ML11126A320: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352  
{{#Wiki_filter:UNITED STATES
May 6, 2011  
                          NUCLEAR REGULATORY COMMISSION
Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC  
                                              REGION III
President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555 SUBJECT: DRESDEN NUCLEAR POWER STATION NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION 05000237/2011008(DRS); 05000249/2011008(DRS) Dear Mr. Pacilio  
                                2443 WARRENVILLE ROAD, SUITE 210
On July 27, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire protection baseline inspection at your Dresden Nuclear Power Station. This inspection will be performed in accordance with Inspection Procedure (IP) 71111.05T, the NRC's baseline fire protection inspection procedure.   Changes were made to the IP 71111.05T, which now requires the fire protection inspection to review your actions to mitigate postulated events that could potentially cause loss of large areas of power reactor facilities due to explosions or fires. This requirement was implemented by the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b and the subsequent requirements of 10 CFR 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this inspection, the B.5.b requirements review will be performed during  
                                        LISLE, IL 60532-4352
the first onsite week of the inspection starting on July 27, 2011. The schedule for the onsite inspection activity is as follows: Information Gathering Visit: July 25 - 27, 2011 B.5.b Requirements: July 27 - 39, 2011, and Fire Protection Inspection: August 8 - 12, 2011, and August 29 - September 2, 2011. The purpose of the information gathering visit is: (1) to obtain information and documentation needed to support the inspection; (2) to become familiar with the Dresden Nuclear Power Station fire protection programs, fire protection features, post-fire safe shutdown capabilities, and plant layout; and (3) to arrange administrative details, such as office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges. Experience has shown that the baseline fire protection inspections are extremely resource intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection  
                                            May 6, 2011
impact on the site and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups. The first group lists information necessary to aid the inspection team in choosing specific focus areas for the inspection.  It is requested that this information be 
Mr. Michael J. Pacilio
  M. Pacilio    -2- provided to the lead inspector via mail or electronically no later than July 5, 2011.  The second group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection. It is requested this information be available during the information gathering visit (July 25, 2011).  The third group of requested documents
Senior Vice President, Exelon Generation Company, LLC
consists of those items that the team will review, or need access to, during the inspection.  Please have this information available by the first day of the second onsite inspection week (August 8, 2011).  The fourth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection.  It is requested that this information be provided to the lead inspector as the information is generated during the inspection.  It is
President and Chief Nuclear Officer (CNO), Exelon Nuclear
important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector for this inspection is Ronald A. Langstaff.  We understand that our regulatory contact for this inspection is Mr. G. Ice, NRC Coordinator, Dresden Regulatory Assurance, of your organization.  If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9747 or via e-mail at Ronald.Langstaff@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection
4300 Winfield Road
requirements were approved by the Office of Management and Budget, Control Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,  /RA/ by R. A. Langstaff For/
Warrenville IL 60555
SUBJECT:         DRESDEN NUCLEAR POWER STATION NOTIFICATION OF AN NRC
                TRIENNIAL FIRE PROTECTION BASELINE INSPECTION
                05000237/2011008(DRS); 05000249/2011008(DRS)
Dear Mr. Pacilio
On July 27, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire
protection baseline inspection at your Dresden Nuclear Power Station. This inspection will be
performed in accordance with Inspection Procedure (IP) 71111.05T, the NRCs baseline fire
protection inspection procedure.
Changes were made to the IP 71111.05T, which now requires the fire protection inspection to
review your actions to mitigate postulated events that could potentially cause loss of large areas
of power reactor facilities due to explosions or fires. This requirement was implemented by the
issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b and the
subsequent requirements of 10 CFR 50.54(hh)(2), which are collectively referred to as B.5.b
requirements. During this inspection, the B.5.b requirements review will be performed during
the first onsite week of the inspection starting on July 27, 2011.
The schedule for the onsite inspection activity is as follows:
Information Gathering Visit: July 25 - 27, 2011
B.5.b Requirements: July 27 - 39, 2011, and
Fire Protection Inspection: August 8 - 12, 2011, and August 29 - September 2, 2011.
The purpose of the information gathering visit is: (1) to obtain information and documentation
needed to support the inspection; (2) to become familiar with the Dresden Nuclear Power
Station fire protection programs, fire protection features, post-fire safe shutdown capabilities,
and plant layout; and (3) to arrange administrative details, such as office space, availability of
knowledgeable office personnel and to ensure unescorted site access privileges.
Experience has shown that the baseline fire protection inspections are extremely resource
intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection
impact on the site and to ensure a productive inspection for both organizations, we have
enclosed a request for documents needed for the inspection. These documents have been
divided into four groups. The first group lists information necessary to aid the inspection team in
choosing specific focus areas for the inspection. It is requested that this information be


Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos.: 50-237; 50-249 License Nos.: DPR 19; DPR 25 Enclosure: Fire Protection Inspection Document Request cc w/encl: Distribution via ListServ
M. Pacilio                                      -2-
FIRE PROTECTION INSPECTION  DOCUMENT REQUESTS Enclosure
provided to the lead inspector via mail or electronically no later than July 5, 2011. The second
1Inspection Report:    05000237/2011008(DRS); 05000249/2011008(DRS) Onsite Inspection Dates: July 25 - 27, 2011   (Information Gathering Visit)     July 27 - 29, 2011  (B.5.b Requirements)    August 8 - 12, 2011  (Fire Protection Inspection)
group also lists information and areas for discussion necessary to aid the inspection team in
    August 29 - September 2, 2011 (Fire Protection Inspection) Inspection Procedures
choosing specific fire protection focus areas for the inspection and to ensure that the inspection
:  IP71111.05T, "Fire Protection (Triennial)" IP71152, "Identification and Resolution of Problems" Inspectors:    R. A. Langstaff    (630) 829-9747
team is adequately prepared for the inspection. It is requested this information be available
    Ronald.Langstaff@nrc.gov
during the information gathering visit (July 25, 2011). The third group of requested documents
    Z. Falevits  R. A. Winter    (630) 829-9717  (630) 829-9758
consists of those items that the team will review, or need access to, during the inspection.
    Zelig.Falevits@nrc.gov
Please have this information available by the first day of the second onsite inspection week
Robert.Winter@nrc.gov
(August 8, 2011). The fourth group lists the information necessary to aid the inspection team in
Observer:    J. S. Bowen    (301) 415-3471
tracking issues identified as a result of the inspection. It is requested that this information be
    Jeremy.Bowen@nrc.gov
provided to the lead inspector as the information is generated during the inspection. It is
I. Information Requested Prior To the Information Gathering Visit The following information is requested by July 5, 2011. If you have any questions regarding this request, please call the lead inspector as soon as possible. All information should be sent to R.A. Langstaff (e-mail address Ronald.Langstaff@nrc.gov).  Electronic media is preferred. The preferred file format is a searchable "pdf" file on a compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if possible.  Please provide four copies of each CD submitted (one for each inspector and observer). 1. The most risk significant fire areas as determined by probabilistic risk analyses, if available.  Otherwise, the reactor plant's Individual Plant Examination for External
important that all of these documents are up to date and complete in order to minimize the
Events (IPEEE) for fire and results of any post-IPEEE reviews for fire. 2. A copy of the current version of the Fire Protection Program (FPP), Fire Hazards Analysis (FHA), Safe Shutdown Analysis (SSA), Updated Safety Analysis Report (USAR), Technical Specifications, license (including the fire protection license condition), and Technical Requirements Manual (TRM) or equivalent for fire
number of additional documents requested during the preparation and/or the onsite portions of
protection structures, systems, and components. 3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for which 10 CFR Part 50, Appendix R, Section III G requirements are satisfied under Section III.G.3), or where both safe shutdown trains can be affected. 
the inspection.
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS Enclosure
The lead inspector for this inspection is Ronald A. Langstaff. We understand that our regulatory
24. Plant operating procedures which would be used and describe shutdown for a postulated fire (for both areas requiring alternative shutdown and areas which do not require alternative shutdown).  Only those procedures with actions specific to shutdown in the event of a fire need be included.  In addition, please include those
contact for this inspection is Mr. G. Ice, NRC Coordinator, Dresden Regulatory Assurance, of
procedures which operators would use for initial response to a fire, such as annunciator or alarm response procedures, the procedure used for activating the fire brigade, and the procedure which directs operators to the applicable safe shutdown procedure. II. Information Requested During the Information Gathering Visit (July 25, 2011) The following information is requested to be provided to the inspection team during the onsite information gathering visit.  Except for Item 1, it is requested that the following information be provided on four sets of CDs (searchable, if possible) with the B.5.b Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CDs. In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d. 1. One set of hard-copy documents for facility layout drawings which identify plant
your organization. If there are any questions about the inspection or the material requested,
fire area delineation; areas protected by automatic fire suppression and detection;
please contact the lead inspector at (630) 829-9747 or via e-mail at Ronald.Langstaff@nrc.gov.
and locations of fire protection equipment. 2. Licensing Information: a. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs) applicable to fire protection (specifically including those SERs referenced by the plant fire protection license condition) and all licensing correspondence referenced by the SERs; b. All licensing correspondence associated with the comparison to Standard Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes; c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated licensing correspondence; d. For pre-1979 plants, all licensing correspondence associated with those sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant under 10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with those fire protection features proposed or implemented by the licensee that have been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection SERs issued before February 19, 1981, (10 CFR
This letter does not contain new or amended information collection requirements subject to
50.48(b)(1)(i)); or those fire protection features, which were accepted by the NRC staff in comprehensive fire protection SERs issued before Appendix A to BTP APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii)); and e. The final safety analysis report (FSAR) sections applicable to fire protection, FHA, and SSA in effect at the time of original licensing.
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
FIRE PROTECTION INSPECTION  DOCUMENT REQUESTS Enclosure
requirements were approved by the Office of Management and Budget, Control Number
33. Fire Protection Program: a. A listing of changes made to the FPP since the last triennial fire protection inspection; b. For pre-1979 plants, a listing of the protection methodologies identified under 10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for selected fire zones/areas (to be determined during information gathering visit). That is, please specify whether 3-hour rated fire barriers; (Section III.G.2.a), 20 foot separation along with detection and suppression; (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression; (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a strategy for each selected fire zone/area; c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe shutdown evaluations); d. A list of applicable codes and standards related to the design of plant fire protection features.  The list should include National Fire Protection Association (NFPA) code versions committed to (i.e., the NFPA Codes of Record); and e. List of plant deviations from code commitments and associated evaluations. 4. Facility Information: a. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for fires outside the control room, those components used for those areas requiring alternative
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to a
shutdown capability, and systems relied upon for B.5.b mitigation strategies.  These can be of the type that are used for training; b. One-line schematic drawings of the electrical distribution system for 4160 Volts alternating current (Vac) down to 480Vac; c. One-line schematic drawings of the electrical distribution system for 250 Volts direct current (Vdc) and 125Vdc systems as applicable; d. Logic diagrams showing the components used to achieve and maintain hot standby and cold shutdown; and e. Safe shutdown cable routing database (requested electronically such as on compact disc, if available.
request for information or an information collection requirement unless the requesting document
FIRE PROTECTION INSPECTION  DOCUMENT REQUESTS Enclosure
displays a currently valid Office of Management and Budget control number.
45. Operations Response for Fire Protection: a. Pre-fire plans for selected fire zones/areas (to be determined during information gathering visit);  b. Plant operating procedures which specify the initial operations response to a fire alarm or annunciator; and c. Procedure for calling out the fire brigade and requesting off-site assistance. 6. Corrective Actions: a. Listing of open and closed fire protection condition reports (i.e., problem identification forms and their resolution reports) since the date of the last triennial fire protection inspection; and  b. List of current fire impairments, including duration. 7. General Information: a. A listing of abbreviations and/or designators for plant systems;  b. Organization charts of site personnel down to the level of fire protection staff personnel; and  c. A phone list for onsite licensee personnel. 8. B.5.b Mitigating Strategies: a. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and 10 CFR 50.54(hh)(2); b. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc.; c. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are used to implement each strategy; d. A listing of engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies; e. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies;  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
FIRE PROTECTION INSPECTION  DOCUMENT REQUESTS Enclosure
its enclosure will be available electronically for public inspection in the NRC Public Document
5f. A list of B.5.b mitigating strategies, if any, which have implementing details that differ from that documented in the submittals and the safety evaluation report; g. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required to implement any mitigating strategies; and h. A list of changes made to B.5.b mitigating strategies and associated procedures since the previous NRC inspection of B.5.b mitigating strategies (October 2008). 9. Onsite Discussions: In addition, during the information gathering visit, it is requested that licensee staff be available for the following: a. Informal discussion on plant procedures operators would use in the event of fire or explosion (including B.5.b mitigation strategies) and under what conditions would the plant be shutdown using alternative shutdown methodology; b. Informal discussion on the plant's safe shutdown cable routing database and the plant-wide cable routing database, as applicable; and c. A tour of alternative shutdown and risk significant fire areas. III. Information Requested to be Available on First Day of
Room or from the Publicly Available Records (PARS) component of NRC's document
the Second ONSITE Inspection Week (August 8, 2011)
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
The following information is requested to be provided on the first day of inspectionIt is requested that this information be provided on four sets of CDs (searchable, if possible). 1. Program Procedures: a. Procedures for: i. Administrative controls (such as allowed out of service times and compensatory measures) for fire protection systems and components ii. Control of transient combustibles iii. Control of hot work b. List of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps, and suppression
rm/adams.html (the Public Electronic Reading Room).
systems; and c. List of maintenance procedures which routinely verify fuse breaker coordination in accordance with the post-fire safe shutdown coordination analysis.
                                                Sincerely,
FIRE PROTECTION INSPECTION  DOCUMENT REQUESTS Enclosure
                                                /RA/ by R. A. Langstaff For/
62. Design and Equipment Information: a. Coordination calculations and/or justifications that verify fuse/breaker coordination for selected fire zones/areas (to be determined during information gathering visit) that are fed off of the same electrical buses as components in the protected safe shutdown train; b. Copies of significant fire protection and post-fire safe shutdown related design change package descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter (GL) 86-10 (or adverse to safe shutdown)
                                                Robert C. Daley, Chief
evaluations; c. Gaseous suppression system pre-operational testing, if applicable, for selected fire zones/areas (to be determined during information gathering visit); d. Hydraulic calculations and supporting test data which demonstrate operability for water suppression systems, if applicable, for selected fire zones/areas (to be determined during information gathering visit
                                                Engineering Branch 3
); e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac electrical systems; and f. List of all fire protection or Appendix R calculations. 3. Assessment and Corrective Actions: The three most recent fire protection Quality Assurance (QA) audits and/or fire protection self-assessments. 4. Any updates to information previously provided. IV. Information Requested to Be Provided Throughout the Inspection 1. Copies of any corrective action documents generated as a result of the inspection team's questions or queries during this inspection. 2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member). If you have questions regarding the information requested, please contact the lead inspector.
                                                Division of Reactor Safety
  M. Pacilio    -2- provided to the lead inspector via mail or electronically no later than July 5, 2011.  The second group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire
Docket Nos.: 50-237; 50-249
protection focus areas for the inspection and to ensure that the inspection team is adequately prepared
License Nos.: DPR 19; DPR 25
for the inspection. It is requested this information be available during the information gathering visit (July
Enclosure:      Fire Protection Inspection Document Request
25, 2011). The third group of requested documents consists of those items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the second onsite inspection week (August 8, 2011).  The fourth group lists the information necessary to aid
cc w/encl:      Distribution via ListServ
the inspection team in tracking issues identified as a result of the inspection. It is requested that this
 
information be provided to the lead inspector as the information is generated during the inspection.  It is
                                FIRE PROTECTION INSPECTION
important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector for this inspection is Ronald A. Langstaff. We understand that our regulatory contact for this inspection is Mr. G. Ice, NRC Coordinator, and Dresden Regulatory Assurance, of your organization. If there are any questions about the inspection or the material requested, please contact
                                      DOCUMENT REQUESTS
the lead inspector at (630) 829-9747 or via e-mail at Ronald.Langstaff@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The
Inspection Report:              05000237/2011008(DRS); 05000249/2011008(DRS)
NRC may not conduct or sponsor, and a person is not required to respond to a request for information or an information collection requirement unless the requesting document displays a currently valid Office of
Onsite Inspection Dates:        July 25 - 27, 2011                    (Information Gathering Visit)
Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is
                                July 27 - 29, 2011                    (B.5.b Requirements)
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,  /RA by R. A. Langstaff For/ Robert C. Daley, Chief
                                August 8 - 12, 2011                  (Fire Protection Inspection)
Engineering Branch 3
                                August 29 - September 2, 2011        (Fire Protection Inspection)
Division of Reactor Safety Docket Nos.: 50-237; 50-249 License Nos.: DPR 19; DPR 25 Enclosure: Fire Protection Inspection Document Request cc w/encl: Distribution via ListServ Distribution
Inspection Procedures:          IP71111.05T, Fire Protection (Triennial)
: See next page DOCUMENT NAME:  G:\DRSIII\DRS\Work in Progress\-Ltr 050611 Dresden FPI RFI RAL.docx  Publicly Available Non-Publicly Available        Sensitive          Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl; "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII     NAME RLangstaff:ls RDaley  DATE 05/06/11 05/06/11  OFFICIAL RECORD COPY
                                IP71152, "Identification and Resolution of Problems"
 
Inspectors:                    R. A. Langstaff
  Letter to Mr. Michael Pacilio from Mr. Robert C. Daley dated May 6, 2011. SUBJECT: DRESDEN Nuclear Power Station NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION 05000237/2011008(DRS); 05000249/2011008(DRS) DISTRIBUTION
                                (630) 829-9747
: Daniel Merzke RidsNrrDorlLpl3-2 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson
                                Ronald.Langstaff@nrc.gov
Steven Orth Jared Heck Allan Barker Carole Ariano
                                Z. Falevits                    R. A. Winter
Linda Linn DRPIII DRSIII
                                (630) 829-9717                (630) 829-9758
Patricia Buckley Tammy Tomczak ROPreports Resource
                                Zelig.Falevits@nrc.gov        Robert.Winter@nrc.gov
Observer:                      J. S. Bowen
                                (301) 415-3471
                                Jeremy.Bowen@nrc.gov
I.     Information Requested Prior To the Information Gathering Visit
      The following information is requested by July 5, 2011. If you have any questions
      regarding this request, please call the lead inspector as soon as possible. All
      information should be sent to R.A. Langstaff (e-mail address
      Ronald.Langstaff@nrc.gov). Electronic media is preferred. The preferred file format is a
      searchable pdf file on a compact disk (CD). The CD should be indexed and hyper-
      linked to facilitate ease of use, if possible. Please provide four copies of each CD
      submitted (one for each inspector and observer).
      1.    The most risk significant fire areas as determined by probabilistic risk analyses, if
            available. Otherwise, the reactor plant's Individual Plant Examination for External
            Events (IPEEE) for fire and results of any post-IPEEE reviews for fire.
      2.    A copy of the current version of the Fire Protection Program (FPP), Fire Hazards
            Analysis (FHA), Safe Shutdown Analysis (SSA), Updated Safety Analysis Report
            (USAR), Technical Specifications, license (including the fire protection license
            condition), and Technical Requirements Manual (TRM) or equivalent for fire
            protection structures, systems, and components.
      3.   A list of fire areas requiring alternative shutdown capability, (i.e., those areas for
            which 10 CFR Part 50, Appendix R, Section III G requirements are satisfied under
            Section III.G.3), or where both safe shutdown trains can be affected.
                                                  1                                        Enclosure
 
                              FIRE PROTECTION INSPECTION
                                  DOCUMENT REQUESTS
    4.   Plant operating procedures which would be used and describe shutdown for a
          postulated fire (for both areas requiring alternative shutdown and areas which do
          not require alternative shutdown). Only those procedures with actions specific to
          shutdown in the event of a fire need be included. In addition, please include those
          procedures which operators would use for initial response to a fire, such as
          annunciator or alarm response procedures, the procedure used for activating the
          fire brigade, and the procedure which directs operators to the applicable safe
          shutdown procedure.
II. Information Requested During the Information Gathering Visit (July 25, 2011)
    The following information is requested to be provided to the inspection team during the
    onsite information gathering visit. Except for Item 1, it is requested that the following
    information be provided on four sets of CDs (searchable, if possible) with the B.5.b
    Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CDs.
    In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d.
    1.   One set of hard-copy documents for facility layout drawings which identify plant fire
          area delineation; areas protected by automatic fire suppression and detection; and
          locations of fire protection equipment.
    2.    Licensing Information:
          a.    All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs)
                applicable to fire protection (specifically including those SERs referenced by
                the plant fire protection license condition) and all licensing correspondence
                referenced by the SERs;
          b.   All licensing correspondence associated with the comparison to Standard
                Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing
                purposes;
          c.    Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and
                associated licensing correspondence;
          d.   For pre-1979 plants, all licensing correspondence associated with those
                sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant
                under 10 CFR 50.48(b)(1). Specifically, the licensing correspondence
                associated with those fire protection features proposed or implemented by the
                licensee that have been accepted by the NRC staff as satisfying the provisions
                of Appendix A to Branch Technical Position (BTP) APCSB 9.5-1 reflected in
                the NRC fire protection SERs issued before February 19, 1981, (10 CFR
                50.48(b)(1)(i)); or those fire protection features, which were accepted by the
                NRC staff in comprehensive fire protection SERs issued before Appendix A to
                BTP APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii)); and
          e.    The final safety analysis report (FSAR) sections applicable to fire protection,
                FHA, and SSA in effect at the time of original licensing.
                                                2                                      Enclosure
 
                      FIRE PROTECTION INSPECTION
                          DOCUMENT REQUESTS
3. Fire Protection Program:
  a.   A listing of changes made to the FPP since the last triennial fire protection
        inspection;
  b.  For pre-1979 plants, a listing of the protection methodologies identified under
        10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for
        selected fire zones/areas (to be determined during information gathering
        visit). That is, please specify whether 3-hour rated fire barriers;
        (Section III.G.2.a), 20 foot separation along with detection and suppression;
        (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;
        (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used
        as a strategy for each selected fire zone/area;
  c.   A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe
        shutdown evaluations);
  d.   A list of applicable codes and standards related to the design of plant fire
        protection features. The list should include National Fire Protection
        Association (NFPA) code versions committed to (i.e., the NFPA Codes of
        Record); and
  e.   List of plant deviations from code commitments and associated evaluations.
4. Facility Information:
  a.   Piping and instrumentation (flow) diagrams showing the components used to
        achieve and maintain hot standby and cold shutdown for fires outside the
        control room, those components used for those areas requiring alternative
        shutdown capability, and systems relied upon for B.5.b mitigation strategies.
        These can be of the type that are used for training;
  b.   One-line schematic drawings of the electrical distribution system for 4160
        Volts alternating current (Vac) down to 480Vac;
  c.   One-line schematic drawings of the electrical distribution system for 250 Volts
        direct current (Vdc) and 125Vdc systems as applicable;
  d.   Logic diagrams showing the components used to achieve and maintain hot
        standby and cold shutdown; and
  e.   Safe shutdown cable routing database (requested electronically such as on
        compact disc, if available.
                                        3                                        Enclosure
 
                      FIRE PROTECTION INSPECTION
                          DOCUMENT REQUESTS
5. Operations Response for Fire Protection:
  a.  Pre-fire plans for selected fire zones/areas (to be determined during
      information gathering visit);
  bPlant operating procedures which specify the initial operations response to a
      fire alarm or annunciator; and
  c.  Procedure for calling out the fire brigade and requesting off-site assistance.
6. Corrective Actions:
  a. Listing of open and closed fire protection condition reports (i.e., problem
      identification forms and their resolution reports) since the date of the last
      triennial fire protection inspection; and
  b. List of current fire impairments, including duration.
7. General Information:
  a. A listing of abbreviations and/or designators for plant systems;
  b.  Organization charts of site personnel down to the level of fire protection staff
      personnel; and
  c.  A phone list for onsite licensee personnel.
8. B.5.b Mitigating Strategies:
  a.  A list of all modifications to regulatory commitments made to meet the
      requirements of Section B.5.b of the ICM Order, EA-02-026, dated
      February 25, 2002, the subsequently imposed license conditions, and
      10 CFR 50.54(hh)(2);
  b. Copies of procedures/guidelines that were revised or generated to implement
      the mitigation strategies. These could be extensive damage mitigation
      guidelines (EDMGs), severe accident management guidelines (SAMGs),
      emergency operating procedures (EOPs), abnormal operating procedures
      (AOPs), etc.;
  c. A matrix that shows the correlation between the mitigation strategies identified
      in Nuclear Energy Institute 06-12 and the site-specific procedures or
      guidelines that are used to implement each strategy;
  d. A listing of engineering evaluations/calculations that were used to verify
      engineering bases for the mitigation strategies;
  e.  Copies of procedures used to inventory equipment (hoses, fittings, pumps,
      etc.) required to be used to implement the mitigation strategies;
                                        4                                      Enclosure
 
                                FIRE PROTECTION INSPECTION
                                      DOCUMENT REQUESTS
          f.       A list of B.5.b mitigating strategies, if any, which have implementing details
                  that differ from that documented in the submittals and the safety evaluation
                  report;
          g.       Copies of Memoranda of Understanding (MOUs) (e.g., with local fire
                  departments) required to implement any mitigating strategies; and
          h.      A list of changes made to B.5.b mitigating strategies and associated
                  procedures since the previous NRC inspection of B.5.b mitigating strategies
                  (October 2008).
    9.  Onsite Discussions:
          In addition, during the information gathering visit, it is requested that licensee staff
          be available for the following:
          a.      Informal discussion on plant procedures operators would use in the event of
                  fire or explosion (including B.5.b mitigation strategies) and under what
                  conditions would the plant be shutdown using alternative shutdown
                  methodology;
          b.      Informal discussion on the plants safe shutdown cable routing database and
                  the plant-wide cable routing database, as applicable; and
          c.      A tour of alternative shutdown and risk significant fire areas.
III. Information Requested to be Available on First Day of the Second ONSITE
    Inspection Week (August 8, 2011)
    The following information is requested to be provided on the first day of inspection. It is
    requested that this information be provided on four sets of CDs (searchable, if possible).
    1.   Program Procedures:
          a. Procedures for:
                i.     Administrative controls (such as allowed out of service times and
                      compensatory measures) for fire protection systems and components
              ii.     Control of transient combustibles
              iii.    Control of hot work
          b. List of maintenance and surveillance testing procedures for alternative
              shutdown capability and fire barriers, detectors, pumps, and suppression
              systems; and
          c. List of maintenance procedures which routinely verify fuse breaker coordination
              in accordance with the post-fire safe shutdown coordination analysis.
                                                  5                                    Enclosure
 
                                  FIRE PROTECTION INSPECTION
                                        DOCUMENT REQUESTS
        2.   Design and Equipment Information:
              a. Coordination calculations and/or justifications that verify fuse/breaker
                  coordination for selected fire zones/areas (to be determined during
                  information gathering visit) that are fed off of the same electrical buses as
                  components in the protected safe shutdown train;
              b. Copies of significant fire protection and post-fire safe shutdown related design
                  change package descriptions (including their associated 10 CFR 50.59
                  evaluations) and Generic Letter (GL) 86-10 (or adverse to safe shutdown)
                  evaluations;
              c. Gaseous suppression system pre-operational testing, if applicable, for selected
                  fire zones/areas (to be determined during information gathering visit);
              d. Hydraulic calculations and supporting test data which demonstrate operability
                  for water suppression systems, if applicable, for selected fire zones/areas (to
                  be determined during information gathering visit);
              e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac
                  electrical systems; and
              fList of all fire protection or Appendix R calculations.
        3.    Assessment and Corrective Actions:
              The three most recent fire protection Quality Assurance (QA) audits and/or fire
              protection self-assessments.
        4.    Any updates to information previously provided.
IV.    Information Requested to Be Provided Throughout the Inspection
     1. Copies of any corrective action documents generated as a result of the inspection
        teams questions or queries during this inspection.
    2. Copies of the list of questions submitted by the inspection team members and the
        status/resolution of the information requested (provided daily during the inspection to
        each inspection team member).
If you have questions regarding the information requested, please contact the lead inspector.
                                                    6                                    Enclosure
 
M. Pacilio                                                                      -2-
provided to the lead inspector via mail or electronically no later than July 5, 2011. The second group also
lists information and areas for discussion necessary to aid the inspection team in choosing specific fire
protection focus areas for the inspection and to ensure that the inspection team is adequately prepared
for the inspection. It is requested this information be available during the information gathering visit (July
25, 2011). The third group of requested documents consists of those items that the team will review, or
need access to, during the inspection. Please have this information available by the first day of the
second onsite inspection week (August 8, 2011). The fourth group lists the information necessary to aid
the inspection team in tracking issues identified as a result of the inspection. It is requested that this
information be provided to the lead inspector as the information is generated during the inspection. It is
important that all of these documents are up to date and complete in order to minimize the number of
additional documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Ronald A. Langstaff. We understand that our regulatory contact
for this inspection is Mr. G. Ice, NRC Coordinator, and Dresden Regulatory Assurance, of your
organization. If there are any questions about the inspection or the material requested, please contact
the lead inspector at (630) 829-9747 or via e-mail at Ronald.Langstaff@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The
NRC may not conduct or sponsor, and a person is not required to respond to a request for information or
an information collection requirement unless the requesting document displays a currently valid Office of
Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure
will be available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
                                                                                Sincerely,
                                                                                /RA by R. A. Langstaff For/
                                                                                Robert C. Daley, Chief
                                                                                Engineering Branch 3
                                                                                Division of Reactor Safety
Docket Nos.:                50-237; 50-249
License Nos.:              DPR 19; DPR 25
Enclosure:                  Fire Protection Inspection Document Request
cc w/encl:                  Distribution via ListServ
Distribution:
See next page
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\-Ltr 050611 Dresden FPI RFI RAL.docx
9 Publicly Available                    9 Non-Publicly Available                      9 Sensitive                9 Non-Sensitive
To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy
OFFICE                      RIII                                      RIII
NAME                        RLangstaff:ls                            RDaley
DATE                        05/06/11                                  05/06/11
                                                              OFFICIAL RECORD COPY
 
Letter to Mr. Michael Pacilio from Mr. Robert C. Daley dated May 6, 2011.
SUBJECT:      DRESDEN Nuclear Power Station NOTIFICATION OF AN NRC TRIENNIAL
              FIRE PROTECTION BASELINE INSPECTION 05000237/2011008(DRS);
              05000249/2011008(DRS)
DISTRIBUTION:
Daniel Merzke
RidsNrrDorlLpl3-2
RidsNrrPMDresden Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Steven Orth
Jared Heck
Allan Barker
Carole Ariano
Linda Linn
DRPIII
DRSIII
Patricia Buckley
Tammy Tomczak
ROPreports Resource
}}
}}

Latest revision as of 00:00, 13 November 2019

Notification of NRC Triennial Fire Protection Baseline Inspection 05000237-11-008 (Drs), 05000249-11-008 (DRS)
ML11126A320
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 05/06/2011
From: Robert Daley
Engineering Branch 3
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
Download: ML11126A320 (10)


See also: IR 05000237/2011008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

May 6, 2011

Mr. Michael J. Pacilio

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer (CNO), Exelon Nuclear

4300 Winfield Road

Warrenville IL 60555

SUBJECT: DRESDEN NUCLEAR POWER STATION NOTIFICATION OF AN NRC

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

05000237/2011008(DRS); 05000249/2011008(DRS)

Dear Mr. Pacilio

On July 27, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire

protection baseline inspection at your Dresden Nuclear Power Station. This inspection will be

performed in accordance with Inspection Procedure (IP) 71111.05T, the NRCs baseline fire

protection inspection procedure.

Changes were made to the IP 71111.05T, which now requires the fire protection inspection to

review your actions to mitigate postulated events that could potentially cause loss of large areas

of power reactor facilities due to explosions or fires. This requirement was implemented by the

issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b and the

subsequent requirements of 10 CFR 50.54(hh)(2), which are collectively referred to as B.5.b

requirements. During this inspection, the B.5.b requirements review will be performed during

the first onsite week of the inspection starting on July 27, 2011.

The schedule for the onsite inspection activity is as follows:

y Information Gathering Visit: July 25 - 27, 2011

y B.5.b Requirements: July 27 - 39, 2011, and

y Fire Protection Inspection: August 8 - 12, 2011, and August 29 - September 2, 2011.

The purpose of the information gathering visit is: (1) to obtain information and documentation

needed to support the inspection; (2) to become familiar with the Dresden Nuclear Power

Station fire protection programs, fire protection features, post-fire safe shutdown capabilities,

and plant layout; and (3) to arrange administrative details, such as office space, availability of

knowledgeable office personnel and to ensure unescorted site access privileges.

Experience has shown that the baseline fire protection inspections are extremely resource

intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection

impact on the site and to ensure a productive inspection for both organizations, we have

enclosed a request for documents needed for the inspection. These documents have been

divided into four groups. The first group lists information necessary to aid the inspection team in

choosing specific focus areas for the inspection. It is requested that this information be

M. Pacilio -2-

provided to the lead inspector via mail or electronically no later than July 5, 2011. The second

group also lists information and areas for discussion necessary to aid the inspection team in

choosing specific fire protection focus areas for the inspection and to ensure that the inspection

team is adequately prepared for the inspection. It is requested this information be available

during the information gathering visit (July 25, 2011). The third group of requested documents

consists of those items that the team will review, or need access to, during the inspection.

Please have this information available by the first day of the second onsite inspection week

(August 8, 2011). The fourth group lists the information necessary to aid the inspection team in

tracking issues identified as a result of the inspection. It is requested that this information be

provided to the lead inspector as the information is generated during the inspection. It is

important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

The lead inspector for this inspection is Ronald A. Langstaff. We understand that our regulatory

contact for this inspection is Mr. G. Ice, NRC Coordinator, Dresden Regulatory Assurance, of

your organization. If there are any questions about the inspection or the material requested,

please contact the lead inspector at (630) 829-9747 or via e-mail at Ronald.Langstaff@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ by R. A. Langstaff For/

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos.: 50-237; 50-249

License Nos.: DPR 19; DPR 25

Enclosure: Fire Protection Inspection Document Request

cc w/encl: Distribution via ListServ

FIRE PROTECTION INSPECTION

DOCUMENT REQUESTS

Inspection Report: 05000237/2011008(DRS); 05000249/2011008(DRS)

Onsite Inspection Dates: July 25 - 27, 2011 (Information Gathering Visit)

July 27 - 29, 2011 (B.5.b Requirements)

August 8 - 12, 2011 (Fire Protection Inspection)

August 29 - September 2, 2011 (Fire Protection Inspection)

Inspection Procedures: IP71111.05T, Fire Protection (Triennial)

IP71152, "Identification and Resolution of Problems"

Inspectors: R. A. Langstaff

(630) 829-9747

Ronald.Langstaff@nrc.gov

Z. Falevits R. A. Winter

(630) 829-9717 (630) 829-9758

Zelig.Falevits@nrc.gov Robert.Winter@nrc.gov

Observer: J. S. Bowen

(301) 415-3471

Jeremy.Bowen@nrc.gov

I. Information Requested Prior To the Information Gathering Visit

The following information is requested by July 5, 2011. If you have any questions

regarding this request, please call the lead inspector as soon as possible. All

information should be sent to R.A. Langstaff (e-mail address

Ronald.Langstaff@nrc.gov). Electronic media is preferred. The preferred file format is a

searchable pdf file on a compact disk (CD). The CD should be indexed and hyper-

linked to facilitate ease of use, if possible. Please provide four copies of each CD

submitted (one for each inspector and observer).

1. The most risk significant fire areas as determined by probabilistic risk analyses, if

available. Otherwise, the reactor plant's Individual Plant Examination for External

Events (IPEEE) for fire and results of any post-IPEEE reviews for fire.

2. A copy of the current version of the Fire Protection Program (FPP), Fire Hazards

Analysis (FHA), Safe Shutdown Analysis (SSA), Updated Safety Analysis Report

(USAR), Technical Specifications, license (including the fire protection license

condition), and Technical Requirements Manual (TRM) or equivalent for fire

protection structures, systems, and components.

3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for

which 10 CFR Part 50, Appendix R, Section III G requirements are satisfied under

Section III.G.3), or where both safe shutdown trains can be affected.

1 Enclosure

FIRE PROTECTION INSPECTION

DOCUMENT REQUESTS

4. Plant operating procedures which would be used and describe shutdown for a

postulated fire (for both areas requiring alternative shutdown and areas which do

not require alternative shutdown). Only those procedures with actions specific to

shutdown in the event of a fire need be included. In addition, please include those

procedures which operators would use for initial response to a fire, such as

annunciator or alarm response procedures, the procedure used for activating the

fire brigade, and the procedure which directs operators to the applicable safe

shutdown procedure.

II. Information Requested During the Information Gathering Visit (July 25, 2011)

The following information is requested to be provided to the inspection team during the

onsite information gathering visit. Except for Item 1, it is requested that the following

information be provided on four sets of CDs (searchable, if possible) with the B.5.b

Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CDs.

In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d.

1. One set of hard-copy documents for facility layout drawings which identify plant fire

area delineation; areas protected by automatic fire suppression and detection; and

locations of fire protection equipment.

2. Licensing Information:

a. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs)

applicable to fire protection (specifically including those SERs referenced by

the plant fire protection license condition) and all licensing correspondence

referenced by the SERs;

b. All licensing correspondence associated with the comparison to Standard

Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing

purposes;

c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and

associated licensing correspondence;

d. For pre-1979 plants, all licensing correspondence associated with those

sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant

under 10 CFR 50.48(b)(1). Specifically, the licensing correspondence

associated with those fire protection features proposed or implemented by the

licensee that have been accepted by the NRC staff as satisfying the provisions

of Appendix A to Branch Technical Position (BTP) APCSB 9.5-1 reflected in

the NRC fire protection SERs issued before February 19, 1981, (10 CFR

50.48(b)(1)(i)); or those fire protection features, which were accepted by the

NRC staff in comprehensive fire protection SERs issued before Appendix A to

BTP APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii)); and

e. The final safety analysis report (FSAR) sections applicable to fire protection,

FHA, and SSA in effect at the time of original licensing.

2 Enclosure

FIRE PROTECTION INSPECTION

DOCUMENT REQUESTS

3. Fire Protection Program:

a. A listing of changes made to the FPP since the last triennial fire protection

inspection;

b. For pre-1979 plants, a listing of the protection methodologies identified under

10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for

selected fire zones/areas (to be determined during information gathering

visit). That is, please specify whether 3-hour rated fire barriers;

(Section III.G.2.a), 20 foot separation along with detection and suppression;

(Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;

(Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used

as a strategy for each selected fire zone/area;

c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe

shutdown evaluations);

d. A list of applicable codes and standards related to the design of plant fire

protection features. The list should include National Fire Protection

Association (NFPA) code versions committed to (i.e., the NFPA Codes of

Record); and

e. List of plant deviations from code commitments and associated evaluations.

4. Facility Information:

a. Piping and instrumentation (flow) diagrams showing the components used to

achieve and maintain hot standby and cold shutdown for fires outside the

control room, those components used for those areas requiring alternative

shutdown capability, and systems relied upon for B.5.b mitigation strategies.

These can be of the type that are used for training;

b. One-line schematic drawings of the electrical distribution system for 4160

Volts alternating current (Vac) down to 480Vac;

c. One-line schematic drawings of the electrical distribution system for 250 Volts

direct current (Vdc) and 125Vdc systems as applicable;

d. Logic diagrams showing the components used to achieve and maintain hot

standby and cold shutdown; and

e. Safe shutdown cable routing database (requested electronically such as on

compact disc, if available.

3 Enclosure

FIRE PROTECTION INSPECTION

DOCUMENT REQUESTS

5. Operations Response for Fire Protection:

a. Pre-fire plans for selected fire zones/areas (to be determined during

information gathering visit);

b. Plant operating procedures which specify the initial operations response to a

fire alarm or annunciator; and

c. Procedure for calling out the fire brigade and requesting off-site assistance.

6. Corrective Actions:

a. Listing of open and closed fire protection condition reports (i.e., problem

identification forms and their resolution reports) since the date of the last

triennial fire protection inspection; and

b. List of current fire impairments, including duration.

7. General Information:

a. A listing of abbreviations and/or designators for plant systems;

b. Organization charts of site personnel down to the level of fire protection staff

personnel; and

c. A phone list for onsite licensee personnel.

8. B.5.b Mitigating Strategies:

a. A list of all modifications to regulatory commitments made to meet the

requirements of Section B.5.b of the ICM Order, EA-02-026, dated

February 25, 2002, the subsequently imposed license conditions, and

10 CFR 50.54(hh)(2);

b. Copies of procedures/guidelines that were revised or generated to implement

the mitigation strategies. These could be extensive damage mitigation

guidelines (EDMGs), severe accident management guidelines (SAMGs),

emergency operating procedures (EOPs), abnormal operating procedures

(AOPs), etc.;

c. A matrix that shows the correlation between the mitigation strategies identified

in Nuclear Energy Institute 06-12 and the site-specific procedures or

guidelines that are used to implement each strategy;

d. A listing of engineering evaluations/calculations that were used to verify

engineering bases for the mitigation strategies;

e. Copies of procedures used to inventory equipment (hoses, fittings, pumps,

etc.) required to be used to implement the mitigation strategies;

4 Enclosure

FIRE PROTECTION INSPECTION

DOCUMENT REQUESTS

f. A list of B.5.b mitigating strategies, if any, which have implementing details

that differ from that documented in the submittals and the safety evaluation

report;

g. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire

departments) required to implement any mitigating strategies; and

h. A list of changes made to B.5.b mitigating strategies and associated

procedures since the previous NRC inspection of B.5.b mitigating strategies

(October 2008).

9. Onsite Discussions:

In addition, during the information gathering visit, it is requested that licensee staff

be available for the following:

a. Informal discussion on plant procedures operators would use in the event of

fire or explosion (including B.5.b mitigation strategies) and under what

conditions would the plant be shutdown using alternative shutdown

methodology;

b. Informal discussion on the plants safe shutdown cable routing database and

the plant-wide cable routing database, as applicable; and

c. A tour of alternative shutdown and risk significant fire areas.

III. Information Requested to be Available on First Day of the Second ONSITE

Inspection Week (August 8, 2011)

The following information is requested to be provided on the first day of inspection. It is

requested that this information be provided on four sets of CDs (searchable, if possible).

1. Program Procedures:

a. Procedures for:

i. Administrative controls (such as allowed out of service times and

compensatory measures) for fire protection systems and components

ii. Control of transient combustibles

iii. Control of hot work

b. List of maintenance and surveillance testing procedures for alternative

shutdown capability and fire barriers, detectors, pumps, and suppression

systems; and

c. List of maintenance procedures which routinely verify fuse breaker coordination

in accordance with the post-fire safe shutdown coordination analysis.

5 Enclosure

FIRE PROTECTION INSPECTION

DOCUMENT REQUESTS

2. Design and Equipment Information:

a. Coordination calculations and/or justifications that verify fuse/breaker

coordination for selected fire zones/areas (to be determined during

information gathering visit) that are fed off of the same electrical buses as

components in the protected safe shutdown train;

b. Copies of significant fire protection and post-fire safe shutdown related design

change package descriptions (including their associated 10 CFR 50.59

evaluations) and Generic Letter (GL) 86-10 (or adverse to safe shutdown)

evaluations;

c. Gaseous suppression system pre-operational testing, if applicable, for selected

fire zones/areas (to be determined during information gathering visit);

d. Hydraulic calculations and supporting test data which demonstrate operability

for water suppression systems, if applicable, for selected fire zones/areas (to

be determined during information gathering visit);

e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac

electrical systems; and

f. List of all fire protection or Appendix R calculations.

3. Assessment and Corrective Actions:

The three most recent fire protection Quality Assurance (QA) audits and/or fire

protection self-assessments.

4. Any updates to information previously provided.

IV. Information Requested to Be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during this inspection.

2. Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

If you have questions regarding the information requested, please contact the lead inspector.

6 Enclosure

M. Pacilio -2-

provided to the lead inspector via mail or electronically no later than July 5, 2011. The second group also

lists information and areas for discussion necessary to aid the inspection team in choosing specific fire

protection focus areas for the inspection and to ensure that the inspection team is adequately prepared

for the inspection. It is requested this information be available during the information gathering visit (July

25, 2011). The third group of requested documents consists of those items that the team will review, or

need access to, during the inspection. Please have this information available by the first day of the

second onsite inspection week (August 8, 2011). The fourth group lists the information necessary to aid

the inspection team in tracking issues identified as a result of the inspection. It is requested that this

information be provided to the lead inspector as the information is generated during the inspection. It is

important that all of these documents are up to date and complete in order to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Ronald A. Langstaff. We understand that our regulatory contact

for this inspection is Mr. G. Ice, NRC Coordinator, and Dresden Regulatory Assurance, of your

organization. If there are any questions about the inspection or the material requested, please contact

the lead inspector at (630) 829-9747 or via e-mail at Ronald.Langstaff@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The

NRC may not conduct or sponsor, and a person is not required to respond to a request for information or

an information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA by R. A. Langstaff For/

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos.: 50-237; 50-249

License Nos.: DPR 19; DPR 25

Enclosure: Fire Protection Inspection Document Request

cc w/encl: Distribution via ListServ

Distribution:

See next page

DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\-Ltr 050611 Dresden FPI RFI RAL.docx

9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive

To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy

OFFICE RIII RIII

NAME RLangstaff:ls RDaley

DATE 05/06/11 05/06/11

OFFICIAL RECORD COPY

Letter to Mr. Michael Pacilio from Mr. Robert C. Daley dated May 6, 2011.

SUBJECT: DRESDEN Nuclear Power Station NOTIFICATION OF AN NRC TRIENNIAL

FIRE PROTECTION BASELINE INSPECTION 05000237/2011008(DRS);

05000249/2011008(DRS)

DISTRIBUTION:

Daniel Merzke

RidsNrrDorlLpl3-2

RidsNrrPMDresden Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

ROPreports Resource