ML20215E441: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IA-86-197, Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V]]
{{Adams
| number = ML20215E441
| issue date = 08/22/1985
| title = Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V
| author name = Martin J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee name = Davis J, Denton H, Taylor J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000000, 05000206, 05000275, 05000312, 05000323, 05000344, 05000361, 05000362, 05000397
| license number =
| contact person =
| case reference number = FOIA-86-197
| document report number = 850822, NUDOCS 8610150301
| package number = ML20215E267
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 2
}}
 
=Text=
{{#Wiki_filter:.
G
      .*    stPEasy                                                            WG " We          '%
        .d                                          UNITED STATES
          '          4*      g NUCLEAR REGU TORY COMMISSION                            hg, o,          c                        1450 MARIA LANE. SUITE 210                      {
5
            *e .e
[                ',.  (, WALNUT CREEK. CALIFORNIA 94596
                                                    .6 '                          ]G1Y4&L
                                        - - .                                        ,i August 22, 1985 cl;<A l.uf
                                                                                                    ~
MEMORANDUM FOR:        Harold R. Denton, Director, NRR John G. Davis, Director, NMSS Janes M. Taylor, Director IE Clemens J. Heltemes, Jr. , Director AEOD FROM:                  J. B. Martin, Regional Administrator
 
==SUBJECT:==
REVISED SCHEDULE FOR 1985-1986 SALP BOARD MEETINGS
  .                                  FOR REGION V .
 
==Reference:==
Memorandum for Regional Administrators from J. M. Taylor, dtd July 8, 1985; Subj ect: SALP Reviews and Evaluations of Facilities with New Operating Licenses Further review and discussion with I&E headquarters, regarding the referenced memorandum, has resulted in the following SALP schedule changes:
(1) San Onofre has been changed to an eighteen month interval,                    ,
(2) the Trojan interval has been reduced to twelve months due to past and recently identified concerns, (3)  the WNP-2 interval was reduced one month, and (4)  the Rancho Seco and Diablo Canyon proposed licensee meeting dates were changed.
Accordingly, the Region V SALP schedule is as follows:
i l
l 8610150301      861003'                                                    1
,                PDR    FOIA                                                              /
I HOLMES 86-197        PDR
 
l REGIONAL    PROPOSED      I
                                                      ~
EVALUATION    g<'                  BOARD      LICENSEE UNITS                    PERIOD                          MEETING      MEETING
                                                                    ~
Rancho Seco            12/01/83 - 05/31/85              08/07/85    09/06/85*+      ;
o.
Diablo Canyon          07/01/84 - 07/31/85              09/19/85*    10/23/85*
Palo Verde            04/01/84 - 09/30/85              11/06/85*    12/09/85*
Trojan                11/01/84 - 10/31/85*            12/12/85*    01/22/86*
WP-2                  02/01/85 - 01/31/86*            03/05/86*    04/23/86*
San Onofre            10/01/84 - 03/31/86*            05/07/86*    06/18/86*
Rancho Seco            06/01/85 - 05/31/86              07/08/86    08/20/86 Diablo Canyon          08/01/85 - 07/,31/86            09/11/86    10/22/86 Palo Verde            10/01/85 - 09/30/86              11/05/86    12/11/86 TROJAN                11/01/85 - 10/31/86              12/10/86    01/22/87 WP-2                  02/01/86 - 07/31/87 12/13/84 San Onofre            04/01/86 - 11/30/87            .
* Indicates changes from July 18, 1985 schedule.
  + Indicates this date is subject to further change.
This schedule replaces the previous schedule provided by Region V {{letter dated|date=July 18, 1985|text=letter dated July 18, 1985}}. Any questions regarding this schedule should be directed to A. E. Chaffee (FIS 463-3753).
                                            ' B.7tcs h f /4 1 (vJ. B. Martin Regional Administratot cc:  J. Carter, NRR F. J. Hebdon, AEOD B. Faulkenberry J. Crews R. Scarano Branch Chiefs, RV Section Chiefs, RV DRS&P Inspectors, RV Director, Division Reactor Projects -
Region I, II, III, IV}}

Latest revision as of 23:26, 5 August 2021

Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V
ML20215E441
Person / Time
Site: Columbia, Diablo Canyon, San Onofre, Rancho Seco, 05000000, Trojan
Issue date: 08/22/1985
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Jennifer Davis, Harold Denton, Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), Office of Nuclear Reactor Regulation
Shared Package
ML20215E267 List:
References
FOIA-86-197 850822, NUDOCS 8610150301
Download: ML20215E441 (2)


Text

.

G

.* stPEasy WG " We '%

.d UNITED STATES

' 4* g NUCLEAR REGU TORY COMMISSION hg, o, c 1450 MARIA LANE. SUITE 210 {

5

  • e .e

[ ',. (, WALNUT CREEK. CALIFORNIA 94596

.6 ' ]G1Y4&L

- - . ,i August 22, 1985 cl;<A l.uf

~

MEMORANDUM FOR: Harold R. Denton, Director, NRR John G. Davis, Director, NMSS Janes M. Taylor, Director IE Clemens J. Heltemes, Jr. , Director AEOD FROM: J. B. Martin, Regional Administrator

SUBJECT:

REVISED SCHEDULE FOR 1985-1986 SALP BOARD MEETINGS

. FOR REGION V .

Reference:

Memorandum for Regional Administrators from J. M. Taylor, dtd July 8, 1985; Subj ect: SALP Reviews and Evaluations of Facilities with New Operating Licenses Further review and discussion with I&E headquarters, regarding the referenced memorandum, has resulted in the following SALP schedule changes:

(1) San Onofre has been changed to an eighteen month interval, ,

(2) the Trojan interval has been reduced to twelve months due to past and recently identified concerns, (3) the WNP-2 interval was reduced one month, and (4) the Rancho Seco and Diablo Canyon proposed licensee meeting dates were changed.

Accordingly, the Region V SALP schedule is as follows:

i l

l 8610150301 861003' 1

, PDR FOIA /

I HOLMES86-197 PDR

l REGIONAL PROPOSED I

~

EVALUATION g<' BOARD LICENSEE UNITS PERIOD MEETING MEETING

~

Rancho Seco 12/01/83 - 05/31/85 08/07/85 09/06/85*+  ;

o.

Diablo Canyon 07/01/84 - 07/31/85 09/19/85* 10/23/85*

Palo Verde 04/01/84 - 09/30/85 11/06/85* 12/09/85*

Trojan 11/01/84 - 10/31/85* 12/12/85* 01/22/86*

WP-2 02/01/85 - 01/31/86* 03/05/86* 04/23/86*

San Onofre 10/01/84 - 03/31/86* 05/07/86* 06/18/86*

Rancho Seco 06/01/85 - 05/31/86 07/08/86 08/20/86 Diablo Canyon 08/01/85 - 07/,31/86 09/11/86 10/22/86 Palo Verde 10/01/85 - 09/30/86 11/05/86 12/11/86 TROJAN 11/01/85 - 10/31/86 12/10/86 01/22/87 WP-2 02/01/86 - 07/31/87 12/13/84 San Onofre 04/01/86 - 11/30/87 .

  • Indicates changes from July 18, 1985 schedule.

+ Indicates this date is subject to further change.

This schedule replaces the previous schedule provided by Region V letter dated July 18, 1985. Any questions regarding this schedule should be directed to A. E. Chaffee (FIS 463-3753).

' B.7tcs h f /4 1 (vJ. B. Martin Regional Administratot cc: J. Carter, NRR F. J. Hebdon, AEOD B. Faulkenberry J. Crews R. Scarano Branch Chiefs, RV Section Chiefs, RV DRS&P Inspectors, RV Director, Division Reactor Projects -

Region I, II, III, IV