ML13135A448: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, DC 20555 - 0001 May 15, 2013  
{{#Wiki_filter:UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON WASHINGTON, DC 20555 - 0001 May 15, 2013 Administrative Judge                                  Administrative Judge Paul S. Ryerson, Chair                               Paul B. Abramson Atomic Safety and Licensing Board Panel               Atomic Safety and Licensing Board Panel Mail Stop T-3 F23                                    Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission                   U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                             Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of TENNESSEE VALLEY AUTHORITY (Watts Bar Nuclear Plant Unit 2)
 
Docket No. 50-391-OL; ASLBP No. 09-893-01-OL-BD01
Administrative Judge Paul S. Ryerson, Chair Atomic Safety and Licensing Board Panel  
 
Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
Administrative Judge Gary S. Arnold  Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
 
Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel  
 
Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
 
In the Matter of TENNESSEE VALLEY AUTHORITY (Watts Bar Nuclear Plant Unit 2) Docket No. 50-391-OL; ASLBP No. 09-893-01-OL-BD01


==Dear Administrative Judges:==
==Dear Administrative Judges:==


The NRC Staff hereby submits Supplement 40 to the hearing file for the Watts Bar Nuclear Plant (Unit 2) OL proceeding, Docket No. 50-391-OL.
The NRC Staff hereby submits Supplement 40 to the hearing file for the Watts Bar Nuclear Plant (Unit 2) OL proceeding, Docket No. 50-391-OL.
Pursuant to the agreement of the parties, disclosures and the hearing file may be limited to final  
Pursuant to the agreement of the parties, disclosures and the hearing file may be limited to final non-privileged documents relevant to the admitted contentions. Further, historical versions of the application need not be listed and privilege logs are waived.
 
This supplement to the hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staffs mandatory disclosures produced pursuant to 10 C.F.R. § 2.336, as modified by the agreement. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of public each item in the hearing file is appended hereto as Attachment 1.
non-privileged documents relevant to the admitted contentions. Further, historical versions of the application need not be listed and privilege logs are waived.      
 
This supplement to the hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staff's mandatory disclosures produced pursuant to 10 C.F.R. § 2.336, as modified by the agreement. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System ("ADAMS"). An index containing the ADAMS accession number, date, and title or description of public each item in the hearing file is appended hereto as Attachment 1.
The Staff has taken a broad approach in identifying potentially-relevant documents for inclusion in the disclosures and hearing file. Additional public documents associated with the application, but not relevant to the admitted contention, are readily accessible in ADAMS. In addition, pursuant to the agreement of the parties, the Staff will continue to work with both parties to provide access to documents.
The Staff has taken a broad approach in identifying potentially-relevant documents for inclusion in the disclosures and hearing file. Additional public documents associated with the application, but not relevant to the admitted contention, are readily accessible in ADAMS. In addition, pursuant to the agreement of the parties, the Staff will continue to work with both parties to provide access to documents.
On or around May 15, 2013, the supplement to the hearing file will be made available via the Electronic Hearing Docket ("EHD"), which may be accessed at the following URL: 


http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub-folder entitled, "Watts Bar Hearing File" of the "Watts_Bar_50-391-OL" folder of the EHD.  
On or around May 15, 2013, the supplement to the hearing file will be made available via the Electronic Hearing Docket (EHD), which may be accessed at the following URL:
 
http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub-folder entitled, Watts Bar Hearing File" of the Watts_Bar_50-391-OL" folder of the EHD.
Further, attached is the affidavit of Justin C. Poole certifying that all relevant materials required under the agreement of the parties by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of May 14, 2013.  
Further, attached is the affidavit of Justin C. Poole certifying that all relevant materials required under the agreement of the parties by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of May 14, 2013.
 
Sincerely,
Sincerely,
                                                    /Signed (electronically) by/
            /
David Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: May 15, 2013
Signed (electronically) by/
 
David Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel  
 
Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov               Signed: May 15, 2013  


==Enclosures:==
==Enclosures:==
Attachment 1 - Public Hearing File Index  
Attachment 1 - Public Hearing File Index Affidavit of Justin C. Poole


Affidavit of Justin C. Poole
May 15, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                 )
 
                                                )
May 15, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of     )  
TENNESSEE VALLEY AUTHORITY                       )     Docket No. 50-391-OL
      )
                                                )
TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL ) (Watts Bar Nuclear Plant, Unit 2) )  
(Watts Bar Nuclear Plant, Unit 2)               )
 
AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Justin C. Poole, do hereby state as follows:
I, Justin C. Poole, do hereby state as follows:
: 1. I am employed as Senior Project Manager, Plant Licensing Branch LPL II-2, in the Division of Operator Reactor Licensing in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. My responsibilities include oversight of the NRC Staff's review and evaluation of the Watts Bar Nuclear Plant, Unit 2 operating license application ("OLA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the OLA at issue in this proceeding. 2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 and 2.1203, as modified by the parties' agreement of December 1, 2009, have been disclosed, and that the disclosures are accurate and complete for documents identified as of May 14, 2013.
: 1.       I am employed as Senior Project Manager, Plant Licensing Branch LPL II-2, in the Division of Operator Reactor Licensing in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. My responsibilities include oversight of the NRC Staffs review and evaluation of the Watts Bar Nuclear Plant, Unit 2 operating license application (OLA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the OLA at issue in this proceeding.
: 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.      
: 2.       I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 and 2.1203, as modified by the parties agreement of December 1, 2009, have been disclosed, and that the disclosures are accurate and complete for documents identified as of May 14, 2013.
 
: 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
                /Executed in Accord with 10 CFR 2.304(d)
                                                  /Executed in Accord with 10 CFR 2.304(d)/
/        Justin C. Poole       Senior Project Manager, NRR/DORL/LPL II-2 U.S. Nuclear Regulatory Commission Washington, DC 20555       Telephone: (301)415-2048       E-mail:
Justin C. Poole Senior Project Manager, NRR/DORL/LPL II-2 U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301)415-2048 E-mail: Justin.Poole@nrc.gov Date Signed: May 15, 2013
Justin.Poole@nrc.gov Date Signed: May 15, 2013
 
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - May 15, 2013 1  ID# Accession Number Document Date Title 40-001 ML13107B494 4/17/201304/16/2013 Meeting Summary with the Public to Discuss the Annual Assessment of the Watts Bar Nuclear Unit 2 Construction Project. 40-002 ML13095A403 4/9/201304/29/2013 Notice of Meeting with Tennessee Valley Authority (TVA) Regarding Extension Request to Respond to Recommendation 2.1, Flooding, of Near-Term Task Force Review of Insights from Fukushima Da-ichi Accident for Sequoyah Nuclear Plant
 
& Watts Bar. 40-003 ML13099A350 3/7/20132013/03/07 Watts Bar 2 OL - 2012-03-07  -  WBN Project Plan  -  Unit 2.pdf 40-004 ML13099A353 3/7/20132013/03/07 Watts Bar 2 OL - TVA letter to NRC_03-06-13_2-PTI-068-13 transmittal to NRC 40-005 ML13099A349 3/11/20132013/03/11 Watts Bar 2 OL - 2012-03-11  -  WBN Project Plan  -  Unit 2.pdf 40-006 ML13099A372 3/12/20132013/03/12 Watts Bar 2 OL - TVA letter to NRC_03-12-2013_Code Transition Change to two Previous Statements 40-007 ML13099A360 3/13/20132013/03/13 Watts Bar 2 OL - TVA letter to NRC_03-13-2013_WBN2 Transmittal of Revised Unit 1 Unit 2 As Designed FPR 40-008 ML13099A344 3/14/20132013/03/14 Watts Bar 2 OL - 2012-03-14  -  WBN Project Plan  -  Unit 2.pdf 40-009 ML13099A341 3/18/20132013/03/18 Watts Bar 2 OL - 2012-03-18  -  WBN Project Plan  -  Unit 2.pdf 40-010 ML13099A369 3/18/20132013/03/18 Watts Bar 2 OL - TVA letter to NRC_03-18-13_FSEIS Document Submittal 40-011 ML13099A370 3/18/20132013/03/18 Watts Bar 2 OL - TVA letter to NRC_03-18-2013_CAT II Cable Letter 40-012 ML13099A336 3/21/20132013/03/21 Watts Bar 2 OL - 2012-03-21  -  WBN Project Plan  -  Unit 2.pdf 40-013 ML13099A438 3/21/20132013/03/21 Watts Bar 2 OL - TVA letter to NRC_03-21-13_TS 3.3.1 RAI Response 40-014 ML13099A436 3/26/20132013/03/26 Watts Bar 2 OL - TVA letter to NRC_03-26-13_2-PTI-002-02 & 2-PTI-084-01 transmittal to NRC 40-015 ML13099A334 3/28/20132013/03/28 Watts Bar 2 OL - 2012-03-28  -  WBN Project Plan  -  Unit 2.pdf 40-016 ML13109A556 4/19/20135/7/2013 Notice of Meeting With Tennessee Valley Authority To Obtain Additional Information To Allow NRC To Make Subsequent Significance Determination & Enforcement Decisions Related To Three Apparent Violations Identified In NRC Inspection Report .....
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - May 15, 2013 2  ID# Accession Number Document Date Title 40-017 ML13107B505 4/17/2013Public Meeting Summary Watts Bar Nuclear Plant Unit 2 Presentation (NRC Inspection Report 05000391/2013601. 40-018 ML13120A132 4/29/2013Sequoyah and Watts Bar Nuclear Plants, Units 1 and 2 - NTTF Recommendation 2.1, Flooding Hazard Reevaluation Report Extension Request. 40-019 ML13108A107 4/16/2013Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Commitment to Install Improved Flood Mitigation Systems. 40-020 ML13121A062 4/26/2013Tennessee Valley Authority - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012. 40-021 ML13092A362 4/2/2013Tennessee Valley Authority Public Meeting Summary. 40-022 ML13121A427 4/29/2013Watts Bar, Unit 2 - Construction Deficiency Report 50-391/2013 Instrument Sense Line Slope Issue-Interim Report. 40-023 ML13120A004 4/25/2013Watts Bar, Units 1 and 2  - 10 CFR 50.46 30-Day Report of Changes and Errors to the Calculated Peak Cladding Temperatures and Annual Report for 2012.
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
 
In the Matter of    )
      ) TENNESSEE VALLEY AUTHORITY  )  Docket No. 50-391-OL ) (Watts Bar Nuclear Plant, Unit 2)  )
 
CERTIFICATE OF SERVICE
 
Pursuant to 10 C.F.R. § 2.305 (revised), I hereby certify that copies of the foregoing "NRC STAFF'S SUPPLEMENTAL DISCLOSURE 40, INCLUDING PUBLIC HEARING FILE INDEX, PROTECTED HEARING FILE INDEX, AND AFFIDAVIT OF JUSTIN C. POOLE" dated April 15, 2013, have been served upon the Electronic Information Exchange, the NRC's E-Filing System, in the above captioned proceeding, this 15th day of May, 2013:


  /Signed (electronically) by/
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - May 15, 2013 Accession Document ID#                                                                  Title Number      Date 04/16/2013 Meeting Summary with the Public to Discuss the Annual Assessment of 40-001 ML13107B494  4/17/2013 the Watts Bar Nuclear Unit 2 Construction Project.
David E. Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel
04/29/2013 Notice of Meeting with Tennessee Valley Authority (TVA) Regarding Extension Request to Respond to Recommendation 2.1, Flooding, of Near-Term Task 40-002 Force Review of Insights from Fukushima Da-ichi Accident for Sequoyah Nuclear Plant ML13095A403    4/9/2013 & Watts Bar.
40-003  ML13099A350    3/7/2013 2013/03/07 Watts Bar 2 OL - 2012-03 WBN Project Plan - Unit 2.pdf 2013/03/07 Watts Bar 2 OL - TVA letter to NRC_03-06-13_2-PTI-068-13 transmittal to 40-004 ML13099A353    3/7/2013 NRC 40-005  ML13099A349  3/11/2013 2013/03/11 Watts Bar 2 OL - 2012-03 WBN Project Plan - Unit 2.pdf 2013/03/12 Watts Bar 2 OL - TVA letter to NRC_03-12-2013_Code Transition Change 40-006 ML13099A372  3/12/2013 to two Previous Statements 40-007                          2013/03/13 Watts Bar 2 OL - TVA letter to NRC_03-13-2013_WBN2 Transmittal of ML13099A360  3/13/2013 Revised Unit 1 Unit 2 As Designed FPR 40-008  ML13099A344  3/14/2013 2013/03/14 Watts Bar 2 OL - 2012-03 WBN Project Plan - Unit 2.pdf 40-009  ML13099A341  3/18/2013 2013/03/18 Watts Bar 2 OL - 2012-03 WBN Project Plan - Unit 2.pdf 40-010  ML13099A369  3/18/2013 2013/03/18 Watts Bar 2 OL - TVA letter to NRC_03-18-13_FSEIS Document Submittal 40-011  ML13099A370  3/18/2013 2013/03/18 Watts Bar 2 OL - TVA letter to NRC_03-18-2013_CAT II Cable Letter 40-012  ML13099A336  3/21/2013 2013/03/21 Watts Bar 2 OL - 2012-03 WBN Project Plan - Unit 2.pdf 40-013  ML13099A438  3/21/2013 2013/03/21 Watts Bar 2 OL - TVA letter to NRC_03-21-13_TS 3.3.1 RAI Response 2013/03/26 Watts Bar 2 OL - TVA letter to NRC_03-26-13_2-PTI-002-02 & 2-PTI-084-01 40-014 ML13099A436  3/26/2013 transmittal to NRC 40-015  ML13099A334  3/28/2013 2013/03/28 Watts Bar 2 OL - 2012-03 WBN Project Plan - Unit 2.pdf 5/7/2013 Notice of Meeting With Tennessee Valley Authority To Obtain Additional Information To Allow NRC To Make Subsequent Significance Determination &
40-016 Enforcement Decisions Related To Three Apparent Violations Identified In NRC ML13109A556  4/19/2013 Inspection Report .....
1


Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - May 15, 2013 Accession Document ID#                                                                    Title Number      Date 40-017                          Public Meeting Summary Watts Bar Nuclear Plant Unit 2 Presentation (NRC Inspection ML13107B505  4/17/2013 Report 05000391/2013601.
40-018                          Sequoyah and Watts Bar Nuclear Plants, Units 1 and 2 - NTTF Recommendation 2.1, ML13120A132  4/29/2013 Flooding Hazard Reevaluation Report Extension Request.
40-019                          Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Commitment to Install Improved ML13108A107  4/16/2013 Flood Mitigation Systems.
40-020                          Tennessee Valley Authority - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task ML13121A062  4/26/2013 Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012.
40-021  ML13092A362    4/2/2013 Tennessee Valley Authority Public Meeting Summary.
Watts Bar, Unit 2 - Construction Deficiency Report 50-391/2013 Instrument Sense 40-022 ML13121A427  4/29/2013 Line Slope Issue-Interim Report.
40-023                          Watts Bar, Units 1 and 2 - 10 CFR 50.46 30-Day Report of Changes and Errors to the ML13120A004  4/25/2013 Calculated Peak Cladding Temperatures and Annual Report for 2012.
2


Signed: May 15, 2013}}
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                            )
                                            )
TENNESSEE VALLEY AUTHORITY                  )      Docket No. 50-391-OL
                                            )
(Watts Bar Nuclear Plant, Unit 2)            )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised), I hereby certify that copies of the foregoing NRC STAFF'S SUPPLEMENTAL DISCLOSURE 40, INCLUDING PUBLIC HEARING FILE INDEX, PROTECTED HEARING FILE INDEX, AND AFFIDAVIT OF JUSTIN C. POOLE dated April 15, 2013, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 15th day of May, 2013:
                                                  /Signed (electronically) by/
David E. Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: May 15, 2013}}

Latest revision as of 19:05, 4 November 2019

NRC Staff Submits Supplement 40 to the Hearing File for the Watts Bar Nuclear Plant (Unit 2)
ML13135A448
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 05/15/2013
From: Roth D
NRC/OGC
To: Abramson P, Gary Arnold, Paul Ryerson
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 24528, 50-391-OL, ASLBP 09-893-01-OL-BD01
Download: ML13135A448 (7)


Text

UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON WASHINGTON, DC 20555 - 0001 May 15, 2013 Administrative Judge Administrative Judge Paul S. Ryerson, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of TENNESSEE VALLEY AUTHORITY (Watts Bar Nuclear Plant Unit 2)

Docket No. 50-391-OL; ASLBP No. 09-893-01-OL-BD01

Dear Administrative Judges:

The NRC Staff hereby submits Supplement 40 to the hearing file for the Watts Bar Nuclear Plant (Unit 2) OL proceeding, Docket No. 50-391-OL.

Pursuant to the agreement of the parties, disclosures and the hearing file may be limited to final non-privileged documents relevant to the admitted contentions. Further, historical versions of the application need not be listed and privilege logs are waived.

This supplement to the hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staffs mandatory disclosures produced pursuant to 10 C.F.R. § 2.336, as modified by the agreement. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of public each item in the hearing file is appended hereto as Attachment 1.

The Staff has taken a broad approach in identifying potentially-relevant documents for inclusion in the disclosures and hearing file. Additional public documents associated with the application, but not relevant to the admitted contention, are readily accessible in ADAMS. In addition, pursuant to the agreement of the parties, the Staff will continue to work with both parties to provide access to documents.

On or around May 15, 2013, the supplement to the hearing file will be made available via the Electronic Hearing Docket (EHD), which may be accessed at the following URL:

http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub-folder entitled, Watts Bar Hearing File" of the Watts_Bar_50-391-OL" folder of the EHD.

Further, attached is the affidavit of Justin C. Poole certifying that all relevant materials required under the agreement of the parties by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of May 14, 2013.

Sincerely,

/Signed (electronically) by/

David Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: May 15, 2013

Enclosures:

Attachment 1 - Public Hearing File Index Affidavit of Justin C. Poole

May 15, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL

)

(Watts Bar Nuclear Plant, Unit 2) )

AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Justin C. Poole, do hereby state as follows:

1. I am employed as Senior Project Manager, Plant Licensing Branch LPL II-2, in the Division of Operator Reactor Licensing in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. My responsibilities include oversight of the NRC Staffs review and evaluation of the Watts Bar Nuclear Plant, Unit 2 operating license application (OLA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the OLA at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 and 2.1203, as modified by the parties agreement of December 1, 2009, have been disclosed, and that the disclosures are accurate and complete for documents identified as of May 14, 2013.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Executed in Accord with 10 CFR 2.304(d)/

Justin C. Poole Senior Project Manager, NRR/DORL/LPL II-2 U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301)415-2048 E-mail: Justin.Poole@nrc.gov Date Signed: May 15, 2013

ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - May 15, 2013 Accession Document ID# Title Number Date 04/16/2013 Meeting Summary with the Public to Discuss the Annual Assessment of 40-001 ML13107B494 4/17/2013 the Watts Bar Nuclear Unit 2 Construction Project.

04/29/2013 Notice of Meeting with Tennessee Valley Authority (TVA) Regarding Extension Request to Respond to Recommendation 2.1, Flooding, of Near-Term Task 40-002 Force Review of Insights from Fukushima Da-ichi Accident for Sequoyah Nuclear Plant ML13095A403 4/9/2013 & Watts Bar.40-003 ML13099A350 3/7/2013 2013/03/07 Watts Bar 2 OL - 2012-03 WBN Project Plan - Unit 2.pdf 2013/03/07 Watts Bar 2 OL - TVA letter to NRC_03-06-13_2-PTI-068-13 transmittal to 40-004 ML13099A353 3/7/2013 NRC 40-005 ML13099A349 3/11/2013 2013/03/11 Watts Bar 2 OL - 2012-03 WBN Project Plan - Unit 2.pdf 2013/03/12 Watts Bar 2 OL - TVA letter to NRC_03-12-2013_Code Transition Change 40-006 ML13099A372 3/12/2013 to two Previous Statements40-007 2013/03/13 Watts Bar 2 OL - TVA letter to NRC_03-13-2013_WBN2 Transmittal of ML13099A360 3/13/2013 Revised Unit 1 Unit 2 As Designed FPR 40-008 ML13099A344 3/14/2013 2013/03/14 Watts Bar 2 OL - 2012-03 WBN Project Plan - Unit 2.pdf 40-009 ML13099A341 3/18/2013 2013/03/18 Watts Bar 2 OL - 2012-03 WBN Project Plan - Unit 2.pdf 40-010 ML13099A369 3/18/2013 2013/03/18 Watts Bar 2 OL - TVA letter to NRC_03-18-13_FSEIS Document Submittal 40-011 ML13099A370 3/18/2013 2013/03/18 Watts Bar 2 OL - TVA letter to NRC_03-18-2013_CAT II Cable Letter 40-012 ML13099A336 3/21/2013 2013/03/21 Watts Bar 2 OL - 2012-03 WBN Project Plan - Unit 2.pdf 40-013 ML13099A438 3/21/2013 2013/03/21 Watts Bar 2 OL - TVA letter to NRC_03-21-13_TS 3.3.1 RAI Response 2013/03/26 Watts Bar 2 OL - TVA letter to NRC_03-26-13_2-PTI-002-02 & 2-PTI-084-01 40-014 ML13099A436 3/26/2013 transmittal to NRC 40-015 ML13099A334 3/28/2013 2013/03/28 Watts Bar 2 OL - 2012-03 WBN Project Plan - Unit 2.pdf 5/7/2013 Notice of Meeting With Tennessee Valley Authority To Obtain Additional Information To Allow NRC To Make Subsequent Significance Determination &

40-016 Enforcement Decisions Related To Three Apparent Violations Identified In NRC ML13109A556 4/19/2013 Inspection Report .....

1

ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - May 15, 2013 Accession Document ID# Title Number Date 40-017 Public Meeting Summary Watts Bar Nuclear Plant Unit 2 Presentation (NRC Inspection ML13107B505 4/17/2013 Report 05000391/2013601.40-018 Sequoyah and Watts Bar Nuclear Plants, Units 1 and 2 - NTTF Recommendation 2.1, ML13120A132 4/29/2013 Flooding Hazard Reevaluation Report Extension Request.40-019 Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Commitment to Install Improved ML13108A107 4/16/2013 Flood Mitigation Systems.40-020 Tennessee Valley Authority - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task ML13121A062 4/26/2013 Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012.40-021 ML13092A362 4/2/2013 Tennessee Valley Authority Public Meeting Summary.

Watts Bar, Unit 2 - Construction Deficiency Report 50-391/2013 Instrument Sense 40-022 ML13121A427 4/29/2013 Line Slope Issue-Interim Report.40-023 Watts Bar, Units 1 and 2 - 10 CFR 50.46 30-Day Report of Changes and Errors to the ML13120A004 4/25/2013 Calculated Peak Cladding Temperatures and Annual Report for 2012.

2

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL

)

(Watts Bar Nuclear Plant, Unit 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised), I hereby certify that copies of the foregoing NRC STAFF'S SUPPLEMENTAL DISCLOSURE 40, INCLUDING PUBLIC HEARING FILE INDEX, PROTECTED HEARING FILE INDEX, AND AFFIDAVIT OF JUSTIN C. POOLE dated April 15, 2013, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 15th day of May, 2013:

/Signed (electronically) by/

David E. Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: May 15, 2013