| number = ML101530099
| number = ML101530099
| issue date = 06/14/2010
| issue date = 06/14/2010
| title = 05/11/2010 Summary of Meeting with Tennessee Valley Authority (TVA) Regarding Watts Bar Unit 2 Fire Protection and Instrumentation and Control Submittals
| title = Summary of Meeting with Tennessee Valley Authority (TVA) Regarding Watts Bar Unit 2 Fire Protection and Instrumentation and Control Submittals
| author name = Wiebe J
| author name = Wiebe J
| author affiliation = NRC/NRR/DORL/LPWB
| author affiliation = NRC/NRR/DORL/LPWB
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:June 14, 2010  
{{#Wiki_filter:June 14, 2010 LICENSEE:       Tennessee Valley Authority FACILITY:       Watts Bar Nuclear Power Plant, Unit 2
 
LICENSEE: Tennessee Valley Authority  
 
FACILITY: Watts Bar Nuclear Power Plant, Unit 2  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF MAY 11, 2010, MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR UNIT 2 FIRE PROTECTION AND INSTRUMENTATION AND CONTROL SUBMITTALS  
OF MAY 11, 2010, MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR UNIT 2 FIRE PROTECTION AND INSTRUMENTATION AND CONTROL SUBMITTALS On May 11, 2010, a meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Tennessee Valley Authority (TVA, the applicant), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the scope and timing of the Watts Bar Unit 2 fire protection plan and instrumentation and control and submittals.
 
The enclosure contains the list of attendees. The applicants presentation provided historical information regarding the Watts Bar Nuclear Power Plant, Units 1 and 2, fire protection plan licensing activities and a summary of program changes since 2001 (see NRC Agencywide Documents Access and Management System Accession No. ML101170102). The staff queried the applicant regarding the timing of the submittal in relation to the current Watts Bar Unit 2 licensing schedule. The applicant informed the NRC that a schedule will be developed and provided to the NRC. The applicant inquired about the acceptability of providing partial submittals for review, such as those portions that are not likely to change as the Unit 2 information is incorporated into the plan and the acceptability of providing as-designed information promptly and providing as-built information as it becomes available. The NRC staff agreed that partial and as-designed information submittals are acceptable to begin the review as long as the submittals are updated and the updates clearly identify what information is being changed.
On May 11, 2010, a meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Tennessee Valley Authority (TVA, the applicant), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the scope and timing of the Watts Bar Unit 2 fire protection plan and instrumentation and control and submittals.  
 
The enclosure contains the list of attendees. The applicant's presentation provided historical information regarding the Watts Bar Nuclear Power Plant, Units 1 and 2, fire protection plan licensing activities and a summary of program changes since 2001 (see NRC Agencywide Documents Access and Management System Accession No. ML101170102). The staff queried the applicant regarding the timing of the submittal in relation to the current Watts Bar Unit 2 licensing schedule. The applicant informed the NRC that a schedule will be developed and provided to the NRC. The applicant inquired about the acceptability of providing partial submittals for review, such as those portions that are not likely to change as the Unit 2 information is incorporated into the plan and the acceptability of providing as-designed information promptly and providing as-built information as it becomes available. The NRC staff agreed that partial and as-designed information submittals are acceptable to begin the review as long as the submittals are updated and the updates clearly identify what information is being changed.
The applicant also discussed the scope and timing of submittals related to the instrumentation and control areas. This portion of the meeting was closed to the public because proprietary information was discussed.
The applicant also discussed the scope and timing of submittals related to the instrumentation and control areas. This portion of the meeting was closed to the public because proprietary information was discussed.
A member of the public was in attendance. Public meeting feedback forms were not received. Please direct any inquiries to me at 301-415-6606 or JoeI.Wiebe@nrc.gov.  
A member of the public was in attendance. Public meeting feedback forms were not received.


        /RA/ Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391  
Please direct any inquiries to me at 301-415-6606 or JoeI.Wiebe@nrc.gov.
                                                            /RA/
Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391


==Enclosure:==
==Enclosure:==
List of Attendees cc w/encl: Distribution via Listserv  Please direct any inquiries to me at 301-415-6606 or JoeI.Wiebe@nrc.gov.


/RA/ Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391  
List of Attendees cc w/encl: Distribution via Listserv
 
Please direct any inquiries to me at 301-415-6606 or JoeI.Wiebe@nrc.gov.
                                                                /RA/
Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391


==Enclosure:==
==Enclosure:==
List of Attendees cc w/encl: Distribution via Listserv
DISTRIBUTION:
PUBLIC  LPWB R/F  RidsNrrDorlLp_WB RidsNrrPMWattsBar2 RidsNrrLABClayton  RidsOgcRp  RidsRgn2MailCenter RidsAcrsAcnw_MailCTR  DDiaz-Toro, EDO  CMoulton, NRR DFrumkin  RidsNrrDraAfpb  CSteger, NRR Accession Numbers:  PKG: ML101530435    Meeting Summary: ML101530099        Mtg Notice: ML101170102  Handouts: ML101520438 OFFICE  DORL/LPWB/PM DORL/LPWB/LA DRA/AFPB/BC DORL/LPWB/BC NAME  JWiebe  BClayton Aklein/ DFrumkin for SCampbell DATE  06 / 14 /10 06/ 9 /10 06/  7 /10 06/ 14 /10                                                      OFFICIAL RECORD COPY LIST OF ATTENDEES MAY 11, 2010, MEETING WITH TENNESSEE VALLEY AUTHORITY FIRE PROTECTION PLAN SCOPE AND SUBMITTAL SCHEDULE WATTS BAR NUCLEAR PLANT, UNIT 2 Office of Nuclear Reactor Regulation Participants
:  Name  Position/Title  Organization Joel Wiebe  Sr. Project Manager  Division of Operating Reactors          Watts Bar Special Projects Branch


Daniel Frumkin Team Leader  Division of Risk Assessment        Fire Protection Branch (DRA/AFPB)
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
Charles Moulton Fire Protection Engineer DRA/AFPB  
PUBLIC                  LPWB R/F            RidsNrrDorlLp_WB RidsNrrPMWattsBar2 RidsNrrLABClayton        RidsOgcRp            RidsRgn2MailCenter RidsAcrsAcnw_MailCTR DDiaz-Toro, EDO          CMoulton, NRR        DFrumkin                  RidsNrrDraAfpb CSteger, NRR Accession Numbers: PKG: ML101530435          Meeting Summary: ML101530099 Mtg Notice: ML101170102  Handouts: ML101520438 OFFICE      DORL/LPWB/PM DORL/LPWB/LA        DRA/AFPB/BC      DORL/LPWB/BC NAME        JWiebe            BClayton      Aklein/          SCampbell DFrumkin for DATE        06 / 14 /10        06/ 9 /10    06/ 7 /10        06/ 14 /10 OFFICIAL RECORD COPY


Tennessee Valley Authority (TVA) Participants
LIST OF ATTENDEES MAY 11, 2010, MEETING WITH TENNESSEE VALLEY AUTHORITY FIRE PROTECTION PLAN SCOPE AND SUBMITTAL SCHEDULE WATTS BAR NUCLEAR PLANT, UNIT 2 Office of Nuclear Reactor Regulation
:
Bill Crouch  Licensing Manager  TVA Watts Bar Unit 2 Charles Brush  Fire Protection Engineer TVA


Public  Watanabe Kenichi Assistant Director  Japan Nuclear Energy Safety Organization  
==Participants:==
Name                  Position/Title              Organization Joel Wiebe          Sr. Project Manager          Division of Operating Reactors Watts Bar Special Projects Branch Daniel Frumkin        Team Leader                  Division of Risk Assessment Fire Protection Branch (DRA/AFPB)
Charles Moulton      Fire Protection Engineer    DRA/AFPB Tennessee Valley Authority (TVA)


Enclosure}}
==Participants:==
Bill Crouch          Licensing Manager            TVA Watts Bar Unit 2 Charles Brush        Fire Protection Engineer    TVA Public Watanabe Kenichi      Assistant Director          Japan Nuclear Energy Safety Organization Enclosure}}

Latest revision as of 19:05, 6 December 2019

Summary of Meeting with Tennessee Valley Authority (TVA) Regarding Watts Bar Unit 2 Fire Protection and Instrumentation and Control Submittals
ML101530099
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/14/2010
From: Joel Wiebe
Watts Bar Special Projects Branch
To:
Wiebe, Joel NRR/DORL/WBSP, 415-6606
References
Download: ML101530099 (4)


Text

June 14, 2010 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF MAY 11, 2010, MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR UNIT 2 FIRE PROTECTION AND INSTRUMENTATION AND CONTROL SUBMITTALS On May 11, 2010, a meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Tennessee Valley Authority (TVA, the applicant), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the scope and timing of the Watts Bar Unit 2 fire protection plan and instrumentation and control and submittals.

The enclosure contains the list of attendees. The applicants presentation provided historical information regarding the Watts Bar Nuclear Power Plant, Units 1 and 2, fire protection plan licensing activities and a summary of program changes since 2001 (see NRC Agencywide Documents Access and Management System Accession No. ML101170102). The staff queried the applicant regarding the timing of the submittal in relation to the current Watts Bar Unit 2 licensing schedule. The applicant informed the NRC that a schedule will be developed and provided to the NRC. The applicant inquired about the acceptability of providing partial submittals for review, such as those portions that are not likely to change as the Unit 2 information is incorporated into the plan and the acceptability of providing as-designed information promptly and providing as-built information as it becomes available. The NRC staff agreed that partial and as-designed information submittals are acceptable to begin the review as long as the submittals are updated and the updates clearly identify what information is being changed.

The applicant also discussed the scope and timing of submittals related to the instrumentation and control areas. This portion of the meeting was closed to the public because proprietary information was discussed.

A member of the public was in attendance. Public meeting feedback forms were not received.

Please direct any inquiries to me at 301-415-6606 or JoeI.Wiebe@nrc.gov.

/RA/

Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

Please direct any inquiries to me at 301-415-6606 or JoeI.Wiebe@nrc.gov.

/RA/

Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPWB R/F RidsNrrDorlLp_WB RidsNrrPMWattsBar2 RidsNrrLABClayton RidsOgcRp RidsRgn2MailCenter RidsAcrsAcnw_MailCTR DDiaz-Toro, EDO CMoulton, NRR DFrumkin RidsNrrDraAfpb CSteger, NRR Accession Numbers: PKG: ML101530435 Meeting Summary: ML101530099 Mtg Notice: ML101170102 Handouts: ML101520438 OFFICE DORL/LPWB/PM DORL/LPWB/LA DRA/AFPB/BC DORL/LPWB/BC NAME JWiebe BClayton Aklein/ SCampbell DFrumkin for DATE 06 / 14 /10 06/ 9 /10 06/ 7 /10 06/ 14 /10 OFFICIAL RECORD COPY

LIST OF ATTENDEES MAY 11, 2010, MEETING WITH TENNESSEE VALLEY AUTHORITY FIRE PROTECTION PLAN SCOPE AND SUBMITTAL SCHEDULE WATTS BAR NUCLEAR PLANT, UNIT 2 Office of Nuclear Reactor Regulation

Participants:

Name Position/Title Organization Joel Wiebe Sr. Project Manager Division of Operating Reactors Watts Bar Special Projects Branch Daniel Frumkin Team Leader Division of Risk Assessment Fire Protection Branch (DRA/AFPB)

Charles Moulton Fire Protection Engineer DRA/AFPB Tennessee Valley Authority (TVA)

Participants:

Bill Crouch Licensing Manager TVA Watts Bar Unit 2 Charles Brush Fire Protection Engineer TVA Public Watanabe Kenichi Assistant Director Japan Nuclear Energy Safety Organization Enclosure