|
|
(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML15258A219 | | | number = ML15258A219 |
| | issue date = 09/14/2015 | | | issue date = 09/14/2015 |
| | title = 2015/09/14 E-mail Capture - Pilgrim Nuclear Power Station Acceptance Review - PRR-50 and PRR-51 (Proposed Alternative to Nozzle-to-Weld Weld Examination (Code Case N-702) MF6362 and RPV Shell Circumferential Weld Examination (BWRVIP-05) MF6 | | | title = E-mail Capture - Pilgrim Nuclear Power Station Acceptance Review - PRR-50 and PRR-51 (Proposed Alternative to Nozzle-to-Weld Weld Examination (Code Case N-702) MF6362 and RPV Shell Circumferential Weld Examination (BWRVIP-05) MF6361 |
| | author name = Guzman R V | | | author name = Guzman R |
| | author affiliation = NRC/NRR/DORL/LPLI-1 | | | author affiliation = NRC/NRR/DORL/LPLI-1 |
| | addressee name = Williams M | | | addressee name = Williams M |
Line 9: |
Line 9: |
| | docket = 05000293 | | | docket = 05000293 |
| | license number = | | | license number = |
| | contact person = Guzman R V | | | contact person = Guzman R |
| | case reference number = TAC MF6361, TAC MF6362 | | | case reference number = TAC MF6361, TAC MF6362 |
| | document type = E-Mail | | | document type = E-Mail |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From: Guzman, Richard Sent: Monday, September 14, 2015 1:32 PM To: 'Williams, Murray' | | {{#Wiki_filter:From: Guzman, Richard Sent: Monday, September 14, 2015 1:32 PM To: 'Williams, Murray' |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance Review Determinatio n - PRR-50 and PRR-51 (Proposed Alternative to Nozzle-to-Weld Weld Examination (Code Case N-702) MF6362 and RPV Shell Circumferential Weld Examination (BWRVIP-05) MF6361 Murray, The subject acceptance reviews were completed on July 10, 2015; however, I failed to send you an e-mail for confirmation. The following message confirms the NRC staff's acceptance | | Acceptance Review Determination - PRR-50 and PRR-51 (Proposed Alternative to Nozzle-to-Weld Weld Examination (Code Case N-702) MF6362 and RPV Shell Circumferential Weld Examination (BWRVIP-05) MF6361 |
| | | : Murray, The subject acceptance reviews were completed on July 10, 2015; however, I failed to send you an e-mail for confirmation. The following message confirms the NRC staffs acceptance determination: |
| determination: | | The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of the subject licensing action requests. |
| | | By letter dated June 4, 2015 (ADAMS Accession No. ML15166A037), Entergy Nuclear Operation, Inc. (ENO) submitted PRR-50 and PRR-51pursuant to 10 CFR 50.55a(z)1) for Pilgrim Nuclear Power Station requesting an alternative to specific portions of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, on the basis that the proposed alternatives provide an acceptable level of quality and safety. |
| The purpose of this e-mail is to provide the results of the NRC staff's acceptance review of the subject licensing action requests. | | The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | | The NRC staff has reviewed ENOs requests for relief and concludes that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence. |
| By letter dated June 4, 2015 (ADAMS Accession No. ML15166A037), Entergy Nuclear | |
| | |
| Operation, Inc. (ENO) submitted PRR-50 and PRR-51pursuant to 10 CFR 50.55a(z)1) for Pilgrim Nuclear Power Station requesting an alternative to specific portions of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, on the basis that the proposed alternatives provide an acceptable level of quality and safety. | |
| | |
| The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | |
| | |
| The NRC staff has reviewed ENO's requests for relief and concludes that it does provide | |
| | |
| technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. | |
| : Thanks, Rich Guzman Sr. Project Manager NRR/DORL USNRC 301-415-1030}} | | : Thanks, Rich Guzman Sr. Project Manager NRR/DORL USNRC 301-415-1030}} |
Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML15195A0522015-07-10010 July 2015 Acceptance Review Pilgrim - PRR- 50 and 51, Proposed Alternative: Implementation of Code Case N-702 (PRR-50) and Implementation of BWRVIP-05 (GL 98-05) (PRR-51) (TAC Nos. MF6362 & MF6361) Project stage: Acceptance Review ML15258A2192015-09-14014 September 2015 E-mail Capture - Pilgrim Nuclear Power Station Acceptance Review - PRR-50 and PRR-51 (Proposed Alternative to Nozzle-to-Weld Weld Examination (Code Case N-702) MF6362 and RPV Shell Circumferential Weld Examination (BWRVIP-05) MF6361 Project stage: Acceptance Review ML15266A5312015-09-23023 September 2015 NRR E-mail Capture - Request for Information Regarding Pilgrim Relief Request (PRR)-50, Implementation of Code Case N-702 Project stage: RAI ML15301A2552015-10-21021 October 2015 Response to Request for Additional Information Regarding Relief Request PRR-50, Implementation of Code Case N-702 Project stage: Response to RAI ML15301A2562015-10-21021 October 2015 Calculation M1396, Evaluation of Probability of Failure for Recirculation Inlet (N2) in the Nozzle-to-Shell Welds and Nozzle Blend Radii Regions, 1400071.301, Revision 0, February 2014 Project stage: Other 2015-07-10
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
From: Guzman, Richard Sent: Monday, September 14, 2015 1:32 PM To: 'Williams, Murray'
Subject:
Acceptance Review Determination - PRR-50 and PRR-51 (Proposed Alternative to Nozzle-to-Weld Weld Examination (Code Case N-702) MF6362 and RPV Shell Circumferential Weld Examination (BWRVIP-05) MF6361
- Murray, The subject acceptance reviews were completed on July 10, 2015; however, I failed to send you an e-mail for confirmation. The following message confirms the NRC staffs acceptance determination:
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of the subject licensing action requests.
By letter dated June 4, 2015 (ADAMS Accession No. ML15166A037), Entergy Nuclear Operation, Inc. (ENO) submitted PRR-50 and PRR-51pursuant to 10 CFR 50.55a(z)1) for Pilgrim Nuclear Power Station requesting an alternative to specific portions of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, on the basis that the proposed alternatives provide an acceptable level of quality and safety.
The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed ENOs requests for relief and concludes that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
- Thanks, Rich Guzman Sr. Project Manager NRR/DORL USNRC 301-415-1030