| | issue date = 03/05/2012 | | | issue date = 03/05/2012 |
| | title = Annual Assessment Letter for Duane Arnold Energy Center, Unit 1 (Report 05000331-11-007) | | | title = Annual Assessment Letter for Duane Arnold Energy Center, Unit 1 (Report 05000331-11-007) |
| | author name = Ring M A | | | author name = Ring M |
| | author affiliation = NRC/RGN-III/DRP/B1 | | | author affiliation = NRC/RGN-III/DRP/B1 |
| | addressee name = Wells P | | | addressee name = Wells P |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES rch 5, 2012 |
| [[Issue date::March 5, 2012]]
| |
|
| |
|
| Mr. Peter Wells Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785
| | ==SUBJECT:== |
| | ANNUAL ASSESSMENT LETTER FOR DUANE ARNOLD ENERGY CENTER, UNIT 1 (REPORT 05000331/2011007) |
|
| |
|
| SUBJECT: ANNUAL ASSESSMENT LETTER FOR DUANE ARNOLD ENERGY CENTER, UNIT 1 (REPORT 05000331/2011007)
| | ==Dear Mr. Wells:== |
| | On February 15, 2012, the NRC staff completed its end-of-cycle performance review of Duane Arnold Energy Center, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan. |
|
| |
|
| ==Dear Mr. Wells:==
| | The NRC determined that overall, Duane Arnold, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Duane Arnold, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. |
| On February 15, 2012, the NRC staff completed its end-of-cycle performance review of Duane Arnold Energy Center, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan. The NRC determined that overall, Duane Arnold, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Duane Arnold, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
| |
|
| |
|
| The enclosed inspection plan lists the inspections scheduled through June 30, 2013. | | The enclosed inspection plan lists the inspections scheduled through June 30, 2013. |
|
| |
|
| The inspections scheduled include: Inspection Procedure (IP) 71003, "Post-Approval Site Inspection for License Renewal," IP 71111.05T, "Fire Protection (Triennial)," IP 71111.11, "Licensed Operator Requalification Program and Licensed Operator Performance," IP 71114.01, | | The inspections scheduled include: Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, IP 71111.05T, Fire Protection (Triennial), IP 71111.11, Licensed Operator Requalification Program and Licensed Operator Performance, IP 71114.01, Exercise Evaluation, IP 71152, Problem Identification and Resolution, and Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). |
| "Exercise Evaluation," IP 71152, "Problem Identification and Resolution," and Temporary Instruction (TI) 2515/182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks." Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| | |
| | ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| Please contact me at 630-829-9703 with any questions you may have regarding this letter. | | Please contact me at 630-829-9703 with any questions you may have regarding this letter. |
|
| |
|
| Sincerely,/RA/ | | Sincerely, |
| Mark A. Ring, Branch Chief Branch 1 Division of Reactor Projects | | /RA/ |
| | | Mark A. Ring, Branch Chief Branch 1 Division of Reactor Projects Docket No. 50-331 License No. DPR-49 Enclosure: Duane Arnold Energy Center Inspection/Activity Plan cc w/encl: Distribution via ListServ |
| Docket No. 50-331 License No. DPR-49 | |
| | |
| ===Enclosure:===
| |
| Duane Arnold Energy Center Inspection/Activity Plan cc w/encl: Distribution via ListServ | |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARML22027A3582022-01-26026 January 2022 DAEC: CY2022 Inspection Plan, Docket No: 05000331, License No: DPR-49 ML21032A1852021-02-0101 February 2021 Daec_ CY2021 Inspection Plan IR 05000331/20200052020-09-0101 September 2020 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2020005) IR 05000331/20190062020-03-0303 March 2020 Annual Assessment Letter Duane Arnold Energy Center (Report 05000331/2019006) ML19290E5482019-10-17017 October 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000331/2020010 IR 05000331/20190052019-08-28028 August 2019 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2019005) ML19099A3522019-04-0909 April 2019 Information Request to Support Upcoming Temporary Instruction 2515/193 Inspection at Duane Arnold Energy Center IR 05000331/20180062019-03-0404 March 2019 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2018006) IR 05000331/20180052018-08-28028 August 2018 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2018005) IR 05000331/20170062018-03-0202 March 2018 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2017006) ML18061A1502018-03-0202 March 2018 Information Request for the Cyber-Security Full Implementation of Inspection, Notification to Perform Inspection 05000331/2018414 (DRS-G.Hausman) ML17313B1882017-11-0909 November 2017 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000331/20170052017-08-28028 August 2017 Updated Inspection Plan (Report 05000331/2017005) ML17172A3872017-06-20020 June 2017 Information Request to Support Upcoming Temporary Instruction 191 Inspection at Duane Arnold Energy Center IR 05000331/20160062017-03-0101 March 2017 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2016006) ML17047A6652017-02-16016 February 2017 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000331/2017008 ML17010A0502017-01-0909 January 2017 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Duane Arnold Energy Center IR 05000331/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Duane Arnold Energy Center (Report 05000331/2016005) IR 05000331/20150062016-03-0202 March 2016 Annual Assessment Letter for Duane Arnold Energy Center (Inspection Report 05000331/2015006) IR 05000331/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Duane Arnold Energy Center (Report 05000331/2015005) IR 05000331/20140012015-03-0404 March 2015 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2014001) ML15057A3472015-02-26026 February 2015 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Duane Arnold Energy Center ML14245A2772014-09-0202 September 2014 Mid-Cycle Assessment Letter for Duane Arnold Energy Center ML14148A4002014-05-27027 May 2014 Notification of NRC Supplemental Inspection (95002) and Request for Information IR 05000331/20130012014-03-0404 March 2014 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2013001) ML13246A2222013-09-0303 September 2013 2013 Duane Arnold Energy Center Mid-Cycle Letter Combined ML13176A0812013-06-24024 June 2013 Ltr 6/24/13 Duane Arnold MOD 50.59 Request for Information IR 05000331/20120012013-03-0404 March 2013 Annual Assessment Letter for Duane Arnold Energy Center, Unit 1 (Report 05000331/2012001) ML12249A4092012-09-0404 September 2012 Mid-Cycle Assessment Letter for Duane Arnold Energy Center Unit 1 IR 05000331/20110072012-03-0505 March 2012 Annual Assessment Letter for Duane Arnold Energy Center, Unit 1 (Report 05000331-11-007) IR 05000331/20110062011-09-0101 September 2011 Mid-Cycle Letter for Duane Arnold Energy Center; 05000331-11-006 IR 05000331/20110012011-03-0404 March 2011 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331-11-001) ML1024400522010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Duane Arnold Energy Center IR 05000331/20100012010-03-0303 March 2010 Duane Arnold Energy Center EOC Annual Assessment Letter (Report 05000331-10-001) ML0924402492009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan IR 05000331/20090012009-03-0404 March 2009 Annual Assessment Letter - Duane Arnold (05000331-09-001) ML0824602612008-09-0202 September 2008 Duane Arnold - Mid Cycle Performance Review and Inspection Plan IR 05000331/20080012008-03-0303 March 2008 IR 05000331-08-001, Duane Arnold Energy Center EOC Annual Assessment Report Letter ML0735403922007-12-19019 December 2007 Change to Inspection Plan 1/1/08 - 12/31/08 NG-07-0878, Second 10-Year Containment Inspection Plan2007-11-16016 November 2007 Second 10-Year Containment Inspection Plan IR 05000331/20070012007-03-0202 March 2007 EOC Annual Assessment Letter (Report 05000331-07-001) ML0624303352006-08-31031 August 2006 8/31/06 Duane Arnold Station-Mid-Cycle Performance Review and Inspection Plan IR 05000331/20060012006-03-0202 March 2006 (EOC) Annual Assessment Letter (Report 05000331/2006001) ML0524204262005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - Duane Arnold Energy Center ML0506203742005-03-0202 March 2005 Annual Assessment Letter - Duane Arnold Energy Center ML0424504992004-08-30030 August 2004 Mid-Cycle Performance Review and Inspection Plan for Physical Protection - Duane Arnold Energy Center IR 05000331/20040012004-03-0404 March 2004 Annual Assessment Letter, Duane Arnold (IR 05000331-04-001) ML0324001542003-08-27027 August 2003 IR 05000331-04-001 - Mid-Cycle Assessment Letter ML0224001502002-08-23023 August 2002 Mid-Cycle Performance Review and Inspection Plan - Duane Arnold Energy Center (August 23, 2002) IR 05000331/20020012002-03-0404 March 2002 Annual Assessment Letter - Duane Arnold Energy Center (Report 50-331/02-01) 2022-01-26
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities NG-24-0004, 2023 Annual Radiological Environmental Operating Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Operating Report NG-24-0003, Submittal of 2023 Annual Radioactive Material Release Report2024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Material Release Report ML24072A0292024-03-29029 March 2024 Nextera Energy Duane Arnold, Llc. Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) NG-24-0002, 2023 Annual Exposure Report - Form 5s2024-03-0606 March 2024 2023 Annual Exposure Report - Form 5s NG-24-0001, 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update2024-03-0606 March 2024 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnold'S Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) 2024-09-04
[Table view] |
Text
UNITED STATES rch 5, 2012
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR DUANE ARNOLD ENERGY CENTER, UNIT 1 (REPORT 05000331/2011007)
Dear Mr. Wells:
On February 15, 2012, the NRC staff completed its end-of-cycle performance review of Duane Arnold Energy Center, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, Duane Arnold, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Duane Arnold, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013.
The inspections scheduled include: Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, IP 71111.05T, Fire Protection (Triennial), IP 71111.11, Licensed Operator Requalification Program and Licensed Operator Performance, IP 71114.01, Exercise Evaluation, IP 71152, Problem Identification and Resolution, and Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9703 with any questions you may have regarding this letter.
Sincerely,
/RA/
Mark A. Ring, Branch Chief Branch 1 Division of Reactor Projects Docket No. 50-331 License No. DPR-49 Enclosure: Duane Arnold Energy Center Inspection/Activity Plan cc w/encl: Distribution via ListServ