{{#Wiki_filter:January 31, 2006EA-05-190Mr. Michael R. KanslerPresident Entergy Nuclear Operations, Inc.
{{#Wiki_filter:January 31, 2006 EA-05-190 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
440 Hamilton Avenue White Plains, NY 10601


==SUBJECT:==
==SUBJECT:==
CONFIRMATORY ORDER MODIFYING LICENSE TO REQUIRE BACKUPPOWER FOR THE EMERGENCY NOTIFICATION SYSTEM FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3
CONFIRMATORY ORDER MODIFYING LICENSE TO REQUIRE BACKUP POWER FOR THE EMERGENCY NOTIFICATION SYSTEM FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3


==Dear Mr. Kansler:==
==Dear Mr. Kansler:==


The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the enclosedConfirmatory Order to Entergy Nuclear Operations, Inc., to address the requirement of PL 109-58, 119 Stat 594, Section 651(b) of the Energy Policy Act (Act) of 2005. The Act was enacted on August 8, 2005. The Act mandates that "for any licensed nuclear power plants located where there is a permanent population, as determined by the 2000 decennial census, in excessof 15,000,000 within a 50-mile radius of the power plant, not later than 18 months after enactment of this Act, the Commission shall require that backup power to be available for the emergency notification system of the power plant, including the emergency siren warningsystem, if the alternating current supply within the 10-mile emergency planning zone of thepower plant is lost.Indian Point Nuclear Generating Unit Nos. 2 and 3 meet the criteria of the Act. The Confirmatory Order will require backup power for the emergency notification systemused for Indian Point Nuclear Generating Unit Nos. 2 and 3. The Confirmatory Order willbecome effective immediately upon issuance and fully implemented by January 30, 2007.Questions concerning this Confirmatory Order should be addressed to Eric J. Leeds, Director,Division of Preparedness and Response, who can be reached at (301) 415-2334 or Nader L. Mamish, Director, Emergency Preparedness Directorate, who can be reached at (301) 415-1086.Pursuant to Section 223 of the Atomic Energy Act of 1954, as amended, any person whowillfully violates, attempts to violate, or conspires to violate, any provision of this Order shall be subject to criminal prosecution as set forth in that section. Violation of this Order may also subject the person to civil monetary penalty.In accordance with Title 10 of the Code of Federal Regulations, Section 2.390 of the NRC's"Rules of Practice," a copy of this letter and its enclosure will be available electronically forpublic inspection in the NRC Public Document Room or from the publicly available recordcomponent of the NRC's Agencywide Documents Access and Management System (ADAMS).
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the enclosed Confirmatory Order to Entergy Nuclear Operations, Inc., to address the requirement of PL 109-58, 119 Stat 594, Section 651(b) of the Energy Policy Act (Act) of 2005. The Act was enacted on August 8, 2005. The Act mandates that for any licensed nuclear power plants located where there is a permanent population, as determined by the 2000 decennial census, in excess of 15,000,000 within a 50-mile radius of the power plant, not later than 18 months after enactment of this Act, the Commission shall require that backup power to be available for the emergency notification system of the power plant, including the emergency siren warning system, if the alternating current supply within the 10-mile emergency planning zone of the power plant is lost. Indian Point Nuclear Generating Unit Nos. 2 and 3 meet the criteria of the Act. The Confirmatory Order will require backup power for the emergency notification system used for Indian Point Nuclear Generating Unit Nos. 2 and 3. The Confirmatory Order will become effective immediately upon issuance and fully implemented by January 30, 2007.
M. Kansler- 2 -ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html(Public Electronic Reading Room). To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. The NRC also includes significant enforcement actions on its Website at www.nrc.gov; select What We Do, Enforcement , then Significant Enforcement Actions
Questions concerning this Confirmatory Order should be addressed to Eric J. Leeds, Director, Division of Preparedness and Response, who can be reached at (301) 415-2334 or Nader L. Mamish, Director, Emergency Preparedness Directorate, who can be reached at (301) 415-1086.
.Sincerely,/RA/J. E. Dyer, DirectorOffice of Nuclear Reactor RegulationDocket Nos. 50-247 and 50-286
Pursuant to Section 223 of the Atomic Energy Act of 1954, as amended, any person who willfully violates, attempts to violate, or conspires to violate, any provision of this Order shall be subject to criminal prosecution as set forth in that section. Violation of this Order may also subject the person to civil monetary penalty.
In accordance with Title 10 of the Code of Federal Regulations, Section 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the publicly available record component of the NRCs Agencywide Documents Access and Management System (ADAMS).


==Enclosure:==
M. Kansler                                   ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room). To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. The NRC also includes significant enforcement actions on its Web site at www.nrc.gov; select What We Do, Enforcement, then Significant Enforcement Actions.
As stated M. Kansler- 2 -ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html(Public Electronic Reading Room). To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. The NRC also includes significant enforcement actions on its Website at www.nrc.gov; select What We Do, Enforcement , then Significant Enforcement Actions
Sincerely,
.Sincerely,/RA/J. E. Dyer, DirectorOffice of Nuclear Reactor RegulationDocket Nos. 50-247 and 50-286
                                            /RA/
J. E. Dyer, Director Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286


==Enclosure:==
==Enclosure:==
As statedcc: w/encl:  See next pageDISTRIBUTIONPublicW. KaneM. JohnsonC. NolanB. BogerRidsNrrOdR. ZimmermanE. LeedsN. MamishC. HaneyS. CollinsE. WeissK. WilliamsJ. BoskaS. LittleOGCG. Hill (4)LPL1-1 R/FS. BurnellACRSB McDermott (R1)SECYS. Lee (EDO)Adams Accession Number:  ML060090405, Order ML060090429, Package ML060090441    .OFFICELPL1-1/PMLPL1-1/LALPL1-1/BCNRR/DORL/DNRR/ADRO/ADNAMEJBoskaCraynor forSLittleRLauferCHolden forCHaneyBBogerDATE1/11/061/11/061/31/061/31/061/31/06OFFICERGN1/RANSIR/ODOEOGCNRR/DNAMEMDapas forSCollinsRZimmermanMJohnsonBJones forLChandlerJDyerDATE1/31/061/31/061/31/061/31/061/31/06OFFICIAL RECORD COPY Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
As stated
Mr. Gary J. TaylorChief Executive Officer Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213Mr. John T. HerronSenior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY  10601Mr. Fred R. DacimoSite Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 1


P.O. Box 249 Buchanan, NY 10511-0249Mr. Paul RubinGeneral Manager, Plant Operations Entergy Nuclear Operations, Inc.
M. Kansler                                                ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room). To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. The NRC also includes significant enforcement actions on its Web site at www.nrc.gov; select What We Do, Enforcement, then Significant Enforcement Actions.
Indian Point Energy Center 295 Broadway, Suite 2
Sincerely,
                                                        /RA/
J. E. Dyer, Director Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286


P.O. Box 249 Buchanan, NY 10511-0249Mr. Oscar LimpiasVice President Engineering Entergy Nuclear Operations, Inc.
==Enclosure:==
440 Hamilton Avenue White Plains, NY  10601Mr. Brian O'GradyVice President, Operations Support Entergy Nuclear Operations, Inc.
As stated cc: w/encl: See next page DISTRIBUTION Public                    W. Kane                      M. Johnson    C. Nolan            B. Boger RidsNrrOd                  R. Zimmerman                  E. Leeds      N. Mamish          C. Haney S. Collins                E. Weiss                      K. Williams    J. Boska            S. Little OGC                        G. Hill (4)                  LPL1-1 R/F    S. Burnell          ACRS B McDermott (R1)          SECY                          S. Lee (EDO)
440 Hamilton Avenue White Plains, NY 10601Mr. John F. McCannDirector, Licensing Entergy Nuclear Operations, Inc.
Adams Accession Number: ML060090405, Order ML060090429, Package ML060090441                        .
440 Hamilton Avenue White Plains, NY 10601Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations, Inc.
OFFICE      LPL1-1/PM              LPL1-1/LA           LPL1-1/BC          NRR/DORL/D              NRR/ADRO/AD NAME        JBoska                Craynor for        RLaufer            CHolden for              BBoger SLittle                                CHaney DATE        1/11/06                1/11/06            1/31/06            1/31/06                  1/31/06 OFFICE          RGN1/RA                NSIR/OD            OE                  OGC                  NRR/D NAME            MDapas for              RZimmerman          MJohnson            BJones for          JDyer SCollins                                                        LChandler DATE            1/31/06                1/31/06            1/31/06              1/31/06              1/31/06 OFFICIAL RECORD COPY
440 Hamilton Avenue White Plains, NY 10601Mr. Michael J. ColumbDirector of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. James ComiotesDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 1
 
P.O. Box 249 Buchanan, NY 10511-0249Mr. Patric ConroyManager, Licensing Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 1
 
P. O. Box 249 Buchanan, NY 10511-0249Mr. Travis C. McCulloughAssistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Ms. Stacey LousteauTreasury Department Entergy Services, Inc.
639 Loyola Avenue Mail Stop: L-ENT-15E New Orleans, LA 70113Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Senior Resident Inspector's OfficeIndian Point 2 U. S. Nuclear Regulatory Commission
 
P.O. Box 59 Buchanan, NY  10511Senior Resident Inspector's OfficeIndian Point 3 U. S. Nuclear Regulatory Commission


P.O. Box 59 Buchanan, NY 10511Mr. Peter R. Smith, PresidentNew York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399Mr. Paul EddyElectric Division New York State Department of Public Service 3 Empire State Plaza, 10 th FloorAlbany, NY 12223Mr. Charles Donaldson, EsquireAssistant Attorney General New York Department of Law 120 Broadway New York, NY 10271Mayor, Village of Buchanan236 Tate Avenue Buchanan, NY 10511Mr. Ray AlbaneseExecutive Chair Four County Nuclear Safety Committee Westchester County Fire Training Center 4 Dana Road Valhalla, NY 10592Mr. William DiProfioPWR SRC Consultant 139 Depot Road East Kingston, NH 03827Mr. Daniel C. PoolePWR SRC Consultant
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Mr. Gary J. Taylor                              Ms. Charlene D. Faison Chief Executive Officer                        Manager, Licensing Entergy Operations, Inc.                        Entergy Nuclear Operations, Inc.
1340 Echelon Parkway                            440 Hamilton Avenue Jackson, MS 39213                              White Plains, NY 10601 Mr. John T. Herron                              Mr. Michael J. Columb Senior Vice President and                      Director of Oversight Chief Operating Officer                      Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.               440 Hamilton Avenue 440 Hamilton Avenue                            White Plains, NY 10601 White Plains, NY 10601 Mr. James Comiotes Mr. Fred R. Dacimo                              Director, Nuclear Safety Assurance Site Vice President                            Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.                Indian Point Energy Center Indian Point Energy Center                      295 Broadway, Suite 1 295 Broadway, Suite 1                          P.O. Box 249 P.O. Box 249                                    Buchanan, NY 10511-0249 Buchanan, NY 10511-0249 Mr. Patric Conroy Mr. Paul Rubin                                  Manager, Licensing General Manager, Plant Operations              Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.               Indian Point Energy Center Indian Point Energy Center                      295 Broadway, Suite 1 295 Broadway, Suite 2                          P. O. Box 249 P.O. Box 249                                    Buchanan, NY 10511-0249 Buchanan, NY 10511-0249 Mr. Travis C. McCullough Mr. Oscar Limpias                              Assistant General Counsel Vice President Engineering                      Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.                440 Hamilton Avenue 440 Hamilton Avenue                             White Plains, NY 10601 White Plains, NY 10601 Ms. Stacey Lousteau Mr. Brian OGrady                              Treasury Department Vice President, Operations Support              Entergy Services, Inc.
Entergy Nuclear Operations, Inc.                639 Loyola Avenue 440 Hamilton Avenue                            Mail Stop: L-ENT-15E White Plains, NY 10601                          New Orleans, LA 70113 Mr. John F. McCann                              Regional Administrator, Region I Director, Licensing                            U.S. Nuclear Regulatory Commission Entergy Nuclear Operations, Inc.               475 Allendale Road 440 Hamilton Avenue                            King of Prussia, PA 19406 White Plains, NY 10601


P.O. Box 579 Inglis, FL 34449Mr. William T. RussellPWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232Mr. Jim RiccioGreenpeace 702 H Street, NW Suite 300 Washington, DC 20001Mr. Phillip Mus egaasRiverkeeper, Inc.
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
828 South Broadway Tarrytown, NY 10591Mr. Mark JacobsIPSEC 46 Highland Drive Garrison, NY 10524}}
Senior Resident Inspectors Office              Mr. William DiProfio Indian Point 2                                  PWR SRC Consultant U. S. Nuclear Regulatory Commission            139 Depot Road P.O. Box 59                                    East Kingston, NH 03827 Buchanan, NY 10511 Mr. Daniel C. Poole Senior Resident Inspectors Office              PWR SRC Consultant Indian Point 3                                  P.O. Box 579 U. S. Nuclear Regulatory Commission            Inglis, FL 34449 P.O. Box 59 Buchanan, NY 10511                              Mr. William T. Russell PWR SRC Consultant Mr. Peter R. Smith, President                  400 Plantation Lane New York State Energy, Research, and            Stevensville, MD 21666-3232 Development Authority 17 Columbia Circle                              Mr. Jim Riccio Albany, NY 12203-6399                          Greenpeace 702 H Street, NW Mr. Paul Eddy                                  Suite 300 Electric Division                              Washington, DC 20001 New York State Department of Public Service                            Mr. Phillip Musegaas 3 Empire State Plaza, 10th Floor                Riverkeeper, Inc.
Albany, NY 12223                                828 South Broadway Tarrytown, NY 10591 Mr. Charles Donaldson, Esquire Assistant Attorney General                      Mr. Mark Jacobs New York Department of Law                      IPSEC 120 Broadway                                    46 Highland Drive New York, NY 10271                              Garrison, NY 10524 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Ray Albanese Executive Chair Four County Nuclear Safety Committee Westchester County Fire Training Center 4 Dana Road Valhalla, NY 10592}}

Latest revision as of 00:21, 24 November 2019

Confirmatory Order Modifying License to Require Backup Power for the Emergency Notification System
ML060090405
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/31/2006
From: Dyer J
Office of Nuclear Reactor Regulation
To: Kansler M
Entergy Nuclear Operations
Boska J, NRR, 301-415-2901
Shared Package
ML060090441 List:
References
Download: ML060090405 (7)


Text

January 31, 2006 EA-05-190 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

CONFIRMATORY ORDER MODIFYING LICENSE TO REQUIRE BACKUP POWER FOR THE EMERGENCY NOTIFICATION SYSTEM FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3

Dear Mr. Kansler:

The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the enclosed Confirmatory Order to Entergy Nuclear Operations, Inc., to address the requirement of PL 109-58, 119 Stat 594, Section 651(b) of the Energy Policy Act (Act) of 2005. The Act was enacted on August 8, 2005. The Act mandates that for any licensed nuclear power plants located where there is a permanent population, as determined by the 2000 decennial census, in excess of 15,000,000 within a 50-mile radius of the power plant, not later than 18 months after enactment of this Act, the Commission shall require that backup power to be available for the emergency notification system of the power plant, including the emergency siren warning system, if the alternating current supply within the 10-mile emergency planning zone of the power plant is lost. Indian Point Nuclear Generating Unit Nos. 2 and 3 meet the criteria of the Act. The Confirmatory Order will require backup power for the emergency notification system used for Indian Point Nuclear Generating Unit Nos. 2 and 3. The Confirmatory Order will become effective immediately upon issuance and fully implemented by January 30, 2007.

Questions concerning this Confirmatory Order should be addressed to Eric J. Leeds, Director, Division of Preparedness and Response, who can be reached at (301) 415-2334 or Nader L. Mamish, Director, Emergency Preparedness Directorate, who can be reached at (301) 415-1086.

Pursuant to Section 223 of the Atomic Energy Act of 1954, as amended, any person who willfully violates, attempts to violate, or conspires to violate, any provision of this Order shall be subject to criminal prosecution as set forth in that section. Violation of this Order may also subject the person to civil monetary penalty.

In accordance with Title 10 of the Code of Federal Regulations, Section 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the publicly available record component of the NRCs Agencywide Documents Access and Management System (ADAMS).

M. Kansler ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room). To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. The NRC also includes significant enforcement actions on its Web site at www.nrc.gov; select What We Do, Enforcement, then Significant Enforcement Actions.

Sincerely,

/RA/

J. E. Dyer, Director Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

As stated

M. Kansler ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room). To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. The NRC also includes significant enforcement actions on its Web site at www.nrc.gov; select What We Do, Enforcement, then Significant Enforcement Actions.

Sincerely,

/RA/

J. E. Dyer, Director Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

As stated cc: w/encl: See next page DISTRIBUTION Public W. Kane M. Johnson C. Nolan B. Boger RidsNrrOd R. Zimmerman E. Leeds N. Mamish C. Haney S. Collins E. Weiss K. Williams J. Boska S. Little OGC G. Hill (4) LPL1-1 R/F S. Burnell ACRS B McDermott (R1) SECY S. Lee (EDO)

Adams Accession Number: ML060090405, Order ML060090429, Package ML060090441 .

OFFICE LPL1-1/PM LPL1-1/LA LPL1-1/BC NRR/DORL/D NRR/ADRO/AD NAME JBoska Craynor for RLaufer CHolden for BBoger SLittle CHaney DATE 1/11/06 1/11/06 1/31/06 1/31/06 1/31/06 OFFICE RGN1/RA NSIR/OD OE OGC NRR/D NAME MDapas for RZimmerman MJohnson BJones for JDyer SCollins LChandler DATE 1/31/06 1/31/06 1/31/06 1/31/06 1/31/06 OFFICIAL RECORD COPY

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Mr. Gary J. Taylor Ms. Charlene D. Faison Chief Executive Officer Manager, Licensing Entergy Operations, Inc. Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John T. Herron Mr. Michael J. Columb Senior Vice President and Director of Oversight Chief Operating Officer Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. James Comiotes Mr. Fred R. Dacimo Director, Nuclear Safety Assurance Site Vice President Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. Indian Point Energy Center Indian Point Energy Center 295 Broadway, Suite 1 295 Broadway, Suite 1 P.O. Box 249 P.O. Box 249 Buchanan, NY 10511-0249 Buchanan, NY 10511-0249 Mr. Patric Conroy Mr. Paul Rubin Manager, Licensing General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. Indian Point Energy Center Indian Point Energy Center 295 Broadway, Suite 1 295 Broadway, Suite 2 P. O. Box 249 P.O. Box 249 Buchanan, NY 10511-0249 Buchanan, NY 10511-0249 Mr. Travis C. McCullough Mr. Oscar Limpias Assistant General Counsel Vice President Engineering Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Ms. Stacey Lousteau Mr. Brian OGrady Treasury Department Vice President, Operations Support Entergy Services, Inc.

Entergy Nuclear Operations, Inc. 639 Loyola Avenue 440 Hamilton Avenue Mail Stop: L-ENT-15E White Plains, NY 10601 New Orleans, LA 70113 Mr. John F. McCann Regional Administrator, Region I Director, Licensing U.S. Nuclear Regulatory Commission Entergy Nuclear Operations, Inc. 475 Allendale Road 440 Hamilton Avenue King of Prussia, PA 19406 White Plains, NY 10601

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Senior Resident Inspectors Office Mr. William DiProfio Indian Point 2 PWR SRC Consultant U. S. Nuclear Regulatory Commission 139 Depot Road P.O. Box 59 East Kingston, NH 03827 Buchanan, NY 10511 Mr. Daniel C. Poole Senior Resident Inspectors Office PWR SRC Consultant Indian Point 3 P.O. Box 579 U. S. Nuclear Regulatory Commission Inglis, FL 34449 P.O. Box 59 Buchanan, NY 10511 Mr. William T. Russell PWR SRC Consultant Mr. Peter R. Smith, President 400 Plantation Lane New York State Energy, Research, and Stevensville, MD 21666-3232 Development Authority 17 Columbia Circle Mr. Jim Riccio Albany, NY 12203-6399 Greenpeace 702 H Street, NW Mr. Paul Eddy Suite 300 Electric Division Washington, DC 20001 New York State Department of Public Service Mr. Phillip Musegaas 3 Empire State Plaza, 10th Floor Riverkeeper, Inc.

Albany, NY 12223 828 South Broadway Tarrytown, NY 10591 Mr. Charles Donaldson, Esquire Assistant Attorney General Mr. Mark Jacobs New York Department of Law IPSEC 120 Broadway 46 Highland Drive New York, NY 10271 Garrison, NY 10524 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Ray Albanese Executive Chair Four County Nuclear Safety Committee Westchester County Fire Training Center 4 Dana Road Valhalla, NY 10592