IR 05000313/2011302: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML113000596 | | number = ML113000596 | ||
| issue date = 10/26/2011 | | issue date = 10/26/2011 | ||
| title = | | title = Er 05000313-11-302; August 26 to September 19, 2011; Arkansas Nuclear One, Unit 1; Initial Operator Licensing Examination Report | ||
| author name = Haire M | | author name = Haire M | ||
| author affiliation = NRC/RGN-IV/DRS | | author affiliation = NRC/RGN-IV/DRS | ||
| addressee name = Schwarz C | | addressee name = Schwarz C | ||
| addressee affiliation = Entergy Operations, Inc | | addressee affiliation = Entergy Operations, Inc | ||
| docket = 05000313 | | docket = 05000313 | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N ber 26, 2011 | ||
==SUBJECT:== | |||
ARKANSAS NUCLEAR ONE, UNIT 1 - NRC EXAMINATION REPORT 05000313/2011302 | |||
SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 1 - NRC EXAMINATION REPORT 05000313/2011302 | |||
==Dear Mr. Schwarz:== | ==Dear Mr. Schwarz:== | ||
Line 31: | Line 29: | ||
The examination included the evaluation of four applicants for reactor operator licenses and four applicants for upgrade senior reactor operator licenses. The license examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure to this letter contains the details of this report. | The examination included the evaluation of four applicants for reactor operator licenses and four applicants for upgrade senior reactor operator licenses. The license examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure to this letter contains the details of this report. | ||
No findings were identified during this examination. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of | No findings were identified during this examination. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Mark S. Haire, Chief Operations Branch Division of Reactor Safety | |||
Entergy Operations, Inc. -2-Docket: 50-313 License: DPR-51 | |||
===Enclosure:=== | ===Enclosure:=== | ||
NRC Examination Report 05000313/2011302 | NRC Examination Report 05000313/2011302 | ||
REGION IV== | |||
Docket: 50-313 License: DPR-51 Report: 05000313/2011302 Licensee: Entergy Operations, Inc. | |||
Facility: Arkansas Nuclear One, Unit 1 Location: Junction of Hwy. 64W and Hwy. 333 South Russellville, Arkansas Dates: August 26 to September 19, 2011 Inspectors: S. Hedger, Chief Examiner, Operations Engineer G. Apger, Operations Engineer S. Garchow, Senior Operations Engineer Approved By: Mark Haire, Chief Operations Branch Division of Reactor Safety-1- Enclosure | |||
=SUMMARY OF FINDINGS= | =SUMMARY OF FINDINGS= | ||
ER05000313/2011302; August 26 to September 19, 2011; Arkansas Nuclear One, Unit 1; Initial | ER05000313/2011302; August 26 to September 19, 2011; Arkansas Nuclear One, Unit 1; Initial | ||
=== | Operator Licensing Examination Report. | ||
NRC examiners evaluated the competency of four applicants for reactor operator licenses and four applicants for upgrade senior reactor operator licenses at Arkansas Nuclear One, Unit 1. | |||
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on August 26, 2011. NRC examiners administered the operating tests on week of August 29, 2011. | |||
The examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. | |||
===NRC-Identified and Self-Revealing Findings=== | |||
No findings were identified. | No findings were identified. | ||
=== | ===Licensee-Identified Violations=== | ||
None. | None. | ||
Line 64: | Line 75: | ||
====a. Scope==== | ====a. Scope==== | ||
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited two of the license applications in detail to confirm that they accurately reflected the subject | NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited two of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes. | ||
====b. Findings==== | ====b. Findings==== | ||
Line 75: | Line 86: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration. NRC examiners determined that the initial submittal for the reactor operator applicants | No findings were identified. | ||
NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration. | |||
NRC examiners determined that the initial submittal for the reactor operator applicants written exam was within the range of acceptability expected for a proposed examination. | |||
NRC examiners determined that the written examination for the senior reactor operator applicants and the operating tests initially submitted by the licensee were outside the acceptable quality range expected for a proposed examination. Common weaknesses with the written exam submittal involved submitted questions that tested only a reactor operator level of knowledge, as well as questions with multiple correct answers or no correct answers. For the operating test, common weaknesses involved Job Performance Measures (JPMs) submitted that didnt have complete and correct evaluation criteria, as well as JPMs that had one or less observable action that could be used as evaluation criteria for licensing decisions. Corrective actions by the licensee are documented in Condition Report CR-ANO-C-2011-02273. | |||
===.3 Operator Knowledge and Performance=== | ===.3 Operator Knowledge and Performance=== | ||
====a. Scope==== | ====a. Scope==== | ||
On August 26, 2011, the licensee proctored the administration of the written examinations to all eight applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on September 5, 2011. The NRC examination team administered the various portions of the operating tests to all eight applicants on week of August 29, 2011. | On August 26, 2011, the licensee proctored the administration of the written examinations to all eight applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on September 5, 2011. | ||
The NRC examination team administered the various portions of the operating tests to all eight applicants on week of August 29, 2011. | |||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. All of the applicants passed the written examination and all parts of the operating test. The final written examinations (on delayed release schedule) and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal. The examination team identified several generic weaknesses with procedural content during the examination development process that needed to be addressed. These procedure issues have been documented for corrective action in Procedure Improvement Forms (PIFs) 1-11-0527 through 1-11-0531. | No findings were identified. | ||
All of the applicants passed the written examination and all parts of the operating test. | |||
The final written examinations (on delayed release schedule) and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal. | |||
The examination team identified several generic weaknesses with procedural content during the examination development process that needed to be addressed. These procedure issues have been documented for corrective action in Procedure Improvement Forms (PIFs) 1-11-0527 through 1-11-0531. | |||
===.4 Simulation Facility Performance=== | ===.4 Simulation Facility Performance=== | ||
====a. Scope==== | ====a. Scope==== | ||
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration. | The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration. | ||
====b. Findings==== | ====b. Findings==== | ||
Line 101: | Line 126: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA6}} | {{a|4OA6}} | ||
==4OA6 Meetings, Including Exit== | ==4OA6 Meetings, Including Exit== | ||
The chief examiner presented the preliminary examination results to members of the plant staff on August 31, 2011. A telephonic exit was conducted on September 19, 2011, between Messrs. Sean D. Hedger, Chief Examiner, and Randal Martin, Superintendent of Operations Training. | The chief examiner presented the preliminary examination results to members of the plant staff on August 31, 2011. A telephonic exit was conducted on September 19, 2011, between Messrs. Sean D. Hedger, Chief Examiner, and Randal Martin, Superintendent of Operations Training. | ||
Line 115: | Line 141: | ||
===Licensee Personnel=== | ===Licensee Personnel=== | ||
: [[contact::R. Martin]], Superintendent, Training | : [[contact::R. Martin]], Superintendent, Training | ||
: [[contact::D. James]], Director of Nuclear Safety Assurance | : [[contact::D. James]], Director of Nuclear Safety Assurance | ||
: [[contact::S. Pyle]], Manager of Licensing | : [[contact::S. Pyle]], Manager of Licensing | ||
: [[contact::K. Jones]], Manager of Operations | : [[contact::K. Jones]], Manager of Operations | ||
: [[contact::A. Clinkingbeard]], Assistant Operations Manager - Training Unit 1 | : [[contact::A. Clinkingbeard]], Assistant Operations Manager - Training Unit 1 | ||
: [[contact::S. Cupp]], Superintendent, Simulator and Training Support | : [[contact::S. Cupp]], Superintendent, Simulator and Training Support | ||
: [[contact::J. Cork]], Operations Training Instructor, Unit 1 | : [[contact::J. Cork]], Operations Training Instructor, Unit 1 | ||
===NRC Personnel=== | ===NRC Personnel=== | ||
: [[contact::A. Sanchez]], Senior Resident Inspector | : [[contact::A. Sanchez]], Senior Resident Inspector | ||
: [[contact::J. Rotton]], Resident Inspector | : [[contact::J. Rotton]], Resident Inspector | ||
: [[contact::W. Shaup]], Resident Inspector | : [[contact::W. Shaup]], Resident Inspector | ||
==ADAMS DOCUMENTS REFERENCED== | ==ADAMS DOCUMENTS REFERENCED== | ||
}} | }} |
Latest revision as of 03:36, 21 December 2019
ML113000596 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear ![]() |
Issue date: | 10/26/2011 |
From: | Mark Haire Division of Reactor Safety IV |
To: | Schwarz C Entergy Operations |
References | |
50-313/11-302 50-313/11-302 | |
Download: ML113000596 (10) | |
Text
UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N ber 26, 2011
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT 1 - NRC EXAMINATION REPORT 05000313/2011302
Dear Mr. Schwarz:
On August 31, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Arkansas Nuclear One, Unit 1. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on August 31, 2011, with Mr. Karl Jones, Manager of Operations, and other members of your staff. A telephonic exit meeting was conducted on September 19, 2011, with Mr. Randal Martin, Superintendent of Operations Training, who was provided the NRC licensing decisions.
The examination included the evaluation of four applicants for reactor operator licenses and four applicants for upgrade senior reactor operator licenses. The license examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure to this letter contains the details of this report.
No findings were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark S. Haire, Chief Operations Branch Division of Reactor Safety
Entergy Operations, Inc. -2-Docket: 50-313 License: DPR-51
Enclosure:
NRC Examination Report 05000313/2011302
REGION IV==
Docket: 50-313 License: DPR-51 Report: 05000313/2011302 Licensee: Entergy Operations, Inc.
Facility: Arkansas Nuclear One, Unit 1 Location: Junction of Hwy. 64W and Hwy. 333 South Russellville, Arkansas Dates: August 26 to September 19, 2011 Inspectors: S. Hedger, Chief Examiner, Operations Engineer G. Apger, Operations Engineer S. Garchow, Senior Operations Engineer Approved By: Mark Haire, Chief Operations Branch Division of Reactor Safety-1- Enclosure
SUMMARY OF FINDINGS
ER05000313/2011302; August 26 to September 19, 2011; Arkansas Nuclear One, Unit 1; Initial
Operator Licensing Examination Report.
NRC examiners evaluated the competency of four applicants for reactor operator licenses and four applicants for upgrade senior reactor operator licenses at Arkansas Nuclear One, Unit 1.
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on August 26, 2011. NRC examiners administered the operating tests on week of August 29, 2011.
The examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
NRC-Identified and Self-Revealing Findings
No findings were identified.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited two of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.
b. Findings
No findings were identified.
NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
NRC examiners determined that the initial submittal for the reactor operator applicants written exam was within the range of acceptability expected for a proposed examination.
NRC examiners determined that the written examination for the senior reactor operator applicants and the operating tests initially submitted by the licensee were outside the acceptable quality range expected for a proposed examination. Common weaknesses with the written exam submittal involved submitted questions that tested only a reactor operator level of knowledge, as well as questions with multiple correct answers or no correct answers. For the operating test, common weaknesses involved Job Performance Measures (JPMs) submitted that didnt have complete and correct evaluation criteria, as well as JPMs that had one or less observable action that could be used as evaluation criteria for licensing decisions. Corrective actions by the licensee are documented in Condition Report CR-ANO-C-2011-02273.
.3 Operator Knowledge and Performance
a. Scope
On August 26, 2011, the licensee proctored the administration of the written examinations to all eight applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on September 5, 2011.
The NRC examination team administered the various portions of the operating tests to all eight applicants on week of August 29, 2011.
b. Findings
No findings were identified.
All of the applicants passed the written examination and all parts of the operating test.
The final written examinations (on delayed release schedule) and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal.
The examination team identified several generic weaknesses with procedural content during the examination development process that needed to be addressed. These procedure issues have been documented for corrective action in Procedure Improvement Forms (PIFs) 1-11-0527 through 1-11-0531.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings were identified.
A discrepancy was found in the simulator during validation of operating test simulator scenario content. The licensee documented with Simulator Discrepancy Report 11-0068, and it is described in Attachment 2 of this report.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the preliminary examination results to members of the plant staff on August 31, 2011. A telephonic exit was conducted on September 19, 2011, between Messrs. Sean D. Hedger, Chief Examiner, and Randal Martin, Superintendent of Operations Training.
The licensee did not identify any information or materials used during the examination as proprietary.
ATTACHMENT 1:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- R. Martin, Superintendent, Training
- D. James, Director of Nuclear Safety Assurance
- S. Pyle, Manager of Licensing
- K. Jones, Manager of Operations
- A. Clinkingbeard, Assistant Operations Manager - Training Unit 1
- S. Cupp, Superintendent, Simulator and Training Support
- J. Cork, Operations Training Instructor, Unit 1
NRC Personnel
- A. Sanchez, Senior Resident Inspector
- J. Rotton, Resident Inspector
- W. Shaup, Resident Inspector