ML17266A087: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17266A087
| number = ML17266A087
| issue date = 07/27/1979
| issue date = 07/27/1979
| title = LER 79-022/03L-0 on 790627:During Periodic Surveillance, Testing Auxiliary Feedwater Pump Failed to Start.Cause Could Not Be Determined.Condensation in Steam Line May Have Delayed Starting Enough to Mislead Operator
| title = LER 79-022/03L-0 on 790627:during Periodic Surveillance, Testing Auxiliary Feedwater Pump Failed to Start.Cause Could Not Be Determined.Condensation in Steam Line May Have Delayed Starting Enough to Mislead Operator
| author name = SCHOPPMAN M A
| author name = Schoppman M
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 15: Line 15:
| page count = 3
| page count = 3
}}
}}
=Text=
{{#Wiki_filter:NRC FORM 568                                                                                                                                    U. S NUCLEAR RKCULATORY COMMISSION P.TT l
                                                                              'LICE')SEE EVENT REPORT
                                                                                              '~O CONTROL SLCCX:                              I      I          I      )QI                  )PI EASE PRINT CR TYPS ALL RECUIREO INFOR7>>IATIONI 1      a    9        UCLVSEE CQQE I
                                                      'IQ                  l            !  !
UCSHSE r
                                                                                                    !      I" VMS ER i5 Q'~lt IQ~Q 9      L.C<<VSc TYDc I
                                                                                                                                                                          <<O CON'T BZa                "...;:        m!0
                                  $O            61 I
OOCICET 'IUMSC I          Aa      63    ''VENT Q*TE                    14      15 7I2 I 7I 7I9 REI>>CRT OA>> c EVENT OESCRIPTION ANO DROSABLE CONSSCUENCcS QIO During eriodic surveillance testin                                                                re                              or                    Soecificatio
~o    3            3    7.2..2            auxiliar                    feedwate                                                                                                          I I pump was aligned to the "B" steam su                                                                1 .        The      stea,
~o    5,          ferred to the "A" side                                        and        t                                                                                Subse      uentl the steam supply was returned to the "B" side                                                                            the          umo        started and the
                                                                                                  ~0 surveillance test performed satisfactoril                                                                  .      This was              the ei hth occur-
~o 1
a 5 5 rence            for the                lC      auxilia                fe                                        1      0 SYSTE34                CAVSE            CAI'SE "0 LJS COMP,            VAL>>lc CQQS                  CQQS          5USCQOE                    CCMDQHEHTCQQE                          SUS QOE            SVSCQCc
~OS 1        5                          9            III            11 L'JS Ia              Ia                                  IS LJS I-'IS I9                  3 5cCUEHTIAL                              OCCVRIIENCE              REPORT                      IIEVI5IQH ~
                                                                ~                                            ~<<'OI EVENT Y<<AR                                      REPORT HQ,                                                        TYPE                          ilo, Gi LSRIRQ
                    >>i>>3'3>>          ~79                                        ~02            2 COOS
                                                                                                                                                        ~L              ~i          ~0
                                                                                                                                                                                ~I' 31            Ta                          24              2$          '31              '3        29 ACTION CUTUPS TAKEN ACTION LIONS MS LJS  34 EDPECT>>
CN PLANT
                                                  <<5 CAUS- OSSCPIPTION ANO CORRKCilVIS AEONS QT SHUTCQ93H uETRQQ 56
                                                                                          ~!    HOVRS ~22 4O ATTACHM'CHT SV934ITTKO IrIS Lcc MIS 41 VDRQ>>4 PCRMSVS 42 PRIAIECcuD SVDPUER 43 C 4DCHc73T 4*NUDA>>URER G
o          The cause                    for the                1C  auxiliar feedwater                                um        failin              to      start      from the-
                  "B" steam supply could not be determined at the time of the occurrence.
Later            pump          operation indicates that condensation in the steam sutt, v ACTIVITY line ma have delaved the start sufficientl to lead the 1
believe the pump, failed to start when in actualit                                                                                  it    was startin
                                                                                                                                                                                                    )'
FACIUTY>>
5            ". POYIER                        ~  CTIIER STATUS        Q        METI4QO QF QISCQVERY                                    OISCQVERY QESCRIDTI H O4'2 3      ~BQ33            ~OI 5        I    7    ID3            NA 44 LB      IQ3>>            0  erator Observ                        ion 1      a                    10          .      1$      13          ~                                4$          4I5 CONTENT RELKASEO QD RELEASE                              WQVNT QF ACTIVITYQSS                                                                LOCATION QP RELSASE          CI
~i 1
      ~
3
            ~z 9
Q22      ~z08 14            II                                                44              4$                                                                            30 P<<RSOVHEL SIIKISVRE5 VVMSER>>                TYDS          OESCPIPTIQH      Q9
~I) 1      9 L000 3
OOQ33    ~ZQ33          I 13 NA 20 DSRSOIIHEL INJURIES VI>>MS ~ R              <<<<CSCIIIPTICIIQ
~ia ~00                  I  0 IQ3 11 NA                        3 LOSS QD CR QAMAC              Q FACILITY r YD'5      CESCRIDTIQH                        Q43 NA
~I          ~zQ2 7      a                I9                                                                                                                                                                    39
                  ~ VSLIC:~
2  O a
            ;~~UEQ
            +giQA OESCPIPT:CH
                          ~
It Q                                                                                                              )
63 I)'))')))))
59 NRC USa CF:LY N. A. Scho                    man                                                    305/552-3802
1 a  '
Reportable Occurrence 335-79-22 Licensee Event Report Page t>>o Additional  Cause  Descri tion and Corrective Action During periodic surveillance testing the 1C auxiliary feedwater  pump  failed to start  from the "B" steam supply. The pump was started successfully from the    "A" steam supply and then started success-fully from the "B" steam supply. No cause for the failure to start on the first attempt could be determined at the time of occurrence. Later pump operation indicates that the pump may not actuallj have failed to start.
On 7-16-79 during  operator training exercises the 1C auxiliary feedwater pump was started  locally  from the "B" steam supply header. An excessive quantity of water was observed issuing from the turbine exhaust, and the pump came up to speed at a much slower rate than normal. Further investi-gation'evealed that a recent change to operating procedure 0700022 changed normally open warm-up valves V8384 and V8385 to normally closed to agree with the system P and 1D. 'Closing these, valves created a trap for conden-sation build-up upstream of the "B" steam supply valve MV08-13.
It is  now hypothesized that the build-up of condensation created a water turbine effect in the first seconds of the attempted pump start which resulted in a much slower rate of acceleration.
Normally, the pump reaches appcoximately 2000 rpm in 15-20 seconds and when the operator did not see any indication of rpm in that time frame, he manually tripped the pump. It is felt that the pu-..p was slowly accelerating as the water was passing through the turbine and the pump would have started had  it not been tripped manually.
Corrective action is to maintain the valves in    a  normally open configuration under  OP 0010122.
Review by the Facility Review Group has determined      that maintaining the valves open does not jeopardize plant safety.      Engineering  will be requested  to verify  the FRG's  findings.}}

Latest revision as of 10:06, 4 February 2020

LER 79-022/03L-0 on 790627:during Periodic Surveillance, Testing Auxiliary Feedwater Pump Failed to Start.Cause Could Not Be Determined.Condensation in Steam Line May Have Delayed Starting Enough to Mislead Operator
ML17266A087
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/27/1979
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17206A944 List:
References
LER-79-022-03L, LER-79-22-3L, NUDOCS 7908070505
Download: ML17266A087 (3)


Text

NRC FORM 568 U. S NUCLEAR RKCULATORY COMMISSION P.TT l

'LICE')SEE EVENT REPORT

'~O CONTROL SLCCX: I I I )QI )PI EASE PRINT CR TYPS ALL RECUIREO INFOR7>>IATIONI 1 a 9 UCLVSEE CQQE I

'IQ l  !  !

UCSHSE r

! I" VMS ER i5 Q'~lt IQ~Q 9 L.C<<VSc TYDc I

<<O CON'T BZa "...;: m!0

$O 61 I

OOCICET 'IUMSC I Aa 63 VENT Q*TE 14 15 7I2 I 7I 7I9 REI>>CRT OA>> c EVENT OESCRIPTION ANO DROSABLE CONSSCUENCcS QIO During eriodic surveillance testin re or Soecificatio

~o 3 3 7.2..2 auxiliar feedwate I I pump was aligned to the "B" steam su 1 . The stea,

~o 5, ferred to the "A" side and t Subse uentl the steam supply was returned to the "B" side the umo started and the

~0 surveillance test performed satisfactoril . This was the ei hth occur-

~o 1

a 5 5 rence for the lC auxilia fe 1 0 SYSTE34 CAVSE CAI'SE "0 LJS COMP, VAL>>lc CQQS CQQS 5USCQOE CCMDQHEHTCQQE SUS QOE SVSCQCc

~OS 1 5 9 III 11 L'JS Ia Ia IS LJS I-'IS I9 3 5cCUEHTIAL OCCVRIIENCE REPORT IIEVI5IQH ~

~ ~<<'OI EVENT Y<<AR REPORT HQ, TYPE ilo, Gi LSRIRQ

>>i>>3'3>> ~79 ~02 2 COOS

~L ~i ~0

~I' 31 Ta 24 2$ '31 '3 29 ACTION CUTUPS TAKEN ACTION LIONS MS LJS 34 EDPECT>>

CN PLANT

<<5 CAUS- OSSCPIPTION ANO CORRKCilVIS AEONS QT SHUTCQ93H uETRQQ 56

~! HOVRS ~22 4O ATTACHM'CHT SV934ITTKO IrIS Lcc MIS 41 VDRQ>>4 PCRMSVS 42 PRIAIECcuD SVDPUER 43 C 4DCHc73T 4*NUDA>>URER G

o The cause for the 1C auxiliar feedwater um failin to start from the-

"B" steam supply could not be determined at the time of the occurrence.

Later pump operation indicates that condensation in the steam sutt, v ACTIVITY line ma have delaved the start sufficientl to lead the 1

believe the pump, failed to start when in actualit it was startin

)'

FACIUTY>>

5 ". POYIER ~ CTIIER STATUS Q METI4QO QF QISCQVERY OISCQVERY QESCRIDTI H O4'2 3 ~BQ33 ~OI 5 I 7 ID3 NA 44 LB IQ3>> 0 erator Observ ion 1 a 10 . 1$ 13 ~ 4$ 4I5 CONTENT RELKASEO QD RELEASE WQVNT QF ACTIVITYQSS LOCATION QP RELSASE CI

~i 1

~

3

~z 9

Q22 ~z08 14 II 44 4$ 30 P<<RSOVHEL SIIKISVRE5 VVMSER>> TYDS OESCPIPTIQH Q9

~I) 1 9 L000 3

OOQ33 ~ZQ33 I 13 NA 20 DSRSOIIHEL INJURIES VI>>MS ~ R <<<<CSCIIIPTICIIQ

~ia ~00 I 0 IQ3 11 NA 3 LOSS QD CR QAMAC Q FACILITY r YD'5 CESCRIDTIQH Q43 NA

~I ~zQ2 7 a I9 39

~ VSLIC:~

2 O a

~~UEQ

+giQA OESCPIPT:CH

~

It Q )

63 I)'))')))))

59 NRC USa CF:LY N. A. Scho man 305/552-3802

1 a '

Reportable Occurrence 335-79-22 Licensee Event Report Page t>>o Additional Cause Descri tion and Corrective Action During periodic surveillance testing the 1C auxiliary feedwater pump failed to start from the "B" steam supply. The pump was started successfully from the "A" steam supply and then started success-fully from the "B" steam supply. No cause for the failure to start on the first attempt could be determined at the time of occurrence. Later pump operation indicates that the pump may not actuallj have failed to start.

On 7-16-79 during operator training exercises the 1C auxiliary feedwater pump was started locally from the "B" steam supply header. An excessive quantity of water was observed issuing from the turbine exhaust, and the pump came up to speed at a much slower rate than normal. Further investi-gation'evealed that a recent change to operating procedure 0700022 changed normally open warm-up valves V8384 and V8385 to normally closed to agree with the system P and 1D. 'Closing these, valves created a trap for conden-sation build-up upstream of the "B" steam supply valve MV08-13.

It is now hypothesized that the build-up of condensation created a water turbine effect in the first seconds of the attempted pump start which resulted in a much slower rate of acceleration.

Normally, the pump reaches appcoximately 2000 rpm in 15-20 seconds and when the operator did not see any indication of rpm in that time frame, he manually tripped the pump. It is felt that the pu-..p was slowly accelerating as the water was passing through the turbine and the pump would have started had it not been tripped manually.

Corrective action is to maintain the valves in a normally open configuration under OP 0010122.

Review by the Facility Review Group has determined that maintaining the valves open does not jeopardize plant safety. Engineering will be requested to verify the FRG's findings.