(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML16078A170 | | | number = ML16078A170 |
| | issue date = 03/18/2016 | | | issue date = 03/18/2016 |
| | title = Accepted for Review - Sequoyah Nuclear Plant License Amendment Request to Extend Allowable Completion Time to Restore Essential Raw Cooling Water System (CAC MF7450 and MF7451) | | | title = NRR E-mail Capture - Accepted for Review - Sequoyah Nuclear Plant License Amendment Request to Extend Allowable Completion Time to Restore Essential Raw Cooling Water System |
| | author name = Hon A | | | author name = Hon A |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1 NRR-PMDAPEm Resource From: Hon, Andrew Sent: Friday, March 18, 2016 9:12 AM To: Shea, Joseph W; Hess, Thomas A (tahess@tva.gov) | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Hon, Andrew Sent: Friday, March 18, 2016 9:12 AM To: Shea, Joseph W; Hess, Thomas A (tahess@tva.gov) |
| Cc: Beasley, Benjamin; Casto, Greg; Wheeler, Larry | | Cc: Beasley, Benjamin; Casto, Greg; Wheeler, Larry |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Accepted for Review - Sequoyah Nuclear Pl ant License Amendment Request to Extend Allowable Completion Time to Restore Essential Raw Cooling Water System (CAC | | Accepted for Review - Sequoyah Nuclear Plant License Amendment Request to Extend Allowable Completion Time to Restore Essential Raw Cooling Water System (CAC MF7450 and MF7451) |
| | By letter dated March 11, 2016 (ADAMS NO. ML16071A333), TVA submitted the subject license amendment request for Sequoyah Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. |
| | If you have any questions, please contact me. |
| | Andy Hon, PE Project Manager (Sequoyah Nuclear Nuclear) |
| | Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN 08H19 Mail Stop O8G-9a andrew.hon@nrc.gov 1 |
|
| |
|
| MF7450 and MF7451) By letter dated March 11, 2016 (ADAMS NO. ML16071A333), TVA submitted the subject license amendment request for Sequoyah Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient te chnical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
| | Hearing Identifier: NRR_PMDA Email Number: 2717 Mail Envelope Properties (Andrew.Hon@nrc.gov20160318091100) |
| | |
| The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
| |
| | |
| If you have any questions, please contact me.
| |
| | |
| Andy Hon , PE Project Manager (Sequoyah Nuclear Nuclear) Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN 08H19 Mail Stop O8G-9a
| |
| | |
| andrew.hon@nrc.gov
| |
| | |
| Hearing Identifier: NRR_PMDA Email Number: 2717 Mail Envelope Properties (Andrew.Hon@nrc.gov20160318091100) | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Accepted for Review - Sequoyah Nuclear Plant License Amendment Request to Extend Allowable Completion Time to Restore Essential Raw Cooling Water System (CAC MF7450 and MF7451) | | Accepted for Review - Sequoyah Nuclear Plant License Amendment Request to Extend Allowable Completion Time to Restore Essential Raw Cooling Water System (CAC MF7450 and MF7451) |
| Sent Date: 3/18/2016 9:11:39 AM Received Date: 3/18/2016 9:11:00 AM From: Hon, Andrew Created By: Andrew.Hon@nrc.gov | | Sent Date: 3/18/2016 9:11:39 AM Received Date: 3/18/2016 9:11:00 AM From: Hon, Andrew Created By: Andrew.Hon@nrc.gov Recipients: |
| | | "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov> |
| Recipients: "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov> Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov> Tracking Status: None "Wheeler, Larry" <Larry.Wheeler@nrc.gov> Tracking Status: None "Shea, Joseph W" <jwshea@tva.gov> | | Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov> |
| Tracking Status: None "Hess, Thomas A (tahess@tva.gov)" <tahess@tva.gov> Tracking Status: None | | Tracking Status: None "Wheeler, Larry" <Larry.Wheeler@nrc.gov> |
| | | Tracking Status: None "Shea, Joseph W" <jwshea@tva.gov> |
| Post Office: Files Size Date & Time MESSAGE 1859 3/18/2016 9:11:00 AM | | Tracking Status: None "Hess, Thomas A (tahess@tva.gov)" <tahess@tva.gov> |
| | | Tracking Status: None Post Office: |
| Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:}} | | Files Size Date & Time MESSAGE 1859 3/18/2016 9:11:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
Letter Sequence Other |
---|
CAC:MF7450, Generic Letter 2008-01, Managing Gas Accumulation (Approved, Closed) |
|
|
|
---|
Category:E-Mail
MONTHYEARML24281A0072024-10-0202 October 2024 NRR E-mail Capture - Acceptance Review Results for the Sequoyah License Amendment Request to Modify the FHA Analysis, Tech Spec TS 3.9.4 and Tech Spec 3.3.6 (L-2024-LLA-0117) ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24152A1542024-05-31031 May 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-03 ML24128A1802024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review for Sequoyah License Amendment Request to Modify TS 3.8.1 and TS 3.8.2 (L-2024-LLA-0047) ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24074A4252024-03-14014 March 2024 NRR E-mail Capture - Sequoyah Hydrologic Analysis License Amendment Request - Notification of Change to Estimated Completion and Hours ML24059A4052024-02-28028 February 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-02 ML24053A0302024-02-21021 February 2024 NRR E-mail Capture - Request for Steam Generator (SG) Tube Inspection Call for Sequoyah, Unit 1 ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A1002024-02-13013 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Sequoyah Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23165A2862023-06-14014 June 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21 ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23062A5952023-02-27027 February 2023 Staff follow-up Questions to Tva'S 12/19/2022 Response of the Staff'S Rsi Regarding 08/04/2022 SQN Exemption Request ML23058A1312023-02-27027 February 2023 FW: TVA Intentions on EA-22-129 ML23052A0792023-02-21021 February 2023 NRR E-mail Capture - Acceptance Review for Browns Ferry and Sequoyah License Amendment Request to Adopt TSTF-541 ML23046A3552023-02-15015 February 2023 Annual Water Withdrawal Report 2022 ML23019A3442023-01-19019 January 2023 Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, and SW-19 ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23026A0282023-01-12012 January 2023 001 Radiation Safety Baseline Inspection Information Request ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22348A0432022-11-28028 November 2022 NRR E-mail Capture - State Consultation - Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Modify the Approved 10 CFR 50.69 Categorization Process (L-2022-LLA-0033) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22214A1582022-08-0202 August 2022 NRR E-mail Capture - Request for Additional Information for Sequoyah Units 1 and 2 License Amendment Request for Fire and Seismic PRA Modification to 10 CFR 50.69 (L-2022-LLA-0033) ML22196A0732022-07-15015 July 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - TSTF-505 RICT (L-2021-LLA-0145) ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22173A0332022-06-17017 June 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - Reactor Trip System Instrumentation (L-2021-LLA-0200) ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22151A0102022-05-27027 May 2022 NRR E-mail Capture - Revised Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3322022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Related to Sequoyah Nuclear Plant'S LAR to Adopt TSTF-505 ML22151A0092022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22137A2692022-05-17017 May 2022 Notice of Termination, TNR192066, Gravel Lot Restoration Project ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22132A1762022-05-12012 May 2022 Tennessee Multi-Sector Permit (Tmsp), 2021 Annual Discharge Monitoring Report for Outfalls SW-2, SW-3, SW-4, SW-6, SW-8, SW-9, and SW-13 ML22123A1812022-05-0303 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-577 2024-06-11
[Table view] |
Text
NRR-PMDAPEm Resource From: Hon, Andrew Sent: Friday, March 18, 2016 9:12 AM To: Shea, Joseph W; Hess, Thomas A (tahess@tva.gov)
Cc: Beasley, Benjamin; Casto, Greg; Wheeler, Larry
Subject:
Accepted for Review - Sequoyah Nuclear Plant License Amendment Request to Extend Allowable Completion Time to Restore Essential Raw Cooling Water System (CAC MF7450 and MF7451)
By letter dated March 11, 2016 (ADAMS NO. ML16071A333), TVA submitted the subject license amendment request for Sequoyah Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Andy Hon, PE Project Manager (Sequoyah Nuclear Nuclear)
Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN 08H19 Mail Stop O8G-9a andrew.hon@nrc.gov 1
Hearing Identifier: NRR_PMDA Email Number: 2717 Mail Envelope Properties (Andrew.Hon@nrc.gov20160318091100)
Subject:
Accepted for Review - Sequoyah Nuclear Plant License Amendment Request to Extend Allowable Completion Time to Restore Essential Raw Cooling Water System (CAC MF7450 and MF7451)
Sent Date: 3/18/2016 9:11:39 AM Received Date: 3/18/2016 9:11:00 AM From: Hon, Andrew Created By: Andrew.Hon@nrc.gov Recipients:
"Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>
Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov>
Tracking Status: None "Wheeler, Larry" <Larry.Wheeler@nrc.gov>
Tracking Status: None "Shea, Joseph W" <jwshea@tva.gov>
Tracking Status: None "Hess, Thomas A (tahess@tva.gov)" <tahess@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1859 3/18/2016 9:11:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: