ML112200390: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 9, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Dominion Energy Kewaunee, Inc. | ||
August 9, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Dominion Energy Kewaunee, Inc. Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 KEWAUNEE POWER STATION -WITHDRAWAL OF A REQUEST FOR ALTERNATIVE TEST REQUIREMENTS FOR LARGE-BORE HYDRAULIC SNUBBERS (TAC NO. ME4722) | Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 | ||
==SUBJECT:== | |||
KEWAUNEE POWER STATION - WITHDRAWAL OF A REQUEST FOR ALTERNATIVE TEST REQUIREMENTS FOR LARGE-BORE HYDRAULIC SNUBBERS (TAC NO. ME4722) | |||
==Dear Mr. Heacock:== | ==Dear Mr. Heacock:== | ||
Bya letter dated September 7,2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102520078), as supplemented by a letter dated January 26, 2011 (ADAMS Accession No. ML110280056), you submitted a request to establish alternate test requirements for the Kewaunee Power Station large-bore hydraulic snubbers. | |||
In your submittal you stated that the proposed alternate test requirements are intended to eliminate the potential for unplanned functional testing of these snubbers while providing an acceptable level of safety and quality. Subsequently, by letter dated June 27,2011 (ADAMS Accession No. ML111791687), you withdrew the request for the alternate test requirements. | Bya letter dated September 7,2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102520078), as supplemented by a letter dated January 26, 2011 (ADAMS Accession No. ML110280056), you submitted a request to establish alternate test requirements for the Kewaunee Power Station large-bore hydraulic snubbers. In your submittal you stated that the proposed alternate test requirements are intended to eliminate the potential for unplanned functional testing of these snubbers while providing an acceptable level of safety and quality. | ||
In your withdrawal letter you stated that you intend to address alternate test requirements for large-bore hydraulic snubbers in the submittal of the Inservice Inspection Program for the fifth 10-year inspection interval (2014-2024) rather than in a separate licensing action. The purpose of this letter is to advise you that the above-cited application is being treated as withdrawn. Karl Feintuch, Project ManC Plant Licensing Branch 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc: Distribution via Listserv August 9, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Dominion Energy Kewaunee, Inc. Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 KEWAUNEE POWER STATION -WITHDRAWAL OF A REQUEST FOR ALTERNATIVE TEST REQUIREMENTS FOR LARGE-BORE HYDRAULIC SNUBBERS (TAC NO. ME4722) | Subsequently, by letter dated June 27,2011 (ADAMS Accession No. ML111791687), you withdrew the request for the alternate test requirements. In your withdrawal letter you stated that you intend to address alternate test requirements for large-bore hydraulic snubbers in the submittal of the Inservice Inspection Program for the fifth 10-year inspection interval (2014-2024) rather than in a separate licensing action. | ||
The purpose of this letter is to advise you that the above-cited application is being treated as withdrawn. | |||
~).~ | |||
Karl Feintuch, Project ManC Plant Licensing Branch 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc: Distribution via Listserv | |||
August 9, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Dominion Energy Kewaunee, Inc. | |||
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 | |||
==SUBJECT:== | |||
KEWAUNEE POWER STATION - WITHDRAWAL OF A REQUEST FOR ALTERNATIVE TEST REQUIREMENTS FOR LARGE-BORE HYDRAULIC SNUBBERS (TAC NO. ME4722) | |||
==Dear Mr. Heacock:== | ==Dear Mr. Heacock:== | ||
By a letter dated September 7,2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102520078), as supplemented by a letter dated January 26, 2011 (ADAMS Accession No. ML110280056), you submitted a request to establish alternate test requirements for the Kewaunee Power Station large-bore hydraulic snubbers. | |||
In your submittal you stated that the proposed alternate test requirements are intended to eliminate the potential for unplanned functional testing of these snubbers while providing an acceptable level of safety and quality. Subsequently, by letter dated June 27,2011 (ADAMS Accession No. ML111791687), you withdrew the request for the alternate test requirements. | By a letter dated September 7,2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102520078), as supplemented by a letter dated January 26, 2011 (ADAMS Accession No. ML110280056), you submitted a request to establish alternate test requirements for the Kewaunee Power Station large-bore hydraulic snubbers. In your submittal you stated that the proposed alternate test requirements are intended to eliminate the potential for unplanned functional testing of these snubbers while providing an acceptable level of safety and quality. | ||
In your withdrawal letter you stated that you intend to address alternate test requirements for large-bore hydraulic snubbers in the submittal of the Inservice Inspection Program for the fifth | Subsequently, by letter dated June 27,2011 (ADAMS Accession No. ML111791687), you withdrew the request for the alternate test requirements. In your withdrawal letter you stated that you intend to address alternate test requirements for large-bore hydraulic snubbers in the submittal of the Inservice Inspection Program for the fifth 1O-year inspection interval (2014-2024) rather than in a separate licensing action. | ||
The purpose of this letter is to advise you that the above-cited application is being treated as withdrawn. | |||
Sincerely, IRAJ Peter Tam for Karl Feintuch, Project Manager Plant Licensing Branch 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc: Distribution via Listserv DISTRIBUTION: | Sincerely, IRAJ Peter Tam for Karl Feintuch, Project Manager Plant Licensing Branch 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc: Distribution via Listserv DISTRIBUTION: | ||
PUBLIC LPL3-1 r/f RidsRgn3MailCenter Resource RidsNrrPMKewaunee Resource | PUBLIC LPL3-1 r/f RidsRgn3MailCenter Resource RidsNrrPMKewaunee Resource RidsAcrsAcnw_ MailCTR Resource RidsNrrDorlDpr Resource GBedi, NRR RidsNrrDciCptb Resource RidsNrrDorlLpl3-1 Resource RidsOgcRp Resource RidsNrrLABTully) Resource ADAMS Accession No. ML112200390 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/LPL3-1/BC NAME KFeintuch IPTam for BTuily ISRohrer for RPascarelli DATE 08/09/11 08/09/11 08/09/11 OFFICIAL AGENCY RECORD}} | ||
Resource ADAMS Accession No. ML112200390 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/LPL3-1/BC NAME KFeintuch IPTam for BTuily ISRohrer for RPascarelli DATE 08/09/11 08/09/11 08/09/11 OFFICIAL AGENCY RECORD}} |
Latest revision as of 17:32, 12 November 2019
ML112200390 | |
Person / Time | |
---|---|
Site: | Kewaunee |
Issue date: | 08/09/2011 |
From: | Feintuch K Plant Licensing Branch III |
To: | Heacock D Dominion Energy Kewaunee |
Feintuch K | |
References | |
TAC ME4722 | |
Download: ML112200390 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 9, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
KEWAUNEE POWER STATION - WITHDRAWAL OF A REQUEST FOR ALTERNATIVE TEST REQUIREMENTS FOR LARGE-BORE HYDRAULIC SNUBBERS (TAC NO. ME4722)
Dear Mr. Heacock:
Bya letter dated September 7,2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102520078), as supplemented by a letter dated January 26, 2011 (ADAMS Accession No. ML110280056), you submitted a request to establish alternate test requirements for the Kewaunee Power Station large-bore hydraulic snubbers. In your submittal you stated that the proposed alternate test requirements are intended to eliminate the potential for unplanned functional testing of these snubbers while providing an acceptable level of safety and quality.
Subsequently, by letter dated June 27,2011 (ADAMS Accession No. ML111791687), you withdrew the request for the alternate test requirements. In your withdrawal letter you stated that you intend to address alternate test requirements for large-bore hydraulic snubbers in the submittal of the Inservice Inspection Program for the fifth 10-year inspection interval (2014-2024) rather than in a separate licensing action.
The purpose of this letter is to advise you that the above-cited application is being treated as withdrawn.
~).~
Karl Feintuch, Project ManC Plant Licensing Branch 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc: Distribution via Listserv
August 9, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
KEWAUNEE POWER STATION - WITHDRAWAL OF A REQUEST FOR ALTERNATIVE TEST REQUIREMENTS FOR LARGE-BORE HYDRAULIC SNUBBERS (TAC NO. ME4722)
Dear Mr. Heacock:
By a letter dated September 7,2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102520078), as supplemented by a letter dated January 26, 2011 (ADAMS Accession No. ML110280056), you submitted a request to establish alternate test requirements for the Kewaunee Power Station large-bore hydraulic snubbers. In your submittal you stated that the proposed alternate test requirements are intended to eliminate the potential for unplanned functional testing of these snubbers while providing an acceptable level of safety and quality.
Subsequently, by letter dated June 27,2011 (ADAMS Accession No. ML111791687), you withdrew the request for the alternate test requirements. In your withdrawal letter you stated that you intend to address alternate test requirements for large-bore hydraulic snubbers in the submittal of the Inservice Inspection Program for the fifth 1O-year inspection interval (2014-2024) rather than in a separate licensing action.
The purpose of this letter is to advise you that the above-cited application is being treated as withdrawn.
Sincerely, IRAJ Peter Tam for Karl Feintuch, Project Manager Plant Licensing Branch 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL3-1 r/f RidsRgn3MailCenter Resource RidsNrrPMKewaunee Resource RidsAcrsAcnw_ MailCTR Resource RidsNrrDorlDpr Resource GBedi, NRR RidsNrrDciCptb Resource RidsNrrDorlLpl3-1 Resource RidsOgcRp Resource RidsNrrLABTully) Resource ADAMS Accession No. ML112200390 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/LPL3-1/BC NAME KFeintuch IPTam for BTuily ISRohrer for RPascarelli DATE 08/09/11 08/09/11 08/09/11 OFFICIAL AGENCY RECORD