ML15334A453: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML15334A453
| number = ML15334A453
| issue date = 12/04/2015
| issue date = 12/04/2015
| title = R.E. Ginna Nuclear Power Plant- Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request-Flood Causing Mechanism Reevaluation
| title = Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request-Flood Causing Mechanism Reevaluation
| author name = Govan T
| author name = Govan T
| author affiliation = NRC/NRR/JLD
| author affiliation = NRC/NRR/JLD
Line 51: Line 51:


R.E. Ginna Nuclear Power Plant Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism              Stillwater        Waves/        Design Basis      Reference Elevation          Run up          Hazard Elevation Local Intense Precipitation Screen House                        254.5 ft          Minimal          254.5 ft  FHRR Section 1.3 NGVD29                              NGVD29 i
R.E. Ginna Nuclear Power Plant Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism              Stillwater        Waves/        Design Basis      Reference Elevation          Run up          Hazard Elevation Local Intense Precipitation Screen House                        254.5 ft          Minimal          254.5 ft  FHRR Section 1.3 NGVD29                              NGVD29 i
:
Streams and Rivers i
Streams and Rivers i
I PMF - Reactor Building              272.0 ft      i    Not            272.0 ft  FHRR Table 2.2-6 NGVD29        ,I applicable        NGVD29 PMF - Auxiliary Building            273.8 ft            Not            273.8 ft  FHRR Table 2.2-6 NGVD29          applicable        NGVD29 PMF - Turbine Building              256.6 ft            Not            256.6 ft  FHRR Table 2.2-6 NGVD29          applicable        NGVD29 PMF - Control Building              272.0 ft            Not            272.0 ft  FHRR Table 2.2-6 NGVD29          applicable        NGVD29 PMF -All-Volatile-Treatment        272.0 ft            Not            272.0 ft  FHRR Table 2.2-6 Building                            NGVD29          applicable        NGVD29 PMF - Standby Auxiliary            273.0 ft    I      Not            273.0 ft  FHRR Table 2.2-6 Feedwater Pump Building            NGVD29      !    applicable        NGVD29 PMF - Screen House                  256.6 ft            Not            256.6 ft  FHRR Table 2.2-6 NGVD29          applicable        NGVD29 PMF - Diesel Generator Building    256.6 ft            Not            256.6 ft  FHRR Table 2.2-6 NGVD29          applicable        NGVD29 i
I PMF - Reactor Building              272.0 ft      i    Not            272.0 ft  FHRR Table 2.2-6 NGVD29        ,I applicable        NGVD29 PMF - Auxiliary Building            273.8 ft            Not            273.8 ft  FHRR Table 2.2-6 NGVD29          applicable        NGVD29 PMF - Turbine Building              256.6 ft            Not            256.6 ft  FHRR Table 2.2-6 NGVD29          applicable        NGVD29 PMF - Control Building              272.0 ft            Not            272.0 ft  FHRR Table 2.2-6 NGVD29          applicable        NGVD29 PMF -All-Volatile-Treatment        272.0 ft            Not            272.0 ft  FHRR Table 2.2-6 Building                            NGVD29          applicable        NGVD29 PMF - Standby Auxiliary            273.0 ft    I      Not            273.0 ft  FHRR Table 2.2-6 Feedwater Pump Building            NGVD29      !    applicable        NGVD29 PMF - Screen House                  256.6 ft            Not            256.6 ft  FHRR Table 2.2-6 NGVD29          applicable        NGVD29 PMF - Diesel Generator Building    256.6 ft            Not            256.6 ft  FHRR Table 2.2-6 NGVD29          applicable        NGVD29 i
I Failure of Dams and Onsite Water Control/Storage Structures Not included , Not included      Not included FHRR Section 3.1.3 in DB            in DB            in DB 1                  --------~
I Failure of Dams and Onsite Water Control/Storage Structures Not included , Not included      Not included FHRR Section 3.1.3 in DB            in DB            in DB 1                  --------~


R.E. Ginna Nuclear Power Plant Table 1. Current Design Basis Flood Hazards for Use in the MSA
R.E. Ginna Nuclear Power Plant Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism                  Stillwater        Waves/                        Design Basis              Reference Elevation            Run up                          Hazard Elevation Storm Surge I
                                    --- -----**--      -- - - - - - - - - - - - - - - - - - - - - - - - - ----------------        ------------
Mechanism                  Stillwater        Waves/                        Design Basis              Reference Elevation            Run up                          Hazard Elevation Storm Surge I
Tropical Storm and Associated        253.3 ft              7.7 ft                        260.9 ft          FHRR Section 1.3 phenomena                            NGVD29                                              NGVD29 I
Tropical Storm and Associated        253.3 ft              7.7 ft                        260.9 ft          FHRR Section 1.3 phenomena                            NGVD29                                              NGVD29 I
Seiche Not included    Not included                        Not included        FHRR Section 3.1.5 in DB              in DB                          in DB I
Seiche Not included    Not included                        Not included        FHRR Section 3.1.5 in DB              in DB                          in DB I
Line 70: Line 67:
R.E. Ginna Nuclear Power Plant Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism                Stillwater        Waves/          Reevaluated            Reference            I I                                      Elevation          Run up            Hazard                                    I I
R.E. Ginna Nuclear Power Plant Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism                Stillwater        Waves/          Reevaluated            Reference            I I                                      Elevation          Run up            Hazard                                    I I
I                      Elevation                                  I Local Intense Precipitation                                          !
I                      Elevation                                  I Local Intense Precipitation                                          !
                                                                                      !
LIP 6-h event: Reactor                270.9 ft          Minimal          270.9 ft        FHRR Table 2.1-1 Containment                        I  NGVD29                              NGVD29 I
LIP 6-h event: Reactor                270.9 ft          Minimal          270.9 ft        FHRR Table 2.1-1 Containment                        I  NGVD29                              NGVD29 I
I LIP 6-h event: Auxiliary Building      270.7 ft          Minimal          270.7 ft        FHRR Table 2.1-1 NGVD29                              NGVD29 I
I LIP 6-h event: Auxiliary Building      270.7 ft          Minimal          270.7 ft        FHRR Table 2.1-1 NGVD29                              NGVD29 I
                                                                                       '                                I I
                                                                                       '                                I I
LIP 6-h event: Turbine Building        255.8 ft          Minimal          255.8 ft        FHRR Table 2.1-1          I NGVD29                              NGVD29 I
LIP 6-h event: Turbine Building        255.8 ft          Minimal          255.8 ft        FHRR Table 2.1-1          I NGVD29                              NGVD29 I
                                                                                      '
I LIP 6-h event: Control Building    i  270.9 ft          Minimal          270.9 ft        FHRR Table 2.1-1 i  NGVD29                              NGVD29 I
I LIP 6-h event: Control Building    i  270.9 ft          Minimal          270.9 ft        FHRR Table 2.1-1 i  NGVD29                              NGVD29
LIP 6-h event: All-Volatile-        i  270.8 ft          Minimal          270.8 ft        FHRR Table 2.1-1 Treatment Building                    NGVD29                              NGVD29 I
                                      !
I LIP 6-h event: All-Volatile-        i  270.8 ft          Minimal          270.8 ft        FHRR Table 2.1-1 Treatment Building                    NGVD29                              NGVD29 I
I I
I I
LIP 6-h event: Standby Auxiliary      270.2 ft          Minimal          270.2 ft        FHRR Table 2.2-1 Feedwater Pump Building                NGVD29                              NGVD29 LIP 6-h event: Proposed Standby        270.5 ft          Minimal          270.5 ft        FHRR Table 2.1-1 Auxiliary Feedwater Pump              NGVD29                              NGVD29 Building Annex LIP 6-h event: Screen House            255.8 ft          Minimal          255.8 ft        FHRR Table 2.1-1 NGVD29                              NGVD29 LIP 6-h event: Diesel Generator        255.8 ft          Minimal          255.8 ft        FHRR Table 2.1-1 Building                              NGVD29                              NGVD29
LIP 6-h event: Standby Auxiliary      270.2 ft          Minimal          270.2 ft        FHRR Table 2.2-1 Feedwater Pump Building                NGVD29                              NGVD29 LIP 6-h event: Proposed Standby        270.5 ft          Minimal          270.5 ft        FHRR Table 2.1-1 Auxiliary Feedwater Pump              NGVD29                              NGVD29 Building Annex LIP 6-h event: Screen House            255.8 ft          Minimal          255.8 ft        FHRR Table 2.1-1 NGVD29                              NGVD29 LIP 6-h event: Diesel Generator        255.8 ft          Minimal          255.8 ft        FHRR Table 2.1-1 Building                              NGVD29                              NGVD29 Streams and Rivers Reactor Building (stillwater: PMF;    272.4 ft            Not            272.4 ft        FHRR Table 2.2-6 total water level: PMF, H.1, H.4.2)    NGVD29          applicable          NGVD29 FHRR Sections 2.9.3 and 3.1.9 Turbine Building (stillwater: PMF;    258.2 ft            Not            258.2 ft  FHRR Sections 2.9.3, 3.1.9 and total water level: H.4.2)              NGVD29          applicable          NGVD29      FHRR Enclosure 1 Table 4 I                                              I
                                                                                      '
Streams and Rivers Reactor Building (stillwater: PMF;    272.4 ft            Not            272.4 ft        FHRR Table 2.2-6 total water level: PMF, H.1, H.4.2)    NGVD29          applicable          NGVD29 FHRR Sections 2.9.3 and 3.1.9 Turbine Building (stillwater: PMF;    258.2 ft            Not            258.2 ft  FHRR Sections 2.9.3, 3.1.9 and total water level: H.4.2)              NGVD29          applicable          NGVD29      FHRR Enclosure 1 Table 4
                                      '
I                                              I


R.E. Ginna Nuclear Power Plant Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism                Stillwater        Waves/          Reevaluated              Reference Elevation          Run up            Hazard Elevation Control Building (stillwater: PMF;      272.4 ft            Not        I    272.4 ft          FHRR Table 2.2-6 total water level: PMF, H.1, H.4.2)    NGVD29          applicable    1 NGVD29 FHRR Section 2.9.3 and 3.1.9 Standby Auxiliary Feedwater            272.8 ft          0.9 ft          273.7 ft          FHRR Table 2.2-6 Pump Building (stillwater: PMF;        NGVD29                              NGVD29 total water level: H.1)                                                              FHRR Enclosure 1 Tables 2 and 3 Proposed Standby Auxiliary              273.5 ft          0.9 ft          274.4ft  FHRR Enclosure 1 Tables 2 and 3 Feedwater Pump Building Annex          NGVD29                            NGVD29 (stillwater: PMF; total water level:
R.E. Ginna Nuclear Power Plant Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism                Stillwater        Waves/          Reevaluated              Reference Elevation          Run up            Hazard Elevation Control Building (stillwater: PMF;      272.4 ft            Not        I    272.4 ft          FHRR Table 2.2-6 total water level: PMF, H.1, H.4.2)    NGVD29          applicable    1 NGVD29 FHRR Section 2.9.3 and 3.1.9 Standby Auxiliary Feedwater            272.8 ft          0.9 ft          273.7 ft          FHRR Table 2.2-6 Pump Building (stillwater: PMF;        NGVD29                              NGVD29 total water level: H.1)                                                              FHRR Enclosure 1 Tables 2 and 3 Proposed Standby Auxiliary              273.5 ft          0.9 ft          274.4ft  FHRR Enclosure 1 Tables 2 and 3 Feedwater Pump Building Annex          NGVD29                            NGVD29 (stillwater: PMF; total water level:

Latest revision as of 07:14, 5 February 2020

Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request-Flood Causing Mechanism Reevaluation
ML15334A453
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/04/2015
From: Tekia Govan
Japan Lessons-Learned Division
To: Bryan Hanson
Exelon Generation Co
Govan, Tekia NRR/JLD 415-6197
References
TAC MF6098
Download: ML15334A453 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 4, 2015 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

R.E. GINNA NUCLEAR POWER PLANT- INTERIM STAFF RESPONSE TO REEVALUATED FLOOD HAZARDS SUBMITTED IN RESPONSE TO 10 CFR 50.54(f) INFORMATION REQUEST- FLOOD-CAUSING MECHANISM REEVALUATION (TAC NO MF6098)

Dear Mr. Hanson:

The purpose of this letter is to provide a summary of the U.S. Nuclear Regulatory Commission (NRC) staff's assessment of the re-evaluated flood-causing mechanisms described in the March 11, 2015 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML15072A009, flood hazard reevaluation report (FHRR) submitted by R. E.

Ginna Nuclear Power Plant, LLC (the licensee) for R. E. Ginna Nuclear Power Plant (Ginna), as well as supplemental information resulting from requests for additional information and audits.

By letter dated March 12, 2012, the NRC issued a request for information pursuant to Title 10 of the Code of Federal Regulations, Section 50.54(f) (hereafter referred to as the 50.54(f) letter)

(ADAMS Accession No. ML12053A340). The request was issued as part of implementing lessons-learned from the accident at the Fukushima Dai-ichi nuclear power plant. Enclosure 2 to the 50.54(f) letter requested licensees to re-evaluate flood-causing mechanisms using present-day methodologies and guidance. Concurrently, with the reevaluation of flooding hazards, licensees were required to develop and implement mitigating strategies in accordance with NRC Order EA-12-049, "Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML12054A735). On March 30, 2015, the Commission provided Staff Requirements Memoranda (SRM) (ADAMS Accession No. ML15089A236) to COMSECY-14-0037, "Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluation of Flooding Hazards," dated November 21, 2014 (ADAMS Accession No. ML14309A256), affirming that licensees need to address the reevaluated flooding hazards within their mitigating strategies for beyond-design-basis external events.

The NRC staff has reviewed the information submitted by the licensee and has summarized the results of the review in the tables provided as an Enclosure to this letter. Table 1 provides the current design-basis flood hazard mechanisms. Table 2 provides the reevaluated flood hazard mechanisms; however, the reevaluated flood hazard mechanisms bounded by the current design-basis (Table 1) are not included.

The NRC staff has concluded that the licensee's reevaluated flood hazards information, as summarized in the Enclosure, is suitable for the assessment of mitigating strategies developed in response to Order EA-12-049 (i.e., defines the mitigating strategies flood hazard information

B. Hanson described in guidance documents currently being finalized by the industry and NRC staff) for Ginna. Further, the NRC staff has concluded that the licensee's reevaluated flood hazard information is a suitable input for other assessments associated with Near-Term Task Force Recommendation 2.1 "Flooding." The NRC staff plans to issue a staff assessment documenting the basis for these conclusions at a later time.

In addition, Nuclear Energy Institute (NEI) guidance document NEI 12-06 "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide" is currently being revised. This revision will include a methodology to perform a Mitigating Strategies Assessment (MSA) with respect to the reevaluated flood hazards. Once this methodology is endorsed by the NRC, flood event duration parameters and applicable flood associated effects should be considered as part of the Ginna MSA. The NRC staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood-related associated effects developed by the licensee during the NRC staff's review of the MSA.

As stated above, Table 2 of the enclosure to this letter describes the reevaluated flood hazards that exceed the current design-basis. In order to complete its response to the information requested by Enclosure 2 to the 50.54(f) letter, the licensee is expected to submit an integrated assessment or a focused evaluation, as appropriate, to address these reevaluated flood hazards, as described in the NRC letter, "Coordination of Request for Information Regarding Flooding Hazard Reevaluation and Mitigating Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML15174A257). This letter describes the changes in the NRC's approach to the flood hazard reevaluations that were approved by the Commission in its SRM to COMSECY-15-0019, "Closure Plan for the Reevaluation of Flooding Hazards for Operating Nuclear Power Plants" (ADAMS Accession No. ML15209A682).

B. Hanson If you have any questions, please contact me at (301) 415-6197 or e-mail at Tekia.Govan@nrc.gov.

Sincerely, Juu~v.~

Tekia Govan, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket No. 50-244

Enclosure:

Summary of Results of Flooding Hazard Re-Evaluation Report cc w/encl: Distribution via Listserv

ENCLOSURE:

SUMMARY

TABLES OF REEVALUATED FLOOD HAZARD LEVELS

R.E. Ginna Nuclear Power Plant Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Run up Hazard Elevation Local Intense Precipitation Screen House 254.5 ft Minimal 254.5 ft FHRR Section 1.3 NGVD29 NGVD29 i

Streams and Rivers i

I PMF - Reactor Building 272.0 ft i Not 272.0 ft FHRR Table 2.2-6 NGVD29 ,I applicable NGVD29 PMF - Auxiliary Building 273.8 ft Not 273.8 ft FHRR Table 2.2-6 NGVD29 applicable NGVD29 PMF - Turbine Building 256.6 ft Not 256.6 ft FHRR Table 2.2-6 NGVD29 applicable NGVD29 PMF - Control Building 272.0 ft Not 272.0 ft FHRR Table 2.2-6 NGVD29 applicable NGVD29 PMF -All-Volatile-Treatment 272.0 ft Not 272.0 ft FHRR Table 2.2-6 Building NGVD29 applicable NGVD29 PMF - Standby Auxiliary 273.0 ft I Not 273.0 ft FHRR Table 2.2-6 Feedwater Pump Building NGVD29  ! applicable NGVD29 PMF - Screen House 256.6 ft Not 256.6 ft FHRR Table 2.2-6 NGVD29 applicable NGVD29 PMF - Diesel Generator Building 256.6 ft Not 256.6 ft FHRR Table 2.2-6 NGVD29 applicable NGVD29 i

I Failure of Dams and Onsite Water Control/Storage Structures Not included , Not included Not included FHRR Section 3.1.3 in DB in DB in DB 1 --------~

R.E. Ginna Nuclear Power Plant Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Run up Hazard Elevation Storm Surge I

Tropical Storm and Associated 253.3 ft 7.7 ft 260.9 ft FHRR Section 1.3 phenomena NGVD29 NGVD29 I

Seiche Not included Not included Not included FHRR Section 3.1.5 in DB in DB in DB I

I Tsunami I Not included Not included Not included FHRR Section 3.1.6 I

I I in DB I I in DB in DB I

Ice-Induced Flooding

! No Impact No Impact No Impact FHRR Section 3.1.7 on the Site i I

on the Site on the Site Identified Identified Identified I

Channel Migrations/Diversions Not included Not included Not included FHRR Section 3.1.8 in DB in DB in DB Note 1: Reported values are rounded to the nearest one-tenth of a foot.

R.E. Ginna Nuclear Power Plant Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Waves/ Reevaluated Reference I I Elevation Run up Hazard I I

I Elevation I Local Intense Precipitation  !

LIP 6-h event: Reactor 270.9 ft Minimal 270.9 ft FHRR Table 2.1-1 Containment I NGVD29 NGVD29 I

I LIP 6-h event: Auxiliary Building 270.7 ft Minimal 270.7 ft FHRR Table 2.1-1 NGVD29 NGVD29 I

' I I

LIP 6-h event: Turbine Building 255.8 ft Minimal 255.8 ft FHRR Table 2.1-1 I NGVD29 NGVD29 I

I LIP 6-h event: Control Building i 270.9 ft Minimal 270.9 ft FHRR Table 2.1-1 i NGVD29 NGVD29 I

LIP 6-h event: All-Volatile- i 270.8 ft Minimal 270.8 ft FHRR Table 2.1-1 Treatment Building NGVD29 NGVD29 I

I I

LIP 6-h event: Standby Auxiliary 270.2 ft Minimal 270.2 ft FHRR Table 2.2-1 Feedwater Pump Building NGVD29 NGVD29 LIP 6-h event: Proposed Standby 270.5 ft Minimal 270.5 ft FHRR Table 2.1-1 Auxiliary Feedwater Pump NGVD29 NGVD29 Building Annex LIP 6-h event: Screen House 255.8 ft Minimal 255.8 ft FHRR Table 2.1-1 NGVD29 NGVD29 LIP 6-h event: Diesel Generator 255.8 ft Minimal 255.8 ft FHRR Table 2.1-1 Building NGVD29 NGVD29 Streams and Rivers Reactor Building (stillwater: PMF; 272.4 ft Not 272.4 ft FHRR Table 2.2-6 total water level: PMF, H.1, H.4.2) NGVD29 applicable NGVD29 FHRR Sections 2.9.3 and 3.1.9 Turbine Building (stillwater: PMF; 258.2 ft Not 258.2 ft FHRR Sections 2.9.3, 3.1.9 and total water level: H.4.2) NGVD29 applicable NGVD29 FHRR Enclosure 1 Table 4 I I

R.E. Ginna Nuclear Power Plant Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Waves/ Reevaluated Reference Elevation Run up Hazard Elevation Control Building (stillwater: PMF; 272.4 ft Not I 272.4 ft FHRR Table 2.2-6 total water level: PMF, H.1, H.4.2) NGVD29 applicable 1 NGVD29 FHRR Section 2.9.3 and 3.1.9 Standby Auxiliary Feedwater 272.8 ft 0.9 ft 273.7 ft FHRR Table 2.2-6 Pump Building (stillwater: PMF; NGVD29 NGVD29 total water level: H.1) FHRR Enclosure 1 Tables 2 and 3 Proposed Standby Auxiliary 273.5 ft 0.9 ft 274.4ft FHRR Enclosure 1 Tables 2 and 3 Feedwater Pump Building Annex NGVD29 NGVD29 (stillwater: PMF; total water level:

H.1) j I

Screen House (stillwater: PMF; 258.2 ft Not 258.2 ft FHRR Sections 2.9.3, 3.1.9 and total water level: H.4.2) NGVD29 applicable NGVD29 FHRR Enclosure 1 Table 4 Diesel Generator Building 258.4 ft Not 258.4 ft FHRR Sections 2.9.3, 3.1.9 and (stillwater: PMF; total water level: NGVD29 applicable NGVD29 FHRR Enclosure 1 Table 4 H.4.2)

Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA. The staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood associated effects during its review of the MSA.

Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table Note 3: Reported values are rounded to the nearest one-tenth of a foot.

PKG ML15334A451; LTR: ML15334A453; ENCL: ML15327A204 *via email OFFICE NRR/JLD/JHMB/PM NRR/JLD/LA NRO/DSEA/RHM2/TR*

NAME TGovan Slent LHibler DATE 12/2/2015 12/2/2015 11/24/2015 OFFICE NRO/DSEA/RHM2/TL

  • NRR/JLD/JHMB/BC NRR/JLD/JHMB/PM NAME ARivera-Varona MShams TGovan DATE 11/24/2015 12/4/2015 12/4/2015