ML060830047: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:March 23, 2006Mr. Jeff T. SpenceManager, Nuclear Training Dominion Nuclear Connecticut, Inc.
{{#Wiki_filter:March 23, 2006 Mr. Jeff T. Spence Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.
Millstone Power Station, Units 2 & 3Rope Ferry Road, Route 156Waterford, CT 06385
Millstone Power Station, Units 2 & 3 Rope Ferry Road, Route 156 Waterford, CT 06385


==Dear Mr. Spence:==
==Dear Mr. Spence:==
The purpose of this letter is to inform you of the individual examination results for your applicanton the written retake examination administered on March 21, 2006 at your facility. This meets theintent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. One individual wasadministered the examination and one passed.
 
This information is considered to be "proprietary"in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.Enclosure 1 is the completed ES-501-2, Power Plant Licensing Examination Results Summary,and is a summary of overall examination results.Enclosure 2 contains the individual results ES-303-1 and 303-2, Operator License ExaminationReport, for the applicant. Contained therein are the deficiencies noted for the applicant. Inaccordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to yourfacility by signing Block 19A of NRC Form 398.Enclosure 3 is a copy of the individual's license.Thank you for your cooperation in this matter. Please refer any questions you have to me at (610)337-5183.Sincerely,/RA/Richard J. Conte, ChiefOperations Branch Division of Reactor SafetyDocket No. 050336 License No. DPR-65
The purpose of this letter is to inform you of the individual examination results for your applicant on the written retake examination administered on March 21, 2006 at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. One individual was administered the examination and one passed. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicant. Contained therein are the deficiencies noted for the applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the individuals license.
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5183.
Sincerely,
                                            /RA/
Richard J. Conte, Chief Operations Branch Division of Reactor Safety Docket No.     050336 License No. DPR-65


==Enclosures:==
==Enclosures:==
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 2. ES-303-1 and 303-2, Individual Examination Results3. License cc w/licenses:Mr. J. A. Price, Site Vice President Mr. Jeff T. SpenceManager, Nuclear Training Dominion Nuclear Connecticut, Inc.
: 2. ES-303-1 and 303-2, Individual Examination Results
Millstone Power Station, Units 2 & 3 Rope Ferry Road, Route 156 Waterford, CT 06385
: 3. License cc w/licenses:
Mr. J. A. Price, Site Vice President
 
Mr. Jeff T. Spence Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.
Millstone Power Station, Units 2 & 3 Rope Ferry Road, Route 156 Waterford, CT 06385


==Dear Mr. Spence:==
==Dear Mr. Spence:==


The purpose of this letter is to inform you of the individual examination results for your applicant on the written retake examinationadministered on March 21, 2006 at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) inNUREG 1021. One individual was administered the examination and one passed.
The purpose of this letter is to inform you of the individual examination results for your applicant on the written retake examination administered on March 21, 2006 at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. One individual was administered the examination and one passed. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
This information is considered to be"proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report fo ryour facility which will be issued shortly.Enclosure 1 is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overallexamination results.Enclosure 2 contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicant. Contained therein are the deficiencies noted for the applicant. In accordance with your Systems Approach to Training (SAT)
Enclosure 1 is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results.
Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of theoverall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398.Enclosure 3 is a copy of the individual's license.
Enclosure 2 contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicant.
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5183.Sincerely,
Contained therein are the deficiencies noted for the applicant. In accordance with your Systems Approach to Training (SAT)
/RA/
Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398.
Richard J. Conte, ChiefOperations Branch Division of Reactor SafetyDocket No. 050336 License No. DPR-65
Enclosure 3 is a copy of the individuals license.
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5183.
Sincerely,
                                                                                /RA/
Richard J. Conte, Chief Operations Branch Division of Reactor Safety Docket No.             050336 License No.           DPR-65


==Enclosures:==
==Enclosures:==
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 2. ES-303-1 and 303-2, Individual Examination Results
: 2. ES-303-1 and 303-2, Individual Examination Results
: 3. Licensecc w/license:Mr. J. A. Price, Site Vice President Distribution: w/o enclosures:Master Exam FileDOCUMENT NAME:E:\Filenet\ML060830047.wpdADAMS PACKAGE: ML053500027 SISP Review Complete:   RJC               (Reviewer's Initials)After declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure   "E" = Copy with attachment/enclosure   "N" = Nocopy OFFICERI/DRS/OSB RI/DRS/OSB RI/DRS/OSB       NAME CJBixler /RA/GAJohnson/RA/RJConte /RA/DATE03/21/0603/23/0603/ 23/06 OFFICIAL RECORD COPY}}
: 3. License cc w/license:
Mr. J. A. Price, Site Vice President Distribution: w/o enclosures:
Master Exam File DOCUMENT NAME:E:\Filenet\ML060830047.wpd ADAMS PACKAGE: ML053500027 SISP Review Complete: RJC                                     (Reviewers Initials)
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB                                 RI/DRS/OSB                   RI/DRS/OSB NAME           CJBixler /RA/                       GAJohnson                     RJConte /RA/
                                                    /RA/
DATE          03/21/06                            03/23/06                      03/ 23/06 OFFICIAL RECORD COPY}}

Latest revision as of 21:48, 23 November 2019

NRC Exam Results Letter W/O Encl. Dtd 03/23/06
ML060830047
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/23/2006
From: Conte R
Operations Branch I
To: Jane Spence
Dominion Nuclear Connecticut
Conte R
References
Download: ML060830047 (2)


Text

March 23, 2006 Mr. Jeff T. Spence Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.

Millstone Power Station, Units 2 & 3 Rope Ferry Road, Route 156 Waterford, CT 06385

Dear Mr. Spence:

The purpose of this letter is to inform you of the individual examination results for your applicant on the written retake examination administered on March 21, 2006 at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. One individual was administered the examination and one passed. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicant. Contained therein are the deficiencies noted for the applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the individuals license.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5183.

Sincerely,

/RA/

Richard J. Conte, Chief Operations Branch Division of Reactor Safety Docket No. 050336 License No. DPR-65

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. License cc w/licenses:

Mr. J. A. Price, Site Vice President

Mr. Jeff T. Spence Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.

Millstone Power Station, Units 2 & 3 Rope Ferry Road, Route 156 Waterford, CT 06385

Dear Mr. Spence:

The purpose of this letter is to inform you of the individual examination results for your applicant on the written retake examination administered on March 21, 2006 at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. One individual was administered the examination and one passed. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.

Enclosure 1 is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results.

Enclosure 2 contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicant.

Contained therein are the deficiencies noted for the applicant. In accordance with your Systems Approach to Training (SAT)

Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398.

Enclosure 3 is a copy of the individuals license.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5183.

Sincerely,

/RA/

Richard J. Conte, Chief Operations Branch Division of Reactor Safety Docket No. 050336 License No. DPR-65

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. License cc w/license:

Mr. J. A. Price, Site Vice President Distribution: w/o enclosures:

Master Exam File DOCUMENT NAME:E:\Filenet\ML060830047.wpd ADAMS PACKAGE: ML053500027 SISP Review Complete: RJC (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CJBixler /RA/ GAJohnson RJConte /RA/

/RA/

DATE 03/21/06 03/23/06 03/ 23/06 OFFICIAL RECORD COPY