| title = 01/14/2015 Summary of Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2
| title = Summary of Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2
| author name = Poole J
| author name = Poole J
| author affiliation = NRC/NRR/DORL/LPWB
| author affiliation = NRC/NRR/DORL/LPWB
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES )'o 11 NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:"~p.R REG(/~                                    UNITED STATES
/! WASHINGTON, D.C. 20555-0001  
  ~~"              )'o11                NUCLEAR REGULATORY COMMISSION
<( 0 ; J February 11, 2015 ,._o **** ... LICENSEE:
/!
Tennessee Valley Authority FACILITY:
<(
Watts Bar Nuclear Power Plant, Unit 2  
                        ~
0 WASHINGTON, D.C. 20555-0001
;  ~
    ~<?          ,._o~
J                           February 11, 2015 LICENSEE:       Tennessee Valley Authority FACILITY:       Watts Bar Nuclear Power Plant, Unit 2


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF JANUARY 14,2015, MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2 On January 14, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
OF JANUARY 14,2015, MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2 On January 14, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of this meeting was for TVA to present the status of construction and licensing efforts for the Watts Bar Nuclear Plant, Unit 2 project. A list of attendees is enclosed.
The purpose of this meeting was for TVA to present the status of construction and licensing efforts for the Watts Bar Nuclear Plant, Unit 2 project. A list of attendees is enclosed.
TVA made a presentation to the NRC staff (Agencywide Documents Access and Management System Accession No. ML15016A042), which covered the following topics: construction completion status; projects risks; licensing topics; and special topics, including fire protection, cyber security, degraded voltage, and buried piping integrity programs. TVA stated that the estimated date to load fuel is June 17, 2015, and that completion of hot functional testing poses the most significant risk to the schedule. TVA discussed the proposed content of construction completion status letters, which would support licensing activities. Throughout the presentation, the NRC staff asked clarifying questions, with a focus on understanding TVA's schedule and those activities that could impact the schedule or pose a safety concern. The NRC staff also commented that an important factor in the staff being able to support TVA's estimated fuel load date, is for TVA to focus on providing high quality submittals and meeting the proposed schedule for those submittals in order to reach timely resolution of the remaining issues.
TVA made a presentation to the NRC staff (Agencywide Documents Access and Management System Accession No. ML15016A042), which covered the following topics: construction completion status; projects risks; licensing topics; and special topics, including fire protection, cyber security, degraded voltage, and buried piping integrity programs.
No regulatory decisions were made at the meeting. Several members of the public, including the press, were in attendance via teleconference and webinar. No Public Meeting Feedback forms were received.
TVA stated that the estimated date to load fuel is June 17, 2015, and that completion of hot functional testing poses the most significant risk to the schedule.
Justin C. Poole, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
TVA discussed the proposed content of construction completion status letters, which would support licensing activities.
Throughout the presentation, the NRC staff asked clarifying questions, with a focus on understanding TVA's schedule and those activities that could impact the schedule or pose a safety concern. The NRC staff also commented that an important factor in the staff being able to support TVA's estimated fuel load date, is for TVA to focus on providing high quality submittals and meeting the proposed schedule for those submittals in order to reach timely resolution of the remaining issues. No regulatory decisions were made at the meeting. Several members of the public, including the press, were in attendance via teleconference and webinar. No Public Meeting Feedback forms were received.
Docket No. 50-391  


==Enclosure:==
==Enclosure:==


List of Attendees cc w/enclosure:
List of Attendees cc w/enclosure: Distribution via Listserv
Distribution via Listserv Justin C. Poole, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES JANUARY 14.2015. MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT. UNIT 2 Licensee:
 
Tennessee Valley Authority (TVA) Plant: Watts Bar Nuclear Plant. Unit 2  
LIST OF ATTENDEES JANUARY 14.2015. MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT. UNIT 2 Licensee: Tennessee Valley Authority (TVA)             Plant: Watts Bar Nuclear Plant. Unit 2


==Subject:==
==Subject:==
Construction Status Date: January 14. 2015 Location:
Construction Status                         Date: January 14. 2015 Location: U.S. Nuclear Regulatory Commission (NRC) Time: 2:00p.m.- 4:00p.m.
U.S. Nuclear Regulatory Commission (NRC) Time: 2:00p.m.-4:00p.m. Headquarters.
Headquarters. Room 0-16B4 NAME                       TITLE                       ORGANIZATION Deputy Regional Frederick Brown                                       NRC/RII Administrator, Region II (RII)
Room 0-16B4 NAME TITLE ORGANIZATION Frederick Brown Deputy Regional NRC/RII Administrator, Region II (RII) William Dean Director, Office of Nuclear NRC/NRR Reactor Regulation (NRR) Patrick Castleman Reactor Advisor to NRC/Office of the Commission Commissioner Svinicki Michele Evans Director, Division of Operating NRC/NRR/DORL Reactor Licensing (DORL) William Jones Director, Division of NRC/RII/DCP Construction Projects (DCP) John Lubinski Director, Division of NRC/NRR/DE Engineering (DE) Jane Marshall Deputy Director, Division of NRC/NRR/DLR License Renewal (DLR) Enclosure   NAME TITLE ORGANIZATION Tomy Nazario Senior Resident Inspector, NRC/RII Watts Bar, Unit 2 Jessie Quichocho Chief, Watts Bar Special NRC/NRR/DORL/LPWB Projects Branch (LPWB) Justin Poole Senior Project Manager, NRC/NRR/DORL/LPWB Watts Bar, Unit 2 Jeanne Dion Project Manager, Watts Bar, NRC/NRR/DORLILPWB Unit 1 Robert Haag Chief, Construction Projects NRC/RII/DCP/CPB3 Branch 3 Christopher Even Senior Construction Project NRC/RII/DCP Inspector Senior Reactor Operations NRC/Office of New Reactors/Division Daniel Pasquale of Construction Inspection and Engineer Operational Programs Office of Nuclear Security and John Rycyna Cyber Security Specialist Incident Response/Cyber Security Directorate Senior Fire Protection Daniel Frumkin Engineer, Division of Risk NRC/NRR/DRA Assessment (ORA) Charles Moulton Fire Protection Engineer NRC/NRR/DRA Senior Level Advisor for Allen Hiser License Renewal Aging NRC/NRR/DLR Management  NAME TITLE ORGANIZATION Christopher Hovanec Materials Engineer NRC/NRR/DLR Joe Shea Vice President Nuclear TVA Licensing Gordon Arent TV A Director, Watts Bar TVA Licensing Paul Simmons Watts Bar Vice President, TVA Unit 2 Start Up Watts Bar, Unit 2 Electrical Steven A. Hilmes and Instrumentation and TVA Control Design Frank Koontz Engineering Specialist, Watts TVA Bar, Unit 2 Bob Williams Fukushima Program Manager TVA Watts Bar, Unit 2 Bill Crouch Mechanical/Nuclear TVA Engineering Manager Scott Brooks Communications Specialists TVA Joe Calle Watts Bar Dual Unit TVA Transition Manager Mark Anderson Principal Conger-Eisea  NAME TITLE ORGANIZATION Chris Chandler
Director, Office of Nuclear William Dean                                          NRC/NRR Reactor Regulation (NRR)
* General Council TVA Chief, Aging Management of Dennis Morey
Reactor Advisor to Patrick Castleman                                      NRC/Office of the Commission Commissioner Svinicki Director, Division of Operating Michele Evans                                          NRC/NRR/DORL Reactor Licensing (DORL)
* Reactor and Mechanical NRC/NRR/DLR/RARB Systems Branch (RARB) Matthew Bandyk
Director, Division of William Jones                                          NRC/RII/DCP Construction Projects (DCP)
* Reporter SNL Financial Chris Charles
Director, Division of John Lubinski                                          NRC/NRR/DE Engineering (DE)
* Editor, Writer Nuclear Energy Institute Michael Blake
Deputy Director, Division of Jane Marshall                                          NRC/NRR/DLR License Renewal (DLR)
* Reporter Nuclear News Brittany Theis
Enclosure
* Member of Public Sara Barczak
* High Risk Energy Choices Southern Alliance for Clean Energy Program Director Daniel Chalk
* Light Water Reactor Scientist Department of Energy Adam Wilson
* Construction Project Rll Inspector Michael King
* Chief, Engineering Branch 1 NRC/RII/Division of Reactor (EB1) Safety/EB1
* By telephone February 11, 2015 LICENSEE:
Tennessee Valley Authority FACILITY:
Watts Bar Nuclear Power Plant, Unit 2


==SUBJECT:==
NAME                  TITLE                      ORGANIZATION Senior Resident Inspector, Tomy Nazario                                  NRC/RII Watts Bar, Unit 2 Chief, Watts Bar Special Jessie Quichocho                              NRC/NRR/DORL/LPWB Projects Branch (LPWB)
Senior Project Manager, Justin Poole                                  NRC/NRR/DORL/LPWB Watts Bar, Unit 2 Project Manager, Watts Bar, Jeanne Dion                                  NRC/NRR/DORLILPWB Unit 1 Chief, Construction Projects Robert Haag                                  NRC/RII/DCP/CPB3 Branch 3 Senior Construction Project Christopher Even                              NRC/RII/DCP Inspector NRC/Office of New Reactors/Division Senior Reactor Operations Daniel Pasquale                              of Construction Inspection and Engineer Operational Programs Office of Nuclear Security and John Rycyna      Cyber Security Specialist    Incident Response/Cyber Security Directorate Senior Fire Protection Daniel Frumkin  Engineer, Division of Risk  NRC/NRR/DRA Assessment (ORA)
Charles Moulton  Fire Protection Engineer    NRC/NRR/DRA Senior Level Advisor for Allen Hiser      License Renewal Aging        NRC/NRR/DLR Management


==SUMMARY==
NAME                    TITLE                    ORGANIZATION Christopher Hovanec Materials Engineer            NRC/NRR/DLR Vice President Nuclear Joe Shea                                          TVA Licensing TVA Director, Watts Bar Gordon Arent                                      TVA Licensing Watts Bar Vice President, Paul Simmons                                      TVA Unit 2 Start Up Watts Bar, Unit 2 Electrical Steven A. Hilmes    and Instrumentation and       TVA Control Design Engineering Specialist, Watts Frank Koontz                                      TVA Bar, Unit 2 Bob Williams        Fukushima Program Manager    TVA Watts Bar, Unit 2 Bill Crouch        Mechanical/Nuclear            TVA Engineering Manager Scott Brooks        Communications Specialists    TVA Watts Bar Dual Unit Joe Calle                                        TVA Transition Manager Mark Anderson      Principal                    Conger-Eisea
OF JANUARY 14,2015, MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2 On January 14, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
The purpose of this meeting was for TVA to present the status of construction and licensing efforts for the Watts Bar Nuclear Plant, Unit 2 project. A list of attendees is enclosed.
TVA made a presentation to the NRC staff (Agencywide Documents Access and Management System Accession No. ML15016A042), which covered the following topics: construction completion status; projects risks; licensing topics; and special topics, including fire protection, cyber security, degraded voltage, and buried piping integrity programs.
TVA stated that the estimated date to load fuel is June 17, 2015, and that completion of hot functional testing poses the most significant risk to the schedule.
TVA discussed the proposed content of construction completion status letters, which would support licensing activities.
Throughout the presentation, the NRC staff asked clarifying questions, with a focus on understanding TVA's schedule and those activities that could impact the schedule or pose a safety concern. The NRC staff also commented that an important factor in the staff being able to support TVA's estimated fuel load date, is for TVA to focus on providing high quality submittals and meeting the proposed schedule for those submittals in order to reach timely resolution of the remaining issues. No regulatory decisions were made at the meeting. Several members of the public, including the press, were in attendance via teleconference and webinar. No Public Meeting Feedback forms were received.
Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
IRA/ Justin C. Poole, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391


==Enclosure:==
NAME                  TITLE                      ORGANIZATION Chris Chandler
* General Council              TVA Chief, Aging Management of Dennis Morey
* Reactor and Mechanical        NRC/NRR/DLR/RARB Systems Branch (RARB)
Matthew Bandyk
* Reporter                      SNL Financial Chris Charles
* Editor, Writer                Nuclear Energy Institute Michael Blake
* Reporter                      Nuclear News Brittany Theis
* Member of Public High Risk Energy Choices Sara Barczak
* Southern Alliance for Clean Energy Program Director Daniel Chalk
* Light Water Reactor Scientist Department of Energy Construction Project Adam Wilson
* Rll Inspector Chief, Engineering Branch 1  NRC/RII/Division of Reactor Michael King *
(EB1)                        Safety/EB1
* By telephone


List of Attendees cc w/enclosure:
PKG ML15027A295 Meeting Not1ce:
Distribution via Listserv DISTRIBUTION:
            '    ML15009A055        Meetmg
PUBLIC LPL2-2 RIF RidsAcrsAcnw_MaiiCTR Resource RidsNrrDorllpwb Resource RidsNrrDir Resource TNazario, Rll FBrown, Rll PCastleman, OCM DPasquale, NRO JRycyna, NSIR JMunday, Rll RidsNrrPMWattsBar2 Resource JDion, NRR RidsNrrLABCiayton Resource RidsRgn2MaiiCenter Resource RidsNrrDra Resource RidsNrrOd Resource AWilson, Rll RidsNrrDe Resource DFrumkin, NRR CMoulton, NRR ADAMS Accession No.: PKG ML15027A295 M ' ML 150 9A05 M . S eeting Not1ce: 0 5 eetmg ummary ML15027A299 OFFICE DORULPWB/PM DORULPWB/PM DORULPL2-2/LAiT NAME JDion JPoole LRonewicz DATE 2/3/15 2/3/15 2/5/15 TWertz, NRR RidsNrrDirRarb Resource MWaters, OEDO CHovanec, NRR MKing, Rll LRonewicz, NRR AHiser, NRR RHaag, Rll CEven, Rll WJones, Rll H d ts ML15016A042 an ou DORULPWB/LA DORULPWB/BC BCiayton JQuichocho 2/5/15 2/11/15 OFFICIAL RECORD COPY DORULPWB/PM JPoole 2/11/15}}
                                          . S ummary ML15027A299       Han d ou ts ML15016A042 OFFICE   DORULPWB/PM       DORULPWB/PM       DORULPL2-2/LAiT   DORULPWB/LA        DORULPWB/BC DORULPWB/PM NAME     JDion             JPoole             LRonewicz         BCiayton          JQuichocho  JPoole DATE     2/3/15             2/3/15             2/5/15             2/5/15             2/11/15     2/11/15}}

Latest revision as of 15:01, 5 February 2020

Summary of Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2
ML15027A299
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/11/2015
From: Justin Poole
Watts Bar Special Projects Branch
To:
Tennessee Valley Authority
Dion J
Shared Package
ML15027A295 List:
References
Download: ML15027A299 (6)


Text

"~p.R REG(/~ UNITED STATES

~~" )'o11 NUCLEAR REGULATORY COMMISSION

/!

<(

~

0 WASHINGTON, D.C. 20555-0001

~

~<? ,._o~

J February 11, 2015 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF JANUARY 14,2015, MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2 On January 14, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of this meeting was for TVA to present the status of construction and licensing efforts for the Watts Bar Nuclear Plant, Unit 2 project. A list of attendees is enclosed.

TVA made a presentation to the NRC staff (Agencywide Documents Access and Management System Accession No. ML15016A042), which covered the following topics: construction completion status; projects risks; licensing topics; and special topics, including fire protection, cyber security, degraded voltage, and buried piping integrity programs. TVA stated that the estimated date to load fuel is June 17, 2015, and that completion of hot functional testing poses the most significant risk to the schedule. TVA discussed the proposed content of construction completion status letters, which would support licensing activities. Throughout the presentation, the NRC staff asked clarifying questions, with a focus on understanding TVA's schedule and those activities that could impact the schedule or pose a safety concern. The NRC staff also commented that an important factor in the staff being able to support TVA's estimated fuel load date, is for TVA to focus on providing high quality submittals and meeting the proposed schedule for those submittals in order to reach timely resolution of the remaining issues.

No regulatory decisions were made at the meeting. Several members of the public, including the press, were in attendance via teleconference and webinar. No Public Meeting Feedback forms were received.

Justin C. Poole, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv

LIST OF ATTENDEES JANUARY 14.2015. MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT. UNIT 2 Licensee: Tennessee Valley Authority (TVA) Plant: Watts Bar Nuclear Plant. Unit 2

Subject:

Construction Status Date: January 14. 2015 Location: U.S. Nuclear Regulatory Commission (NRC) Time: 2:00p.m.- 4:00p.m.

Headquarters. Room 0-16B4 NAME TITLE ORGANIZATION Deputy Regional Frederick Brown NRC/RII Administrator, Region II (RII)

Director, Office of Nuclear William Dean NRC/NRR Reactor Regulation (NRR)

Reactor Advisor to Patrick Castleman NRC/Office of the Commission Commissioner Svinicki Director, Division of Operating Michele Evans NRC/NRR/DORL Reactor Licensing (DORL)

Director, Division of William Jones NRC/RII/DCP Construction Projects (DCP)

Director, Division of John Lubinski NRC/NRR/DE Engineering (DE)

Deputy Director, Division of Jane Marshall NRC/NRR/DLR License Renewal (DLR)

Enclosure

NAME TITLE ORGANIZATION Senior Resident Inspector, Tomy Nazario NRC/RII Watts Bar, Unit 2 Chief, Watts Bar Special Jessie Quichocho NRC/NRR/DORL/LPWB Projects Branch (LPWB)

Senior Project Manager, Justin Poole NRC/NRR/DORL/LPWB Watts Bar, Unit 2 Project Manager, Watts Bar, Jeanne Dion NRC/NRR/DORLILPWB Unit 1 Chief, Construction Projects Robert Haag NRC/RII/DCP/CPB3 Branch 3 Senior Construction Project Christopher Even NRC/RII/DCP Inspector NRC/Office of New Reactors/Division Senior Reactor Operations Daniel Pasquale of Construction Inspection and Engineer Operational Programs Office of Nuclear Security and John Rycyna Cyber Security Specialist Incident Response/Cyber Security Directorate Senior Fire Protection Daniel Frumkin Engineer, Division of Risk NRC/NRR/DRA Assessment (ORA)

Charles Moulton Fire Protection Engineer NRC/NRR/DRA Senior Level Advisor for Allen Hiser License Renewal Aging NRC/NRR/DLR Management

NAME TITLE ORGANIZATION Christopher Hovanec Materials Engineer NRC/NRR/DLR Vice President Nuclear Joe Shea TVA Licensing TVA Director, Watts Bar Gordon Arent TVA Licensing Watts Bar Vice President, Paul Simmons TVA Unit 2 Start Up Watts Bar, Unit 2 Electrical Steven A. Hilmes and Instrumentation and TVA Control Design Engineering Specialist, Watts Frank Koontz TVA Bar, Unit 2 Bob Williams Fukushima Program Manager TVA Watts Bar, Unit 2 Bill Crouch Mechanical/Nuclear TVA Engineering Manager Scott Brooks Communications Specialists TVA Watts Bar Dual Unit Joe Calle TVA Transition Manager Mark Anderson Principal Conger-Eisea

NAME TITLE ORGANIZATION Chris Chandler

  • Reactor and Mechanical NRC/NRR/DLR/RARB Systems Branch (RARB)

Matthew Bandyk

  • Reporter SNL Financial Chris Charles
  • Editor, Writer Nuclear Energy Institute Michael Blake
  • Reporter Nuclear News Brittany Theis
  • Member of Public High Risk Energy Choices Sara Barczak
  • Light Water Reactor Scientist Department of Energy Construction Project Adam Wilson
  • Rll Inspector Chief, Engineering Branch 1 NRC/RII/Division of Reactor Michael King *