NOC-AE-16003423, Extension Request - STPNOC Review and Comment of License Renewal Application Safety Evaluation Report with Open Items: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:South Texas Project Electric Generating Station P.O. Box 2851 Wadsworth, Texas 77483 November 9, 2016 NOC-AE-16003423 10 CFR 54 File No. G25 U. S. Nuclear Regulatory Commission Attention:
{{#Wiki_filter:South Texas Project Electric Generating Station P.O. Box 2851 Wadsworth, Texas 77483 November 9, 2016 NOC-AE-16003423 10 CFR 54 File No. G25 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Extension Request - STPNOC Review and Comment of License Renewal Application Safety Evaluation Report with Open Items (TAC NOS. ME4936 and ME4937)
Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Extension Request -STPNOC Review and Comment of License Renewal Application Safety Evaluation Report with Open Items (TAC NOS. ME4936 and ME4937)  


==References:==
==References:==
: 1. Letter; G. T. Powell to the NRC Document Control Desk; "License Renewal Application", NOC-AE-10002607; dated October 25, 2010. (ML103010257)
: 1. Letter; G. T. Powell to the NRC Document Control Desk; "License Renewal Application",
: 2. Letter; NRC to STP Nuclear Operating Company; "Safety Evaluation Report With Open Items Related To STP Nuclear Operating Company, Units 1 and 2 (TAC No. ME4936 and ME4937)";
NOC-AE-10002607; dated October 25, 2010. (ML103010257)
dated October 14, 2016. (ML16271A011)
: 2. Letter; NRC to STP Nuclear Operating Company; "Safety Evaluation Report With Open Items Related To STP Nuclear Operating Company, Units 1 and 2 (TAC No. ME4936 and ME4937)"; dated October 14, 2016. (ML16271A011)
By Reference 1, STP Nuclear Operating Company (STPNOC) submitted an application to the Nuclear Regulatory Commission (NRC) for the renewal of Facility Operating Licenses NPF-76 and NPF-80, for South Texas Project (STP) Units 1 and 2, respectively.
By Reference 1, STP Nuclear Operating Company (STPNOC) submitted an application to the Nuclear Regulatory Commission (NRC) for the renewal of Facility Operating Licenses NPF-76 and NPF-80, for South Texas Project (STP) Units 1 and 2, respectively. In Reference 2, the NRC transmitted the Safety Evaluation Report (SER) with Open Items related to the license renewal of the South Texas Project, Units 1 and 2. STPNOC is requesting an extension to provide Safety Evaluation Report review comments by December 15, 2016.
In Reference 2, the NRC transmitted the Safety Evaluation Report (SER) with Open Items related to the license renewal of the South Texas Project, Units 1 and 2. STPNOC is requesting an extension to provide Safety Evaluation Report review comments by December 15, 2016. There are no regulatory commitments in this letter. Should you have any questions regarding this letter, please contact Arden Aldridge, STP License Renewal Project Lead, at (361) 972-8243, or Rafael Gonzales, STP License Renewal Project regulatory point-of-contact, at (361) 972-4779.
There are no regulatory commitments in this letter.
rjg Michael P. Murray Manager, Regulatory Affairs STI: 34405879 cc: (paper copy) Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 8 G9A) 11555 Rockville Pike Rockville, MD 20852 NRC Resident lnspeetor U.S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 Wadsworth, TX 77483 Lois James License Renewal Project Manager (Safety) One White Flint North (MS 011-F1) U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Tam Tran License Renewal Project Manager (Environmental)
Should you have any questions regarding this letter, please contact Arden Aldridge, STP License Renewal Project Lead, at (361) 972-8243, or Rafael Gonzales, STP License Renewal Project regulatory point-of-contact, at (361) 972-4779.
One White Flint North (MS 011F0'1) U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (electronic copy) NOC-AE-16003423 Page 2 of 2 Morgan. Lewis & Beckius LLP Steve Frantz U.S. Nuclear Regulatory Commission Lisa M. Regner
Michael P. Murray Manager, Regulatory Affairs rjg STI: 34405879
* Lois James Tam Tran NRG South Texas LP Chris O'Hara Jim van Suski! Skip Zahn CPS Energy Kevin Pollo Cris Eugster L. D. Blaylock City of Austin Elaina Ball John Wester Texas Dept. of State Health Services Helen Watkins Robert Free}}
 
NOC-AE-16003423 Page 2 of 2 cc:
(paper copy)                             (electronic copy)
Regional Administrator, Region IV       Morgan. Lewis & Beckius LLP U.S. Nuclear Regulatory Commission       Steve Frantz 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S. Nuclear Regulatory Commission Lisa M. Regner
* Lisa M. Regner                          Lois James Senior Project Manager                   Tam Tran U.S. Nuclear Regulatory Commission One White Flint North (MS 8 G9A) 11555 Rockville Pike                     NRG South Texas LP Rockville, MD 20852                     Chris O'Hara Jim van Suski!
Skip Zahn NRC Resident lnspeetor U.S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116         CPS Energy Wadsworth, TX 77483                     Kevin Pollo Cris Eugster L. D. Blaylock Lois James License Renewal Project Manager (Safety)
One White Flint North (MS 011-F1)       City of Austin U.S. Nuclear Regulatory Commission       Elaina Ball Washington, DC 20555-0001               John Wester Tam Tran                                 Texas Dept. of State Health Services License Renewal Project Manager         Helen Watkins (Environmental)                         Robert Free One White Flint North (MS 011F0'1)
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001}}

Latest revision as of 12:46, 30 October 2019

Extension Request - STPNOC Review and Comment of License Renewal Application Safety Evaluation Report with Open Items
ML16326A258
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/09/2016
From: Marc-Anthony Murray
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-16003423, TAC ME4936, TAC ME4937
Download: ML16326A258 (2)


Text

South Texas Project Electric Generating Station P.O. Box 2851 Wadsworth, Texas 77483 November 9, 2016 NOC-AE-16003423 10 CFR 54 File No. G25 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Extension Request - STPNOC Review and Comment of License Renewal Application Safety Evaluation Report with Open Items (TAC NOS. ME4936 and ME4937)

References:

1. Letter; G. T. Powell to the NRC Document Control Desk; "License Renewal Application",

NOC-AE-10002607; dated October 25, 2010. (ML103010257)

2. Letter; NRC to STP Nuclear Operating Company; "Safety Evaluation Report With Open Items Related To STP Nuclear Operating Company, Units 1 and 2 (TAC No. ME4936 and ME4937)"; dated October 14, 2016. (ML16271A011)

By Reference 1, STP Nuclear Operating Company (STPNOC) submitted an application to the Nuclear Regulatory Commission (NRC) for the renewal of Facility Operating Licenses NPF-76 and NPF-80, for South Texas Project (STP) Units 1 and 2, respectively. In Reference 2, the NRC transmitted the Safety Evaluation Report (SER) with Open Items related to the license renewal of the South Texas Project, Units 1 and 2. STPNOC is requesting an extension to provide Safety Evaluation Report review comments by December 15, 2016.

There are no regulatory commitments in this letter.

Should you have any questions regarding this letter, please contact Arden Aldridge, STP License Renewal Project Lead, at (361) 972-8243, or Rafael Gonzales, STP License Renewal Project regulatory point-of-contact, at (361) 972-4779.

Michael P. Murray Manager, Regulatory Affairs rjg STI: 34405879

NOC-AE-16003423 Page 2 of 2 cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV Morgan. Lewis & Beckius LLP U.S. Nuclear Regulatory Commission Steve Frantz 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S. Nuclear Regulatory Commission Lisa M. Regner

  • Lisa M. Regner Lois James Senior Project Manager Tam Tran U.S. Nuclear Regulatory Commission One White Flint North (MS 8 G9A) 11555 Rockville Pike NRG South Texas LP Rockville, MD 20852 Chris O'Hara Jim van Suski!

Skip Zahn NRC Resident lnspeetor U.S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 CPS Energy Wadsworth, TX 77483 Kevin Pollo Cris Eugster L. D. Blaylock Lois James License Renewal Project Manager (Safety)

One White Flint North (MS 011-F1) City of Austin U.S. Nuclear Regulatory Commission Elaina Ball Washington, DC 20555-0001 John Wester Tam Tran Texas Dept. of State Health Services License Renewal Project Manager Helen Watkins (Environmental) Robert Free One White Flint North (MS 011F0'1)

U.S. Nuclear Regulatory Commission Washington, DC 20555-0001