior to an event.
: 2. The event is still in progress.
: 3. E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16.
INITIATING CUES:
: 1. You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM C
SIM JPM C Page 2 of 23 RO/SRO JOB PERFORMANCE MEASURE Task:              Respond to a Shutdown LOCA Task #:            3210330301 Task Standard:      The examinee will align Charging to the CCPIT and initiate a Containment Vent Isolation by closing individual valves in response to a LOCA while in MODE 5 and RHR in service.
Alternate Path:              YES:      X      NO:
Time Critical Task:          YES:              NO:        X K/A Reference/Ratings:      EPE 011 EA 2.04 (3.8/4.0)
Method of Testing:
Simulated Performance:                        Actual Performance:          X Evaluation Method:
Simulator        X      In-Plant                Classroom Main Control Room                                Mock-up Performer:
Trainee Name Evaluator:                                        /
Name / Signature                                      DATE Performance Rating:      SAT:                  UNSAT:
Validation Time:            25 min                          Total Time:
Performance Time:            Start Time:                      Finish Time:
COMMENTS
SIM JPM C Page 3 of 23 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 349
: 3. If IC 349 is not available, perform the following:
Reset to IC 36 Run scenario file 1311 NRC JPM C Remove power form CCPIT valves IRF CVR12 f:0 Remove power form CCPIT valves IRF CVR14 f:0
: 4. Place Red Hold Orders on CLA valves: FCV-63-118, -98, -80, & -67 Containment Spray valves: FCV-72-39, -2, -40, -41, -23, -20, Containment Spray Pumps HS-72 -27A, & 72-10A CCPIT valves: FCV-63-25, -26, -39, & -40
: 5. Place the following in PTL and hang red tags on the following:
1B CCP HS-62-104A 1A SIP HS-63-10A 1B SIP HS-63-15A
: 6. Place Yellow Caution Orders on:
Cold Leg Injection valves: FCV-63-93, & -94 SI Hot leg Injection Valves: FCV-63 -156, -157, & -172 Makeup to Accumulators from SI FCV-63-23 Suction to RHR Pumps from RWST 63-1 RHR Hx Valves 74-16 and 74-28 (flow limiting blocks installed)
: 7. PLACE SIMULATOR IN RUN
: 8. Place Mode 5 placard on panels.
: 9. Place A Train Week sign on the simulator.
: 10. Change valve FCV-74-1 and FCV-74-1 plaque on M5 to reflect power ON and valve OPEN.
: 11. An extra operator will be required to acknowledge alarms.
SIM JPM C Page 4 of 23
: 12. ACKNOWLEDGE ALARMS
: 13. FREEZE SIMULATOR.
: 14. PLACE SIMULATOR IN RUN
: 15. When directed IMF TH01D f:0.1 k:1 to initiate LOCA
: 16. When directed IRF CVR12 f:1 and IRF CVR14 f:1 k:2 to energize CCPIT valves Tools/Equipment/Procedures Needed:
==References:==
Reference                                  Title                    Rev No.
: 1. AOP-R.02            SHUTDOWN LOCA                                        18 2.
SIM JPM C Page 5 of 23 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.      Unit has recently entered Mode 5.
: 2.      RCS Temperature is 180o F.
: 3.      RCS Pressure is 315 psig.
: 4.      Pressurizer Cold Cal level (LI-68-321) is 55%.
: 5.      RCPs for Loop 2 and Loop 4 are in service.
: 6.      Both Trains of RHR are in service.
: 7.      0-GO-7 UNIT SHUTDOWN FROM HOT STANDBY TO COLD SHUTDOWN is in progress at Section 5.4 Step 5.
INITIATING CUES:
: 1.      Respond to plant conditions.
SIM JPM C Page 6 of 23 Start Time STEP    1  :                                                                                    SAT UNSAT Standard:  Examinee transitions to AOP-R.02, SHUTDOWN LOCA If required direct the Simulator Operator to initiate the following cue, Cue:    There is a large leak in lower containment, I cannot see where the leak is coming from.
Examiner  The Examinee may go directly to AOP-R.02, SHUTDOWN LOCA on Note:    JPM step 2.
Comment
SIM JPM C Page 7 of 23 STEP  2  :                                                              SAT Obtain a copy of AOP-R.02, SHUTDOWN LOCA UNSAT Standard:  Examinee obtains a copy of AOP-R.02, SHUTDOWN LOCA Comment STEP  3  :                                                              SAT UNSAT Standard:  The Examinee places HS 68-31A, and 73A RCPs to STOP when CRITICAL RCP trip criteria is reached.
Comment
SIM JPM C Page 8 of 23 STEP  4  :                                                                SAT UNSAT Standard:  The Examinee determines RHR SUCTION FROM LOOP 4 HL OPEN by observing red lights above handswitches ON.
Comment STEP  5  :                                                                SAT UNSAT The Examinee determines Pressurizer Level less than 10% by Standard:
observing installed instrumentation.
Comment
SIM JPM C Page 9 of 23 STEP  6  :                                                                SAT UNSAT Standard:  The Examinee places HS-74-10A and HS-74-20A RHR Pumps to CRITICAL PTL.
Comment STEP  7  :                                                                SAT UNSAT The Examinee places HS-74-1A or HS-74-2A RHR SUCTION FROM LOOP 4 HL to CLOSE.
Standard:  AND                                                        CRITICAL The Examinee places HS-74-33A or HS-74-35A RHR HX 1A and 1B CROSSTIE ISOL to CLOSE Comment
SIM JPM C Page 10 of 23 STEP  8  :                                                                    SAT UNSAT The Examinee determines LETDOWN OREFICE ISOLATION valves Standard:  CLOSED by observing green lights above handswitches ON. The Examinee may place the handswitches to CLOSE.
Comment STEP  9  :                                                                    SAT UNSAT The Examinee determines LETDOWN ISOLATION valves CLOSED Standard:  by observing green lights above handswitches ON. The Examinee may place the handswitches to CLOSE.
Comment
SIM JPM C Page 11 of 23 STEP  10  :                                                                        SAT UNSAT Standard:  The Examinee places HIC-62-83A RHR LETDOWN fully CW.                CRITICAL Comment STEP  11  :                                                                        SAT UNSAT Standard:  The Examinee determines SI did not actuate and proceeds to step 4.
Comment STEP  12  :                                                                        SAT UNSAT Standard:  The Examinee places HIC-63-93 CHARGING FLOW CONTROL in CRITICAL MANUAL and zero output. (OPEN)
Comment
SIM JPM C Page 12 of 23 STEP  13  :                                                                            SAT UNSAT Standard:  The Examinee determines Pressurizer Level less than 10% by observing installed instrumentation.
Comment STEP  14  :                                                                            SAT UNSAT Standard:  The Examinee determines RHR was in service by the initial conditions.
Comment STEP  15  :                                                                            SAT UNSAT Standard:  The Examinee addresses the procedure step as N/A.
Comment
SIM JPM C Page 13 of 23 STEP  16  :                                                                          SAT UNSAT Standard:  The Examinee addresses the procedure step.
Cue:      If asked, provide the following cue, Another operator will address this procedure step.
Comment STEP  17  :                                                                          SAT UNSAT Standard:  The Examinee addresses the procedure step.
Cue:      If asked, provide the following cue, Another operator will address this procedure step.
Comment
SIM JPM C Page 14 of 23 STEP    18 :                                                                      SAT UNSAT Standard:  The Examinee determines 1B Charging Pump is in PTL by observing HS-62-104A in PTL.
Comment STEP    19 :                                                                      SAT UNSAT The Examinee determines the 1A Charging Pump is running by Standard:  observing red light above HS-63-108A is ON.
The Examinee dispatches operators to energize CCPIT valves.
Cue:    If asked provide the following cue, Operators have been dispatched to energize CCPIT valves.
Examiner Note:    Direct the simulator operator to energize the CCPIT valves.
The floor operator will remove tags from the CCPIT valve hand Cue:    switches, Time has been compressed, the CCPIT valves tags have been removed.
When the CCPIT valves have been energized provide the following Cue:    cue, Time has been compressed, the CCPIT valves have been energized.
Comment
SIM JPM C Page 15 of 23 STEP  20  :                                                                          SAT UNSAT Standard:  The Examinee determines Safety Injection pumps are in PTL by observing HS-63-10A and HS-63-15A in PTL.
Comment STEP  21  :                                                                          SAT UNSAT Standard:  The Examinee addresses the procedure step.
The floor operator will remove tags from the SI Pump hand switches, Cue:    Time has been compressed, the SI pump tags have been removed.
Comment STEP  22  :                                                                          SAT UNSAT Standard:  The Examinee determines the 1A Charging Pump is running by observing red light above HS-63-108A is ON.
Comment
SIM JPM C Page 16 of 23 STEP  23  :                                                                  SAT UNSAT Standard:  The Examinee determines Pressurizer Level less than 10% by observing installed instrumentation.
Comment STEP  24  :                                                                  SAT UNSAT The Examinee verifies LCV-62-135 and LCV-62-136 OPEN by observing red lights above handswitch ON.
Standard:  AND Verifies LCV-62-132 and LCV-62-133 CLOSED by observing green lights above handswitch ON.
Comment
SIM JPM C Page 17 of 23 STEP    25  :                                                                    SAT UNSAT Standard:  The Examinee places HS-62-91 and HS-62-90 CHARGING FLOW CRITICAL ISOL to CLOSE Comment STEP    26  :                                                                    SAT UNSAT Standard:  The Examinee places HS-62-26 and HS-62-25 CCPIT OUTLET ISOL CRITICAL to OPEN.
Comment STEP  27  :                                                                    SAT UNSAT Standard:  The Examinee places HS-62-39 and HS-62-40 CCPIT INLET ISOL to CRITICAL OPEN.
Comment
SIM JPM C Page 18 of 23 STEP    28 :                                                                          SAT UNSAT Standard:  The Examinee places HIC-63-93 CHARGING FLOW CONTROL in MANUAL and zero output. (If not already performed.)
Examiner Note:    This step was previously performed in JPM step 12.
Comment STEP    29 :                                                                          SAT UNSAT Standard:  The Examinee addresses the procedure step.
Cue:    If asked, provide the following cue, Another operator will address this procedure step.
Comment
SIM JPM C Page 19 of 23 STEP  29  :                                                                      SAT UNSAT The Examinee determines RHR pumps stopped by observing green Standard:  lights above HS-74-10A and HS-74-20A and RHR discharge less than 150 psig by observing plant instrumentation.
Comment STEP  30  :                                                                      SAT UNSAT Standard:  The Examinee addresses the procedure step.
Cue:      If asked, provide the following cue, The SM and STA have been informed.
Comment
SIM JPM C Page 20 of 23 STEP  31  :                                                                          SAT UNSAT Standard:  The Examinee addresses the procedure step.
Cue:    If asked, provide the following cue, Another operator will address this procedure step.
Comment STEP  32  :                                                                          SAT UNSAT Standard:  The Examinee determines ECCS Termination is not met by observing installed plant instrumentation.
Comment
SIM JPM C Page 21 of 23 STEP  33  :                                                                    SAT UNSAT Standard:  The Examinee places HS 68-31A, and 73A RCPs to STOP, (if not CRITICAL already performed.
Comment STEP  34  :                                                                    SAT UNSAT Standard:    The Examinee places HS-30-63A and HS-30-63B PHASE A AND CONTAINMENT VENT ISOL to ACTUATE.
Comment
SIM JPM C Page 22 of 23 ALTERNATE PATH STEP    35  :                                                                            SAT UNSAT The examinee observes all Containment Vent lights NOT GREEN (Not critical) and goes to the RNO.
Standard:                                                                          CRITICAL The Examinee places HS-90-113, HS-90-114, HS-90-115, HS-90-116, HS-90-117, Containment Rad Monitor Isolation and HS-30-14 Containment Purge Isolation to CLOSE Examiner    The Examinee must perform step 35 OR 36 in its entirety to achieve Note:    the minimum standard.
Comment STEP    36  :                                                                            SAT UNSAT The examinee observes all Containment Vent lights NOT GREEN (Not critical) and goes to the RNO.
Standard:                                                                          CRITICAL The Examinee places HS-90-107, HS-90-108, HS-90-109, HS-90-110, HS-90-111, Containment Rad Monitor Isolation and HS-30-15 Containment Purge Isolation to CLOSE Comment Terminating  Provide the following cue, Another operator will complete the STOP Cue:      remaining steps of this procedure.
Stop Time
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit has recently entered Mode 5.
: 2. RCS Temperature is 180o F.
: 3. RCS Pressure is 315 psig.
: 4. Pressurizer Cold Cal level (LI-68-321) is 55%.
: 5. RCPs for Loop 2 and Loop 4 are in service.
: 6. Both Trains of RHR are in service.
: 7. 0-GO-7 UNIT SHUTDOWN FROM HOT STANDBY TO COLD SHUTDOWN is in progress at Section 5.4 Step 5.
INITIATING CUES:
: 1. Respond to plant conditions.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM F
SIM JPM F Page 2 of 15 RO/SRO JOB PERFORMANCE MEASURE Task:              Perform Equipment Checks Following ESF Actuation with a Failure of ESF Slave Relays Task #:            3010010601 Task Standard:      The Examinee will manually start at least one Emergency Gas Treatment System fan and manually start at least one Auxiliary Building Gas Treatment fans using EA-0-1, EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.
Alternate Path:            YES:                NO:        X Time Critical Task:        YES:                NO:        X K/A Reference/Ratings:
Method of Testing:
Simulated Performance:                        Actual Performance:          X Evaluation Method:
Simulator        X      In-Plant                Classroom Main Control Room                                Mock-up Performer:
Trainee Name Evaluator:                                        /
Name / Signature                                        DATE Performance Rating:      SAT:                    UNSAT:
Validation Time:            10 min                            Total Time:
Performance Time:          Start Time:                      Finish Time:
COMMENTS
SIM JPM F Page 3 of 15 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 337
: 3. If IC 337 is not available perform the following:
Reset to IC 16 IOR ZDIHS6523A f:3 IOR ZLOHS6523A_GREEN f:1
{global95[2481]} DOR ZDIHS6523A
{global95[2481]} DOR ZLOHS6523A_GREEN IOR ZDIHS6542A f:3 IOR ZLOHS6542A_GREEN f:1
{global95[2494]} DOR ZDIHS6542A
{global95[2494]} DOR ZLOHS6542A_GREEN IOR ZDIHS30146A f:3 IOR ZLOHS30146A_GREEN f:1 IOR ZLOHS30146AM6_GREEN f:1
{global95[2138]} DOR ZDIHS30146A
{global95[2138]} DOR ZLOHS30146A_GREEN
{global95[2138]} DOR ZLOHS30146AM6_GREEN IOR ZDIHS30157A f:3 IOR ZLOHS30157A_GREEN f:1 IOR ZLOHS30157AM6_GREEN f:1
{global95[7964]} DOR ZDIHS30157A
{global95[7964]} DOR ZLOHS30157A_GREEN
{global95[7964]} DOR ZLOHS30157AM6_GREEN IMF RP04A f:1 Terminate SI.
SIM JPM F Page 4 of 15 Place Letdown in service.
Perform GO-12.
: 4. PLACE SIMULATOR IN RUN
: 5. An extra operator will be required to acknowledge alarms.
: 6. ACKNOWLEDGE ALARMS
: 7. FREEZE SIMULATOR.
: 8. Save as a temporary IC, if repeat runs of JPM will be desired.
: 9. PLACE SIMULATOR IN RUN
: 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
Tools/Equipment/Procedures Needed:
==References:==
Reference                                      Title                                Rev No.
: 1. EA-0-1                  EQUIPMENT CHECKS FOLLOWING ESF ACTUATION                              11 2.
SIM JPM F Page 5 of 15 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.      Unit 1 is in MODE 3.
: 2.      Safety Injection actuated and was terminated.
: 3.      Letdown was placed in service.
INITIATING CUES:
: 1.      You have been directed to perform EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.
: 2.      Inform the SRO when complete.
SIM JPM F Page 6 of 15 Start Time STEP  1  :                                                                  SAT Obtain a copy of EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.                                                        UNSAT Standard:  Examinee obtains a copy of EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.
Comment STEP  2  :                                                                  SAT UNSAT Standard:  The examinee addresses the procedure step.
Comment
SIM JPM F Page 7 of 15 STEP    3  :                                                                  SAT UNSAT Standard:  The Examinee places HS-65-23A and 65-42A Train A and Train B CRITICAL EGTS fans to START.
Comment STEP    4  :                                                                  SAT UNSAT The Examinee determines Annulus Vacuum Fans have stopped by Standard:
observing green lights above HS-65-77A and HS-65-74A ON.
Examiner Note Comment STEP    5  :                                                                  SAT UNSAT Standard:  The Examinee addresses the procedure step as N/A.
Comment
SIM JPM F Page 8 of 15 STEP  6  :                                                                      SAT UNSAT The Examinee determines EGTS Filter A & B  P is between 1 and 7 Standard:
inches of water by observing installed instrumentation.
Comment STEP  7  :                                                                      SAT UNSAT The Examinee determines annulus differential pressure is more Standard:  negative than -0.5 inches of water by observing installed instrumentation.
Comment
SIM JPM F Page 9 of 15 STEP  8  :                                                          SAT UNSAT Standard:  The Examinee determines Unit 2 EGTS Dampers CLOSED by observing green lights above handswitches ON.
Comment STEP  9  :                                                          SAT UNSAT Standard:  The Examinee addresses the procedure step as N/A.
Comment
SIM JPM F Page 10 of 15 STEP  10  :                                                                        SAT UNSAT The Examinee checks Containment Purge stopped by observing green lights above HS-30-1A and HS-30-4A ON.
Standard:
The Examinee checks Incore Instrument Room purge fans stopped by observing green lights above HS-30-4A and HS-30-11A ON.
Cue:      Provide the following cue, Unit 2 Containment Purge is not in service.
Comment STEP  11  :                                                                        SAT UNSAT The Examinee determines Unit 1 and 2 Auxiliary Building General Standard:  Supply fans stopped by observing green lights above handswitch ON or handswitch in PTL.
Comment
SIM JPM F Page 11 of 15 STEP  12  :                                                                        SAT UNSAT The Examinee determines Unit 1 and 2 Auxiliary Building General Standard:  Exhaust fans stopped by observing green lights above handswitch ON or handswitch in PTL.
Comment STEP  13  :                                                                        SAT UNSAT Standard:  The Examinee determines Unit 1 Auxiliary Building Dampers CLOSED by observing green lights above handswitches ON.
Comment
SIM JPM F Page 12 of 15 STEP  14  :                                                                      SAT UNSAT Standard:  The Examinee determines Unit 2 Auxiliary Building Dampers CLOSED by observing green lights above handswitches ON.
Comment STEP  15  :                                                                      SAT UNSAT Standard:  The Examinee determines Cask Loading Area Dampers CLOSED by observing green lights above handswitches ON.
Comment
SIM JPM F Page 13 of 15 STEP  16  :                                                                      SAT UNSAT Standard:  The Examinee determines Fuel Handling Exhaust Fans STOPPED by observing green lights above handswitch ON or handswitch in PTL.
Comment STEP  17  :                                                                      SAT UNSAT Standard:  The Examinee determines Fuel Handling dampers CLOSED by observing green lights above handswitches ON.
Comment STEP  18  :                                                                      SAT UNSAT Standard:  The Examinee places HS-30-146A and HS 30-157A to START.          CRITICAL Comment
SIM JPM F Page 14 of 15 Terminating Provide the following cue, Another operator will complete the STOP Cue:    remaining steps of this procedure.
Stop Time
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 3.
: 2. Safety Injection actuated and was terminated.
: 3. Letdown was placed in service.
INITIATING CUES:
: 1. You have been directed to perform EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM H
SIM JPM H Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task:              Perform CR Actions for Fire in the Auxiliary Building Task #:            3010070401 Task Standard:      The Examinee re-aligns Charging Pump suction to the SI Pump and re-starts Charging Pumps.
Alternate Path:            YES:              NO:        X Time Critical Task:        YES:              NO:        X K/A Reference/Ratings:      APE 067 AA2.17 (3.5/4.3)
Method of Testing:
Simulated Performance:                      Actual Performance:          X Evaluation Method:
Simulator        X      In-Plant              Classroom Main Control Room                              Mock-up Performer:
Trainee Name Evaluator:                                      /
Name / Signature                                    DATE Performance Rating:      SAT:                  UNSAT:
Validation Time:            6 min                          Total Time:
Performance Time:          Start Time:                    Finish Time:
COMMENTS
SIM JPM H Page 3 of 14 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 348
: 3. Place an in-progress copy of AOP-N.08 on the operators desk.
: 4. If IC 348 is not available, perform the following.
: 5. Reset to IC 16 IMF RP04A f:1 PLACE SIMULATOR IN RUN PLACE all RCP handswitches in STOP/PULL TO LOCK.
PLACE all four S/G atmospheric relief valve handswitches in CLOSE.
PLACE atmospheric relief valve controllers in MANUAL with output adjusted to zero.
PLACE MSIV switches in CLOSE.
PLACE all MFW Reg Valve controllers to MANUAL and CLOSE.
PLACE FIC-15-43 S/G Blowdown Flow Controller output adjusted to ZERO.
Place TD AFW in MANUAL at minimum speed.
: 6. An extra operator will be required to acknowledge alarms.
: 7. ACKNOWLEDGE ALARMS
: 8. FREEZE SIMULATOR.
: 9. Save as a temporary IC, if repeat runs of JPM will be desired.
: 10. PLACE SIMULATOR IN RUN
: 11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
Tools/Equipment/Procedures Needed:
==References:==
Reference                                      Title                                Rev No.
: 1. AOP-N.08                APPENDIX R FIRE SAFE SHUTDOWN                                      32 2.
SIM JPM H Page 4 of 14 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.      Unit 1 is in MODE 3.
: 2.      An uncontrolled fire is in Aux Building el. 669 Unit 1 Penetration Room.
: 3.      AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN is in progress, completed through step 6.
INITIATING CUES:
: 1.      You have been directed to perform AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN starting at step 7.
: 2.      Inform the SRO when complete.
SIM JPM H Page 5 of 14 Start Time STEP  1  :                                                                            SAT Obtain a copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN.
UNSAT Standard:  Examinee obtains a copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN.
Cue:      Provide an in progress copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN completed through step 6.
Comment STEP  2  :                                                                            SAT UNSAT Standard:  The examinee goes to step 7.b based on the initial conditions.
Comment
SIM JPM H Page 6 of 14 STEP  3  :                                                                  SAT UNSAT Standard:  The examinee places HS-62-108A and HS-62-104A Charging Pump A CRITICAL and B in PTL.
Comment STEP  4  :                                                                  SAT UNSAT Standard:  The examinee proceeds to step 10.
Comment
SIM JPM H Page 7 of 14 STEP  5  :                                                                    SAT UNSAT The examinee places HS-62-72A, FCV-62-73A, FCV-62-74A Letdown Standard:  Orifice Isolation valves and HS-62-69A, HS-62-70A Letdown Loop CRITICAL Isolation valves to CLOSE.
Comment STEP  6  :                                                                    SAT UNSAT The examinee verifies FCV-62-90 and FCV-62-91 Charging Flow Standard:  Isolation valves closed by observing the green lights above handswitches ON.
Comment
SIM JPM H Page 8 of 14 STEP  7  :                                                                    SAT UNSAT Standard:
Cue:      If asked provide the following cue, The Incident Commander has been recalled to the MCR.
Comment STEP  8  :                                                                    SAT UNSAT Standard:  The examinee addresses the procedure step.
Comment STEP  9  :                                                                    SAT UNSAT Standard:  The examinee proceeds to step 15 based on the initiating cue.
Comment
SIM JPM H Page 9 of 14 STEP  10  :                                                                      SAT UNSAT Standard:  The Examinee proceeds to Section 2.4 based on the initiating cue.
Comment STEP  11  :                                                                      SAT UNSAT Standard:  The examinee addresses the procedure step based on the initiating cue.
Comment
SIM JPM H Page 10 of 14 STEP  12  :                                                                    SAT UNSAT Standard:  The examinee addresses the procedure step.
Cue:      If asked provide the following cue, Operators have been dispatched.
Comment STEP  13  :                                                                    SAT UNSAT The examinee verifies FCV-63-5 and RWST To SIS Pumps Flow Standard:  Control Valve and FCV-63-47 SIS Pump 1A-A Inlet Valve open by observing the red lights above handswitches ON.
Comment
SIM JPM H Page 11 of 14 STEP  14  :                                                                      SAT UNSAT Standard:  The Examinee places 1-FCV-63-6 SIS Pump Inlet To CCP Valve OR CRITICAL 1-FCV-63-7 SIS Pump 1A-A Inlet to CCP Valve to OPEN.
Comment STEP  15  :                                                                      SAT UNSAT Standard:  The examinee addresses the procedure step as N/A.
Comment STEP  15  :                                                                      SAT UNSAT Standard:  The examinee verifies LCV-62-132 and LCV-62-133 VCT Outlet to CCP closed by observing the green lights above handswitches ON.
Comment
SIM JPM H Page 12 of 14 STEP  16  :                                                                        SAT UNSAT The Examinee determines CCPIT valves open by observing red lights Standard:  above HS-63-39A, HS-63-40A, HS-63-26A and HS-63-25 CCPIT INLET/OUTLET ISOL ON.
Comment STEP  17  :                                                                        SAT UNSAT Standard:  The Examinee depresses HS-63-134A AND HS-63-134B.                  CRITICAL Comment
SIM JPM H Page 13 of 14 STEP  18  :                                                                        SAT UNSAT Standard:    The examinee places HS-63-39A and HS-63-40A CCPIT INLET ISOL CRITICAL OR HS-63-26A and HS-63-25 CCPIT OUTLET ISOL to CLOSE.
Comment STEP  19  :                                                                        SAT UNSAT Standard:    The examinee places HS-62-108A Charging Pump A OR HS-62-104A CRITICAL Charging Pump B to START.
Comment Terminating  Provide the following cue, another operator will complete the Cue:                                                                            STOP remaining steps of this procedure.
Stop Time
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 3.
: 2. An uncontrolled fire is in Aux Building el. 669 Unit 1 Penetration Room.
: 3. AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN is in progress, completed through step 6.
INITIATING CUES:
: 1. You have been directed to perform AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN starting at step 7.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.}}

Latest revision as of 07:40, 4 November 2019

Initial Exam 2013-302 Final Sim In-Plant Jpms
ML14080A046
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/21/2014
From:
NRC/RGN-II
To:
Tennessee Valley Authority
Shared Package
ML14080A058 List:
References
50-327/13-302, 50-328/13-302
Download: ML14080A046 (146)


Text

SEQUOYAH NUCLEAR PLANT 1311 NRC PLANT JPM J

PLANT JPM J Page 2 of 15 RO/SRO JOB PERFORMANCE MEASURE Task: Local Alignment of 2-RM-90-112 to Lower Containment Task #: 0730990101 Task Standard: The Examinee manually starts a sample pump and aligns 2-RM-90-112 to Lower Containment.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 002 A3.01 (3.7/3.9)

Method of Testing:

Simulated Performance: X Actual Performance:

Evaluation Method:

Simulator In-Plant X Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 15 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

PLANT JPM J Page 3 of 15 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

1. 2-SO-90-2, Sections 5.1 and 8.3

References:

Reference Title Rev No.

2-SO-90-2 Gaseous Process Radiation Monitoring 37 System

========================================================================

READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 2 is in MODE 1.
2. 2-RM-90-112 had been isolated and tagged electrically for maintenance. The Hold Order has been picked up from the breaker, Checklist 2-90-2.03 attachment 3 is complete, but the pumps are off.
3. 2-RM-90-106 has just tripped and neither of its associated pumps can be started.
4. Section 3 and 4 of 2-SO-90-2 Gaseous Process Radiation Monitoring System, is complete.
5. I&C is available for support as required.

INITIATING CUES:

1. The Control Room has directed you to start a sample pump and align monitor 2-RM-90-112 to sample lower containment using 2-SO-90-2, Section 8.3 steps 1 through 4.
2. Inform the Control Room when complete.

PLANT JPM J Page 4 of 15 Start Time STEP 1  : SAT Obtain a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System. UNSAT Standard: Examinee obtains a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System.

Cue Provide a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System section 8.3.

Comment STEP 2  : SAT UNSAT Standard: The Examinee addresses the procedure step as being complete in the initial conditions.

Comment

PLANT JPM J Page 5 of 15 STEP 3  : SAT UNSAT The Examinee determines a sample pump for 2-RM-90-112 is not Standard:

running and goes to section 5.1.

Provide the following cue, No noise in coming from the area of the Cue:

pump.

Cue: Provide a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System section 5.1.

Comment STEP 4  : SAT UNSAT Standard: The Examinee selects 2-RM-90-112 based on the initiating cue.

Comment

PLANT JPM J Page 6 of 15 STEP 5  : SAT UNSAT The Examinee determines the valve checklist is complete for 2-RM Standard:

112 based on the initial conditions.

Comment STEP 6  : SAT UNSAT The Examinee determines the step is N/A based on the initial Standard:

conditions.

Comment

PLANT JPM J Page 7 of 15 STEP 7  : SAT UNSAT The Examinee simulates placing 2-HS-90-112, Heat Trace for 2-RM-Standard: CRITICAL 90-112 to ON (LEFT).

Provide the following cue, 2-HS-90-112, Heat Trace for 2-RM-90-112 Cue 1:

to the right. (OFF)

If asked provide the following cue, Amber light for RM-90-112 on Cue 2:

Heat Trace Control Panel [2-JBOX-90-3919] is ON.

Comment STEP 8  : SAT UNSAT Standard: The Examinee addresses the step as N/A.

Cue: Provide the following cue, Testing is not required Comment

PLANT JPM J Page 8 of 15 STEP 9  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Provide the following cue, The Unit 2 Control Room has contacted Cue:

I&C.

Comment STEP 10  : SAT UNSAT The Examinee simulates depressing 2-HS-90-112A or 2-HS-90-112B, Standard: CRITICAL Sample pump for 2-RM-90-112 to ON.

Provide the following cue, 2-HS-90-112A (2-HS-90-112B) BLACK Cue 1:

switch is recessed.

If asked provide the following cue, You hear a rotational Cue 2:

mechanical sound from the vicinity of the sample pump.

Comment

PLANT JPM J Page 9 of 15 STEP 11  : SAT UNSAT Standard: The Examinee addresses the step as N/A.

Comment STEP 12  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked provide the following cue, I&C has been informed.

Comment

PLANT JPM J Page 10 of 15 STEP 13  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked provide the following cue, Flow has been established.

Comment STEP 14  : SAT UNSAT The Examinee simulates resetting local low flow seal-in by turning [2-Standard: CRITICAL HS-90-112F] to the right to RESET.

Comment

PLANT JPM J Page 11 of 15 STEP 15  : SAT UNSAT Standard: The Examinee addresses the procedure step.

If asked provide the following cue, Alarms on Panel 0-XA-55-12D Cue:

Windows A-2 and A-3 are dark.

Comment STEP 16  : SAT UNSAT Standard: The Examinee addresses the step as N/A.

Comment

PLANT JPM J Page 12 of 15 STEP 17  : SAT UNSAT Standard: The Examinee addresses the step as N/A.

Provide the following cue, Background count rate is greater than Cue:

9,000 cpm.

Examiner The Examinee returns to section 8.3 step 1[c].

Note:

Comment STEP 18  : SAT UNSAT Standard: The Examinee addresses the procedure step Examiner Note: The heat tracing was placed in service in JPM step 7.

Comment

PLANT JPM J Page 13 of 15 STEP 19  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked provide the following cue, Testing of the heat trace is not required.

Comment STEP 20  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Provide the following cue, Background count rate is greater than Cue:

9,000 cpm.

Comment Examiner Note

PLANT JPM J Page 14 of 15 STEP 21  : SAT UNSAT Standard: The Examinee simulates opening 1-ISIV-90-283G by indicating CRITICAL handwheel turned as far left (counter-clockwise) as possible.

Cue: If asked provide the following cue, The valve HW turns several turns CCW and movement has stopped.

Comment Terminating The task is complete when the Examinee returns the cue sheet to Cue: STOP the Examiner.

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 2 is in MODE 1.
2. 2-RM-90-112 had been isolated and tagged electrically for maintenance. The Hold Order has been picked up from the breaker, Checklist 2-90-2.03 attachment 3 is complete, but the pumps are off.
3. 2-RM-90-106 has just tripped and neither of its associated pumps can be started.
4. Section 3 and 4 of 2-SO-90-2 Gaseous Process Radiation Monitoring System, is complete.
5. I&C is available for support as required.

INITIATING CUES:

1. The Control Room has directed you to start a sample pump and align monitor 2-RM-90-112 to sample lower containment using 2-SO-90-2, Section 8.3 steps 1 through 4.
2. Inform the Control Room when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM B

SIM JPM B Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task: Vent an unisolable Cold Leg Accumulator.

Task #: 0060060101 Task Standard: The examinee vents the #4 Cold Leg Accumulator using EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: 006 A4.02 (4.0/3.8)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 8 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM B Page 3 of 14 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 350
3. If IC 350 is not available perform the following.

Reset to IC 24 Complete ES-1.3 Transfer to RHR Containment Sump.

IOR ZDIHS6367A f:0 IRF IAR06 f:2 IRF SIR01 f:1

4. PLACE SIMULATOR IN RUN
5. Place MODE 1 sign on the simulator.
6. Place an in-progress copy of E-1 on the operators desk.
7. An extra operator will be required to acknowledge alarms.
8. ACKNOWLEDGE ALARMS
9. FREEZE SIMULATOR.
10. Save as a temporary IC, if repeat runs of JPM will be desired.
11. PLACE SIMULATOR IN RUN
12. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
13. When directed enter IRF IAR06 f:2 to supply non-essential air to the containment.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. EA-63-1 VENTING UNISOLATED COLD LEG ACCUMULATOR. 0 2.

SIM JPM B Page 4 of 14 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 was in MODE 1 prior to an event.
2. The event is still in progress.
3. E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16.

INITIATING CUES:

1. You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17.
2. Inform the SRO when complete.

SIM JPM B Page 5 of 14 Start Time STEP 1  : SAT Obtain a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT. UNSAT Standard: Examinee obtains a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.

Cue: Provide an in progress copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.

Comment STEP 2  : SAT UNSAT Standard: The examinee determines RHR Spray will not be placed in service and proceeds to step 18.

Cue: If asked provide the following cue, It has been greater than one hour since shutdown.

Comment

SIM JPM B Page 6 of 14 STEP 3  : SAT UNSAT Standard: The examinee determines RCS pressure is less than 100 psig by observing installed instrumentation.

Comment STEP 4  : SAT UNSAT Standard: The examinee determines dispatches personnel to restore power to the CLA Isolation valves.

Cue: Provide the following cue, Time has been compressed, power has been restored to the CLA Isolation valves.

Comment STEP 5  : SAT UNSAT Standard: Examinee depresses HS-63-134A and HS-63-134B SIS RESET TRAIN 1A and 1B.

Comment

SIM JPM B Page 7 of 14 STEP 6  : SAT UNSAT Standard: The examinee places HS-63-118A,63-98A, 63-80A and HS-63-67A NO CRITICAL 1, 2, and 3 CL ACCUM OUTLET ISOL to CLOSE.

Comment ALTERNATE PATH STEP 7  : SAT UNSAT Standard: The examinee places HS-63-67A NO 4 CL ACCUM OUTLET ISOL to CLOSE, observes RED light above HS and proceeds to the RNO.

Comment

SIM JPM B Page 8 of 14 STEP 8  : SAT UNSAT Standard: The examinee places HS-63-67A NO 4 CL ACCUM OUTLET ISOL to CLOSE, observes RED light above HS and proceeds to the RNO.

Cue: Booth operator when asked provide the following cue, Time has been compressed, FCV-63-67 cannot be closed electrically.

Cue: When asked provide the following cue, TSC has determined CLA #4 should be vented.

Comment

SIM JPM B Page 9 of 14 STEP 9  : ALTERNATE PATH SAT UNSAT Standard: The examinee depresses HS-30-64D and HS-30-64D PHASE B ISOL CRITICAL RESET TR-A and TR-B.

Comment STEP 10  : SAT UNSAT Standard: The examinee addresses the procedure step.

Cue: Direct the simulator operator to align Non-Essential Control Air to the Containment.

Cue: Booth operator when directed enter IRF IAR06 f:2 to supply non-essential air to the containment.

Booth operator when asked provide the following cue, Time has been Cue: compressed, Non-Essential Air has been supplied to the Containment.

Comment

SIM JPM B Page 10 of 14 STEP 11  : SAT UNSAT Standard: The examinee goes to EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.

Comment STEP 12  : SAT Obtain a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR. UNSAT Standard: Examinee obtains a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.

Comment STEP 13  : SAT UNSAT Standard: The examinee addresses the procedure step.

Comment

SIM JPM B Page 11 of 14 STEP 14  : SAT UNSAT Standard: The examinee simultaneously depresses HS-30-64D and HS-30-64D PHASE B ISOL RESET TR-A and TR-B.

Examiner Note The examinee reset Containment Isolation Phase B in JPM Step 9.

Comment STEP 15  : SAT UNSAT Standard: The examinee addresses the procedure step.

Cue: Provide the following cue, Time has been compressed, Non-Essential Air has been supplied to the Containment.

Examiner Note The examinee reset Containment Isolation Phase B in JPM Step 10.

Comment

SIM JPM B Page 12 of 14 STEP 16  : SAT UNSAT Standard: The examinee verifies valves closed by observing green lights above valve handswitches ON.

Comment STEP 17  : SAT UNSAT Standard: The examinee rotates HIC-63-65 CL ACCUM N2 HDR VENT FLOW CRITICAL CONTROL fully CCW.

Comment STEP 18  : SAT UNSAT Standard: The examinee places HS-63-63A NO 4 CL ACCUM N2 SUPPLY ISOL CRITICAL to OPEN.

Comment

SIM JPM B Page 13 of 14 Terminating Provide the following cue, Another operator will address the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 was in MODE 1 prior to an event.
2. The event is still in progress.
3. E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16.

INITIATING CUES:

1. You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM C

SIM JPM C Page 2 of 23 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to a Shutdown LOCA Task #: 3210330301 Task Standard: The examinee will align Charging to the CCPIT and initiate a Containment Vent Isolation by closing individual valves in response to a LOCA while in MODE 5 and RHR in service.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE 011 EA 2.04 (3.8/4.0)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 25 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM C Page 3 of 23 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 349
3. If IC 349 is not available, perform the following:

Reset to IC 36 Run scenario file 1311 NRC JPM C Remove power form CCPIT valves IRF CVR12 f:0 Remove power form CCPIT valves IRF CVR14 f:0

4. Place Red Hold Orders on CLA valves: FCV-63-118, -98, -80, & -67 Containment Spray valves: FCV-72-39, -2, -40, -41, -23, -20, Containment Spray Pumps HS-72 -27A, & 72-10A CCPIT valves: FCV-63-25, -26, -39, & -40
5. Place the following in PTL and hang red tags on the following:

1B CCP HS-62-104A 1A SIP HS-63-10A 1B SIP HS-63-15A

6. Place Yellow Caution Orders on:

Cold Leg Injection valves: FCV-63-93, & -94 SI Hot leg Injection Valves: FCV-63 -156, -157, & -172 Makeup to Accumulators from SI FCV-63-23 Suction to RHR Pumps from RWST 63-1 RHR Hx Valves 74-16 and 74-28 (flow limiting blocks installed)

7. PLACE SIMULATOR IN RUN
8. Place Mode 5 placard on panels.
9. Place A Train Week sign on the simulator.
10. Change valve FCV-74-1 and FCV-74-1 plaque on M5 to reflect power ON and valve OPEN.
11. An extra operator will be required to acknowledge alarms.

SIM JPM C Page 4 of 23

12. ACKNOWLEDGE ALARMS
13. FREEZE SIMULATOR.
14. PLACE SIMULATOR IN RUN
15. When directed IMF TH01D f:0.1 k:1 to initiate LOCA
16. When directed IRF CVR12 f:1 and IRF CVR14 f:1 k:2 to energize CCPIT valves Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. AOP-R.02 SHUTDOWN LOCA 18 2.

SIM JPM C Page 5 of 23 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit has recently entered Mode 5.
2. RCS Temperature is 180o F.
3. RCS Pressure is 315 psig.
4. Pressurizer Cold Cal level (LI-68-321) is 55%.
5. RCPs for Loop 2 and Loop 4 are in service.
6. Both Trains of RHR are in service.
7. 0-GO-7 UNIT SHUTDOWN FROM HOT STANDBY TO COLD SHUTDOWN is in progress at Section 5.4 Step 5.

INITIATING CUES:

1. Respond to plant conditions.

SIM JPM C Page 6 of 23 Start Time STEP 1  : SAT UNSAT Standard: Examinee transitions to AOP-R.02, SHUTDOWN LOCA If required direct the Simulator Operator to initiate the following cue, Cue: There is a large leak in lower containment, I cannot see where the leak is coming from.

Examiner The Examinee may go directly to AOP-R.02, SHUTDOWN LOCA on Note: JPM step 2.

Comment

SIM JPM C Page 7 of 23 STEP 2  : SAT Obtain a copy of AOP-R.02, SHUTDOWN LOCA UNSAT Standard: Examinee obtains a copy of AOP-R.02, SHUTDOWN LOCA Comment STEP 3  : SAT UNSAT Standard: The Examinee places HS68-31A, and 73A RCPs to STOP when CRITICAL RCP trip criteria is reached.

Comment

SIM JPM C Page 8 of 23 STEP 4  : SAT UNSAT Standard: The Examinee determines RHR SUCTION FROM LOOP 4 HL OPEN by observing red lights above handswitches ON.

Comment STEP 5  : SAT UNSAT The Examinee determines Pressurizer Level less than 10% by Standard:

observing installed instrumentation.

Comment

SIM JPM C Page 9 of 23 STEP 6  : SAT UNSAT Standard: The Examinee places HS-74-10A and HS-74-20A RHR Pumps to CRITICAL PTL.

Comment STEP 7  : SAT UNSAT The Examinee places HS-74-1A or HS-74-2A RHR SUCTION FROM LOOP 4 HL to CLOSE.

Standard: AND CRITICAL The Examinee places HS-74-33A or HS-74-35A RHR HX 1A and 1B CROSSTIE ISOL to CLOSE Comment

SIM JPM C Page 10 of 23 STEP 8  : SAT UNSAT The Examinee determines LETDOWN OREFICE ISOLATION valves Standard: CLOSED by observing green lights above handswitches ON. The Examinee may place the handswitches to CLOSE.

Comment STEP 9  : SAT UNSAT The Examinee determines LETDOWN ISOLATION valves CLOSED Standard: by observing green lights above handswitches ON. The Examinee may place the handswitches to CLOSE.

Comment

SIM JPM C Page 11 of 23 STEP 10  : SAT UNSAT Standard: The Examinee places HIC-62-83A RHR LETDOWN fully CW. CRITICAL Comment STEP 11  : SAT UNSAT Standard: The Examinee determines SI did not actuate and proceeds to step 4.

Comment STEP 12  : SAT UNSAT Standard: The Examinee places HIC-63-93 CHARGING FLOW CONTROL in CRITICAL MANUAL and zero output. (OPEN)

Comment

SIM JPM C Page 12 of 23 STEP 13  : SAT UNSAT Standard: The Examinee determines Pressurizer Level less than 10% by observing installed instrumentation.

Comment STEP 14  : SAT UNSAT Standard: The Examinee determines RHR was in service by the initial conditions.

Comment STEP 15  : SAT UNSAT Standard: The Examinee addresses the procedure step as N/A.

Comment

SIM JPM C Page 13 of 23 STEP 16  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked, provide the following cue, Another operator will address this procedure step.

Comment STEP 17  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked, provide the following cue, Another operator will address this procedure step.

Comment

SIM JPM C Page 14 of 23 STEP 18 : SAT UNSAT Standard: The Examinee determines 1B Charging Pump is in PTL by observing HS-62-104A in PTL.

Comment STEP 19 : SAT UNSAT The Examinee determines the 1A Charging Pump is running by Standard: observing red light above HS-63-108A is ON.

The Examinee dispatches operators to energize CCPIT valves.

Cue: If asked provide the following cue, Operators have been dispatched to energize CCPIT valves.

Examiner Note: Direct the simulator operator to energize the CCPIT valves.

The floor operator will remove tags from the CCPIT valve hand Cue: switches, Time has been compressed, the CCPIT valves tags have been removed.

When the CCPIT valves have been energized provide the following Cue: cue, Time has been compressed, the CCPIT valves have been energized.

Comment

SIM JPM C Page 15 of 23 STEP 20  : SAT UNSAT Standard: The Examinee determines Safety Injection pumps are in PTL by observing HS-63-10A and HS-63-15A in PTL.

Comment STEP 21  : SAT UNSAT Standard: The Examinee addresses the procedure step.

The floor operator will remove tags from the SI Pump hand switches, Cue: Time has been compressed, the SI pump tags have been removed.

Comment STEP 22  : SAT UNSAT Standard: The Examinee determines the 1A Charging Pump is running by observing red light above HS-63-108A is ON.

Comment

SIM JPM C Page 16 of 23 STEP 23  : SAT UNSAT Standard: The Examinee determines Pressurizer Level less than 10% by observing installed instrumentation.

Comment STEP 24  : SAT UNSAT The Examinee verifies LCV-62-135 and LCV-62-136 OPEN by observing red lights above handswitch ON.

Standard: AND Verifies LCV-62-132 and LCV-62-133 CLOSED by observing green lights above handswitch ON.

Comment

SIM JPM C Page 17 of 23 STEP 25  : SAT UNSAT Standard: The Examinee places HS-62-91 and HS-62-90 CHARGING FLOW CRITICAL ISOL to CLOSE Comment STEP 26  : SAT UNSAT Standard: The Examinee places HS-62-26 and HS-62-25 CCPIT OUTLET ISOL CRITICAL to OPEN.

Comment STEP 27  : SAT UNSAT Standard: The Examinee places HS-62-39 and HS-62-40 CCPIT INLET ISOL to CRITICAL OPEN.

Comment

SIM JPM C Page 18 of 23 STEP 28 : SAT UNSAT Standard: The Examinee places HIC-63-93 CHARGING FLOW CONTROL in MANUAL and zero output. (If not already performed.)

Examiner Note: This step was previously performed in JPM step 12.

Comment STEP 29 : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked, provide the following cue, Another operator will address this procedure step.

Comment

SIM JPM C Page 19 of 23 STEP 29  : SAT UNSAT The Examinee determines RHR pumps stopped by observing green Standard: lights above HS-74-10A and HS-74-20A and RHR discharge less than 150 psig by observing plant instrumentation.

Comment STEP 30  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked, provide the following cue, The SM and STA have been informed.

Comment

SIM JPM C Page 20 of 23 STEP 31  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked, provide the following cue, Another operator will address this procedure step.

Comment STEP 32  : SAT UNSAT Standard: The Examinee determines ECCS Termination is not met by observing installed plant instrumentation.

Comment

SIM JPM C Page 21 of 23 STEP 33  : SAT UNSAT Standard: The Examinee places HS68-31A, and 73A RCPs to STOP, (if not CRITICAL already performed.

Comment STEP 34  : SAT UNSAT Standard: The Examinee places HS-30-63A and HS-30-63B PHASE A AND CONTAINMENT VENT ISOL to ACTUATE.

Comment

SIM JPM C Page 22 of 23 ALTERNATE PATH STEP 35  : SAT UNSAT The examinee observes all Containment Vent lights NOT GREEN (Not critical) and goes to the RNO.

Standard: CRITICAL The Examinee places HS-90-113, HS-90-114, HS-90-115, HS-90-116, HS-90-117, Containment Rad Monitor Isolation and HS-30-14 Containment Purge Isolation to CLOSE Examiner The Examinee must perform step 35 OR 36 in its entirety to achieve Note: the minimum standard.

Comment STEP 36  : SAT UNSAT The examinee observes all Containment Vent lights NOT GREEN (Not critical) and goes to the RNO.

Standard: CRITICAL The Examinee places HS-90-107, HS-90-108, HS-90-109, HS-90-110, HS-90-111, Containment Rad Monitor Isolation and HS-30-15 Containment Purge Isolation to CLOSE Comment Terminating Provide the following cue, Another operator will complete the STOP Cue: remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit has recently entered Mode 5.
2. RCS Temperature is 180o F.
3. RCS Pressure is 315 psig.
4. Pressurizer Cold Cal level (LI-68-321) is 55%.
5. RCPs for Loop 2 and Loop 4 are in service.
6. Both Trains of RHR are in service.
7. 0-GO-7 UNIT SHUTDOWN FROM HOT STANDBY TO COLD SHUTDOWN is in progress at Section 5.4 Step 5.

INITIATING CUES:

1. Respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM F

SIM JPM F Page 2 of 15 RO/SRO JOB PERFORMANCE MEASURE Task: Perform Equipment Checks Following ESF Actuation with a Failure of ESF Slave Relays Task #: 3010010601 Task Standard: The Examinee will manually start at least one Emergency Gas Treatment System fan and manually start at least one Auxiliary Building Gas Treatment fans using EA-0-1, EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings:

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 10 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM F Page 3 of 15 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 337
3. If IC 337 is not available perform the following:

Reset to IC 16 IOR ZDIHS6523A f:3 IOR ZLOHS6523A_GREEN f:1

{global95[2481]} DOR ZDIHS6523A

{global95[2481]} DOR ZLOHS6523A_GREEN IOR ZDIHS6542A f:3 IOR ZLOHS6542A_GREEN f:1

{global95[2494]} DOR ZDIHS6542A

{global95[2494]} DOR ZLOHS6542A_GREEN IOR ZDIHS30146A f:3 IOR ZLOHS30146A_GREEN f:1 IOR ZLOHS30146AM6_GREEN f:1

{global95[2138]} DOR ZDIHS30146A

{global95[2138]} DOR ZLOHS30146A_GREEN

{global95[2138]} DOR ZLOHS30146AM6_GREEN IOR ZDIHS30157A f:3 IOR ZLOHS30157A_GREEN f:1 IOR ZLOHS30157AM6_GREEN f:1

{global95[7964]} DOR ZDIHS30157A

{global95[7964]} DOR ZLOHS30157A_GREEN

{global95[7964]} DOR ZLOHS30157AM6_GREEN IMF RP04A f:1 Terminate SI.

SIM JPM F Page 4 of 15 Place Letdown in service.

Perform GO-12.

4. PLACE SIMULATOR IN RUN
5. An extra operator will be required to acknowledge alarms.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Save as a temporary IC, if repeat runs of JPM will be desired.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION 11 2.

SIM JPM F Page 5 of 15 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. Safety Injection actuated and was terminated.
3. Letdown was placed in service.

INITIATING CUES:

1. You have been directed to perform EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.
2. Inform the SRO when complete.

SIM JPM F Page 6 of 15 Start Time STEP 1  : SAT Obtain a copy of EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION. UNSAT Standard: Examinee obtains a copy of EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.

Comment STEP 2  : SAT UNSAT Standard: The examinee addresses the procedure step.

Comment

SIM JPM F Page 7 of 15 STEP 3  : SAT UNSAT Standard: The Examinee places HS-65-23A and 65-42A Train A and Train B CRITICAL EGTS fans to START.

Comment STEP 4  : SAT UNSAT The Examinee determines Annulus Vacuum Fans have stopped by Standard:

observing green lights above HS-65-77A and HS-65-74A ON.

Examiner Note Comment STEP 5  : SAT UNSAT Standard: The Examinee addresses the procedure step as N/A.

Comment

SIM JPM F Page 8 of 15 STEP 6  : SAT UNSAT The Examinee determines EGTS Filter A & B P is between 1 and 7 Standard:

inches of water by observing installed instrumentation.

Comment STEP 7  : SAT UNSAT The Examinee determines annulus differential pressure is more Standard: negative than -0.5 inches of water by observing installed instrumentation.

Comment

SIM JPM F Page 9 of 15 STEP 8  : SAT UNSAT Standard: The Examinee determines Unit 2 EGTS Dampers CLOSED by observing green lights above handswitches ON.

Comment STEP 9  : SAT UNSAT Standard: The Examinee addresses the procedure step as N/A.

Comment

SIM JPM F Page 10 of 15 STEP 10  : SAT UNSAT The Examinee checks Containment Purge stopped by observing green lights above HS-30-1A and HS-30-4A ON.

Standard:

The Examinee checks Incore Instrument Room purge fans stopped by observing green lights above HS-30-4A and HS-30-11A ON.

Cue: Provide the following cue, Unit 2 Containment Purge is not in service.

Comment STEP 11  : SAT UNSAT The Examinee determines Unit 1 and 2 Auxiliary Building General Standard: Supply fans stopped by observing green lights above handswitch ON or handswitch in PTL.

Comment

SIM JPM F Page 11 of 15 STEP 12  : SAT UNSAT The Examinee determines Unit 1 and 2 Auxiliary Building General Standard: Exhaust fans stopped by observing green lights above handswitch ON or handswitch in PTL.

Comment STEP 13  : SAT UNSAT Standard: The Examinee determines Unit 1 Auxiliary Building Dampers CLOSED by observing green lights above handswitches ON.

Comment

SIM JPM F Page 12 of 15 STEP 14  : SAT UNSAT Standard: The Examinee determines Unit 2 Auxiliary Building Dampers CLOSED by observing green lights above handswitches ON.

Comment STEP 15  : SAT UNSAT Standard: The Examinee determines Cask Loading Area Dampers CLOSED by observing green lights above handswitches ON.

Comment

SIM JPM F Page 13 of 15 STEP 16  : SAT UNSAT Standard: The Examinee determines Fuel Handling Exhaust Fans STOPPED by observing green lights above handswitch ON or handswitch in PTL.

Comment STEP 17  : SAT UNSAT Standard: The Examinee determines Fuel Handling dampers CLOSED by observing green lights above handswitches ON.

Comment STEP 18  : SAT UNSAT Standard: The Examinee places HS-30-146A and HS 30-157A to START. CRITICAL Comment

SIM JPM F Page 14 of 15 Terminating Provide the following cue, Another operator will complete the STOP Cue: remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. Safety Injection actuated and was terminated.
3. Letdown was placed in service.

INITIATING CUES:

1. You have been directed to perform EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM H

SIM JPM H Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task: Perform CR Actions for Fire in the Auxiliary Building Task #: 3010070401 Task Standard: The Examinee re-aligns Charging Pump suction to the SI Pump and re-starts Charging Pumps.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: APE 067 AA2.17 (3.5/4.3)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 6 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM H Page 3 of 14 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 348
3. Place an in-progress copy of AOP-N.08 on the operators desk.
4. If IC 348 is not available, perform the following.
5. Reset to IC 16 IMF RP04A f:1 PLACE SIMULATOR IN RUN PLACE all RCP handswitches in STOP/PULL TO LOCK.

PLACE all four S/G atmospheric relief valve handswitches in CLOSE.

PLACE atmospheric relief valve controllers in MANUAL with output adjusted to zero.

PLACE MSIV switches in CLOSE.

PLACE all MFW Reg Valve controllers to MANUAL and CLOSE.

PLACE FIC-15-43 S/G Blowdown Flow Controller output adjusted to ZERO.

Place TD AFW in MANUAL at minimum speed.

6. An extra operator will be required to acknowledge alarms.
7. ACKNOWLEDGE ALARMS
8. FREEZE SIMULATOR.
9. Save as a temporary IC, if repeat runs of JPM will be desired.
10. PLACE SIMULATOR IN RUN
11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN 32 2.

SIM JPM H Page 4 of 14 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. An uncontrolled fire is in Aux Building el. 669 Unit 1 Penetration Room.
3. AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN is in progress, completed through step 6.

INITIATING CUES:

1. You have been directed to perform AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN starting at step 7.
2. Inform the SRO when complete.

SIM JPM H Page 5 of 14 Start Time STEP 1  : SAT Obtain a copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN.

UNSAT Standard: Examinee obtains a copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN.

Cue: Provide an in progress copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN completed through step 6.

Comment STEP 2  : SAT UNSAT Standard: The examinee goes to step 7.b based on the initial conditions.

Comment

SIM JPM H Page 6 of 14 STEP 3  : SAT UNSAT Standard: The examinee places HS-62-108A and HS-62-104A Charging Pump A CRITICAL and B in PTL.

Comment STEP 4  : SAT UNSAT Standard: The examinee proceeds to step 10.

Comment

SIM JPM H Page 7 of 14 STEP 5  : SAT UNSAT The examinee places HS-62-72A, FCV-62-73A, FCV-62-74A Letdown Standard: Orifice Isolation valves and HS-62-69A, HS-62-70A Letdown Loop CRITICAL Isolation valves to CLOSE.

Comment STEP 6  : SAT UNSAT The examinee verifies FCV-62-90 and FCV-62-91 Charging Flow Standard: Isolation valves closed by observing the green lights above handswitches ON.

Comment

SIM JPM H Page 8 of 14 STEP 7  : SAT UNSAT Standard:

Cue: If asked provide the following cue, The Incident Commander has been recalled to the MCR.

Comment STEP 8  : SAT UNSAT Standard: The examinee addresses the procedure step.

Comment STEP 9  : SAT UNSAT Standard: The examinee proceeds to step 15 based on the initiating cue.

Comment

SIM JPM H Page 9 of 14 STEP 10  : SAT UNSAT Standard: The Examinee proceeds to Section 2.4 based on the initiating cue.

Comment STEP 11  : SAT UNSAT Standard: The examinee addresses the procedure step based on the initiating cue.

Comment

SIM JPM H Page 10 of 14 STEP 12  : SAT UNSAT Standard: The examinee addresses the procedure step.

Cue: If asked provide the following cue, Operators have been dispatched.

Comment STEP 13  : SAT UNSAT The examinee verifies FCV-63-5 and RWST To SIS Pumps Flow Standard: Control Valve and FCV-63-47 SIS Pump 1A-A Inlet Valve open by observing the red lights above handswitches ON.

Comment

SIM JPM H Page 11 of 14 STEP 14  : SAT UNSAT Standard: The Examinee places 1-FCV-63-6 SIS Pump Inlet To CCP Valve OR CRITICAL 1-FCV-63-7 SIS Pump 1A-A Inlet to CCP Valve to OPEN.

Comment STEP 15  : SAT UNSAT Standard: The examinee addresses the procedure step as N/A.

Comment STEP 15  : SAT UNSAT Standard: The examinee verifies LCV-62-132 and LCV-62-133 VCT Outlet to CCP closed by observing the green lights above handswitches ON.

Comment

SIM JPM H Page 12 of 14 STEP 16  : SAT UNSAT The Examinee determines CCPIT valves open by observing red lights Standard: above HS-63-39A, HS-63-40A, HS-63-26A and HS-63-25 CCPIT INLET/OUTLET ISOL ON.

Comment STEP 17  : SAT UNSAT Standard: The Examinee depresses HS-63-134A AND HS-63-134B. CRITICAL Comment

SIM JPM H Page 13 of 14 STEP 18  : SAT UNSAT Standard: The examinee places HS-63-39A and HS-63-40A CCPIT INLET ISOL CRITICAL OR HS-63-26A and HS-63-25 CCPIT OUTLET ISOL to CLOSE.

Comment STEP 19  : SAT UNSAT Standard: The examinee places HS-62-108A Charging Pump A OR HS-62-104A CRITICAL Charging Pump B to START.

Comment Terminating Provide the following cue, another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. An uncontrolled fire is in Aux Building el. 669 Unit 1 Penetration Room.
3. AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN is in progress, completed through step 6.

INITIATING CUES:

1. You have been directed to perform AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN starting at step 7.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.