| issue date = 03/05/2012
| issue date = 03/05/2012
| title = Annual Assessment Letter for Duane Arnold Energy Center, Unit 1 (Report 05000331-11-007)
| title = Annual Assessment Letter for Duane Arnold Energy Center, Unit 1 (Report 05000331-11-007)
| author name = Ring M A
| author name = Ring M
| author affiliation = NRC/RGN-III/DRP/B1
| author affiliation = NRC/RGN-III/DRP/B1
| addressee name = Wells P
| addressee name = Wells P
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES rch 5, 2012
[[Issue date::March 5, 2012]]


Mr. Peter Wells Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR DUANE ARNOLD ENERGY CENTER, UNIT 1 (REPORT 05000331/2011007)


SUBJECT: ANNUAL ASSESSMENT LETTER FOR DUANE ARNOLD ENERGY CENTER, UNIT 1 (REPORT 05000331/2011007)
==Dear Mr. Wells:==
On February 15, 2012, the NRC staff completed its end-of-cycle performance review of Duane Arnold Energy Center, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.


==Dear Mr. Wells:==
The NRC determined that overall, Duane Arnold, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Duane Arnold, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
On February 15, 2012, the NRC staff completed its end-of-cycle performance review of Duane Arnold Energy Center, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan. The NRC determined that overall, Duane Arnold, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Duane Arnold, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


The enclosed inspection plan lists the inspections scheduled through June 30, 2013.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013.


The inspections scheduled include: Inspection Procedure (IP) 71003, "Post-Approval Site Inspection for License Renewal," IP 71111.05T, "Fire Protection (Triennial)," IP 71111.11, "Licensed Operator Requalification Program and Licensed Operator Performance," IP 71114.01,  
The inspections scheduled include: Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, IP 71111.05T, Fire Protection (Triennial), IP 71111.11, Licensed Operator Requalification Program and Licensed Operator Performance, IP 71114.01, Exercise Evaluation, IP 71152, Problem Identification and Resolution, and Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
"Exercise Evaluation," IP 71152, "Problem Identification and Resolution," and Temporary Instruction (TI) 2515/182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks." Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 630-829-9703 with any questions you may have regarding this letter.
Please contact me at 630-829-9703 with any questions you may have regarding this letter.


Sincerely,/RA/
Sincerely,
Mark A. Ring, Branch Chief Branch 1 Division of Reactor Projects  
/RA/
 
Mark A. Ring, Branch Chief Branch 1 Division of Reactor Projects Docket No. 50-331 License No. DPR-49 Enclosure: Duane Arnold Energy Center Inspection/Activity Plan cc w/encl: Distribution via ListServ
Docket No. 50-331 License No. DPR-49  
 
===Enclosure:===
Duane Arnold Energy Center Inspection/Activity Plan cc w/encl: Distribution via ListServ
}}
}}

Latest revision as of 07:13, 12 November 2019

Annual Assessment Letter for Duane Arnold Energy Center, Unit 1 (Report 05000331-11-007)
ML12065A028
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 03/05/2012
From: Ring M
NRC/RGN-III/DRP/B1
To: Wells P
NextEra Energy Duane Arnold
References
IR-11-007
Download: ML12065A028 (6)


Text

UNITED STATES rch 5, 2012

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR DUANE ARNOLD ENERGY CENTER, UNIT 1 (REPORT 05000331/2011007)

Dear Mr. Wells:

On February 15, 2012, the NRC staff completed its end-of-cycle performance review of Duane Arnold Energy Center, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Duane Arnold, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Duane Arnold, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2013.

The inspections scheduled include: Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, IP 71111.05T, Fire Protection (Triennial), IP 71111.11, Licensed Operator Requalification Program and Licensed Operator Performance, IP 71114.01, Exercise Evaluation, IP 71152, Problem Identification and Resolution, and Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9703 with any questions you may have regarding this letter.

Sincerely,

/RA/

Mark A. Ring, Branch Chief Branch 1 Division of Reactor Projects Docket No. 50-331 License No. DPR-49 Enclosure: Duane Arnold Energy Center Inspection/Activity Plan cc w/encl: Distribution via ListServ