{{#Wiki_filter:AVERAGE DAILY UNIT POWER LEVEL O . | {{#Wiki_filter:AVERAGE DAILY UNIT POWER LEVEL O . | ||
DOCKET NO. 50-293 g3j7 Pilgritt I DAE 07/07/80 COMPLETED BY G.G. Whitney TELEPHONE 617-746-7900 June, 1980 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe. Net) (Mwe. Net) g 514 g ., | |||
DOCKET NO. 50-293 g3j7 Pilgritt I DAE 07/07/80 COMPLETED BY G.G. Whitney TELEPHONE 617-746-7900 June, 1980 MONTH | |||
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe. Net) (Mwe. Net) g 514 g ., | |||
620. | 620. | ||
: 492. 33' 646. | : 492. 33' 646. | ||
3 534. 39 666. | 3 534. 39 666. | ||
~~ | ~~ | ||
4 563. ,, 29 | 4 563. ,, 29 669. | ||
669. | |||
y 549. | y 549. | ||
,3 632. *- | ,3 632. *- | ||
6 545- 22 666. | 6 545- 22 666. | ||
Line 44: | Line 37: | ||
15 486. 3g 0. | 15 486. 3g 0. | ||
^ | ^ | ||
16 513- | 16 513-INSTRUCTIONS . | ||
INSTRUCTIONS . | |||
On this formst.!ist the average daily unit power levelin MWe Net for each day in the repomng month. Compute to the nearest whole megswatt. | On this formst.!ist the average daily unit power levelin MWe Net for each day in the repomng month. Compute to the nearest whole megswatt. | ||
(o/77) 8007150 % | |||
(o/77) | |||
8007150 % | |||
OPERATING DATA REPORT w | OPERATING DATA REPORT w | ||
DOCKET NO. 50-293 DATE 7/07/80 COMPLETED BY U.G. wn1cnet TELEPHONE o1i-74o-e900 OPERATING STATUS Pilgrim I Notes | DOCKET NO. 50-293 DATE 7/07/80 COMPLETED BY U.G. wn1cnet TELEPHONE o1i-74o-e900 OPERATING STATUS Pilgrim I Notes | ||
Line 90: | Line 67: | ||
: 18. Net Electrical Energy Generated (MWH) 401031.0 563775.0 23769898.0 , | : 18. Net Electrical Energy Generated (MWH) 401031.0 563775.0 23769898.0 , | ||
: 19. Unit Service Factor 97.5 24.4 67.3 ._ | : 19. Unit Service Factor 97.5 24.4 67.3 ._ | ||
: 20. Unit Availability Factor 97.5 24.4 67.3 ~~~ | : 20. Unit Availability Factor 97.5 24.4 67.3 ~~~ | ||
: 21. Unit Capacity Factor (Using MDC Net) 83.1 19.3 53.5 , | : 21. Unit Capacity Factor (Using MDC Net) 83.1 19.3 53.5 , | ||
Line 101: | Line 77: | ||
: 26. Units in Test Status (Prior to Commercial Operationi: Forecast Achieved | : 26. Units in Test Status (Prior to Commercial Operationi: Forecast Achieved | ||
. INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77) | . INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77) | ||
' DOCKET No. 50-293 , | ' DOCKET No. 50-293 , | ||
UNIT SilulDOWNS AND POWER REDtM.110NS Pilgrim I UNIT NAME DATE 7/7/80 COMPLElED gy G. G. Whitney REN)RT MON 111 'IEl.EPHONE 617-746-7900 | UNIT SilulDOWNS AND POWER REDtM.110NS Pilgrim I UNIT NAME DATE 7/7/80 COMPLElED gy G. G. Whitney REN)RT MON 111 'IEl.EPHONE 617-746-7900 I | ||
I | |||
n. | n. | ||
;, .$ E 3 E* Licensee h ''t, Cause A Corrective No; Date g, 3g i jg5 Event F'g 3 Action to F | ;, .$ E 3 E* Licensee h ''t, Cause A Corrective No; Date g, 3g i jg5 Event F'g 3 Action to F | ||
$5 5 3 ! ut t, gu e$c Report # | $5 5 3 ! ut t, gu e$c Report # | ||
v Picsent Recurrence 6 | v Picsent Recurrence 6 | ||
3 80/05/26 F 0.0 H 4 N.A. IIG DEMINX. liigh D/P Across Condensate 0 // 0.0 Demineralizers due to rust buildup in lines during outage. | 3 80/05/26 F 0.0 H 4 N.A. IIG DEMINX. liigh D/P Across Condensate 0 // 0.0 Demineralizers due to rust buildup in lines during outage. | ||
4 80/06/08 F 9.0 11 # N.A. IIC HTEXCH Reactor scrammed at 0451 ON O // 0.0 6/8/80 due to low vacuum during condenser backwash. | 4 80/06/08 F 9.0 11 # N.A. IIC HTEXCH Reactor scrammed at 0451 ON O // 0.0 6/8/80 due to low vacuum during condenser backwash. | ||
i 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data ll-Maintenance of Test 2-Manual Scram. Entry Shecis for tjecusee C Refueling 3 Autondlic Scram. Evens Report (LER) Fde tNilHI G-D Regulatory Restriction 4-Other (Explain) 0161) | i 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data ll-Maintenance of Test 2-Manual Scram. Entry Shecis for tjecusee C Refueling 3 Autondlic Scram. Evens Report (LER) Fde tNilHI G-D Regulatory Restriction 4-Other (Explain) 0161) | ||
E-Opesator Training a license lixamination F Administrative 5 G-Operational Enor (Explain) Eshibit I - Same Source 19/77) Il Other (Explain) | E-Opesator Training a license lixamination F Administrative 5 G-Operational Enor (Explain) Eshibit I - Same Source 19/77) Il Other (Explain) | ||
R_ M - | R_ M - | ||
e m | |||
e | e = | ||
I I | I I | ||
s s | s s | ||
e u | e u | ||
G = | G = | ||
O' D E | |||
O' D | T A | ||
I C A. G | |||
C A. G | |||
- O N S | - O N S | ||
0 S . | 0 S . | ||
8 A 9 _ | 8 A 9 _ | ||
1 | 1 E , | ||
E , | |||
~ | ~ | ||
M _ - | M _ - | ||
O r | |||
O | h Ne t | ||
Ne t | |||
Or 9 I r n To o Cn H AJ g m n _ | Or 9 I r n To o Cn H AJ g m n _ | ||
Er i Vn k I r _ , | Er i Vn k I r _ , | ||
Tm o Cu w Er Rv 1 Rn 1 On i Cu t S | Tm o Cu w Er Rv 1 Rn 1 On i Cu t S | ||
n T _ | n T _ | ||
9 E s t | |||
9 | |||
E s t | |||
N C r O N a I A E p T N C _ | N C r O N a I A E p T N C _ | ||
A E N f T T A o S N N I E l t | A E N f T T A o S N N I E l t | ||
l A n a | l A n a | ||
Line 176: | Line 121: | ||
L R C | L R C | ||
U Y s N T g E | U Y s N T g E | ||
M F E n D | M F E n D i | ||
I A S nr R S U ra C A oe L R C I O W B _. 4 P T M | |||
N O _ | N O _ | ||
I _ | I _ | ||
T g C n _ | T g C n _ | ||
N i _ | N i _ | ||
t | t U a .. | ||
U a .. | |||
F L b r _. | F L b r _. | ||
A i | A i M V . | ||
M V | |||
. | |||
p m | p m | ||
u T P N | u T P N | ||
Line 204: | Line 136: | ||
- P M | - P M | ||
O "E C " | O "E C " | ||
l | l | ||
* 1 | * 1 | ||
- E 2 T . | - E 2 T . | ||
Line 213: | Line 142: | ||
f | f | ||
7 | 7 BOSTC!: CDISC:! COMPANY PILGRI:t ?!UCLEAR P0k'ZR STATICt! | ||
BOSTC!: CDISC:! COMPANY PILGRI:t ?!UCLEAR P0k'ZR STATICt! | |||
Surmary of Onerations for June. 1980 The average power level for the first seven days of the sonth was 83%. | Surmary of Onerations for June. 1980 The average power level for the first seven days of the sonth was 83%. | ||
A reactor scram occurred at 0451 on 6-8-80 due to low vacuum during condenser backwash. The unit was back on the line at 2312 on 6-B-80. | A reactor scram occurred at 0451 on 6-8-80 due to low vacuum during condenser backwash. The unit was back on the line at 2312 on 6-B-80. | ||
Line 221: | Line 148: | ||
The unit was brought to 100% power at 1241 on 6-18-80, and was maintained until 2200 on 6-27-80, when the power was reduced to 50% to backwash the condenser. | The unit was brought to 100% power at 1241 on 6-18-80, and was maintained until 2200 on 6-27-80, when the power was reduced to 50% to backwash the condenser. | ||
Power was increased to 92% at 0800 on 6-28-80, and 100% power was reached at 0145 on 6-29-80, and remained there for the remainder of the month. | Power was increased to 92% at 0800 on 6-28-80, and 100% power was reached at 0145 on 6-29-80, and remained there for the remainder of the month. | ||
1 a | |||
1 | 3 4 | ||
RIERTG nt?C?2ii.p0N ... | RIERTG nt?C?2ii.p0N ... | ||
Tho felle'.-isg refueling infor=a:ic is included in tha li:::hly Report as reques:ed in a le::ar := lir. G. C. Andognini dated Januarf 13, 1973: | Tho felle'.-isg refueling infor=a:ic is included in tha li:::hly Report as reques:ed in a le::ar := lir. G. C. Andognini dated Januarf 13, 1973: | ||
Line 239: | Line 159: | ||
: 2. Scheduled da:e for nex: Refueling Shutdown: Septa =ber, 1981 . | : 2. Scheduled da:e for nex: Refueling Shutdown: Septa =ber, 1981 . | ||
: 3. Scheduled da:e for res.2:: foll wi=g rafueling: | : 3. Scheduled da:e for res.2:: foll wi=g rafueling: | ||
~. | ~. | ||
: 5. Due to their sd d 'irity, requests 4, 5, & 6 are responded o collectively. | : 5. Due to their sd d 'irity, requests 4, 5, & 6 are responded o collectively. | ||
: 5. ~..e fuel, which has been loaded duri=g :he preses: scheduled refueling outage, is of :he new FSx3R design, consis:ing of approxi=a:ely 64 ?SDR3232 assemblies and 120 PSDR3255 assedlies. | : 5. ~..e fuel, which has been loaded duri=g :he preses: scheduled refueling outage, is of :he new FSx3R design, consis:ing of approxi=a:ely 64 ?SDR3232 assemblies and 120 PSDR3255 assedlies. | ||
: 7. (2) hare are 520 fuel asse:blies in de cera. | : 7. (2) hare are 520 fuel asse:blies in de cera. | ||
(S) here are 754 fuel asse_blies in the spen fuel ;ccl. | (S) here are 754 fuel asse_blies in the spen fuel ;ccl. | ||
Line 251: | Line 168: | ||
('o) The planned spen: fuel s:orage capacity is 2320 fuel asse:blies. | ('o) The planned spen: fuel s:orage capacity is 2320 fuel asse:blies. | ||
: 9. 'Jith presen: speut fuel in s:crage, the spent fuel pool scw has :he capa-city to accc _.cda:e an additic-*' 1006 fuel asse=blies . - | : 9. 'Jith presen: speut fuel in s:crage, the spent fuel pool scw has :he capa-city to accc _.cda:e an additic-*' 1006 fuel asse=blies . - | ||
e g 'W l'}} | |||
e | |||
g 'W l'}} |
Latest revision as of 22:00, 18 February 2020
ML19320C055 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 07/07/1980 |
From: | Whitney G BOSTON EDISON CO. |
To: | |
Shared Package | |
ML19320C052 | List: |
References | |
NUDOCS 8007150704 | |
Download: ML19320C055 (4) | |
Text
AVERAGE DAILY UNIT POWER LEVEL O .
DOCKET NO. 50-293 g3j7 Pilgritt I DAE 07/07/80 COMPLETED BY G.G. Whitney TELEPHONE 617-746-7900 June, 1980 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe. Net) (Mwe. Net) g 514 g .,
620.
- 492. 33' 646.
3 534. 39 666.
~~
4 563. ,, 29 669.
y 549.
,3 632. *-
6 545- 22 666.
- 526. ,3 666.
3 01- 24 665.
9 4 19. ,3 657.
10 462- 26 656.
n 513. 7 625.
[2 sna ;g 544.
13 482. ,9 663.
g4 491. 30 661.
15 486. 3g 0.
^
16 513-INSTRUCTIONS .
On this formst.!ist the average daily unit power levelin MWe Net for each day in the repomng month. Compute to the nearest whole megswatt.
(o/77) 8007150 %
OPERATING DATA REPORT w
DOCKET NO. 50-293 DATE 7/07/80 COMPLETED BY U.G. wn1cnet TELEPHONE o1i-74o-e900 OPERATING STATUS Pilgrim I Notes
- 1. Unit Name:
- 2. Reporting Period: June, 1980 1990*
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Grosa MWe): Y' D##*
- 5. Design Electrical Rating (Net MWe): .
- 6. Maximum Dependable Capacity (Gross MWe): 690. ._
- 7. Maximum Dependable Capacity (Net MWe):
670.
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons.
l None
- 9. Power Level To Which Restricted,if Any (Net MWe): None
- 10. Reasons For Restrictions. lf Any:
. N/A l
This Month Yr..to-Date Cumuiauve
- 11. Hours in Reporting Period 720.0 4367.0 66263.0
- 12. Number Of Hours Reactor Was Critical 711.0 1159.0 46139.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 702.3 lobo.o o a .1
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1221120.0 1730328.0 74621440.0 .
_ ,, 17. Gross Electrical Energy Generated (MWH) 416870.0 ,
586740.0 24751574.0 ,
- 18. Net Electrical Energy Generated (MWH) 401031.0 563775.0 23769898.0 ,
- 19. Unit Service Factor 97.5 24.4 67.3 ._
- 20. Unit Availability Factor 97.5 24.4 67.3 ~~~
- 21. Unit Capacity Factor (Using MDC Net) 83.1 19.3 53.5 ,
_ _ 22. Unit Capacity Factor (Using DER Net) 85.0 19.7 54.8 ,
- 23. Unit Forced Outage Rate 1.3 3.2 10.5 _
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
~
NONE _
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: Unit Operating ,
- 26. Units in Test Status (Prior to Commercial Operationi: Forecast Achieved
. INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)
' DOCKET No. 50-293 ,
UNIT SilulDOWNS AND POWER REDtM.110NS Pilgrim I UNIT NAME DATE 7/7/80 COMPLElED gy G. G. Whitney REN)RT MON 111 'IEl.EPHONE 617-746-7900 I
n.
- , .$ E 3 E* Licensee h t, Cause A Corrective No; Date g, 3g i jg5 Event F'g 3 Action to F
$5 5 3 ! ut t, gu e$c Report #
v Picsent Recurrence 6
3 80/05/26 F 0.0 H 4 N.A. IIG DEMINX. liigh D/P Across Condensate 0 // 0.0 Demineralizers due to rust buildup in lines during outage.
4 80/06/08 F 9.0 11 # N.A. IIC HTEXCH Reactor scrammed at 0451 ON O // 0.0 6/8/80 due to low vacuum during condenser backwash.
i 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data ll-Maintenance of Test 2-Manual Scram. Entry Shecis for tjecusee C Refueling 3 Autondlic Scram. Evens Report (LER) Fde tNilHI G-D Regulatory Restriction 4-Other (Explain) 0161)
E-Opesator Training a license lixamination F Administrative 5 G-Operational Enor (Explain) Eshibit I - Same Source 19/77) Il Other (Explain)
R_ M -
e m
e =
I I
s s
e u
G =
O' D E
T A
I C A. G
- O N S
0 S .
8 A 9 _
1 E ,
~
M _ -
O r
h Ne t
Or 9 I r n To o Cn H AJ g m n _
Er i Vn k I r _ ,
Tm o Cu w Er Rv 1 Rn 1 On i Cu t S
n T _
9 E s t
N C r O N a I A E p T N C _
A E N f T T A o S N N I E l t
l A n a
. E M u
. W l l e O D A n ~ 9 P E I I e T _ R _
R A _
A L E E _ _
L R C
U Y s N T g E
M F E n D i
I A S nr R S U ra C A oe L R C I O W B _. 4 P T M
N O _
I _
T g C n _
N i _
t U a ..
F L b r _.
A i M V .
p m
u T P N
E W S
N O S
- P M
O "E C "
l
- 1
- E 2 T .
S .
f
7 BOSTC!: CDISC:! COMPANY PILGRI:t ?!UCLEAR P0k'ZR STATICt!
Surmary of Onerations for June. 1980 The average power level for the first seven days of the sonth was 83%.
A reactor scram occurred at 0451 on 6-8-80 due to low vacuum during condenser backwash. The unit was back on the line at 2312 on 6-B-80.
Power level at 0800 was 67% and being incransed under the direction of the Reactor Engineer.
The unit was brought to 100% power at 1241 on 6-18-80, and was maintained until 2200 on 6-27-80, when the power was reduced to 50% to backwash the condenser.
Power was increased to 92% at 0800 on 6-28-80, and 100% power was reached at 0145 on 6-29-80, and remained there for the remainder of the month.
1 a
3 4
RIERTG nt?C?2ii.p0N ...
Tho felle'.-isg refueling infor=a:ic is included in tha li:::hly Report as reques:ed in a le::ar := lir. G. C. Andognini dated Januarf 13, 1973:
Ic:'ycur cc:venience, :he infor=a:10 supplied has been e===erated so that ct.ch nunber cc: esponds :s aquivales: no ta:1== utilized in the request.
- 1. Tus ma=c cf this facili:y is Pilgri= Nuclea: Power Station, rocke: No.
50-293.
~
- 2. Scheduled da:e for nex: Refueling Shutdown: Septa =ber, 1981 .
- 3. Scheduled da:e for res.2:: foll wi=g rafueling:
~.
- 5. Due to their sd d 'irity, requests 4, 5, & 6 are responded o collectively.
- 5. ~..e fuel, which has been loaded duri=g :he preses: scheduled refueling outage, is of :he new FSx3R design, consis:ing of approxi=a:ely 64 ?SDR3232 assemblies and 120 PSDR3255 assedlies.
- 7. (2) hare are 520 fuel asse:blies in de cera.
(S) here are 754 fuel asse_blies in the spen fuel ;ccl.
- 3. (a) 2e sea ica is presently licensed to s:cre 2320 spe : fuel asse=blies.
~e.e actual spe : fuel s:crage capaci:7 is 1770 fuel asse=blies at preses:.
('o) The planned spen: fuel s:orage capacity is 2320 fuel asse:blies.
- 9. 'Jith presen: speut fuel in s:crage, the spent fuel pool scw has :he capa-city to accc _.cda:e an additic-*' 1006 fuel asse=blies . -
e g 'W l'