{{#Wiki_filter:PREPARED!
{{#Wiki_filter:JPMI-AP Page 1 of9 Rev 21 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 1-AP Emergency Boration (Stuck Rods)
REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:
* ** SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 1-AP Emergency Boration (Stuck Rods) Date/ Date/ Date/ (Operations Training Manager) Date! (Operations Representative)
JPMI-AP Page 1 of9 Rev 21
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
PREPARED!
PREPARED!
REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:  
REVISED BY:                                                             Date/
* ** SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 1-AP Emergency Boration (Stuck Rods) Date/ Date/ Date/ (Operations Training Manager) Date! (Operations Representative)
VALIDATED BY:
JPMI-AP Page 1 of9 Rev 21
* Date/
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
APPROVED BY:                                                            Date/
NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 8 Transfer from WP. Minor enhancements.
(Operations Training Manager)
N 8/12/94 9 Boron Conc. changes N 9/16/94 10 Chg due to Rev B procedure.
CONCURRED:    **                                                        Date!
Y 9/9/95 11 Incorp previous pen/inks:
(Operations Representative)
which corrected N 1/19/96 step 10 to continue with procedure instead of transition (JPM performance comment. Moved T ave cue from step 14 to 17 added step to determine fully inserted, 12 steps. Latest EA-68-4 & ES-0.1 Rev Chgd 'rods full out' to 'rods >12 steps', added step to use the com puter to verify Rods position 12 Major flow change for the start of EA-68-4 Y 2/2/98 13 Revision to ES-0.1 had no impact. Made N 9/23/98 step 28 a critical step. Revised KIA ratings. Reformatted critical steps. pen/ink ES-0.1 procedure revision had no impact N 8/22/00 pen/ink Minor clarification N 11/27/01 14 Incorporated change to EA-68-4. Change N 8/12/02 was editorial in nature 15 Incorporated REV. 1 C changes to ES-0.1 Y 9/8/03 and EA-68-4 16 Incorporated comments N 3/30/04 17 Made minor editorial changes throughout.
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
N 7/27/04 Updated to current revisions of EA-68-4 and ES-0.1. 18 Updated to current revisions of EA-68-4 and Y 9/20/2005 ES-0.1. Made minor editorial changes throughout.
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
19 Revised format and updated IC. Added N 11/21/07 candidate cue sheet and minor revisions to match procedure references.
 
20 Added H3 auto generate of Handout. N 7/15/08 Remove handout page. Minor step chgs base on previous procedure changes. 21 Updated procedure revisions, deleted steps Y 11/30/09 to realign Emergency Boration, validation time change to 15 minutes. v -Specify If the JPM change will require another validation (Y or N). See cover sheet for criteria.
JPMI-AP Page 2 of9 Rev 21 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                       DESCRIPTION OF                   V       DATE     PAGES      PREPARED/
PAGES AFFECTED All All All 6 All All 4 4,6,7,9 All All All All All All 5, 7, 9 All JPMI-AP Page 2 of9 Rev 21 PREPARED/
NUMBER                           REVISION                                     AFFECTED    REVISED BY:
REVISED BY: HJ Birch HJ Birch HJ Birch HJ Birch HJ Birch JP Kearney S. R. Taylor L. Pauley J P Kearney G S Poteet G.S. Poteet MG Croteau JJ Tricoglou R Putnam H J Birch M Hankins NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 8 Transfer from WP. Minor enhancements.
8         Transfer from WP. Minor enhancements.           N     8/12/94     All        HJ Birch 9         Boron Conc. changes                             N     9/16/94     All        HJ Birch 10         Chg due to Rev B procedure.                     Y       9/9/95     All        HJ Birch 11         Incorp previous pen/inks: which corrected       N       1/19/96     6          HJ Birch step 10 to continue with procedure instead of transition (JPM performance comment.
N 8/12/94 9 Boron Conc. changes N 9/16/94 10 Chg due to Rev B procedure.
Moved T ave cue from step 14 to 17 added step to determine fully inserted, 12 steps.
Y 9/9/95 11 Incorp previous pen/inks:
Latest EA-68-4 & ES-0.1 Rev Chgd 'rods full out' to 'rods >12 steps', added step to use the com puter to verify Rods position 12         Major flow change for the start of EA-68-4     Y       2/2/98     All        HJ Birch 13         Revision to ES-0.1 had no impact. Made         N       9/23/98     All      JP Kearney step 28 a critical step. Revised KIA ratings.
which corrected N 1/19/96 step 10 to continue with procedure instead of transition (JPM performance comment. Moved T ave cue from step 14 to 17 added step to determine fully inserted, 12 steps. Latest EA-68-4 & ES-0.1 Rev Chgd 'rods full out' to 'rods >12 steps', added step to use the com puter to verify Rods position 12 Major flow change for the start of EA-68-4 Y 2/2/98 13 Revision to ES-0.1 had no impact. Made N 9/23/98 step 28 a critical step. Revised KIA ratings. Reformatted critical steps. pen/ink ES-0.1 procedure revision had no impact N 8/22/00 pen/ink Minor clarification N 11/27/01 14 Incorporated change to EA-68-4. Change N 8/12/02 was editorial in nature 15 Incorporated REV. 1 C changes to ES-0.1 Y 9/8/03 and EA-68-4 16 Incorporated comments N 3/30/04 17 Made minor editorial changes throughout.
Reformatted critical steps.
N 7/27/04 Updated to current revisions of EA-68-4 and ES-0.1. 18 Updated to current revisions of EA-68-4 and Y 9/20/2005 ES-0.1. Made minor editorial changes throughout.
pen/ink       ES-0.1 procedure revision had no impact         N       8/22/00     4        S. R. Taylor pen/ink       Minor clarification                             N     11/27/01   4,6,7,9       L. Pauley 14         Incorporated change to EA-68-4. Change         N       8/12/02     All      J P Kearney was editorial in nature 15         Incorporated REV. 1C changes to ES-0.1         Y       9/8/03     All        G S Poteet and EA-68-4 16         Incorporated comments                           N       3/30/04     All      G.S. Poteet 17         Made minor editorial changes throughout.       N       7/27/04     All      MG Croteau Updated to current revisions of EA-68-4 and ES-0.1.
19 Revised format and updated IC. Added N 11/21/07 candidate cue sheet and minor revisions to match procedure references.
18         Updated to current revisions of EA-68-4 and     Y   9/20/2005     All      JJ Tricoglou ES-0.1. Made minor editorial changes throughout.
20 Added H3 auto generate of Handout. N 7/15/08 Remove handout page. Minor step chgs base on previous procedure changes. 21 Updated procedure revisions, deleted steps Y 11/30/09 to realign Emergency Boration, validation time change to 15 minutes. v -Specify If the JPM change will require another validation (Y or N). See cover sheet for criteria.
19         Revised format and updated IC. Added           N     11/21/07     All        R Putnam candidate cue sheet and minor revisions to match procedure references.
PAGES AFFECTED All All All 6 All All 4 4,6,7,9 All All All All All All 5, 7, 9 All JPMI-AP Page 2 of9 Rev 21 PREPARED/
20         Added H3 auto generate of Handout.             N       7/15/08   5, 7, 9      H J Birch Remove handout page. Minor step chgs base on previous procedure changes.
REVISED BY: HJ Birch HJ Birch HJ Birch HJ Birch HJ Birch JP Kearney S. R. Taylor L. Pauley J P Kearney G S Poteet G.S. Poteet MG Croteau JJ Tricoglou R Putnam H J Birch M Hankins SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task: Emergency Boration (Stuck Rods) Note: This JPM satisfies Simulator Manipulation "T". JAiTA task # : 0000980501 KIA Ratings: 005AA2.03 (3.5/4.4) 024AA 1.17 (3.9/3.9) 024AA 1.18 (3.7/3.6) 024AA1.15 (3.1/2.9)
21         Updated procedure revisions, deleted steps     Y     11/30/09     All        M Hankins to realign Emergency Boration, validation time change to 15 minutes.
Task Standard: (RO) 005AK3.01 (4.0/4.3) 005AK3.06 (3.9/4.2) 005AA2.03 (3.5/4.4)
v - Specify If the JPM change will require another validation (Y or N).
JPMI-AP Page 3 of9 Rev 21 .::: 5040 (or amount determined per 0-SI-NUC-000-038.0 and TI-44) gallons of boric acid injected into the reactor coolant system using the normal boration path. Evaluation Method: Simulator X In-Plant __ _ ====================================================================================
See cover sheet for criteria.
 
JPMI-AP Page 3 of9 Rev 21 SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task:
Emergency Boration (Stuck Rods)
Note: This JPM satisfies Simulator Manipulation "T".
JAiTA task # : 0000980501       (RO)
KIA Ratings:
005AA2.03 (3.5/4.4) 024AA 1.17 (3.9/3.9)            005AK3.01 (4.0/4.3) 024AA 1.18 (3.7/3.6)             005AK3.06 (3.9/4.2) 024AA1.15 (3.1/2.9)             005AA2.03 (3.5/4.4)
Task Standard:
      .::: 5040 (or amount determined per 0-SI-NUC-000-038.0 and TI-44) gallons of boric acid injected into the reactor coolant system using the normal boration path.
Evaluation Method:       Simulator -~--
X         In-Plant _ __
====================================================================================
Performer:
Performer:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:  
NAME                                                   Start Time _ __
---------------------/----
Performance Rating: SAT             UNSAT           Performance Time                   Finish Time _ __
SIGNATURE DATE ====================================================================================
Evaluator:       ----------~~~~~------~/_---
COMMENTS SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task: Emergency Boration (Stuck Rods) Note: This JPM satisfies Simulator Manipulation "T". JAiTA task # : 0000980501 KIA Ratings: 005AA2.03 (3.5/4.4) 024AA 1.17 (3.9/3.9) 024AA 1.18 (3.7/3.6) 024AA1.15 (3.1/2.9)
                  ---------------------/----
Task Standard: (RO) 005AK3.01 (4.0/4.3) 005AK3.06 (3.9/4.2) 005AA2.03 (3.5/4.4)
SIGNATURE                 DATE
JPMI-AP Page 3 of9 Rev 21 .::: 5040 (or amount determined per 0-SI-NUC-000-038.0 and TI-44) gallons of boric acid injected into the reactor coolant system using the normal boration path. Evaluation Method: Simulator X In-Plant __ _ ====================================================================================
====================================================================================
Performer:
COMMENTS
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
 
SIGNATURE DATE ====================================================================================
lPM1-AP Page 4 of9 Rev 21 SPECIAL INSTRUCTIONS TO EVALUATOR:
COMMENTS SPECIAL INSTRUCTIONS TO EVALUATOR: 1 . Sequenced steps identified by an "s" 2. Any UNSAT requires comments 3. Initialize the simulator in IC-11S. 4. Insert the following:  
1 . Sequenced steps identified by an "s"
: a. IMF RD13A f:1 b. IMF RD13E f:1 c. Override lOR ZDIHS6213SA f:O d. IMF RD07C5 (F-S) e. IMF RD07DS (H-14) f. IMF AN_OV_325 CPU alarm for Control Rods Dev & Seq-Nuisance alarm 5. INITIATE a reactor trip. lPM1-AP Page 4 of9 Rev 21 6. Close TDAFW valves and freeze the simulator after you have acknowledged the control board alarms. 7. The Console operator can be used to acknowledge alarms not associated with the JPM. 8. Ensure operator performs the following required actions for SELF-CHECKING;  
: 2. Any UNSAT requires comments
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.  
: 3. Initialize the simulator in IC-11S.
: 4. Insert the following:
: a. IMF RD13A f:1
: b. IMF RD13E f:1
: c. Override lOR ZDIHS6213SA f:O
: d. IMF RD07C5 (F-S)
: e. IMF RD07DS (H-14)
: f. IMF AN_OV_325 CPU alarm for Control Rods Dev & Seq- Nuisance alarm
: 5. INITIATE a reactor trip.
: 6. Close TDAFW valves and freeze the simulator after you have acknowledged the control board alarms.
: 7. The Console operator can be used to acknowledge alarms not associated with the JPM.
: 8. Ensure operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc.
: b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR. 15 mins Local ____ _ Tools/Equipment/Procedures Needed: 1. EA-68-4, 2. ES-O.1  
Validation Time: CR. 15 mins Local _ _ _ __
Tools/Equipment/Procedures Needed:
: 1. EA-68-4,
: 2. ES-O.1


==REFERENCES:==
==REFERENCES:==


Reference Title Rev No. A. EA-68-4 Emergency Boration 10 B. ES-0.1 Reactor Trip Response 32 =======================================================
Reference                                       Title                   Rev No.
SPECIAL INSTRUCTIONS TO EVALUATOR: 1 . Sequenced steps identified by an "s" 2. Any UNSAT requires comments 3. Initialize the simulator in IC-11S. 4. Insert the following:  
A. EA-68-4                                 Emergency Boration                               10 B. ES-0.1                                   Reactor Trip Response                             32
: a. IMF RD13A f:1 b. IMF RD13E f:1 c. Override lOR ZDIHS6213SA f:O d. IMF RD07C5 (F-S) e. IMF RD07DS (H-14) f. IMF AN_OV_325 CPU alarm for Control Rods Dev & Seq-Nuisance alarm 5. INITIATE a reactor trip. lPM1-AP Page 4 of9 Rev 21 6. Close TDAFW valves and freeze the simulator after you have acknowledged the control board alarms. 7. The Console operator can be used to acknowledge alarms not associated with the JPM. 8. Ensure operator performs the following required actions for SELF-CHECKING;
=======================================================
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
 
: c. Compares the actual response to the expected response.
READ TO OPERATOR Directions to Trainee:
Validation Time: CR. 15 mins Local ____ _ Tools/Equipment/Procedures Needed: 1. EA-68-4, 2. ES-O.1
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1. The reactor has tripped with no safety injection and the Immediate Actions of E-O, Reactor Trip or Safety Injection, were completed.
: 2. The transition was made to ES-O.1 "Reactor Trip Response".
INITIATING CUES:
: 1. You are directed to PERFORM step 6 of ES-O.1.
: 2. NOTIFY the US/SRO when you have completed all actions required by Step 6 of ES-O.1.
 
JPM1-AP Page 5 of9 Rev 21 Job Performance Checklist:
STEP/STANDARD                                        SAT/U NSAT STEP 1.:      OBTAIN the appropriate procedure(s).                                                    SAT UNSAT STANDARD: Operator obtains a copy of ES-O.1 (and EA-68-4 at step 3 of JPM)
Start Time_ _
NOTE:      The next three steps of the JPM are from ES-O.1.                                        SAT STEP 2.        6. CHECK if emergency boration required:                                                UNSAT
: a. VERIFY all control rods fully inserted STANDARD:    Determinre that two rods F8 and H14 are indicating full out by checkin g rod  Critical Step bottom lights and rod position indicators for control rod position. Enters Step 6.a RNO.
STEP 3.        IF all rod bottom lights are de-energized, THEN                                    -    SAT RESTORE power to RPls by switching Instrument Rack B Transfer Switch to ALTERNATE. [M-7, lower switch]                                                  -    UNSAT STANDARD:    Operator determines this step N/A since power is available.
STEP 4.        IF any of the following conditions exists:                                        -    SAT
* two or more RPI's indicate greater than 12 steps OR                                                                        -    UNSAT
* two or more control rod positions CANNOT be determined, THEN EMERGENCY BORATE USING EA-68-4, EMERGENCY BORATION STANDARD:    Operator transitions to EA-68-4, Emergency Boration STEP 5.         IF entering this instruction from any of the following:                          -    SAT
                                                                                                  -    UNSAT STANDARD:    Operator determines this step is N/A, since procedure entry was from ES-O.1, Reactor Trip Response.
 
JPM1-AP Page 6 of9 Rev 21 Job Performance Checklist:
STEP/STANDARD                                      SAT/UNSAT STEP 6.       IF entering this instruction from ES-O.1 AND any of the following                -    SAT conditions are met:
* RCS temperature less than 540°F AND core burnup is greater than          -    UNSAT 12,000 MWD/MTU OR
* RCS temperature less than 530°F Cue:      If checked, cue that RCS temperature reads 547 degrees on all loops.
STANDARD:    Operator recognizes that emergency boration is not required based on temperature.
L STEP 7.         IF rod positions CANNOT be verified due to RP,S de-energized,                  -    SAT
                                                                                                -    UNSAT STANDARD:    Operator determines this step is N/A, since procedure entry was from ES-0.1, Reactor Trip Response due to two stuck rods, continue with next step.
STEP 8.         IF entering this instruction from ES-0.1 AND any of the following conditions    -    SAT are met:
* Two or more control rods indicating greater than 12 steps                -   UNSAT OR
* Two or more rod positions CANNOT be determined due to RPls unavailable THEN PERFORM the following:
: a. IF using BAT as a boration source GO TO Section 4.2, Emergency Boration from BAT
: b. IF using RWST as a boration source GO TO Section 4.3, Emergency Boration from RWST NOTE:      Since section 4.3 is an acceptable path, if the operator chooses this path give the following cue:
Cue:       If the operator chooses to go to section 4.3, role playas US and state that the preferred boration method is via the SA T.
STANDARD:   Operator selects Section 4.2.


==REFERENCES:==
JPM1-AP Page 7 of9 Rev 21 Job Performance Checklist:
STEP/STANDARD                                    SAT/U NSAT NOTE:      The following steps are from Section 4.2.                                    _SAT STEP 9.:        PLACE boric acid transfer pumps to fast speed.                                    UNSAT IF asked, BA T "A" is aligned to unit 1 via the 1A pump.
NOTE:      Standard 1 and 2 can be done in any order.
STANDARD:    1)  Pump(s) stopped. Green light on HS
: 2)  Speed selector switch placed on "FAST" position                      Critical Step
: 3)  Pump(s) restarted, Red light on right comes on for fast speed.
: 4)  (Starting only 1A pump is acceptable)
STEP 10.:      ADJUST emergency borate valve [FCV-62-1381 to maintain flow between          _SAT 35 and 150 gpm on [FI-62-137Al.
UNSAT NOTE:        FCV-62-138 will not operate.
STANDARD:    Operator recognizes that FCV-62-138 will not operate. Operator continues with procedure.
STEP 11.:      MONITOR emergency boration flow:                                            _SAT
: a. CHECK emergency boration flow established on [FI-62-137Al.
: b. IF boric acid flow less than 35 gpm, THEN CLOSE recirculation            UNSAT valve for the BAT aligned to the blender:
                        * [1-FCV-62-2371 for BAT A.
NOTE:        Since FCV-62-138 will not operate, this step will have no affect on flow.
Operator continues to next step.
Cue:        If asked, BA T A is aligned to unit 1.
STANDARD:    Operator determines FCV-62-138 will not open and no flow is available.
Continues to next step STEP 12.:    IF emergency boration flow NOT established, THEN ALIGN normal                      SAT boration path:
UNSAT
: a. VERIFY VCT outlet valves [LCV-62-1321 and [LCV-62-1331 OPEN STANDARD:      Control board positions indicator lights for LCV-62-132 and 133 indicate open by red lights.


Reference Title Rev No. A. EA-68-4 Emergency Boration 10 B. ES-0.1 Reactor Trip Response 32 =======================================================
JPM1-AP Page 8 of9 Rev 21 Job Performance Checklist:
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
STEP/STANDARD                                       SAT/UNSAT STEP 13.:           b. ALIGN normal boration to VCT outlet:                                     -   SAT
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* OPEN [FCV-62-140J .                                               -  UNSAT
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1. The reactor has tripped with no safety injection and the Immediate Actions of E-O, Reactor Trip or Safety Injection, were completed.
: 2. The transition was made to ES-O.1 "Reactor Trip Response".
INITIATING CUES: 1. You are directed to PERFORM step 6 of ES-O.1. 2. NOTIFY the US/SRO when you have completed all actions required by Step 6 of ES-O.1. READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1. The reactor has tripped with no safety injection and the Immediate Actions of E-O, Reactor Trip or Safety Injection, were completed.
: 2. The transition was made to ES-O.1 "Reactor Trip Response".
INITIATING CUES: 1. You are directed to PERFORM step 6 of ES-O.1. 2. NOTIFY the US/SRO when you have completed all actions required by Step 6 of ES-O.1.
Job Performance Checklist:
STEP/STANDARD STEP 1.: OBTAIN the appropriate procedure(s).
STANDARD:
Operator obtains a copy of ES-O.1 (and EA-68-4 at step 3 of JPM) NOTE: The next three steps of the JPM are from ES-O.1. STEP 2. 6. CHECK if emergency boration required:
: a. VERIFY all control rods fully inserted STANDARD:
Determinre that two rods F8 and H14 are indicating full out by checkin g rod bottom lights and rod position indicators for control rod position.
Enters Step 6.a RNO. STEP 3. IF all rod bottom lights are de-energized, THEN RESTORE power to RPls by switching Instrument Rack B Transfer Switch to ALTERNATE.
[M-7, lower switch] STANDARD:
Operator determines this step N/A since power is available.
STEP 4. IF any of the following conditions exists:
* two or more RPI's indicate greater than 12 steps OR
* two or more control rod positions CANNOT be determined, THEN EMERGENCY BORATE USING EA-68-4, EMERGENCY BORATION
* STANDARD:
Operator transitions to EA-68-4, Emergency Boration STEP 5. IF entering this instruction from any of the following:
STANDARD:
Operator determines this step is N/A, since procedure entry was from ES-O.1, Reactor Trip Response.
JPM1-AP Page 5 of9 Rev 21 SAT/U N SAT SAT UNSAT Start Time __ SAT UNSAT Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD STEP 1.: OBTAIN the appropriate procedure(s).
STANDARD:
Operator obtains a copy of ES-O.1 (and EA-68-4 at step 3 of JPM) NOTE: The next three steps of the JPM are from ES-O.1. STEP 2. 6. CHECK if emergency boration required:
: a. VERIFY all control rods fully inserted STANDARD:
Determinre that two rods F8 and H14 are indicating full out by checkin g rod bottom lights and rod position indicators for control rod position.
Enters Step 6.a RNO. STEP 3. IF all rod bottom lights are de-energized, THEN RESTORE power to RPls by switching Instrument Rack B Transfer Switch to ALTERNATE.
[M-7, lower switch] STANDARD:
Operator determines this step N/A since power is available.
STEP 4. IF any of the following conditions exists:
* two or more RPI's indicate greater than 12 steps OR
* two or more control rod positions CANNOT be determined, THEN EMERGENCY BORATE USING EA-68-4, EMERGENCY BORATION
* STANDARD:
Operator transitions to EA-68-4, Emergency Boration STEP 5. IF entering this instruction from any of the following:
STANDARD:
Operator determines this step is N/A, since procedure entry was from ES-O.1, Reactor Trip Response.
JPM1-AP Page 5 of9 Rev 21 SAT/U N SAT SAT UNSAT Start Time __ SAT UNSAT Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
Job Performance Checklist:
STEP/STANDARD STEP 6. IF entering this instruction from ES-O.1 AND any of the following conditions are met:
* RCS temperature less than 540°F AND core burnup is greater than 12,000 MWD/MTU OR
* RCS temperature less than 530°F Cue: If checked, cue that RCS temperature reads 547 degrees on all loops. STANDARD:
Operator recognizes that emergency boration is not required based on temperature.
L STEP 7. IF rod positions CANNOT be verified due to RP,S de-energized, STANDARD:
Operator determines this step is N/A, since procedure entry was from ES-0.1, Reactor Trip Response due to two stuck rods, continue with next step. STEP 8. IF entering this instruction from ES-0.1 AND any of the following conditions are met:
* Two or more control rods indicating greater than 12 steps OR
* Two or more rod positions CANNOT be determined due to RPls unavailable THEN PERFORM the following:
: a. IF using BAT as a boration source GO TO Section 4.2, Emergency Boration from BAT b. IF using RWST as a boration source GO TO Section 4.3, Emergency Boration from RWST NOTE: Since section 4.3 is an acceptable path, if the operator chooses this path give the following cue: Cue: If the operator chooses to go to section 4.3, role playas US and state that the preferred boration method is via the SA T. STANDARD:
Operator selects Section 4.2. JPM1-AP Page 6 of9 Rev 21 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD STEP 6. IF entering this instruction from ES-O.1 AND any of the following conditions are met:
* RCS temperature less than 540°F AND core burnup is greater than 12,000 MWD/MTU OR
* RCS temperature less than 530°F Cue: If checked, cue that RCS temperature reads 547 degrees on all loops. STANDARD:
Operator recognizes that emergency boration is not required based on temperature.
L STEP 7. IF rod positions CANNOT be verified due to RP,S de-energized, STANDARD:
Operator determines this step is N/A, since procedure entry was from ES-0.1, Reactor Trip Response due to two stuck rods, continue with next step. STEP 8. IF entering this instruction from ES-0.1 AND any of the following conditions are met:
* Two or more control rods indicating greater than 12 steps OR
* Two or more rod positions CANNOT be determined due to RPls unavailable THEN PERFORM the following:
: a. IF using BAT as a boration source GO TO Section 4.2, Emergency Boration from BAT b. IF using RWST as a boration source GO TO Section 4.3, Emergency Boration from RWST NOTE: Since section 4.3 is an acceptable path, if the operator chooses this path give the following cue: Cue: If the operator chooses to go to section 4.3, role playas US and state that the preferred boration method is via the SA T. STANDARD:
Operator selects Section 4.2. JPM1-AP Page 6 of9 Rev 21 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
Job Performance Checklist:
STEP/STANDARD NOTE: The following steps are from Section 4.2. STEP 9.: PLACE boric acid transfer pumps to fast speed. IF asked, BA T "A" is aligned to unit 1 via the 1A pump. NOTE: Standard 1 and 2 can be done in any order. STANDARD:
: 1) Pump(s) stopped. Green light on HS STEP 10.: NOTE: 2) Speed selector switch placed on "FAST" position 3) Pump(s) restarted, Red light on right comes on for fast speed. 4) (Starting only 1A pump is acceptable)
ADJUST emergency borate valve [FCV-62-1381 to maintain flow between 35 and 150 gpm on [FI-62-137Al.
FCV-62-138 will not operate. STANDARD:
Operator recognizes that FCV-62-138 will not operate. Operator continues with procedure.
STEP 11.: NOTE: Cue: MONITOR emergency boration flow: a. CHECK emergency boration flow established on [FI-62-137Al.
: b. IF boric acid flow less than 35 gpm, THEN CLOSE recirculation valve for the BAT aligned to the blender: * [1-FCV-62-2371 for BAT A. Since FCV-62-138 will not operate, this step will have no affect on flow. Operator continues to next step. If asked, BA T A is aligned to unit 1. STANDARD:
Operator determines FCV-62-138 will not open and no flow is available.
STEP 12.: STANDARD:
Continues to next step IF emergency boration flow NOT established, THEN ALIGN normal boration path: a. VERIFY VCT outlet valves [LCV-62-1321 and [LCV-62-1331 OPEN Control board positions indicator lights for LCV-62-132 and 133 indicate open by red lights. JPM1-AP Page 7 of9 Rev 21 SAT/U N SAT _SAT UNSAT Critical Step _SAT UNSAT _SAT UNSAT SAT UNSAT Job Performance Checklist:
STEP/STANDARD NOTE: The following steps are from Section 4.2. STEP 9.: PLACE boric acid transfer pumps to fast speed. IF asked, BA T "A" is aligned to unit 1 via the 1A pump. NOTE: Standard 1 and 2 can be done in any order. STANDARD:
: 1) Pump(s) stopped. Green light on HS STEP 10.: NOTE: 2) Speed selector switch placed on "FAST" position 3) Pump(s) restarted, Red light on right comes on for fast speed. 4) (Starting only 1A pump is acceptable)
ADJUST emergency borate valve [FCV-62-1381 to maintain flow between 35 and 150 gpm on [FI-62-137Al.
FCV-62-138 will not operate. STANDARD:
Operator recognizes that FCV-62-138 will not operate. Operator continues with procedure.
STEP 11.: NOTE: Cue: MONITOR emergency boration flow: a. CHECK emergency boration flow established on [FI-62-137Al.
: b. IF boric acid flow less than 35 gpm, THEN CLOSE recirculation valve for the BAT aligned to the blender: * [1-FCV-62-2371 for BAT A. Since FCV-62-138 will not operate, this step will have no affect on flow. Operator continues to next step. If asked, BA T A is aligned to unit 1. STANDARD:
Operator determines FCV-62-138 will not open and no flow is available.
STEP 12.: STANDARD:
Continues to next step IF emergency boration flow NOT established, THEN ALIGN normal boration path: a. VERIFY VCT outlet valves [LCV-62-1321 and [LCV-62-1331 OPEN Control board positions indicator lights for LCV-62-132 and 133 indicate open by red lights. JPM1-AP Page 7 of9 Rev 21 SAT/U N SAT _SAT UNSAT Critical Step _SAT UNSAT _SAT UNSAT SAT UNSAT Job Performance Checklist:
STEP/STANDARD STEP 13.: b. ALIGN normal boration to VCT outlet:
* OPEN [FCV-62-140J .
* OPEN [FCV-62-144J.
* OPEN [FCV-62-144J.
STANDARD:
STANDARD:   Operator verifies FCV-62-140 is OPEN and ensures FCV-62-144 OPEN and         Critical Step verifies control board indicator lights for FCV-62-140 and 144 indicate open by RED lights illuminated.
Operator verifies FCV-62-140 is OPEN and ensures FCV-62-144 OPEN and verifies control board indicator lights for FCV-62-140 and 144 indicate open by RED lights illuminated.
STEP 14.:       c. CHECK boration flow greater than 35 gpm on [FI-62-139J.                 -  SAT NOTE:       Flow should be kept on scale, less than or equal to 50 gpm, to allow             -  UNSAT calculation of total flow. Flow rate may be controlled by throttling 1-HIC-62-237, 1A BAT recirc valve.
STEP 14.: c. CHECK boration flow greater than 35 gpm on [FI-62-139J.
CUE:           If operator notifies the SRO that emergency boration has been established acknowledge flow has been established.
NOTE: Flow should be kept on scale, less than or equal to 50 gpm, to allow calculation of total flow. Flow rate may be controlled by throttling 1-HIC-62-237, 1A BAT recirc valve. CUE: If operator notifies the SRO that emergency boration has been established acknowledge flow has been established.
STANDARD:   Operator ensures flow rate is greater than 35 gpm. May notify SRO that emergency boration flow has been established.
STANDARD:
STEP 15.:     IF boration flow NOT established, THEN PERFORM one of                         -    SAT the following ...
Operator ensures flow rate is greater than 35 gpm. May notify SRO that emergency boration flow has been established.
                                                                                              -    UNSAT STANDARD:   Operator N/A's this step.
STEP 15.: IF boration flow NOT established, THEN PERFORM one of the following  
STEP 16.:     VERIFY charging flow established.                                             -    SAT STANDARD:   Operator verifies charging flow established.                                   -    UNSAT STEP 17.:     MAINTAIN boric acid flow between 35 and 150 gpm.                               -    SAT STANDARD:   Operator monitors flow and ensures it remains between 35 and 150 gpm.         -    UNSAT STEP 18.:     Monitor BAT level.                                                             -    SAT STANDARD:   Operator monitors BAT level.                                                   -    UNSAT STEP 19.:     IF FR-S.1 ATWS or FR-S.2 Loss of core Shutdown condition exists,               -    SAT THEN ....
... STANDARD:
                                                                                              -    UNSAT STANDARD:   Operator N/A's this step.
Operator N/A's this step. STEP 16.: VERIFY charging flow established.
 
STANDARD:
JPM1-AP Page 9 of9 Rev 21 Job Performance Checklist:
Operator verifies charging flow established.
STEP/STANDARD                                     SAT/U NSAT STEP 20.:     IF emergency boration required for RCS cooldown, THEN DETERMINE                   SAT required boric acid volume based on RCS Temperature UNSAT STANDARD:   Operator N/As this step.
STEP 17.: MAINTAIN boric acid flow between 35 and 150 gpm. STANDARD:
STEP 21.:     IF any of the following conditions are met:                                       SAT
Operator monitors flow and ensures it remains between 35 and 150 gpm. STEP 18.: Monitor BAT level. STANDARD:
* 2 or more control rods greater than 12 steps OR                                                                       UNSAT
Operator monitors BAT level. STEP 19.: IF FR-S.1 ATWS or FR-S.2 Loss of core Shutdown condition exists, THEN .... STANDARD:
Operator N/A's this step. JPM1-AP Page 8 of9 Rev 21 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD STEP 13.: b. ALIGN normal boration to VCT outlet:
* OPEN [FCV-62-140J .
* OPEN [FCV-62-144J.
STANDARD:
Operator verifies FCV-62-140 is OPEN and ensures FCV-62-144 OPEN and verifies control board indicator lights for FCV-62-140 and 144 indicate open by RED lights illuminated.
STEP 14.: c. CHECK boration flow greater than 35 gpm on [FI-62-139J.
NOTE: Flow should be kept on scale, less than or equal to 50 gpm, to allow calculation of total flow. Flow rate may be controlled by throttling 1-HIC-62-237, 1A BAT recirc valve. CUE: If operator notifies the SRO that emergency boration has been established acknowledge flow has been established.
STANDARD:
Operator ensures flow rate is greater than 35 gpm. May notify SRO that emergency boration flow has been established.
STEP 15.: IF boration flow NOT established, THEN PERFORM one of the following
... STANDARD:
Operator N/A's this step. STEP 16.: VERIFY charging flow established.
STANDARD:
Operator verifies charging flow established.
STEP 17.: MAINTAIN boric acid flow between 35 and 150 gpm. STANDARD:
Operator monitors flow and ensures it remains between 35 and 150 gpm. STEP 18.: Monitor BAT level. STANDARD:
Operator monitors BAT level. STEP 19.: IF FR-S.1 ATWS or FR-S.2 Loss of core Shutdown condition exists, THEN .... STANDARD:
Operator N/A's this step. JPM1-AP Page 8 of9 Rev 21 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
Job Performance Checklist:
STEP 20.: STEP/STANDARD IF emergency boration required for RCS cooldown, THEN DETERMINE required boric acid volume based on RCS Temperature STANDARD:
Operator N/As this step. STEP 21.: IF any of the following conditions are met:
* 2 or more control rods greater than 12 steps OR
* 2 or more control rods positions CANNOT be determined THEN PERFORM one of the following:
* 2 or more control rods positions CANNOT be determined THEN PERFORM one of the following:
Critical Step
* Determine Boric Acid Volume from Table OR
* Determine Boric Acid Volume from Table OR
* CALCULATE required boric acid volume USING 0-SI-NUC-000-038.0 and TI-44. STANDARD:
* CALCULATE required boric acid volume USING 0-SI-NUC-000-038.0 and TI-44.
Operator Determines boric acid volume using table and determines that 5040 gallons of boric acid are required.  
STANDARD:   Operator Determines boric acid volume using table and determines that 5040 gallons of boric acid are required. [If 0-SI-NUC-000-038.0 is used and a different number is obtained using correctly from the SI, this is acceptable.]
[If 0-SI-NUC-000-038.0 is used and a different number is obtained using correctly from the SI, this is acceptable.]
STEP 22.:     CALCULATE time to inject boric acid volume determined in EA-68-4                   SAT step 11 at established flow rate:
STEP 22.: NOTE: CALCULATE time to inject boric acid volume determined in EA-68-4 step 11 at established flow rate: 5040/ (flow indicated by FI-62-139)  
UNSAT NOTE:      5040/ (flow indicated by FI-62-139)     =___ minutes STANDARD:   Operator determines the time required to inject 5040 gallons of boric acid Critical Step based on the flow rate they establish. 5040 gall 35 gpm = 144 minutes Max time to inject, 5040 gall 35 gpm =101 minutes min time to inject.
= ___ minutes STANDARD:
    *NOTE:     If 0-SI-NUC-OOO-038.0 and TI-44 were used instead of table to determine boration amount, substitute value determined using these procedures.
Operator determines the time required to inject 5040 gallons of boric acid based on the flow rate they establish.
STEP 23.:     WHEN either of the following conditions exists:                                   SAT
5040 gall 35 gpm = 144 minutes Max time to inject, 5040 gall 35 gpm = 101 minutes min time to inject. *NOTE: STEP 23.: If 0-SI-NUC-OOO-038.0 and TI-44 were used instead of table to determine boration amount, substitute value determined using these procedures.
* FR-O Subcriticality Status Tree is GREEN AND                                                               UNSAT
WHEN either of the following conditions exists:
* Required Boric Acid Volume has been injected to RCS OR Adequate SDM verified OR Conditions which require Emergency Boration no longer exist, THEN GO TO Section 4.4 for Termination of Boron.
* FR-O Subcriticality Status Tree is GREEN AND
Cue:       When the operator determines the time, cue them that the JPM is complete.
* Required Boric Acid Volume has been injected to RCS OR Adequate SDM verified OR Conditions which require Emergency Boration no longer exist, THEN GO TO Section 4.4 for Termination of Boron. Cue: When the operator determines the time, cue them that the JPM is complete.
STANDARD:   Operator notifies the US that boration has been established to RCS.
STANDARD:
End ofJPM
Operator notifies the US that boration has been established to RCS. End ofJPM JPM1-AP Page 9 of9 Rev 21 SAT/U N SAT SAT UNSAT SAT UNSAT Critical Step SAT UNSAT Critical Step SAT UNSAT Job Performance Checklist:
 
STEP 20.: STEP/STANDARD IF emergency boration required for RCS cooldown, THEN DETERMINE required boric acid volume based on RCS Temperature STANDARD:
JPM13AP1 Page 1 of 10 Rev. 6 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM13AP1 Transfer to Hot Leg Recirculation PREPARED/
Operator N/As this step. STEP 21.: IF any of the following conditions are met:
REVISED BY:                                                              Date/
* 2 or more control rods greater than 12 steps OR
VALIDATED BY:
* 2 or more control rods positions CANNOT be determined THEN PERFORM one of the following:
* Determine Boric Acid Volume from Table OR
* CALCULATE required boric acid volume USING 0-SI-NUC-000-038.0 and TI-44. STANDARD:
Operator Determines boric acid volume using table and determines that 5040 gallons of boric acid are required.
[If 0-SI-NUC-000-038.0 is used and a different number is obtained using correctly from the SI, this is acceptable.]
STEP 22.: NOTE: CALCULATE time to inject boric acid volume determined in EA-68-4 step 11 at established flow rate: 5040/ (flow indicated by FI-62-139)
= ___ minutes STANDARD:
Operator determines the time required to inject 5040 gallons of boric acid based on the flow rate they establish.
5040 gall 35 gpm = 144 minutes Max time to inject, 5040 gall 35 gpm = 101 minutes min time to inject. *NOTE: STEP 23.: If 0-SI-NUC-OOO-038.0 and TI-44 were used instead of table to determine boration amount, substitute value determined using these procedures.
WHEN either of the following conditions exists:
* FR-O Subcriticality Status Tree is GREEN AND
* Required Boric Acid Volume has been injected to RCS OR Adequate SDM verified OR Conditions which require Emergency Boration no longer exist, THEN GO TO Section 4.4 for Termination of Boron. Cue: When the operator determines the time, cue them that the JPM is complete.
STANDARD:
Operator notifies the US that boration has been established to RCS. End ofJPM JPM1-AP Page 9 of9 Rev 21 SAT/U N SAT SAT UNSAT SAT UNSAT Critical Step SAT UNSAT Critical Step SAT UNSAT PREPARED/
REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM13AP1 Transfer to Hot Leg Recirculation Date/ JPM13AP1 Page 1 of 10 Rev. 6 VALIDATED BY:
* Date/
* Date/
APPROVED BY: CONCURRED:
              ------------------------------------~~----------
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
APPROVED BY:                                                            Date/
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
(Operations Training Manager)
PREPARED/
CONCURRED:    **                                                         Date/
REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM13AP1 Transfer to Hot Leg Recirculation Date/ JPM13AP1 Page 1 of 10 Rev. 6 VALIDATED BY:
(Operations Representative)
* Date/ APPROVED BY: CONCURRED:
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
--------------------------------------------------
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
 
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
JPM13AP1 Page 2 of 10 Rev. 6 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                     DESCRIPTION OF                 V       DATE   PAGES    PREPARED/
NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Transfer from Word Perfect N 1994 1 Add cover sheep and Incorporate Rev B Y 9/12/95 minor changes. Chgd performance time to based on validation.
NUMBER                             REVISION                                 AFFECTED REVISED BY:
pen/ink Chg intiat cue to since time of event to N 1/25/96 match ES-1.3. Comment from student. pen/ink Chg due to procedure revision and chg N 03/19/02 recirc criteria from 12 hr to 5.5 hr 2 Incorporated penfink changes N 8/22/02 3 Updated to current revision of EOP. N 9/22/03 4 Corrected IC. Corrected typos. 5 vice 5.5 N 8/2/04 hours. 5 Corrected IC. Revised JPM to conform to Y 9/30/2005 latest revision of ES-1.4. 6 Updated special instructions to the Y 11/30/09 Evaluator, deleted extra page for directions to trainee v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
0         Transfer from Word Perfect                   N       1994     All      HJ Birch 1         Add cover sheep and Incorporate Rev B       Y     9/12/95   All      HJ Birch minor changes. Chgd performance time to based on validation.
PAGES AFFECTED All All 4 4 4 All All All 4 JPM13AP1 Page 2 of 10 Rev. 6 PREPARED/
pen/ink       Chg intiat cue to since time of event to     N     1/25/96     4      HJ Birch match ES-1.3. Comment from student.
REVISED BY: HJ Birch HJ Birch HJ Birch WR Ramsey J P Kearney MG Croteau MG Croteau JJ Tricoglou M Hankins \ NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Transfer from Word Perfect N 1994 1 Add cover sheep and Incorporate Rev B Y 9/12/95 minor changes. Chgd performance time to based on validation.
pen/ink       Chg due to procedure revision and chg       N     03/19/02     4    WR Ramsey recirc criteria from 12 hr to 5.5 hr 2         Incorporated penfink changes                 N     8/22/02     4    J P Kearney 3         Updated to current revision of EOP.         N     9/22/03   All    MG Croteau 4         Corrected IC. Corrected typos. 5 vice 5.5   N     8/2/04     All    MG Croteau hours.
pen/ink Chg intiat cue to since time of event to N 1/25/96 match ES-1.3. Comment from student. pen/ink Chg due to procedure revision and chg N 03/19/02 recirc criteria from 12 hr to 5.5 hr 2 Incorporated penfink changes N 8/22/02 3 Updated to current revision of EOP. N 9/22/03 4 Corrected IC. Corrected typos. 5 vice 5.5 N 8/2/04 hours. 5 Corrected IC. Revised JPM to conform to Y 9/30/2005 latest revision of ES-1.4. 6 Updated special instructions to the Y 11/30/09 Evaluator, deleted extra page for directions to trainee v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
5         Corrected IC. Revised JPM to conform to     Y   9/30/2005   All    JJ Tricoglou latest revision of ES-1.4.
PAGES AFFECTED All All 4 4 4 All All All 4 JPM13AP1 Page 2 of 10 Rev. 6 PREPARED/
6         Updated special instructions to the         Y     11/30/09     4      M Hankins Evaluator, deleted extra page for directions to trainee
REVISED BY: HJ Birch HJ Birch HJ Birch WR Ramsey J P Kearney MG Croteau MG Croteau JJ Tricoglou M Hankins \
                                                                                              \
SEQUOYAH NUCLEAR PLANT RO/SRO JPM13AP1 Page 3 of 10 Rev. 6 JOB PERFORMANCE MEASURE Task: Transfer to Hot Leg Recirculation JAITA Task # : 0000790501 (RO) KIA Ratings: 194001 A1.02 (4.1/3.9) 000011 EA1.13 (4.1/4.2) 006020 A4.02 (3.9/3.8)
v - Specify if the JPM change will require another Validation (Y or N).
See cover sheet for criteria.
 
JPM13AP1 Page 3 of 10 Rev. 6 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task:
Transfer to Hot Leg Recirculation JAITA Task # : 0000790501       (RO)
KIA Ratings:
194001 A1.02 (4.1/3.9)          194001 A1.13 (4.3/4.1)          000011 EA1.11 (4.2/4.2) 000011 EA1.13 (4.1/4.2)          006020 A4.01 (3.7/3.6)          000011 EA1.05 (4.3/3.9) 006020 A4.02 (3.9/3.8)
Task Standard:
Task Standard:
194001 A1.13 (4.3/4.1) 006020 A4.01 (3.7/3.6) 000011 EA 1.11 (4.2/4.2) 000011 EA1.05 (4.3/3.9)
Realign RHR to cold leg injection and BOTH trains of safety injection to hot leg recirculation flow path. (RHR hot leg injection valve fails to open)
Realign RHR to cold leg injection and BOTH trains of safety injection to hot leg recirculation flow path. (RHR hot leg injection valve fails to open) Evaluation Method: Simulator
Evaluation Method:     Simulator -~-- X
_-'-X"'---_
_-'-X"'---_     In-Plant _ __
In-Plant __ _ ===================================================================================
===================================================================================
Performer:
Performer:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
NAME                                                       Start Time _ __
____ --I __ -SIGNATURE DATE ===================================================================================
Performance Rating: SAT             UNSAT             Performance Time                   Finish Time _ __
COMMENTS SEQUOYAH NUCLEAR PLANT RO/SRO JPM13AP1 Page 3 of 10 Rev. 6 JOB PERFORMANCE MEASURE Task: Transfer to Hot Leg Recirculation JAITA Task # : 0000790501 (RO) KIA Ratings: 194001 A1.02 (4.1/3.9) 000011 EA1.13 (4.1/4.2) 006020 A4.02 (3.9/3.8)
Evaluator:     ------~----~
Task Standard:
______~~~--~ _                  __  __ __   _I_~~
194001 A1.13 (4.3/4.1) 006020 A4.01 (3.7/3.6) 000011 EA 1.11 (4.2/4.2) 000011 EA1.05 (4.3/3.9)
_--I _ _-
Realign RHR to cold leg injection and BOTH trains of safety injection to hot leg recirculation flow path. (RHR hot leg injection valve fails to open) Evaluation Method: Simulator X In-Plant __ _ ===================================================================================
SIGNATURE                         DATE
Performer:
===================================================================================
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
COMMENTS
______
_____
SIGNATURE DATE ===================================================================================
COMMENTS JPM13AP1 Page 4 of 10 Rev. 6 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps identified.
: 2. Any UNSAT requires comments.
: 3. Initialize Simulator to IC #24, after automatic containment sump swapover is initiated, perform required alignment of ECCS to Containment Sump per ES-1.3. Insert the following remote functions:
: a. IRF RHR14 f:1 b. IRF SIR06 f:O) c. lOR ZDIHS63172A f:O (Fails FCV-63-172 closed) 5. If sump recirc IC is not available, then initialize to IC #16 and complete the following setup: a. Insert IMF TH01A f:10 (10% LOCA on Loop #1 Hot Leg) and trip RCPs. b. After automatic containment sump swapover is initiated, perform required alignment of ECCS to containment sump per ES-1.3. c. Place operating power on FCV-63-1 (remote function IRF RHR14 f:1). d. When RWST level decreases to 8% realign containment spray pump suction to containment sump per ES-1.3. e. Place operating power on FCV-63-22 (remote function IRF SIR06 f:O). f. Insert override lOR ZDIHS63172A f:O (Fails [FCV-63-172J CLOSED) g. Acknowledge and clear ALL alarms. h. Freeze simulator after realignment of containment spray suction to containment sump. 6. Insert overrides to silence following nuisance alarms: a. IMF AN_OV_304 f:3 (Saturation Margin Trouble) b. IMF AN_OV _420 f:3 (Lower Compt Moisture High) c. IMF AN_OV _96 f:3 (Turbine Zero Speed) d. Change plaque next to FCV-63-22 to indicate power restored to valve. 7. Ensure Operator performs the following required actions for SELF-CHECKING;
: a. Reviews the intended action and expected response.
: b. Compares the actual response to the expected response.
Validation Time: CR. 15 mins Local ____ _ Tools/Equipment/Procedures Needed: ES-1.4, Transfer to Hot Leg Recirculation
 
==References:==


Reference Title Rev No. ES-1.4 Transfer to Hot Le Recirculation 5 READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
JPM13AP1 Page 4 of 10 Rev. 6 SPECIAL INSTRUCTIONS TO EVALUATOR:
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 1. Critical steps identified.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 2. Any UNSAT requires comments.
: 1. All ECCS components and Containment Spray pumps are aligned and taking suction from containment sump per ES-1.3, Transfer To RHR Containment Sump. 2. RCS pressure is less than 180 psig. RHR spray is NOT in service. 3. Both RHR pumps are in service. INITIATING CUES: 1. 5 hours have elapsed since the time of the event. 2. As the OATC, you are directed to transfer to hot leg recirculation in accordance with ES-1.4, Transfer To Hot Leg Recirculation.
: 3. Initialize Simulator to IC #24, after automatic containment sump swapover is initiated, perform required alignment of ECCS to Containment Sump per ES-1.3. Insert the following remote functions:
: 3. Notify the US/SRO when you have completed ES-1.4. JPM13AP1 Page 4 of 10 Rev. 6 SPECIAL INSTRUCTIONS TO EVALUATOR:  
: a. IRF RHR14 f:1
: 1. Critical steps identified.  
: b. IRF SIR06 f:O)
: 2. Any UNSAT requires comments.  
: c. lOR ZDIHS63172A f:O (Fails FCV-63-172 closed)
: 3. Initialize Simulator to IC #24, after automatic containment sump swapover is initiated, perform required alignment of ECCS to Containment Sump per ES-1.3. Insert the following remote functions:  
: 5. If sump recirc IC is not available, then initialize to IC #16 and complete the following setup:
: a. IRF RHR14 f:1 b. IRF SIR06 f:O) c. lOR ZDIHS63172A f:O (Fails FCV-63-172 closed) 5. If sump recirc IC is not available, then initialize to IC #16 and complete the following setup: a. Insert IMF TH01A f:10 (10% LOCA on Loop #1 Hot Leg) and trip RCPs. b. After automatic containment sump swapover is initiated, perform required alignment of ECCS to containment sump per ES-1.3. c. Place operating power on FCV-63-1 (remote function IRF RHR14 f:1). d. When RWST level decreases to 8% realign containment spray pump suction to containment sump per ES-1.3. e. Place operating power on FCV-63-22 (remote function IRF SIR06 f:O). f. Insert override lOR ZDIHS63172A f:O (Fails [FCV-63-172J CLOSED) g. Acknowledge and clear ALL alarms. h. Freeze simulator after realignment of containment spray suction to containment sump. 6. Insert overrides to silence following nuisance alarms: a. IMF AN_OV_304 f:3 (Saturation Margin Trouble) b. IMF AN_OV _420 f:3 (Lower Compt Moisture High) c. IMF AN_OV _96 f:3 (Turbine Zero Speed) d. Change plaque next to FCV-63-22 to indicate power restored to valve. 7. Ensure Operator performs the following required actions for SELF-CHECKING;  
: a. Insert IMF TH01A f:10 (10% LOCA on Loop #1 Hot Leg) and trip RCPs.
: a. Reviews the intended action and expected response.  
: b. After automatic containment sump swapover is initiated, perform required alignment of ECCS to containment sump per ES-1.3.
: c. Place operating power on FCV-63-1 (remote function IRF RHR14 f:1).
: d. When RWST level decreases to 8% realign containment spray pump suction to containment sump per ES-1.3.
: e. Place operating power on FCV-63-22 (remote function IRF SIR06 f:O).
: f. Insert override lOR ZDIHS63172A f:O (Fails [FCV-63-172J CLOSED)
: g. Acknowledge and clear ALL alarms.
: h. Freeze simulator after realignment of containment spray suction to containment sump.
: 6. Insert overrides to silence following nuisance alarms:
: a. IMF AN_OV_304 f:3 (Saturation Margin Trouble)
: b. IMF AN_OV_420 f:3 (Lower Compt Moisture High)
: c. IMF AN_OV_96 f:3 (Turbine Zero Speed)
: d. Change plaque next to FCV-63-22 to indicate power restored to valve.
: 7. Ensure Operator performs the following required actions for SELF-CHECKING;
: a. Reviews the intended action and expected response.
: b. Compares the actual response to the expected response.
: b. Compares the actual response to the expected response.
Validation Time: CR. 15 mins Local ____ _ Tools/Equipment/Procedures Needed: ES-1.4, Transfer to Hot Leg Recirculation  
Validation Time: CR. 15 mins Local _ _ _ __
Tools/Equipment/Procedures Needed:
ES-1.4, Transfer to Hot Leg Recirculation


==References:==
==References:==


Reference Title Rev No. ES-1.4 Transfer to Hot Le Recirculation 5 READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
Reference                                           Title                               Rev No.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
ES-1.4                                     Transfer to Hot Le Recirculation                             5 READ TO OPERATOR Directions to Trainee:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 1. All ECCS components and Containment Spray pumps are aligned and taking suction from containment sump per ES-1.3, Transfer To RHR Containment Sump. 2. RCS pressure is less than 180 psig. RHR spray is NOT in service. 3. Both RHR pumps are in service. INITIATING CUES: 1. 5 hours have elapsed since the time of the event. 2. As the OATC, you are directed to transfer to hot leg recirculation in accordance with ES-1.4, Transfer To Hot Leg Recirculation.  
INITIAL CONDITIONS:
: 1. All ECCS components and Containment Spray pumps are aligned and taking suction from containment sump per ES-1.3, Transfer To RHR Containment Sump.
: 2. RCS pressure is less than 180 psig. RHR spray is NOT in service.
: 3. Both RHR pumps are in service.
INITIATING CUES:
: 1. 5 hours have elapsed since the time of the event.
: 2. As the OATC, you are directed to transfer to hot leg recirculation in accordance with ES-1.4, Transfer To Hot Leg Recirculation.
: 3. Notify the US/SRO when you have completed ES-1.4.
: 3. Notify the US/SRO when you have completed ES-1.4.
Job Performance Checklist:
 
STEP/STANDARD STEP 1: Obtain a copy of the appropriate procedure.
JPM 13AP1 Page 5 of 10 Rev. 6 Job Performance Checklist:
STANDARD:
STEP/STANDARD                                             SAT/U NSAT STEP 1:       Obtain a copy of the appropriate procedure.                               -    SAT STANDARD:   Operator obtains a copy of ES-1.4.                                         -    UNSAT COMMENTS:
Operator obtains a copy of ES-1.4. COMMENTS:
Start Time_ _
STEP 2: 1. DETERMINE if RHR spray should be isolated:  
STEP 2:       1. DETERMINE if RHR spray should be isolated:                           -    SAT
: a. CHECK RHR spray IN SERVICE:
: a. CHECK RHR spray IN SERVICE:
* Train A RHR spray valve FCV-72-40 OPEN OR
* Train A RHR spray valve FCV-72-40 OPEN                           -    UNSAT OR
* Train B RHR spray valve FCV-72-41 OPEN . STANDARD:
* Train B RHR spray valve FCV-72-41 OPEN .
Operator determines FCV-72-40 and FCV-72-41 closed, verifies green lights ON and red lights OFF for both valves. Operator goes to step 2. COMMENTS:
STANDARD:     Operator determines FCV-72-40 and FCV-72-41 closed, verifies green lights ON and red lights OFF for both valves.
STEP 3: 2. CHECK RHR pump A-A RUNNING. STANDARD:
Operator goes to step 2.
Operator checks RHR pump A-A running, verifies red light ON and green light OFF. Operator may also verify pump amps normal. COMMENTS:
COMMENTS:
STEP *4: 3. ALIGN RHR Train A for hot leg recirculation:  
STEP 3:       2. CHECK RHR pump A-A RUNNING.                                           -    SAT STANDARD:   Operator checks RHR pump A-A running, verifies red light ON and           -    UNSAT green light OFF.
Operator may also verify pump amps normal.
COMMENTS:
STEP *4:       3. ALIGN RHR Train A for hot leg recirculation:                         -    SAT
: a. CLOSE RHR Train A cold leg isolation valve FCV-63-93.
: a. CLOSE RHR Train A cold leg isolation valve FCV-63-93.
STANDARD:
                                                                                          -    UNSAT STANDARD: Operator places FCV-63-93 to Close, verifies green light ON and red light OFF.
Operator places FCV-63-93 to Close, verifies green light ON and red light OFF. COMMENTS:
Critical Step COMMENTS:
STEP 5: 3. ALIGN RHR Train A for hot leg recirculation:  
STEP 5:       3. ALIGN RHR Train A for hot leg recirculation:                         -    SAT
: b. ENSURE RHR Train B discharge crosstie valve FCV-74-35 CLOSED. STANDARD:
: b. ENSURE RHR Train B discharge crosstie valve FCV-74-35 CLOSED.                                                           -    UNSAT STANDARD:   Operator ensures FCV-74-35 Closed, verifies green light ON and red light OFF.
Operator ensures FCV-74-35 Closed, verifies green light ON and red light OFF. COMMENTS:
COMMENTS:
JPM 13AP1 Page 5 of 10 Rev. 6 SAT/U N SAT SAT -UNSAT -Start Time __ SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Job Performance Checklist:
 
STEP/STANDARD STEP 1: Obtain a copy of the appropriate procedure.
JPM 13AP1 Page 6 of 10 Rev. 6 Job Performance Checklist:
STANDARD:
STEP/STANDARD                                                 SAT/UNSAT STEP *6:       3. ALIGN RHR Train A for hot leg recirculation:                                 SAT
Operator obtains a copy of ES-1.4. COMMENTS:
STEP 2: 1. DETERMINE if RHR spray should be isolated:
: a. CHECK RHR spray IN SERVICE:
* Train A RHR spray valve FCV-72-40 OPEN OR
* Train B RHR spray valve FCV-72-41 OPEN . STANDARD:
Operator determines FCV-72-40 and FCV-72-41 closed, verifies green lights ON and red lights OFF for both valves. Operator goes to step 2. COMMENTS:
STEP 3: 2. CHECK RHR pump A-A RUNNING. STANDARD:
Operator checks RHR pump A-A running, verifies red light ON and green light OFF. Operator may also verify pump amps normal. COMMENTS:
STEP *4: 3. ALIGN RHR Train A for hot leg recirculation:
: a. CLOSE RHR Train A cold leg isolation valve FCV-63-93.
STANDARD:
Operator places FCV-63-93 to Close, verifies green light ON and red light OFF. COMMENTS:
STEP 5: 3. ALIGN RHR Train A for hot leg recirculation:
: b. ENSURE RHR Train B discharge crosstie valve FCV-74-35 CLOSED. STANDARD:
Operator ensures FCV-74-35 Closed, verifies green light ON and red light OFF. COMMENTS:
JPM 13AP1 Page 5 of 10 Rev. 6 SAT/U N SAT SAT -UNSAT -Start Time __ SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -
Job Performance Checklist:
STEP/STANDARD STEP *6: 3. ALIGN RHR Train A for hot leg recirculation:  
: c. OPEN RHR Train A discharge crosstie valve FCV-74-33.
: c. OPEN RHR Train A discharge crosstie valve FCV-74-33.
STANDARD:
                                                                                            -  UNSAT STANDARD: Operator places FCV-74-33 to Open, verifies red light ON and green light OFF.
Operator places FCV-74-33 to Open, verifies red light ON and green light OFF. COMMENTS:
Critical Step COMMENTS:
STEP *7: 3. ALIGN RHR Train A for hot leg recirculation:  
STEP *7:       3. ALIGN RHR Train A for hot leg recirculation:                                 SAT
: d. OPEN RHR HL injection valve FCV-63-172.
: d. OPEN RHR HL injection valve FCV-63-172.
NOTE: FCV-63-172 fails to open. Operator must transition to RNO Column and realign RHR trains to cold legs. STANDARD:
                                                                                            -  UNSAT NOTE:       FCV-63-172 fails to open. Operator must transition to RNO Column and realign RHR trains to cold legs.
Operator places FCV-63-172 to Open. Operator determines FCV-63-172 will NOT open, verifies green light remains ON. Operator goes to RNO Column. COMMENTS:
Critical Step STANDARD: Operator places FCV-63-172 to Open.
NOTE: Begin alternate path steps. STEP 8: 1) ENSURE RHR hot leg injection valve FCV-63-172 CLOSED. STANDARD:
Operator determines FCV-63-172 will NOT open, verifies green light remains ON.                                                                 .
Operator ensures FCV-63-172 Closed, verifies green light ON and red light OFF. COMMENTS:
Operator goes to RNO Column. ~                                        ;
STEP *9: 2) ENSURE RHR Train A discharge crosstie valve FCV-74-33 CLOSED. STANDARD:
(
Operator places FCV-74-33 to Close, verifies green light ON and red light OFF. COMMENTS: ( JPM 13AP1 Page 6 of 10 Rev. 6 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step . SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/STANDARD STEP *6: 3. ALIGN RHR Train A for hot leg recirculation:  
: c. OPEN RHR Train A discharge crosstie valve FCV-74-33.
STANDARD:
Operator places FCV-74-33 to Open, verifies red light ON and green light OFF. COMMENTS:
STEP *7: 3. ALIGN RHR Train A for hot leg recirculation:
: d. OPEN RHR HL injection valve FCV-63-172.
NOTE: FCV-63-172 fails to open. Operator must transition to RNO Column and realign RHR trains to cold legs. STANDARD:
Operator places FCV-63-172 to Open. Operator determines FCV-63-172 will NOT open, verifies green light remains ON. Operator goes to RNO Column. COMMENTS:
NOTE: Begin alternate path steps. STEP 8: 1) ENSURE RHR hot leg injection valve FCV-63-172 CLOSED. STANDARD:
Operator ensures FCV-63-172 Closed, verifies green light ON and red light OFF. COMMENTS:
STEP *9: 2) ENSURE RHR Train A discharge crosstie valve FCV-74-33 CLOSED. STANDARD:
Operator places FCV-74-33 to Close, verifies green light ON and red light OFF. COMMENTS:
; JPM 13AP1 Page 6 of 10 Rev. 6 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step . SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/STANDARD STEP *10: 3) ENSURE RHR Train A cold leg isolation valve FCV-63-93 OPEN. STANDARD:
Operator places FCV-63-93 to Open, verifies red light ON and green light OFF. COMMENTS:
STEP 11: 4) IF FCV-63-172 is NOT capable of opening from MCR, THEN GO TO Step 11 . STANDARD:
Operator determines FCV-63-172 not able to be opened and goes to Step 11. COMMENTS:
STEP 12: 11. CHECK SI pump A-A RUNNING. STANDARD: Operator checks SI pump A-A running, verifies red light ON and green light OFF. Operator may also verify pump amps normal. COMMENTS:
STEP *13: 12. ALIGN SI pump A-A for hot leg recirculation:
: a. ENSURE SI pump A-A STOPPED. STANDARD:
Operator places SI pump A-A to Stop, verifies green light ON and red light OFF (HS-63-10A).
COMMENTS:
COMMENTS:
STEP *14: 12. ALIGN SI pump A-A for hot leg recirculation:
NOTE:         Begin alternate path steps.                                                   -   SAT STEP 8:       1) ENSURE RHR hot leg injection valve FCV-63-172 CLOSED.                     -   UNSAT STANDARD: Operator ensures FCV-63-172 Closed, verifies green light ON and red light OFF.
: b. CLOSE SI Train A crosstie valve FCV-63-152.
STANDARD:
Operator places FCV-63-152 to Close, verifies green light ON and red light OFF. COMMENTS:
JPM 13AP1 Page 7 of 10 Rev. 6 SAT/U N SAT SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/STANDARD STEP *10: 3) ENSURE RHR Train A cold leg isolation valve FCV-63-93 OPEN. STANDARD:
Operator places FCV-63-93 to Open, verifies red light ON and green light OFF. COMMENTS:
STEP 11: 4) IF FCV-63-172 is NOT capable of opening from MCR, THEN GO TO Step 11 . STANDARD:
Operator determines FCV-63-172 not able to be opened and goes to Step 11. COMMENTS:
STEP 12: 11. CHECK SI pump A-A RUNNING. STANDARD: Operator checks SI pump A-A running, verifies red light ON and green light OFF. Operator may also verify pump amps normal. COMMENTS:
STEP *13: 12. ALIGN SI pump A-A for hot leg recirculation:
: a. ENSURE SI pump A-A STOPPED. STANDARD:
Operator places SI pump A-A to Stop, verifies green light ON and red light OFF (HS-63-10A).
COMMENTS:
COMMENTS:
STEP *14: 12. ALIGN SI pump A-A for hot leg recirculation:
STEP *9:       2)  ENSURE RHR Train A discharge crosstie valve FCV-74-33                    -   SAT CLOSED.
: b. CLOSE SI Train A crosstie valve FCV-63-152.
                                                                                            -  UNSAT STANDARD: Operator places FCV-74-33 to Close, verifies green light ON and red light OFF.
STANDARD:
Critical Step COMMENTS:
Operator places FCV-63-152 to Close, verifies green light ON and red light OFF. COMMENTS:
 
JPM 13AP1 Page 7 of 10 Rev. 6 SAT/U N SAT SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist:
JPM 13AP1 Page 7 of 10 Rev. 6 Job Performance Checklist:
STEP/ST ANDARD STEP *15: 12. ALIGN SI pump A-A for hot leg recirculation:
STEP/STANDARD                                                SAT/U NSAT STEP *10:     3)   ENSURE RHR Train A cold leg isolation valve FCV-63-93                  -    SAT OPEN.
: c. WHEN FCV-63-152 closed, THEN PERFORM the following:
                                                                                            -    UNSAT STANDARD:   Operator places FCV-63-93 to Open, verifies red light ON and green light OFF.
: 1) OPEN SI Train A hot leg injection FCV-63-156.
Critical Step COMMENTS:
STANDARD:
STEP 11:       4)  IF FCV-63-172 is NOT capable of opening from MCR, THEN                 -    SAT GO TO Step 11 .
Operator places FCV-63-156 to Open, verifies red light ON and green light OFF. COMMENTS:
                                                                                            -   UNSAT STANDARD: Operator determines FCV-63-172 not able to be opened and goes to Step 11.
STEP *16: 12. ALIGN SI pump A-A for hot leg recirculation:
: c. WHEN FCV-63-152 closed, THEN PERFORM the following:
: 2) START SI pump A-A. STANDARD:
Operator places SI pump A-A to Start, verifies red light ON and green light OFF (HS-63-10A).
COMMENTS:
COMMENTS:
STEP 17: 13. VERIFY SI Train A discharge flow on FI-63-151.
STEP 12:       11. CHECK SI pump A-A RUNNING.                                              -   SAT STANDARD:   Operator checks SI pump A-A running, verifies red light ON and green light  -   UNSAT OFF.
STANDARD:
Operator may also verify pump amps normal.
Operator verifies SI Train A discharge flow indicated on FI-63-151.
COMMENTS:
COMMENTS:
STEP 18: 14. CHECK SI pump 8-8 RUNNING. STANDARD:
STEP *13:      12. ALIGN SI pump A-A for hot leg recirculation:                            -    SAT
Operator checks SI pump 8-8 running, verifies red light ON and green light OFF. Operator may also verify pump amps normal. COMMENTS:
: a. ENSURE SI pump A-A STOPPED.
STEP *19: 15. ALIGN SI pump 8-8 for hot leg recirculation:  
                                                                                            -    UNSAT STANDARD:    Operator places SI pump A-A to Stop, verifies green light ON and red light OFF (HS-63-10A).
: a. STOP SI pump 8-8. STANDARD:
Critical Step COMMENTS:
Operator places SI pump 8-8 to Stop, verifies green light ON and red light OFF (HS-63-15A).
STEP *14:      12. ALIGN SI pump A-A for hot leg recirculation:                              -  SAT
: b. CLOSE SI Train A crosstie valve FCV-63-152.
                                                                                            -    UNSAT STANDARD: Operator places FCV-63-152 to Close, verifies green light ON and red light OFF.
Critical Step COMMENTS:
 
JPM 13AP1 Page 8 of 10 Rev. 6 Job Performance Checklist:
STEP/STANDARD                                             SAT/UNSAT STEP *15:      12. ALIGN SI pump A-A for hot leg recirculation:                          -    SAT
: c. WHEN FCV-63-152 closed, THEN PERFORM the following:
: 1) OPEN SI Train A hot leg injection FCV-63-156.                  -    UNSAT STANDARD: Operator places FCV-63-156 to Open, verifies red light ON and green light OFF.                                                                     Critical Step COMMENTS:
STEP *16:     12. ALIGN SI pump A-A for hot leg recirculation:                               SAT
: c. WHEN FCV-63-152 closed, THEN PERFORM the following:
: 2) START SI pump A-A.                                             -    UNSAT STANDARD: Operator places SI pump A-A to Start, verifies red light ON and green light OFF (HS-63-10A).                                                        Critical Step COMMENTS:
STEP 17:      13. VERIFY SI Train A discharge flow on FI-63-151.                              SAT STANDARD: Operator verifies SI Train A discharge flow indicated on FI-63-151.          -    UNSAT COMMENTS:
STEP 18:      14. CHECK SI pump 8-8 RUNNING.                                            -    SAT STANDARD: Operator checks SI pump 8-8 running, verifies red light ON and green light    -    UNSAT OFF.
Operator may also verify pump amps normal.
COMMENTS:
COMMENTS:
JPM 13AP1 Page 8 of 10 Rev. 6 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
STEP *19:     15. ALIGN SI pump 8-8 for hot leg recirculation:                           -    SAT
STEP/ST ANDARD STEP *15: 12. ALIGN SI pump A-A for hot leg recirculation:
: a. STOP SI pump 8-8.
: c. WHEN FCV-63-152 closed, THEN PERFORM the following:
                                                                                          -    UNSAT STANDARD: Operator places SI pump 8-8 to Stop, verifies green light ON and red light OFF (HS-63-15A).
: 1) OPEN SI Train A hot leg injection FCV-63-156.
Critical Step COMMENTS:
STANDARD:
 
Operator places FCV-63-156 to Open, verifies red light ON and green light OFF. COMMENTS:
JPM 13AP1 Page 9 of 10 Rev. 6 Job Performance Checklist:
STEP *16: 12. ALIGN SI pump A-A for hot leg recirculation:
STEP/STANDARD                                             SAT/UNSAT STEP *20:     15. ALIGN SI pump 8-8 for hot leg recirculation:                           -    SAT
: c. WHEN FCV-63-152 closed, THEN PERFORM the following:
: 2) START SI pump A-A. STANDARD:
Operator places SI pump A-A to Start, verifies red light ON and green light OFF (HS-63-10A).
COMMENTS:
STEP 17: 13. VERIFY SI Train A discharge flow on FI-63-151.
STANDARD:
Operator verifies SI Train A discharge flow indicated on FI-63-151.
COMMENTS:
STEP 18: 14. CHECK SI pump 8-8 RUNNING. STANDARD:
Operator checks SI pump 8-8 running, verifies red light ON and green light OFF. Operator may also verify pump amps normal. COMMENTS:
STEP *19: 15. ALIGN SI pump 8-8 for hot leg recirculation:  
: a. STOP SI pump 8-8. STANDARD:
Operator places SI pump 8-8 to Stop, verifies green light ON and red light OFF (HS-63-15A).
COMMENTS:
JPM 13AP1 Page 8 of 10 Rev. 6 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/STANDARD STEP *20: 15. ALIGN SI pump 8-8 for hot leg recirculation:  
: b. CLOSE SI Train 8 crosstie FCV-63-153.
: b. CLOSE SI Train 8 crosstie FCV-63-153.
STANDARD:
                                                                                          -    UNSAT STANDARD: Operator places FCV-63-153 to Close, verifies green light ON and red light OFF.
Operator places FCV-63-153 to Close, verifies green light ON and red light OFF. COMMENTS:
Critical Step COMMENTS:
STEP *21: 15. ALIGN SI pump 8-8 for hot leg recirculation:  
STEP *21:     15. ALIGN SI pump 8-8 for hot leg recirculation:                           -    SAT
: c. WHEN FCV-63-153 closed, THEN PERFORM the following:  
: c. WHEN FCV-63-153 closed, THEN PERFORM the following:
: 1) OPEN SI Train 8 hot leg injection FCV-63-157.
: 1) OPEN SI Train 8 hot leg injection FCV-63-157.                   -    UNSAT STANDARD: Operator places FCV-63-157 to Open, verifies red light ON and green light OFF.                                                                     Critical Step COMMENTS:
STANDARD:
STEP *22:     15. ALIGN SI pump 8-8 for hot leg recirculation:                           -    SAT
Operator places FCV-63-157 to Open, verifies red light ON and green light OFF. COMMENTS:
: c. WHEN FCV-63-153 closed, THEN PERFORM the following:
STEP *22: 15. ALIGN SI pump 8-8 for hot leg recirculation:  
: 2) START SI pump 8-8.                                             -    UNSAT STANDARD: Operator places SI pump 8-8 to Start, verifies red light ON and green light OFF (HS-63-1SA).                                                        Critical Step COMMENTS:
: c. WHEN FCV-63-153 closed, THEN PERFORM the following:  
STEP 23:      16. VERIFY SI Train 8 discharge flow on FI-63-20.                          -    SAT STANDARD: Operator verifies SI Train 8 discharge flow indicated on FI-63-20.            -    UNSAT COMMENTS:
: 2) START SI pump 8-8. STANDARD:
STEP 24:      17. ISOLATESI pump flow to cold legs:                                      -    SAT
Operator places SI pump 8-8 to Start, verifies red light ON and green light OFF (HS-63-1SA).
: a. CHECK 80TH SI pumps ALIGNED for hot leg recirculation.
                                                                                          -    UNSAT STANDARD: Operator checks both SI pumps aligned for hot leg recirculation per previous steps.
COMMENTS:
COMMENTS:
STEP 23: 16. VERIFY SI Train 8 discharge flow on FI-63-20.
 
STANDARD:
JPM 13AP1 Page 10 of 10 Rev. 6 Job Performance Checklist:
Operator verifies SI Train 8 discharge flow indicated on FI-63-20.
STEP/STANDARD                                            SAT/UNSAT STEP 25:       17. ISOLATE SI pump flow to cold legs:                                    -  SAT
: b. CHECK power AVAILABLE to SI pump cold leg injection valve FCV-63-22.                                                      -    UNSAT NOTE:        Console Operator insert IRF SIR06 f:O to place power on FCV-63-22.
Cue:        Inform Operator that power is restored to FCV-63-22.
STANDARD:     Operator contacts AUO to restore power to FCV-63-22.
COMMENTS:
COMMENTS:
STEP 24: 17. ISOLATESI pump flow to cold legs: a. CHECK 80TH SI pumps ALIGNED for hot leg recirculation.
STEP 26:       17. ISOLATE SI pump flow to cold legs:                                   -   SAT
STANDARD:
: c. CLOSE SI pump cold leg injection valve FCV-63-22.
Operator checks both SI pumps aligned for hot leg recirculation per previous steps. COMMENTS:
                                                                                          -    UNSAT STANDARD:     Operator checks FCV-63-22 Closed, verifies green light ON and red light OFF.
JPM 13AP1 Page 9 of 10 Rev. 6 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD STEP *20: 15. ALIGN SI pump 8-8 for hot leg recirculation:
: b. CLOSE SI Train 8 crosstie FCV-63-153.
STANDARD:
Operator places FCV-63-153 to Close, verifies green light ON and red light OFF. COMMENTS:
STEP *21: 15. ALIGN SI pump 8-8 for hot leg recirculation:
: c. WHEN FCV-63-153 closed, THEN PERFORM the following:
: 1) OPEN SI Train 8 hot leg injection FCV-63-157.
STANDARD:
Operator places FCV-63-157 to Open, verifies red light ON and green light OFF. COMMENTS:
STEP *22: 15. ALIGN SI pump 8-8 for hot leg recirculation:
: c. WHEN FCV-63-153 closed, THEN PERFORM the following:
: 2) START SI pump 8-8. STANDARD:
Operator places SI pump 8-8 to Start, verifies red light ON and green light OFF (HS-63-1SA).
COMMENTS:
COMMENTS:
STEP 23: 16. VERIFY SI Train 8 discharge flow on FI-63-20.
.5TEP 27:       Notify US/SRO that ES-1.4 is completed with hot leg recirculation        -   SAT established.
STANDARD:
                                                                                          -    UNSAT STANDARD:     Operator notifies US/SRO that ES-1.4 is completed.
Operator verifies SI Train 8 discharge flow indicated on FI-63-20.
COMMENTS:
COMMENTS:
STEP 24: 17. ISOLATESI pump flow to cold legs: a. CHECK 80TH SI pumps ALIGNED for hot leg recirculation.
Stop Time_ _
STANDARD:
End ofJPM
Operator checks both SI pumps aligned for hot leg recirculation per previous steps. COMMENTS:
 
JPM 13AP1 Page 9 of 10 Rev. 6 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -
READ TO OPERATOR Directions to Trainee:
Job Performance Checklist:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
STEP/ST ANDARD STEP 25: 17. ISOLATE SI pump flow to cold legs: b. CHECK power AVAILABLE to SI pump cold leg injection valve FCV-63-22.
INITIAL CONDITIONS:
NOTE: Console Operator insert IRF SIR06 f:O to place power on FCV-63-22.
: 1. All ECCS components and Containment Spray pumps are aligned and taking suction from containment sump per ES-1.3, Transfer To RHR Containment Sump.
Cue: Inform Operator that power is restored to FCV-63-22.
: 2. RCS pressure is less than 180 psig. RHR spray is NOT in service.
STANDARD:
: 3. Both RHR pumps are in service.
Operator contacts AUO to restore power to FCV-63-22.
INITIATING CUES:
COMMENTS:
: 1. 5 hours have elapsed since the time of the event.
STEP 26: 17. ISOLATE SI pump flow to cold legs: c. CLOSE SI pump cold leg injection valve FCV-63-22.
: 2. As the OATC, you are directed to transfer to hot leg recirculation in accordance with ES-1.4, Transfer To Hot Leg Recirculation.
STANDARD:
Operator checks FCV-63-22 Closed, verifies green light ON and red light OFF. COMMENTS:
.5TEP 27: Notify US/SRO that ES-1.4 is completed with hot leg recirculation established.
STANDARD:
Operator notifies US/SRO that ES-1.4 is completed.
COMMENTS:
End ofJPM JPM 13AP1 Page 10 of 10 Rev. 6 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Stop Time __ Job Performance Checklist:
STEP/ST ANDARD STEP 25: 17. ISOLATE SI pump flow to cold legs: b. CHECK power AVAILABLE to SI pump cold leg injection valve FCV-63-22.
NOTE: Console Operator insert IRF SIR06 f:O to place power on FCV-63-22.
Cue: Inform Operator that power is restored to FCV-63-22.
STANDARD:
Operator contacts AUO to restore power to FCV-63-22.
COMMENTS:
STEP 26: 17. ISOLATE SI pump flow to cold legs: c. CLOSE SI pump cold leg injection valve FCV-63-22.
STANDARD:
Operator checks FCV-63-22 Closed, verifies green light ON and red light OFF. COMMENTS:
.5TEP 27: Notify US/SRO that ES-1.4 is completed with hot leg recirculation established.
STANDARD:
Operator notifies US/SRO that ES-1.4 is completed.
COMMENTS:
End ofJPM JPM 13AP1 Page 10 of 10 Rev. 6 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Stop Time __
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  
: 1. All ECCS components and Containment Spray pumps are aligned and taking suction from containment sump per ES-1.3, Transfer To RHR Containment Sump. 2. RCS pressure is less than 180 psig. RHR spray is NOT in service. 3. Both RHR pumps are in service. INITIATING CUES: 1. 5 hours have elapsed since the time of the event. 2. As the OATC, you are directed to transfer to hot leg recirculation in accordance with ES-1.4, Transfer To Hot Leg Recirculation.
: 3. Notify the US/SRO when you have completed ES-1.4. READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1. All ECCS components and Containment Spray pumps are aligned and taking suction from containment sump per ES-1.3, Transfer To RHR Containment Sump. 2. RCS pressure is less than 180 psig. RHR spray is NOT in service. 3. Both RHR pumps are in service. INITIATING CUES: 1. 5 hours have elapsed since the time of the event. 2. As the OATC, you are directed to transfer to hot leg recirculation in accordance with ES-1.4, Transfer To Hot Leg Recirculation.  
: 3. Notify the US/SRO when you have completed ES-1.4.
: 3. Notify the US/SRO when you have completed ES-1.4.
PREPAREDI REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:
 
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 2 RO/SRO Remove Excess Letdown from Service Date/
JPM 2 RO/SRO Page 1 of 7 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 2 RO/SRO Remove Excess Letdown from Service PREPAREDI REVISED BY:                                                              Date/
* Date/ Date/ (Operations Training Manager) ** Date/ (Operations Representative)
VALIDATED BY:
JPM 2 RO/SRO Page 1 of 7 Rev. 0
* Date/
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
APPROVED BY:                                                            Date/
PREPAREDI REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:
(Operations Training Manager)
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 2 RO/SRO Remove Excess Letdown from Service Date/
CONCURRED:    **                                                         Date/
* Date/ Date/ (Operations Training Manager) ** Date/ (Operations Representative)
(Operations Representative)
JPM 2 RO/SRO Page 1 of 7 Rev. 0
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Initial Issue Y 11/30109 v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
 
PAGES AFFECTED All JPM 2 RO/SRO Page 2 of 7 Rev. 0 PREPARED/
JPM 2 RO/SRO Page 2 of 7 Rev. 0 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                 DESCRIPTION OF                     V     DATE   PAGES    PREPARED/
REVISED BY: M. Hankins NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Initial Issue Y 11/30109 v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
NUMBER                         REVISION                                   AFFECTED REVISED BY:
PAGES AFFECTED All JPM 2 RO/SRO Page 2 of 7 Rev. 0 PREPARED/
0                         Initial Issue               Y   11/30109   All    M. Hankins v - Specify if the JPM change will require another Validation (Y or N).
REVISED BY: M. Hankins Task SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Place excess letdown in service to the VCT IRCDT KIA Ratings: 004 A4.06 (3.6/3.1)
See cover sheet for criteria.
A4.06 (3.6/3.1) 004 A4.05 (3.6/3.1)
 
JPM 2 RO/SRO Page 3 of 7 Rev. 0 JAiTA task # 0040160101 Task Standard:
JPM 2 RO/SRO Page 3 of 7 Rev. 0 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task                                                                              JAiTA task #
Remove Excess letdown from service in accordance with 1-S0-62-6, Excess Letdown, section 7.0 Evaluation Method: Simulator
Place excess letdown in service to the VCT IRCDT                                   0040160101 KIA Ratings:
_X__ In-Plant __ _ ====================================================================================
004 A4.06 (3.6/3.1)             004 A4.05 (3.6/3.1)
A4.06 (3.6/3.1)
Task Standard: Remove Excess letdown from service in accordance with 1-S0-62-6, Excess Letdown, section 7.0 Evaluation Method:     Simulator _ X _ _      In-Plant _ __
====================================================================================
Performer:
Performer:
NAME Start time __ _ Performance Rating: SAT UNSAT Performance Time Finish time __ _ Evaluator:  
NAME                                           Start time _ __
/ _____ _ SIGNATURE DATE ====================================================================================
Performance Rating: SAT           UNSAT           Performance Time           Finish time _
COMMENTS Task SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Place excess letdown in service to the VCT IRCDT KIA Ratings: 004 A4.06 (3.6/3.1)
Evaluator:                                   /_ _ _ __ __ ___
A4.06 (3.6/3.1) 004 A4.05 (3.6/3.1)
SIGNATURE           DATE
JPM 2 RO/SRO Page 3 of 7 Rev. 0 JAiTA task # 0040160101 Task Standard:
====================================================================================
Remove Excess letdown from service in accordance with 1-S0-62-6, Excess Letdown, section 7.0 Evaluation Method: Simulator
COMMENTS
_X__ In-Plant __ _ ====================================================================================
 
Performer:
JPM 2 RO/SRO Page 4 of 7 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:
NAME Start time __ _ Performance Rating: SAT UNSAT Performance Time Finish time ___ _ Evaluator:
: 1.       A Critical step is identified bold type in the SAT/UNSAT column.
/ _____ _ SIGNATURE DATE ====================================================================================
: 2.       Any UNSAT requires comments
COMMENTS JPM 2 RO/SRO Page 4 of 7 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:  
: 3.       Task should begin at the IC198, B CCP liS, Excess LD liS, LD liS at -73 gpm.
: 1. A Critical step is identified bold type in the SAT/UNSAT column. 2. Any UNSAT requires comments 3. Task should begin at the IC198, B CCP liS, Excess LD liS, LD liS at -73 gpm. 5. Ensure operator performs the following required actions for SELF-CHECKING;  
: 5.       Ensure operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.  
: a. Identifies the correct unit, train, component, etc.
: b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR 7 min Local ____ _ Tools/Equipment/Procedures Needed:  
Validation Time: CR       7 min             Local _ _ _ __
Tools/Equipment/Procedures Needed:


==REFERENCES:==
==REFERENCES:==


Procedure Title Rev No. 1-S0-62-6 Excess Letdown 17 1-AR-M5-B Annunciator Response 36 I Task Number Task Title 0040160101 Place excess letdown in service to the VCT /RCDT =============================================================================
Procedure                                           Title                               Rev No.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
1-S0-62-6                                     Excess Letdown                             17 1-AR-M5-B                                   Annunciator Response                           36 I Task Number                                                 Task Title                                           ContTRN 0040160101 Place excess letdown in service to the VCT /RCDT
I will provide initiating cues and reports on other actions when directed by you. All steps shall be performed for this task When you complete the task successfully, the objective for this job performance measure will be satisfied.
  =============================================================================
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
READ TO OPERATOR Directions to Trainee:
ContTRN The Unit is operating at 100% power. After repair of a leaking valve, normal letdown has been restored to service. Excess letdown had been placed in service while the repairs were made. Excess letdown temperature is -207°F and 45 psig on 1-PI-62-57.
I will explain the initial conditions, and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. All steps shall be performed for this task When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
The Unit is operating at 100% power. After repair of a leaking valve, normal letdown has been restored to service. Excess letdown had been placed in service while the repairs were made. Excess letdown temperature is -207°F and 45 psig on 1-PI-62-57.
Normal Letdown has been restored to service in accordance with 1-S0-62-1.
Normal Letdown has been restored to service in accordance with 1-S0-62-1.
INITIATING CUES: You are the U-1 OATC. You have been directed to remove excess letdown from service using 1-S0-62-6.
INITIATING CUES:
Report to Unit supervisor when excess letdown has been removed from service. JPM 2 RO/SRO Page 4 of 7 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:  
You are the U-1 OATC. You have been directed to remove excess letdown from service using 1-S0-62-6. Report to Unit supervisor when excess letdown has been removed from service.
: 1. A Critical step is identified bold type in the SAT/UNSAT column. 2. Any UNSAT requires comments 3. Task should begin at the IC198, B CCP liS, Excess LD liS, LD liS at -73 gpm. 5. Ensure operator performs the following required actions for SELF-CHECKING;
 
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.  
JPM 2 RO/SRO Page 5 of 7 Rev. 0 Job Performance Checklist:
: c. Compares the actual response to the expected response.
STEP/STANDARD                              SAT/UNSAT STEP 1.:      IF letdown is to be placed in service, THEN RETURN to service      -  SAT per 1-S0-62-1 .
Validation Time: CR 7 min Local ____ _ Tools/Equipment/Procedures Needed:  
                                                                                  -  UNSAT STANDARD: Operator verifies letdown is in service. Initial conditions stated STEP 2.:      CLOSE [1-FCV-62-561 Excess Letdown Heat Exchanger outlet          -  SAT valve.
                                                                                  -  UNSAT STANDARD: Operator verifies valve closes, green light illuminated and red    CRITICAL light dark; and temperature and pressure decrease on TI-62-58    STEP and PI-62-57.
STEP 3.:      VERIFY [1-FCV-62-59J Excess Letdown 3-way valve in                -  SAT NORMAL.
                                                                                  -  UNSAT STANDARD: Operator verifies the HS for FCV-62-59 is in NORMAL.
STEP 4.:      CLOSE [1-FCV-62-55] Excess Letdown containment isolation          -   SAT valve.
                                                                                  -  UNSAT STANDARD: Operator places HS in closed and verifies green light illuminated and red light dark STEP 5.:      CLOSE [1-FCV-62-541 COLD LEG Loop #3 Excess Letdown                -  SAT valve.
                                                                                  -  UNSAT STANDARD:      Operator places HS to close and verifies green light illuminated CRITICAL and red light dark                                              STEP
 
JPM 2 RO/SRO Page 6 of 7 Rev. 0 Job Performance Checklist:
STEP/STANDARD                            SAT/UNSAT STEP 6.:      IF charging is in service, THEN                                    -  SAT ADJUST seal injection flow to 6-11 gpm using [1-FCV-62-891
                                                                                  -  UNSAT STANDARD: Operator checks seal injection flow between 6-11 gpm and makes adjustments as required.
STEP 7.:      IF auto operation is desired and system conditions will allow it,   -  SAT THEN PLACE [1-FCV-62-931 in AUTO.                                        -  UNSAT STANDARD:      Operator should adjust Pressurizer level, if needed, prior to placing charging in automatic.
STEP 8.:      NOTIFY RADCON that Excess Letdown is REMOVED from                  -  SAT SERVICE.
                                                                                  -  UNSAT CUE:        Acknowledge as RADCON that Excess Letdown has been removed from service.
STANDARD: Operator should call RADCON and notify them Excess Letdown has been removed from service on Unit 1.
STEP 9.:      ENSURE [1-FCV-70-85J Excess Letdown HX CCS FCV is                  -  SAT CLOSED.
NOTE          Operator should address the need to have a CV (Concurrent          -  UNSAT Verifier) present prior to operating the valve.
CRITICAL STANDARD:      Operator takes the HS for 1-FCV-70-85 to CLOSE position and      STEP verfies green light illuminated and red light dark.
STEP 10.:     ENSURE [1-HS-70-85Al is in the A-Auto position.                     -  SAT NOTE          Operator should address the need to have a CV (Concurrent          -  UNSAT Verifier) present prior to operating the valve.
CRITICAL STANDARD:     Operator places the HS in the A-Auto position.                    STEP


==REFERENCES:==
JPM 2 RO/SRO Page 7 of 7 Rev. 0 Job Performance Checklist:
STEP/STANDARD                            SAT/UNSAT STEP 11.:      INDEPENDENTLY VERIFy ....                                        -  SAT
                                                                                -  UNSAT NOTE          The next four steps are independent verification of manipulations previously made by the operator CUE:      Tell the operator the independent verifications were performed by another operator.
STANDARD: Operator requests an independent verification for previous manipulations.
STEP 12.:      IF operation at greater than 200°F has occurred, THEN            -  SAT CO NTACT Systems Engineering to evaluate Grinnell Valve maintenance requirements.                                        -  UNSAT STANDARD:      Operator notifies the US that excess letdown temperature exceeded 200°F, therefore System Engineering must be notified to evaluate Grinell Valve maintenance requirements.
End OfJPM


Procedure Title Rev No. 1-S0-62-6 Excess Letdown 17 1-AR-M5-B Annunciator Response 36 I Task Number Task Title 0040160101 Place excess letdown in service to the VCT /RCDT =============================================================================
Directions to Trainee:
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
I will explain the initial conditions, and state the task to be perfonned. I will provide initiating cues and reports on other actions when directed by you. All steps shall be perfonned for this task When you complete the task successfully, the objective for this job perfonnance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will provide initiating cues and reports on other actions when directed by you. All steps shall be performed for this task When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
The Unit is operating at 100% power. After repair of a leaking valve, nonnal letdown has been restored to service. Excess letdown had been placed in service while the repairs were made. Excess letdown temperature is ~207°F and 45 psig on I-PI-62-57.
ContTRN The Unit is operating at 100% power. After repair of a leaking valve, normal letdown has been restored to service. Excess letdown had been placed in service while the repairs were made. Excess letdown temperature is -207°F and 45 psig on 1-PI-62-57.
Normal Letdown has been restored to service in accordance with 1-S0-62-1.
INITIATING CUES: You are the U-1 OATC. You have been directed to remove excess letdown from service using 1-S0-62-6.
Report to Unit supervisor when excess letdown has been removed from service.
Job Performance Checklist:
STEP/ST ANDARD STEP 1.: IF letdown is to be placed in service, THEN RETURN to service per 1-S0-62-1 . STANDARD:
Operator verifies letdown is in service. Initial conditions stated STEP 2.: CLOSE [1-FCV-62-561 Excess Letdown Heat Exchanger outlet valve. STANDARD:
Operator verifies valve closes, green light illuminated and red light dark; and temperature and pressure decrease on TI-62-58 and PI-62-57.
STEP 3.: VERIFY [1-FCV-62-59J Excess Letdown 3-way valve in NORMAL. STANDARD:
Operator verifies the HS for FCV-62-59 is in NORMAL. STEP 4.: CLOSE [1-FCV-62-55]
Excess Letdown containment isolation valve. STANDARD:
Operator places HS in closed and verifies green light illuminated and red light dark STEP 5.: CLOSE [1-FCV-62-541 COLD LEG Loop #3 Excess Letdown valve. STANDARD:
Operator places HS to close and verifies green light illuminated and red light dark JPM 2 RO/SRO Page 5 of 7 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -CRITICAL STEP Job Performance Checklist:
STEP/ST ANDARD STEP 1.: IF letdown is to be placed in service, THEN RETURN to service per 1-S0-62-1 . STANDARD:
Operator verifies letdown is in service. Initial conditions stated STEP 2.: CLOSE [1-FCV-62-561 Excess Letdown Heat Exchanger outlet valve. STANDARD:
Operator verifies valve closes, green light illuminated and red light dark; and temperature and pressure decrease on TI-62-58 and PI-62-57.
STEP 3.: VERIFY [1-FCV-62-59J Excess Letdown 3-way valve in NORMAL. STANDARD:
Operator verifies the HS for FCV-62-59 is in NORMAL. STEP 4.: CLOSE [1-FCV-62-55]
Excess Letdown containment isolation valve. STANDARD:
Operator places HS in closed and verifies green light illuminated and red light dark STEP 5.: CLOSE [1-FCV-62-541 COLD LEG Loop #3 Excess Letdown valve. STANDARD:
Operator places HS to close and verifies green light illuminated and red light dark JPM 2 RO/SRO Page 5 of 7 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -CRITICAL STEP Job Performance Checklist:
STEP/ST ANDARD STEP 6.: IF charging is in service, THEN ADJUST seal injection flow to 6-11 gpm using [1-FCV-62-891 STANDARD:
Operator checks seal injection flow between 6-11 gpm and makes adjustments as required.
STEP 7.: IF auto operation is desired and system conditions will allow it, THEN PLACE [1-FCV-62-931 in AUTO. STANDARD:
Operator should adjust Pressurizer level, if needed, prior to placing charging in automatic.
STEP 8.: NOTIFY RADCON that Excess Letdown is REMOVED from SERVICE. CUE: Acknowledge as RADCON that Excess Letdown has been removed from service. STANDARD:
Operator should call RADCON and notify them Excess Letdown has been removed from service on Unit 1. STEP 9.: ENSURE [1-FCV-70-85J Excess Letdown HX CCS FCV is CLOSED. NOTE Operator should address the need to have a CV (Concurrent Verifier) present prior to operating the valve. STANDARD:
Operator takes the HS for 1-FCV-70-85 to CLOSE position and verfies green light illuminated and red light dark. STEP 10.: ENSURE [1-HS-70-85Al is in the A-Auto position.
NOTE Operator should address the need to have a CV (Concurrent Verifier) present prior to operating the valve. STANDARD:
Operator places the HS in the A-Auto position.
JPM 2 RO/SRO Page 6 of 7 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -CRITICAL STEP SAT -UNSAT -CRITICAL STEP Job Performance Checklist:
STEP/ST ANDARD STEP 6.: IF charging is in service, THEN ADJUST seal injection flow to 6-11 gpm using [1-FCV-62-891 STANDARD:
Operator checks seal injection flow between 6-11 gpm and makes adjustments as required.
STEP 7.: IF auto operation is desired and system conditions will allow it, THEN PLACE [1-FCV-62-931 in AUTO. STANDARD:
Operator should adjust Pressurizer level, if needed, prior to placing charging in automatic.
STEP 8.: NOTIFY RADCON that Excess Letdown is REMOVED from SERVICE. CUE: Acknowledge as RADCON that Excess Letdown has been removed from service. STANDARD:
Operator should call RADCON and notify them Excess Letdown has been removed from service on Unit 1. STEP 9.: ENSURE [1-FCV-70-85J Excess Letdown HX CCS FCV is CLOSED. NOTE Operator should address the need to have a CV (Concurrent Verifier) present prior to operating the valve. STANDARD:
Operator takes the HS for 1-FCV-70-85 to CLOSE position and verfies green light illuminated and red light dark. STEP 10.: ENSURE [1-HS-70-85Al is in the A-Auto position.
NOTE Operator should address the need to have a CV (Concurrent Verifier) present prior to operating the valve. STANDARD:
Operator places the HS in the A-Auto position.
JPM 2 RO/SRO Page 6 of 7 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -CRITICAL STEP SAT -UNSAT -CRITICAL STEP Job Performance Checklist:
STEP/STANDARD STEP 11.: INDEPENDENTLY VERIFy .... NOTE The next four steps are independent verification of manipulations previously made by the operator CUE: Tell the operator the independent verifications were performed by another operator.
STANDARD:
Operator requests an independent verification for previous manipulations.
STEP 12.: IF operation at greater than 200°F has occurred, THEN CO NT ACT Systems Engineering to evaluate Grinnell Valve maintenance requirements.
STANDARD:
Operator notifies the US that excess letdown temperature exceeded 200°F, therefore System Engineering must be notified to evaluate Grinell Valve maintenance requirements.
End OfJPM JPM 2 RO/SRO Page 7 of 7 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD STEP 11.: INDEPENDENTLY VERIFy .... NOTE The next four steps are independent verification of manipulations previously made by the operator CUE: Tell the operator the independent verifications were performed by another operator.
STANDARD:
Operator requests an independent verification for previous manipulations.
STEP 12.: IF operation at greater than 200°F has occurred, THEN CO NT ACT Systems Engineering to evaluate Grinnell Valve maintenance requirements.
STANDARD:
Operator notifies the US that excess letdown temperature exceeded 200°F, therefore System Engineering must be notified to evaluate Grinell Valve maintenance requirements.
End OfJPM JPM 2 RO/SRO Page 7 of 7 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -
Directions to Trainee: I will explain the initial conditions, and state the task to be perfonned.
I will provide initiating cues and reports on other actions when directed by you. All steps shall be perfonned for this task When you complete the task successfully, the objective for this job perfonnance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
The Unit is operating at 100% power. After repair of a leaking valve, nonnal letdown has been restored to service. Excess letdown had been placed in service while the repairs were made. Excess letdown temperature is and 45 psig on I-PI-62-57.
Nonnal Letdown has been restored to service in accordance with I-SO-62-1.
Nonnal Letdown has been restored to service in accordance with I-SO-62-1.
INITIATING CUES: You are the U-l OATe. You have been directed to remove excess letdown from service using I-SO-62-6.
INITIATING CUES:
Report to Unit supervisor when excess letdown has been removed from service. Directions to Trainee: I will explain the initial conditions, and state the task to be perfonned.
You are the U-l OATe. You have been directed to remove excess letdown from service using I-SO-62-6. Report to Unit supervisor when excess letdown has been removed from service.
I will provide initiating cues and reports on other actions when directed by you. All steps shall be perfonned for this task When you complete the task successfully, the objective for this job perfonnance measure will be satisfied.
 
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
JPM 152-1 Page 1 of 8 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 152-1 Swap RHR Pumps (Train B to Train A)
The Unit is operating at 100% power. After repair of a leaking valve, nonnal letdown has been restored to service. Excess letdown had been placed in service while the repairs were made. Excess letdown temperature is and 45 psig on I-PI-62-57.
With Level in the Pressurizer PREPARED!
Nonnal Letdown has been restored to service in accordance with I-SO-62-1.
REVISED BY:                                                                        Datel VALIDATED BY:
INITIATING CUES: You are the U-l OATe. You have been directed to remove excess letdown from service using I-SO-62-6.
* Datel APPROVED BY:                                                                      Datel (Operations Training Manager)
Report to Unit supervisor when excess letdown has been removed from service.
CONCURRED:    **                                                                 Datel (Operations Representative)
PREPARED!
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 152-1 Swap RHR Pumps (Train B to Train A) With Level in the Pressurizer Datel
 
* Datel Datel (Operations Training Manager) ** Datel (Operations Representative)
JPM 152-1 Page 2 of 8 Rev. 0 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                 DESCRIPTION OF                     V     DATE   PAGES    PREPARED/
JPM 152-1 Page 1 of 8 Rev. 0
NUMBER                       REVISION                                     AFFECTED  REVISED BY:
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
0         New JPM based on JPM 152, changed to         Y   12/03/09   All  M Hankins swap from Train B to Train A RHR pump.
PREPARED!
v - Specify if the JPM change will require another validation (Y or N).
REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:
See cover sheet for criteria.
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 152-1 Swap RHR Pumps (Train B to Train A) With Level in the Pressurizer Datel
 
* Datel Datel (Operations Training Manager) ** Datel (Operations Representative)
JPM 1S2-1 Page 3 of 8 Rev. 0 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task:      Swap RHR Pumps (Train B to                 JAITA task # :  00S0030101    (RO)
JPM 152-1 Page 1 of 8 Rev. 0
Train A) with Level in the                                 00S0080101    (RO)
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
Pressurizer KIA Ratings:
NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 New JPM based on JPM 152, changed to Y 12/03/09 swap from Train B to Train A RHR pump. v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
00SK4.03 (2.9/3.2)                  00SA1.01 (3.S/3.6)            00SA4.02 (3.4/3.1) 00SK4.10 (3.1/3.1)                  OOSA 1 .02 (3.3/3.4)          00SA4.01 (3.6/3.4) 00SA4.01 (3.6/3.4)
PAGES AFFECTED All JPM 152-1 Page 2 of 8 Rev. 0 PREPARED/
REVISED BY: M Hankins NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 New JPM based on JPM 152, changed to Y 12/03/09 swap from Train B to Train A RHR pump. v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
PAGES AFFECTED All JPM 152-1 Page 2 of 8 Rev. 0 PREPARED/
REVISED BY: M Hankins Task: SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Swap RHR Pumps (Train B to Train A) with Level in the Pressurizer JAITA task # : KIA Ratings: 00SK4.03 (2.9/3.2) 00SK4.10 (3.1/3.1) 00SA4.01 (3.6/3.4)
Task Standard:
Task Standard:
00SA1.01 (3.S/3.6)
      'A' Train RHR is placed in service injecting to Loops 2 & 3.
OOSA 1 .02 (3.3/3.4)
Evaluation Method:       Simulator _--'X~_
'A' Train RHR is placed in service injecting to Loops 2 & 3. Evaluation Method: Simulator In-Plant __ _ 00S0030101 (RO) 00S0080101 (RO) 00SA4.02 (3.4/3.1) 00SA4.01 (3.6/3.4)
_-'X'-'---_ In-Plant _ __
JPM 1S2-1 Page 3 of 8 Rev. 0 ====================================================================================
====================================================================================
Performer:
Performer:
NAME Start time __ _ Performance Rating: SAT UNSAT Performance Time Finish time __ _ Evaluator:  
NAME                                               Start time _ __
/ ------SIGNATURE DATE ====================================================================================
Performance Rating: SAT               UNSAT           Performance Time               Finish time _ __
COMMENTS Task: SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Swap RHR Pumps (Train B to Train A) with Level in the Pressurizer JAITA task # : KIA Ratings: 00SK4.03 (2.9/3.2) 00SK4.10 (3.1/3.1) 00SA4.01 (3.6/3.4)
Evaluator:                                       1_ _ _,,--__
Task Standard:
                                                /- -----
00SA1.01 (3.S/3.6)
SIGNATURE             DATE
OOSA 1 .02 (3.3/3.4)
====================================================================================
'A' Train RHR is placed in service injecting to Loops 2 & 3. Evaluation Method: Simulator
COMMENTS
_-'X'-'---_
 
In-Plant __ _ 00S0030101 (RO) 00S0080101 (RO) 00SA4.02 (3.4/3.1) 00SA4.01 (3.6/3.4)
JPM 152-1 Page 4 of 8 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:
JPM 1S2-1 Page 3 of 8 Rev. 0 ====================================================================================
: 1. Initialize IC-197. Ensure Train B RHR is in service with flow aligned through FCV-63-94 to Loops 1 & 4.
Performer:
: 2. An extra operator will be required to acknowledge alarms and monitor S/G levels, RCS temp, RCS press.
NAME Start time __ _ Performance Rating: SAT UNSAT Performance Time Finish time __ _ Evaluator:
: 3. Any UNSAT requires comments
1 ___ ,,--__ SIGNATURE DATE ====================================================================================
: 4. Ensure operator performs the following required actions for SELF-CHECKING;
COMMENTS SPECIAL INSTRUCTIONS TO EVALUATOR:
: a. Identifies the correct unit, train, component, etc.
JPM 152-1 Page 4 of 8 Rev. 0 1. Initialize IC-197. Ensure Train B RHR is in service with flow aligned through FCV-63-94 to Loops 1 & 4. 2. An extra operator will be required to acknowledge alarms and monitor S/G levels, RCS temp, RCS press. 3. Any UNSAT requires comments 4. Ensure operator performs the following required actions for SELF-CHECKING;  
: b. Reviews the intended action and expected response.
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.  
: c. Compares the actual response to the expected response.
: c. Compares the actual response to the expected response.  
d.
: d. Validation Time: CR. 15 minutes Local Tools/Equipment/Procedures Needed: 0-SO-74-1, Section 8.
Validation Time: CR.       15 minutes           Local -
Tools/Equipment/Procedures Needed:
0-SO-74-1, Section 8.


==3.1 REFERENCES==
==3.1 REFERENCES==
:
Reference                                           Title                          Rev No.
Reference  
0-SO-74-1                                   Residual Heat Removal S stem                               69
-----Title 0-SO-74-1 Residual Heat Removal S stem =============================================================================
=============================================================================
READ TO OPERATOR Directions to Trainee: Rev No. 69 I will explain the initial conditions, and state the task to be performed.
READ TO OPERATOR Directions to Trainee:
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you and to indicate completion of your answer to a knowledge question return the written copy of the question to me. INITIAL CONDITIONS:  
When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 1. Unit 1 had been in Mode 5 for 72 hours to repair a leak on the #1 Steam Line. 2. RCS boron is 1400 ppm and the previous shift determined that Train A RHR boron concentration is 1450 ppm. 3. Shutdown margin required boron concentration is 1200 ppm. 4. Train B RHR pump needs to be shutdown to allow Maintenance to add oil to the motor. 5. Train A RHR has been checked out locally by the Auxiliary Bldg. AUO and is ready for service. The AUO is standing by in the Auxiliary Building INITIATING CUES: You are the Unit 1 OATC and the SRO has directed you to place Train A RHR in service and remove Train B RHR from service. Align Train A injection flowpath to loops 2 & 3. Notify the SRO when you have Train A RHR in service. SPECIAL INSTRUCTIONS TO EVALUATOR:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you and to indicate completion of your answer to a knowledge question return the written copy of the question to me.
JPM 152-1 Page 4 of 8 Rev. 0 1. Initialize IC-197. Ensure Train B RHR is in service with flow aligned through FCV-63-94 to Loops 1 & 4. 2. An extra operator will be required to acknowledge alarms and monitor S/G levels, RCS temp, RCS press. 3. Any UNSAT requires comments 4. Ensure operator performs the following required actions for SELF-CHECKING;
INITIAL CONDITIONS:
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: 1. Unit 1 had been in Mode 5 for 72 hours to repair a leak on the #1 Steam Line.
: c. Compares the actual response to the expected response.
: 2. RCS boron is 1400 ppm and the previous shift determined that Train A RHR boron concentration is 1450 ppm.
: d. Validation Time: CR. 15 minutes Local ____ _ Tools/Equipment/Procedures Needed: 0-SO-74-1, Section 8.
: 3. Shutdown margin required boron concentration is 1200 ppm.
: 4. Train B RHR pump needs to be shutdown to allow Maintenance to add oil to the motor.
: 5. Train A RHR has been checked out locally by the Auxiliary Bldg. AUO and is ready for service.
The AUO is standing by in the Auxiliary Building INITIATING CUES:
You are the Unit 1 OATC and the SRO has directed you to place Train A RHR in service and remove Train B RHR from service. Align Train A injection flowpath to loops 2 & 3.
Notify the SRO when you have Train A RHR in service.


==3.1 REFERENCES==
JPM 152-1 Page 5 of 8 Rev. 0 Job Performance Checklist:
:
STEP/STANDARD                                    SAT/UNSAT STEP 1.:       Obtain copy of 0-SO-74-1 and determine appropriate section                  -    SAT
Reference Title 0-SO-74-1 Residual Heat Removal S stem =============================================================================
                                                                                          -    UNSAT STANDARD: Operator obtains a copy of 0-SO-74-1 and determines Section 8.3.1 is the section for Placing Train A RHR liS.                                Start Time_ _
READ TO OPERATOR Directions to Trainee: Rev No. 69 I will explain the initial conditions, and state the task to be performed.
STEP 2.:      IF adjustment is required on CCS flow through RHR Hxs, THEN                -    SAT ENSURE [FCV-70-1561 RHR Hx B CCS outlet is THROTTLED.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
                                                                                            -  UNSAT NOTE:      Operator may decide to keep FCV-70-156 Open STANDARD: Operator ensures HS-70-156 has a RED & GREEN light LIT with flow indicated on O-M-27A.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you and to indicate completion of your answer to a knowledge question return the written copy of the question to me. INITIAL CONDITIONS:
STEP 3.:      ENSURE [FCV-74-161 RHR Hx A Outlet is CLOSED.                               -  SAT
: 1. Unit 1 had been in Mode 5 for 72 hours to repair a leak on the #1 Steam Line. 2. RCS boron is 1400 ppm and the previous shift determined that Train A RHR boron concentration is 1450 ppm. 3. Shutdown margin required boron concentration is 1200 ppm. 4. Train B RHR pump needs to be shutdown to allow Maintenance to add oil to the motor. 5. Train A RHR has been checked out locally by the Auxiliary Bldg. AUO and is ready for service. The AUO is standing by in the Auxiliary Building INITIATING CUES: You are the Unit 1 OATC and the SRO has directed you to place Train A RHR in service and remove Train B RHR from service. Align Train A injection flowpath to loops 2 & 3. Notify the SRO when you have Train A RHR in service.
                                                                                            -  UNSAT STANDARD: Operator ensures FCV-74-16 RHR Hx A Outlet CLOSED, HIC-74-28 @ 100%.
Job Performance Checklist:
STEP 4.:        START RHR Pump A-A with [HS-74-10AJ.                                       -  SAT
STEP/ST ANDARD STEP 1.: Obtain copy of 0-SO-74-1 and determine appropriate section STANDARD:
                                                                                            -  UNSAT STANDARD:    Operator should address making a plant announcement prior to starting 1A-A RHR Pump, Starts pump and verifies RED light LIT on      Critical Step HS, verifies amps.
Operator obtains a copy of 0-SO-74-1 and determines Section 8.3.1 is the section for Placing Train A RHR liS. STEP 2.: IF adjustment is required on CCS flow through RHR Hxs, THEN ENSURE [FCV-70-1561 RHR Hx B CCS outlet is THROTTLED.
STEP 5.:      VERIFY [FCV-74-121 RHR Pump A-A miniflow OPENS or greater than              -  SAT 500 gpm in indicated on FI-74-12.
NOTE: Operator may decide to keep FCV-70-156 Open STANDARD:
                                                                                            -  UNSAT Cue:      IF dispatched: FI-74-12 indicates >500 gpm.
Operator ensures HS-70-156 has a RED & GREEN light LIT with flow indicated on O-M-27 A. STEP 3.: ENSURE [FCV-74-161 RHR Hx A Outlet is CLOSED. STANDARD:
STANDARD: Operator verifies FCV-74-24 is open by Red light LIT on handswitch or checks with AUO locally to verify >500 gpm flow indicated on local flow indicator FI-4 7-24.
Operator ensures FCV-74-16 RHR Hx A Outlet CLOSED, HIC-74-28
STEP 6.:      IF aligning Train A RHR cooling to loops 2 and 3, THEN                      -  SAT PERFORM the following:
@ 100%. STEP 4.: START RHR Pump A-A with [HS-74-10AJ.
[a] ENSURE [FCV-63-93] OPEN.                                                 -  UNSAT STANDARD: Operator ensures FCV-63-93 OPEN, red light illuminated, green light dark.
STANDARD:
Critical Step
Operator should address making a plant announcement prior to starting 1 A-A RHR Pump, Starts pump and verifies RED light LIT on HS, verifies amps. STEP 5.: VERIFY [FCV-74-121 RHR Pump A-A miniflow OPENS or greater than 500 gpm in indicated on FI-74-12.
 
Cue: IF dispatched:
JPM 152-1 Page 6 of 8 Rev. 0 Job Performance Checklist:
FI-74-12 indicates
STEP/STANDARD                                    SAT/UNSAT STEP 7.:      [b] ADJUST [FCV-74-16] to establish flow from train B RHR.                   -  SAT
>500 gpm. STANDARD:
                                                                                              -   UNSAT STANDARD:     Operator adjusts FCV-74-16 RHR Hx A Outlet OPEN, using HIC-74-28.
Operator verifies FCV-74-24 is open by Red light LIT on handswitch or checks with AUO locally to verify >500 gpm flow indicated on local flow indicator FI-4 7-24. STEP 6.: IF aligning Train A RHR cooling to loops 2 and 3, THEN PERFORM the following:
Critical Step STEP 8.:       [c] ADJUST [FCV-74-281 AND [FCV-74-321 to reduce                            -   SAT Train B RHR flow.
[a] ENSURE [FCV-63-93]
                                                                                              -  UNSAT STANDARD:     Operator closes FCV-74-28 RHR Hx B Outlet, place HIC-74-28 to 0%.
OPEN. STANDARD:
Critical Step STEP 9.:       [d] VERIFY [FCV-74-241 RHR Pump B-B miniflow OPENS or greater              -  SAT than 500 gpm in indicated on FI-74-12.
Operator ensures FCV-63-93 OPEN, red light illuminated, green light dark. JPM 152-1 Page 5 of 8 Rev. 0 SAT/UNSAT SAT -UNSAT -Start Time __ SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
                                                                                              -  UNSAT Cue:       IF dispatched: FI-74-24 indicates >500 gpm.
STEP/ST ANDARD STEP 1.: Obtain copy of 0-SO-74-1 and determine appropriate section STANDARD:
STANDARD: Operator verifies FCV-74-24 is open by Red light LIT on handswitch or checks with AUO locally to verify >500 gpm flow indicated on local flow indicator FI-47-24.
Operator obtains a copy of 0-SO-74-1 and determines Section 8.3.1 is the section for Placing Train A RHR liS. STEP 2.: IF adjustment is required on CCS flow through RHR Hxs, THEN ENSURE [FCV-70-1561 RHR Hx B CCS outlet is THROTTLED.
STEP 10.:       [e] CLOSE [FCV-74-351 RHR Hx B Outlet.                                    -  SAT
NOTE: Operator may decide to keep FCV-70-156 Open STANDARD:
                                                                                              -   UNSAT STANDARD:      Operator closes FCV-74-35, green light illuminated, red light dark.
Operator ensures HS-70-156 has a RED & GREEN light LIT with flow indicated on O-M-27 A. STEP 3.: ENSURE [FCV-74-161 RHR Hx A Outlet is CLOSED. STANDARD:
Critical Step STEP 11.:     [f] ENSURE [FCV-74-331 RHR Hx A Outlet OPEN.                                 -  SAT STANDARD: Operator ensures FCV-74-33 RHR Hx A Outlet OPEN, red light                     -   UNSAT illuminated, green light dark.
Operator ensures FCV-74-16 RHR Hx A Outlet CLOSED, HIC-74-28
STEP 12.:     [g] OPEN [VLV-74-530J RHR Hx A to Letdown Hx.                               -  SAT NOTE:     Console operator needs to modify remote function RHR03 to 100.              -   UNSAT Cue:      AUO reports that VLV-74-530 has been opened locally, operator should dicuss the need for cv.                                         Critical Step STANDARD: Operator directs an AUO to OPEN VLV-74-530 RHR Hx A to Letdown Hx.
@ 100%. STEP 4.: START RHR Pump A-A with [HS-74-10AJ.
 
STANDARD:
JPM 152-1 Page 7 of 8 Rev. 0 Job Performance Checklist:
Operator should address making a plant announcement prior to starting 1 A-A RHR Pump, Starts pump and verifies RED light LIT on HS, verifies amps. STEP 5.: VERIFY [FCV-74-121 RHR Pump A-A miniflow OPENS or greater than 500 gpm in indicated on FI-74-12.
STEP/STANDARD                                SAT/UNSAT STEP 13.:      [h] STOP RHR Pump B-B with [HS-74-20Al.                                  -   SAT
Cue: IF dispatched:
                                                                                        -   UNSAT STANDARD: Operator stops RHR pump 1A-A, verifies GREEN light on handswitch.
FI-74-12 indicates
Critical Step STEP 14.:      [i] OPEN [HCV-74-36] RHR Hx A Bypass.                                    -  SAT NOTE:      Console operator needs to modify remote function RHR06 to 100.          -   UNSAT Cue:      Open HCV-74-36 as an AUO locally (including IV).
>500 gpm. STANDARD:
Critical Step STANDARD: Operator directs an AUO to OPEN HCV-74-37 RHR Hx B Bypass.
Operator verifies FCV-74-24 is open by Red light LIT on handswitch or checks with AUO locally to verify >500 gpm flow indicated on local flow indicator FI-4 7-24. STEP 6.: IF aligning Train A RHR cooling to loops 2 and 3, THEN PERFORM the following:
STEP 15.:     [j] CLOSE [HCV-74-37] RHR Hx B Bypass.                                   -  SAT NOTE:      Console operator needs to modify remote function RHR07 to O.             -  UNSAT Cue:       AUO reports HCV-74-37 has been closed locally (including CV).
[a] ENSURE [FCV-63-93]
Critical Step STANDARD: Operator directs an AUO to CLOSE HCV-74-37 RHR Hx B Bypass.
OPEN. STANDARD:
STEP 16.:     [k] CLOSE rVLV-74-5311 RHR Hx B-B to Letdown Hx.                        -   SAT NOTE:      Console operator needs to modify remote function RHR04 to O.           -  UNSAT Cue:       AUO report s VLV-74-531 has been closed an AUO locally (including CV).
Operator ensures FCV-63-93 OPEN, red light illuminated, green light dark. JPM 152-1 Page 5 of 8 Rev. 0 SAT/UNSAT SAT -UNSAT -Start Time __ SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
STANDARD: Operator directs an AUO to close HCV-74-531.
STEP/ST ANDARD STEP 7.: [b] ADJUST [FCV-74-16]
STEP 17.:     [I] ENSURE (FCV-63-941 CLOSED.                                           -  SAT
to establish flow from train B RHR. STANDARD:
                                                                                        -  UNSAT STANDARD: Operator ensures FCV-63-94 CLOSED, green light illuminated, red light dark                                                                Critical Step STEP 18.:     IF aligning RHR cooling to loops 1 and 4, THEN ENSURE the following      -   SAT valves are in the required position.
Operator adjusts FCV-74-16 RHR Hx A Outlet OPEN, using HIC-74-28.
                                                                                        -   UNSAT NOTE:     Step is NA'd, initiating Cues direct alignment to loops 2 & 3.
STEP 8.: [c] ADJUST [FCV-74-281 AND [FCV-74-321 to reduce Train B RHR flow. STANDARD:
STANDARD: Operator NA's the step.
Operator closes FCV-74-28 RHR Hx B Outlet, place HIC-74-28 to 0%. STEP 9.: [d] VERIFY [FCV-74-241 RHR Pump B-B miniflow OPENS or greater than 500 gpm in indicated on FI-74-12.
 
Cue: IF dispatched:
JPM 152-1 Page 8 of 8 Rev. 0 Job Performance Checklist:
FI-74-24 indicates
STEP/STANDARD                              SAT/UNSAT STEP 19.:      THROTTLE one or both of the following to maintain desired cooling      -   SAT rate:
>500 gpm. STANDARD:
FCV-74-16, RHR Hx A Outlet, AND/OR                                    -   UNSAT FCV-74-32, RHR Hx Bypass.
Operator verifies FCV-74-24 is open by Red light LIT on handswitch or checks with AUO locally to verify >500 gpm flow indicated on local flow indicator FI-47-24.
STANDARD: Operator throttles open FCV-74-16 and/or FCV-74-32 to stabilize RCS  Critical Step temperature and establish RHR flowrates at approximately the same values that were present prior to the flowpath realignment.
STEP 10.: [e] CLOSE [FCV-74-351 RHR Hx B Outlet. STANDARD:
STEP 20.:     WHEN injection flow is> 1250 gpm, THEN VERIFY £FCV-74-12J RHR          -   SAT Pump A-A miniflow is CLOSED.
Operator closes FCV-74-35, green light illuminated, red light dark. STEP 11.: [f] ENSURE [FCV-74-331 RHR Hx A Outlet OPEN. STANDARD:
                                                                                      -  UNSAT STANDARD: Operator verifies FCV-74-24 closed, GREEN light LIT on handswitch.
Operator ensures FCV-74-33 RHR Hx A Outlet OPEN, red light ,-illuminated, green light dark. STEP 12.: [g] OPEN [VLV-74-530J RHR Hx A to Letdown Hx. NOTE: Console operator needs to modify remote function RHR03 to 100. Cue: AUO reports that VLV-74-530 has been opened locally, operator should dicuss the need for cv. STANDARD:
STEP 21.:     IF cooling water is to be removed from Train B Hx, THEN                -  SAT CLOSE £FCV-70-153].
Operator directs an AUO to OPEN VLV-74-530 RHR Hx A to Letdown Hx. JPM 152-1 Page 6 of 8 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
                                                                                      -   UNSAT Cue:      Leave cooling water aligned to Train B at its current flowrate.
STEP/ST ANDARD STEP 7.: [b] ADJUST [FCV-74-16]
STANDARD: Operator NA's step.
to establish flow from train B RHR. STANDARD:
STEP 22.:     NOTIFY U1 US that Train A of RHR is in service to loops 2 & 3 and      -   SAT Train B of RHR has been removed from service.
Operator adjusts FCV-74-16 RHR Hx A Outlet OPEN, using HIC-74-28.
                                                                                      -   UNSAT STANDARD: None.                                                                Stop Time_ _
STEP 8.: [c] ADJUST [FCV-74-281 AND [FCV-74-321 to reduce Train B RHR flow. STANDARD:
End of JPM
Operator closes FCV-74-28 RHR Hx B Outlet, place HIC-74-28 to 0%. STEP 9.: [d] VERIFY [FCV-74-241 RHR Pump B-B miniflow OPENS or greater than 500 gpm in indicated on FI-74-12.
 
Cue: IF dispatched:
READ TO OPERATOR Directions to Trainee:
FI-74-24 indicates
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
>500 gpm. STANDARD:
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Operator verifies FCV-74-24 is open by Red light LIT on handswitch or checks with AUO locally to verify >500 gpm flow indicated on local flow indicator FI-47-24.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you and to indicate completion of your answer to a knowledge question return the written copy of the question to me.
STEP 10.: [e] CLOSE [FCV-74-351 RHR Hx B Outlet. STANDARD:
INITIAL CONDITIONS:
Operator closes FCV-74-35, green light illuminated, red light dark. STEP 11.: [f] ENSURE [FCV-74-331 RHR Hx A Outlet OPEN. STANDARD:
: 1. Unit 1 had been in Mode 5 for 72 hours to repair a leak on the #1 Steam Line.
Operator ensures FCV-74-33 RHR Hx A Outlet OPEN, red light ,-illuminated, green light dark. STEP 12.: [g] OPEN [VLV-74-530J RHR Hx A to Letdown Hx. NOTE: Console operator needs to modify remote function RHR03 to 100. Cue: AUO reports that VLV-74-530 has been opened locally, operator should dicuss the need for cv. STANDARD:
: 2. RCS boron is 1400 ppm and the previous shift determined that Train A RHR boron concentration is 1450 ppm.
Operator directs an AUO to OPEN VLV-74-530 RHR Hx A to Letdown Hx. JPM 152-1 Page 6 of 8 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
: 3. Shutdown margin required boron concentration is 1200 ppm.
STEP/ST ANDARD STEP 13.: [h] STOP RHR Pump B-B with [HS-74-20Al.
: 4. Train B RHR pump needs to be shutdown to allow Maintenance to add oil to the motor.
STANDARD:
: 5. Train A RHR has been checked out locally by the Auxiliary Bldg. AUO and is ready for service.
Operator stops RHR pump 1A-A, verifies GREEN light on handswitch.
The AUO is standing by in the Auxiliary Building INITIATING CUES:
STEP 14.: [i] OPEN [HCV-74-36]
You aJe the Unit 1 OATC and the SRO has directed you to place Train A RHR in service and remove Train~B.IjR from service. Align Train A injection flowpath to loops 2 & 3.
RHR Hx A Bypass. NOTE: Console operator needs to modify remote function RHR06 to 100. Cue: Open HCV-74-36 as an AUO locally (including IV). STANDARD:
Notify the SRO when you have Train A RHR in service.
Operator directs an AUO to OPEN HCV-74-37 RHR Hx B Bypass. STEP 15.: [j] CLOSE [HCV-74-37]
 
RHR Hx B Bypass. NOTE: Console operator needs to modify remote function RHR07 to O. Cue: AUO reports HCV-74-37 has been closed locally (including CV). STANDARD:
JPM # 34-1 Page 1 of 11 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 34-1 Establishing Secondary Heat Sink Using Main Feedwater or Condensate PREPARED!
Operator directs an AUO to CLOSE HCV-74-37 RHR Hx B Bypass. STEP 16.: [k] CLOSE rVLV-74-5311 RHR Hx B-B to Letdown Hx. NOTE: Console operator needs to modify remote function RHR04 to O. Cue: AUO report s VLV-74-531 has been closed an AUO locally (including CV). STANDARD:
REVISED BY:                                                             Date!
Operator directs an AUO to close HCV-74-531.
VALIDATED BY: _**_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _---=D=-:a::..:;te==-!    Date! _ _ _ _ __
STEP 17.: [I] ENSURE (FCV-63-941 CLOSED. STANDARD:
              --------------------------------~~=-----------
Operator ensures FCV-63-94 CLOSED, green light illuminated, red light dark STEP 18.: IF aligning RHR cooling to loops 1 and 4, THEN ENSURE the following valves are in the required position.
APPROVED BY:                                                           Date/
NOTE: Step is NA'd, initiating Cues direct alignment to loops 2 & 3. STANDARD:
(Operations Training Manager)
Operator NA's the step. JPM 152-1 Page 7 of 8 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Job Performance Checklist:
CONCURRED:     **                                                        Date/
STEP/ST ANDARD STEP 13.: [h] STOP RHR Pump B-B with [HS-74-20Al.
(Operations Representative)
STANDARD:
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
Operator stops RHR pump 1A-A, verifies GREEN light on handswitch.
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
STEP 14.: [i] OPEN [HCV-74-36]
 
RHR Hx A Bypass. NOTE: Console operator needs to modify remote function RHR06 to 100. Cue: Open HCV-74-36 as an AUO locally (including IV). STANDARD:
JPM # 34-1 Page 2 of 11 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                DESCRIPTION OF                      V    DATE    PAGES    PREPARED/
Operator directs an AUO to OPEN HCV-74-37 RHR Hx B Bypass. STEP 15.: [j] CLOSE [HCV-74-37]
NUMBER                        REVISION                                    AFFECTED REVISED BY:
RHR Hx B Bypass. NOTE: Console operator needs to modify remote function RHR07 to O. Cue: AUO reports HCV-74-37 has been closed locally (including CV). STANDARD:
0                        Initial issue                  Y    12/03/09    All    M Hankins v - Specify if the JPM change will require another validation (Y or N).
Operator directs an AUO to CLOSE HCV-74-37 RHR Hx B Bypass. STEP 16.: [k] CLOSE rVLV-74-5311 RHR Hx B-B to Letdown Hx. NOTE: Console operator needs to modify remote function RHR04 to O. Cue: AUO report s VLV-74-531 has been closed an AUO locally (including CV). STANDARD:
See cover sheet for criteria.
Operator directs an AUO to close HCV-74-531.
 
STEP 17.: [I] ENSURE (FCV-63-941 CLOSED. STANDARD:
JPM # 34-1 Page 3 of 11 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task:   Establishing Secondary Heat sink using Main Feedwater or Condensate System JA/TAtask#: 3110060601          (RO) 0100040101      (RO)
Operator ensures FCV-63-94 CLOSED, green light illuminated, red light dark STEP 18.: IF aligning RHR cooling to loops 1 and 4, THEN ENSURE the following valves are in the required position.
KIA Ratings:
NOTE: Step is NA'd, initiating Cues direct alignment to loops 2 & 3. STANDARD:
WE05 EA2.1 (3.4/4.4)
Operator NA's the step. JPM 152-1 Page 7 of 8 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -
Job Performance Checklist:
STEP/STANDARD STEP 19.: THROTTLE one or both of the following to maintain desired cooling rate: FCV-74-16, RHR Hx A Outlet, AND/OR FCV-74-32, RHR Hx Bypass. STANDARD:
Operator throttles open FCV-74-16 and/or FCV-74-32 to stabilize RCS temperature and establish RHR flowrates at approximately the same values that were present prior to the flowpath realignment.
STEP 20.: WHEN injection flow is> 1250 gpm, THEN VERIFY £FCV-74-12J RHR Pump A-A miniflow is CLOSED. STANDARD:
Operator verifies FCV-74-24 closed, GREEN light LIT on handswitch.
STEP 21.: IF cooling water is to be removed from Train B Hx, THEN CLOSE £FCV-70-153].
Cue: Leave cooling water aligned to Train B at its current flowrate.
STANDARD:
Operator NA's step. STEP 22.: NOTIFY U1 US that Train A of RHR is in service to loops 2 & 3 and Train B of RHR has been removed from service. STANDARD:
None. End of JPM JPM 152-1 Page 8 of 8 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Stop Time __ Job Performance Checklist:
STEP/STANDARD STEP 19.: THROTTLE one or both of the following to maintain desired cooling rate: FCV-74-16, RHR Hx A Outlet, AND/OR FCV-74-32, RHR Hx Bypass. STANDARD:
Operator throttles open FCV-74-16 and/or FCV-74-32 to stabilize RCS temperature and establish RHR flowrates at approximately the same values that were present prior to the flowpath realignment.
STEP 20.: WHEN injection flow is> 1250 gpm, THEN VERIFY £FCV-74-12J RHR Pump A-A miniflow is CLOSED. STANDARD:
Operator verifies FCV-74-24 closed, GREEN light LIT on handswitch.
STEP 21.: IF cooling water is to be removed from Train B Hx, THEN CLOSE £FCV-70-153].
Cue: Leave cooling water aligned to Train B at its current flowrate.
STANDARD:
Operator NA's step. STEP 22.: NOTIFY U1 US that Train A of RHR is in service to loops 2 & 3 and Train B of RHR has been removed from service. STANDARD:
None. End of JPM JPM 152-1 Page 8 of 8 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Stop Time __
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you and to indicate completion of your answer to a knowledge question return the written copy of the question to me. INITIAL CONDITIONS:
: 1. Unit 1 had been in Mode 5 for 72 hours to repair a leak on the #1 Steam Line. 2. RCS boron is 1400 ppm and the previous shift determined that Train A RHR boron concentration is 1450 ppm. 3. Shutdown margin required boron concentration is 1200 ppm. 4. Train B RHR pump needs to be shutdown to allow Maintenance to add oil to the motor. 5. Train A RHR has been checked out locally by the Auxiliary Bldg. AUO and is ready for service. The AUO is standing by in the Auxiliary Building INITIATING CUES: You aJe the Unit 1 OATC and the SRO has directed you to place Train A RHR in service and remove from service. Align Train A injection flowpath to loops 2 & 3. Notify the SRO when you have Train A RHR in service. READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you and to indicate completion of your answer to a knowledge question return the written copy of the question to me. INITIAL CONDITIONS:
: 1. Unit 1 had been in Mode 5 for 72 hours to repair a leak on the #1 Steam Line. 2. RCS boron is 1400 ppm and the previous shift determined that Train A RHR boron concentration is 1450 ppm. 3. Shutdown margin required boron concentration is 1200 ppm. 4. Train B RHR pump needs to be shutdown to allow Maintenance to add oil to the motor. 5. Train A RHR has been checked out locally by the Auxiliary Bldg. AUO and is ready for service. The AUO is standing by in the Auxiliary Building INITIATING CUES: You aJe the Unit 1 OATC and the SRO has directed you to place Train A RHR in service and remove from service. Align Train A injection flowpath to loops 2 & 3. Notify the SRO when you have Train A RHR in service.
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 34-1 JPM # 34-1 Page 1 of 11 Establishing Secondary Heat Sink Using Main Feedwater or Condensate PREPARED!
REVISED BY: Date! VALIDATED BY:
* Date!
APPROVED BY: CONCURRED:
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 34-1 JPM # 34-1 Page 1 of 11 Establishing Secondary Heat Sink Using Main Feedwater or Condensate PREPARED!
REVISED BY: Date! VALIDATED BY: _* ________________
---=D=-:a::..:;te==-!
_____ _ APPROVED BY: CONCURRED:
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Initial issue Y 12/03/09 v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
PAGES AFFECTED All JPM # 34-1 Page 2 of 11 PREPARED/
REVISED BY: M Hankins NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Initial issue Y 12/03/09 v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
PAGES AFFECTED All JPM # 34-1 Page 2 of 11 PREPARED/
REVISED BY: M Hankins SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task: Establishing Secondary Heat sink using Main Feedwater or Condensate System JA/TAtask#:
3110060601 (RO) 0100040101 (RO) KIA Ratings: WE05 EA2.1 (3.4/4.4)
Task Standard:
Task Standard:
JPM # 34-1 Page 3 of 11 Loss of Secondary Heat Sink, Establish Secondary Heat Sink Using Main Feedwater or Condensate System Evaluation Method: Simulator In-Plant ---====================================================================================
Loss of Secondary Heat Sink, Establish Secondary Heat Sink Using Main Feedwater or Condensate System Evaluation Method:     Simulator _~X~_
X
                                  -~--
In-Plant -
====================================================================================
Performer:
Performer:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
NAME                                                 Start Time _ __
SIGNATURE DATE ====================================================================================
Performance Rating:   SAT         UNSAT         Performance Time                 Finish Time _
COMMENTS SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task: Establishing Secondary Heat sink using Main Feedwater or Condensate System JA/TAtask#:
Evaluator:       ------------------~------~/_--
3110060601 (RO) 0100040101 (RO) KIA Ratings: WE05 EA2.1 (3.4/4.4)
                --------~~-=~~--------/-=-=~
Task Standard:
SIGNATURE                 DATE
JPM # 34-1 Page 3 of 11 Loss of Secondary Heat Sink, Establish Secondary Heat Sink Using Main Feedwater or Condensate System Evaluation Method: Simulator X In-Plant __ _ ====================================================================================
====================================================================================
Performer:
COMMENTS
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
 
SIGNATURE DATE ====================================================================================
JPM # 34-1 Page 4 of 11 SPECIAL INSTRUCTIONS TO EVALUATOR:
COMMENTS JPM # 34-1 Page 4 of 11 SPECIAL INSTRUCTIONS TO EVALUATOR: 1 . Critical steps are identified.  
: 1.       Critical steps are identified.
: 2. Any UNSAT requires comments 3. Acknowledge any associated alarms. 4. Initialize simulator in IC: 119 Steam Dump Pressure Mode Setpoint-968 psig All AFW pumps are shutdown, MDAFW A-A tagged, TDAFW pump and MDAFW 8-8 trip on Reactor Trip. RX trip due Rod control problems (multiple rod drops), adjust steam dumps in pressure mode to control Tavg 544-546°F.  
: 2.       Any UNSAT requires comments
: 5. Allow S/G narrow range levels are <-20%. (allow SD to steam off to reduce S/G level if necessary)  
: 3.       Acknowledge any associated alarms.
: 6. Console operator will role playas CRO and acknowledge/clear alarms as needed. 7. Ensure operator performs the following required actions for SELF-CHECKING;  
: 4.       Initialize simulator in IC: 119 Steam Dump Pressure Mode Setpoint-968 psig All AFW pumps are shutdown, MDAFW A-A tagged, TDAFW pump and MDAFW 8-8 trip on Reactor Trip. RX trip due Rod control problems (multiple rod drops), adjust steam dumps in pressure mode to control Tavg 544-546&deg;F.
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.  
: 5.       Allow S/G narrow range levels are <-20%. (allow SD to steam off to reduce S/G level if necessary)
: 6.       Console operator will role playas CRO and acknowledge/clear alarms as needed.
: 7.       Ensure operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc.
: b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR. 30 mins Local ____ _ Tools/Equipment/Procedures Needed: EA-2-2  
Validation Time: CR.       30 mins                 _-
Local -  __ -_ -_-
Tools/Equipment/Procedures Needed:
EA-2-2


==References:==
==References:==


Reference Title Rev No. 1. EA-2-2 Establishing Secondary Heat sink using Main 8 Feedwater or Condensate  
Reference                                           Title                           Rev No.
====================================================================================
: 1. EA-2-2                                       Establishing Secondary Heat sink using Main               8 Feedwater or Condensate
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
  ====================================================================================
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
READ TO OPERATOR Directions to Trainee:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
: 1. Unit 1 has experienced a Reactor Trip due multiple dropped rods. 2. MDAFW pump A-A is tagged out for maintenance, MDAFW pump 8-8 tripped on electrical fault and the TDAFW pump tripped on electrical overs peed just after RX trip. 3. Unit has transitioned to ES-O.1 and are ready to perform the RNO for STEP 5. 4. All four S/G levels have been decreasing.  
When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 5. AFW Flow to the S/Gs can NOT be established.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIATING CUES: 1. You are the eRO and the US directed you to establish main feedwater flow USING EA-2-2, Establishing Secondary Heat sink Using Main Feedwater or Condensate System. 2. Inform the US when Main Feedwater or Condensate flow has been established.
INITIAL CONDITIONS:
JPM # 34-1 Page 4 of 11 SPECIAL INSTRUCTIONS TO EVALUATOR: 1 . Critical steps are identified.
: 1.       Unit 1 has experienced a Reactor Trip due multiple dropped rods.
: 2. Any UNSAT requires comments 3. Acknowledge any associated alarms. 4. Initialize simulator in IC: 119 Steam Dump Pressure Mode Setpoint-968 psig All AFW pumps are shutdown, MDAFW A-A tagged, TDAFW pump and MDAFW 8-8 trip on Reactor Trip. RX trip due Rod control problems (multiple rod drops), adjust steam dumps in pressure mode to control Tavg 544-546&deg;F.
: 2.       MDAFW pump A-A is tagged out for maintenance, MDAFW pump 8-8 tripped on electrical fault and the TDAFW pump tripped on electrical overs peed just after RX trip.
: 5. Allow S/G narrow range levels are <-20%. (allow SD to steam off to reduce S/G level if necessary)
: 3.       Unit has transitioned to ES-O.1 and are ready to perform the RNO for STEP 5.
: 6. Console operator will role playas CRO and acknowledge/clear alarms as needed. 7. Ensure operator performs the following required actions for SELF-CHECKING;
: 4.       All four S/G levels have been decreasing.
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: 5.       AFW Flow to the S/Gs can NOT be established.
: c. Compares the actual response to the expected response.
INITIATING CUES:
Validation Time: CR. 30 mins Local -----Tools/Equipment/Procedures Needed: EA-2-2
: 1.       You are the eRO and the US directed you to establish main feedwater flow USING EA-2-2, Establishing Secondary Heat sink Using Main Feedwater or Condensate System.
: 2.       Inform the US when Main Feedwater or Condensate flow has been established.


==References:==
JPM # 34 Page 5 of 11 Rev 0 STEP 1.:     Obtain copy of the appropriate procedure.                                -    SAT
                                                                                      -    UNSAT STANDARD: Operator may obtain a copy of ES-O.1 and review step 5 RNO.
Start Time_ _
STEP 2.:    IF directed by ES-0.1, Reactor Trip Response, to establish main          -    SAT Feedwater flow, THEN PERFORM Section 4.2.
                                                                                      -    UNSAT STANDARD: Operator recognizes Section 4.2 is the correct section for performance.
Critical Step STEP 3.      REFER TO the following EAPs to attempt to restore AFW flow in parallel with this procedure:
* EA-3-10 Establishing MDAFW flow                                  -    SAT
* EA-3-9, establishing TDAFW flow
                                                                                      -    UNSAT CUE:      Maintenance and Ops personnel have been dispatched to restore MDAFW pumps A and B and the TDAFWP, EA-3-10 and EA-3-9 are in progress.
STANDARD: Operator contacts the US and or the MSS to have personnel dispatched to establish AFW flow.
STEP 4.:    CLOSE MFW Regulating valves.                                            -    SAT
                                                                                      -    UNSAT STANDARD: Operator ensures the MFW reg valves output signal is zero, on 1-FIC 3-35, 48, 90 and 103 and check lights for MFW reg valves on 1-XX-3-35.
STEP 5.:    ENSURE MFW regulating bypass valves CLOSED.                              -    SAT STANDARD:        Operator ensures MFW bypass valves CLOSED using                -    UNSAT 1-LlC-3-35, 48, 90, 103 STEP 6.:    CYCLE Reactor Trip breakers.                                            -    SAT STANDARD: Operator places 1-HS-99-7 in the CLOSE position, and places 1-RT-1        -    UNSAT in the trip position. Rx trip breaker lights turn red and then green.
Critical Step STEP 7.:    RESET FW Isolation signal.                                              -    SAT
                                                                                      -    UNSAT STANDARD: Operator depresses push buttons 1-HS-3-99A and 99B, and Annunciator Window 1-XA-55-6B, LOW Tavg Reactor Trip MFW          Critical Step Vales Actuated alarm clears.


Reference Title Rev No. 1. EA-2-2 Establishing Secondary Heat sink using Main 8 Feedwater or Condensate
JPM # 34 Page 6 of 11 Rev 0 STEP 8.:   OPEN FW isolation vavles for S/G's to be fed.                                 SAT
====================================================================================
                                                                                    -    UNSAT STANDARD: Operator opens applicable FWI valves, using 1-HS-3-33A, 47A, 87A and 100A.                                                             Critical Step STEP 9.:    PERFORM Section 4.4 to establish manin feedwater flow to S/G's.         -    SAT
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
                                                                                    -    UNSAT STANDARD: Operator transitions to Section 4.4.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
STEP 10.:   DISPATCH operator to PERFROM Appendix A, Part I to remove fuses          -    SAT to disable intermediate heater string Isolation.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
                                                                                    -    UNSAT Cue      Respond as an AUO and tell operator you will perform Appendix A to remove fuses to disable intermediate heater string isolation.
: 1. Unit 1 has experienced a Reactor Trip due multiple dropped rods. 2. MDAFW pump A-A is tagged out for maintenance, MDAFW pump 8-8 tripped on electrical fault and the TDAFW pump tripped on electrical overs peed just after RX trip. 3. Unit has transitioned to ES-O.1 and are ready to perform the RNO for STEP 5. 4. All four S/G levels have been decreasing.  
: 5. AFW Flow to the S/Gs can NOT be established.
INITIATING CUES: 1. You are the eRO and the US directed you to establish main feedwater flow USING EA-2-2, Establishing Secondary Heat sink Using Main Feedwater or Condensate System. 2. Inform the US when Main Feedwater or Condensate flow has been established.
STEP 1.: Obtain copy of the appropriate procedure.
STANDARD:
STANDARD:
Operator may obtain a copy of ES-O.1 and review step 5 RNO. STEP 2.: IF directed by ES-0.1, Reactor Trip Response, to establish main Feedwater flow, THEN PERFORM Section 4.2. STANDARD:
STEP 11.:   ENSURE Condensate inlet and outlet vavles for at least one LP heater     -    SAT String OPEN.
Operator recognizes Section 4.2 is the correct section for performance.
                                                                                    -    UNSAT STANDARD: Operator verfies LP Heater Inlet/Outlet valves OPEN, red light and green lights illuminated for 1-HS 2-46A, 66A, 56A, 55A, 65A and 75A.
STEP 3. REFER TO the following EAPs to attempt to restore AFW flow in parallel with this procedure:
STEP 12.:   ENSURE the following condensate pumps RUNNING:                           -    SAT
* EA-3-10 Establishing MDAFW flow
* EA-3-9, establishing TDAFW flow CUE: Maintenance and Ops personnel have been dispatched to restore MDAFW pumps A and B and the TDAFWP, EA-3-10 and EA-3-9 are in progress.
STANDARD:
Operator contacts the US and or the MSS to have personnel dispatched to establish AFW flow. STEP 4.: CLOSE MFW Regulating valves. STANDARD:
Operator ensures the MFW reg valves output signal is zero, on 1-FIC 3-35, 48, 90 and 103 and check lights for MFW reg valves on 1-XX-3-35.
STEP 5.: ENSURE MFW regulating bypass valves CLOSED. STANDARD:
Operator ensures MFW bypass valves CLOSED using 1-LlC-3-35, 48, 90, 103 STEP 6.: CYCLE Reactor Trip breakers.
STANDARD:
Operator places 1-HS-99-7 in the CLOSE position, and places 1-RT-1 in the trip position.
Rx trip breaker lights turn red and then green. STEP 7.: RESET FW Isolation signal. STANDARD:
Operator depresses push buttons 1-HS-3-99A and 99B, and Annunciator Window 1-XA-55-6B, LOW Tavg Reactor Trip MFW Vales Actuated alarm clears. JPM # 34 Page 5 of 11 Rev 0 SAT -UNSAT -Start Time __ SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step STEP 1.: Obtain copy of the appropriate procedure.
STANDARD:
Operator may obtain a copy of ES-O.1 and review step 5 RNO. STEP 2.: IF directed by ES-0.1, Reactor Trip Response, to establish main Feedwater flow, THEN PERFORM Section 4.2. STANDARD:
Operator recognizes Section 4.2 is the correct section for performance.
STEP 3. REFER TO the following EAPs to attempt to restore AFW flow in parallel with this procedure:
* EA-3-10 Establishing MDAFW flow
* EA-3-9, establishing TDAFW flow CUE: Maintenance and Ops personnel have been dispatched to restore MDAFW pumps A and B and the TDAFWP, EA-3-10 and EA-3-9 are in progress.
STANDARD:
Operator contacts the US and or the MSS to have personnel dispatched to establish AFW flow. STEP 4.: CLOSE MFW Regulating valves. STANDARD:
Operator ensures the MFW reg valves output signal is zero, on 1-FIC 3-35, 48, 90 and 103 and check lights for MFW reg valves on 1-XX-3-35.
STEP 5.: ENSURE MFW regulating bypass valves CLOSED. STANDARD:
Operator ensures MFW bypass valves CLOSED using 1-LlC-3-35, 48, 90, 103 STEP 6.: CYCLE Reactor Trip breakers.
STANDARD:
Operator places 1-HS-99-7 in the CLOSE position, and places 1-RT-1 in the trip position.
Rx trip breaker lights turn red and then green. STEP 7.: RESET FW Isolation signal. STANDARD:
Operator depresses push buttons 1-HS-3-99A and 99B, and Annunciator Window 1-XA-55-6B, LOW Tavg Reactor Trip MFW Vales Actuated alarm clears. JPM # 34 Page 5 of 11 Rev 0 SAT -UNSAT -Start Time __ SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step STEP 8.: OPEN FW isolation vavles for S/G's to be fed. STANDARD:
Operator opens applicable FWI valves, using 1-HS-3-33A, 47A, 87A and 100A. STEP 9.: PERFORM Section 4.4 to establish manin feedwater flow to S/G's. STANDARD:
Operator transitions to Section 4.4. STEP 10.: DISPATCH operator to PERFROM Appendix A, Part I to remove fuses to disable intermediate heater string Isolation.
Cue Respond as an AUO and tell operator you will perform Appendix A to remove fuses to disable intermediate heater string isolation.
STANDARD:
STEP 11.: ENSURE Condensate inlet and outlet vavles for at least one LP heater String OPEN. STANDARD:
Operator verfies LP Heater Inlet/Outlet valves OPEN, red light and green lights illuminated for 1-HS 2-46A, 66A, 56A, 55A, 65A and 75A. STEP 12.: ENSURE the following condensate pumps RUNNING:
* 2 Hotwell pumps
* 2 Hotwell pumps
* 1 CBP (suction valve open)
* 1 CBP (suction valve open)                                       -    UNSAT
* 1 Injection water pump STANDARD:
* 1 Injection water pump STANDARD: Operator ensures 2 HW pumps, 1 CBP with suction valve open and 1 injection water pump running.
Operator ensures 2 HW pumps, 1 CBP with suction valve open and 1 injection water pump running. STEP 13.: ENSURE MFPT Recirc Valves in MANUAL and CLOSED: STANDARD:
STEP 13.:   ENSURE MFPT Recirc Valves in MANUAL and CLOSED:                         -    SAT STANDARD: Operator ensures recirc valves for the MFP's are in manual and closed,   -    UNSAT 1-FIC-3-70 and 3-84.
Operator ensures recirc valves for the MFP's are in manual and closed, 1-FIC-3-70 and 3-84. STEP 14.: ENSURE MFW reg controllers in MANUAL and CLOSED: STANDARD:
STEP 14.:   ENSURE MFW reg controllers in MANUAL and CLOSED:                         -    SAT STANDARD: Operator ensures Main FRV are in manual and closed using 1-FIC       -   UNSAT 35, 48, 90, 103, and checks status lights green on 1-XX-3-35.
Operator ensures Main FRV are in manual and closed using 1-FIC-3-35, 48, 90, 103, and checks status lights green on 1-XX-3-35.
 
JPM # 34 Page 6 of 11 Rev 0 SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -STEP 8.: OPEN FW isolation vavles for S/G's to be fed. STANDARD:
JPM # 34 Page 7 of 11 Rev 0 STEP 1S.:  ENSURE MFW bypass reg valves controllers in MANUAL and output              -  SAT ZERO.
Operator opens applicable FWI valves, using 1-HS-3-33A, 47A, 87A and 100A. STEP 9.: PERFORM Section 4.4 to establish manin feedwater flow to S/G's. STANDARD:
                                                                                      -   UNSAT STANDARD: Operator ensures all MFW reg bypass valves are in Manual (amber light illuminated) and output ZERO using 1-LlC-3-3S, 48, 90-103.
Operator transitions to Section 4.4. STEP 10.: DISPATCH operator to PERFROM Appendix A, Part I to remove fuses to disable intermediate heater string Isolation.
STEP 16.:  IF a flowpath is not available through at least one Intermediate Heater    -   SAT string ......
Cue Respond as an AUO and tell operator you will perform Appendix A to remove fuses to disable intermediate heater string isolation.
                                                                                      -   UNSAT STANDARD: Operator N/A's this step, flow path is available.
STANDARD:
STEP 17.:   ENSURE Inlet and outlet valves for at least one string of Intermediate    -  SAT and High Pressure Heaters OPEN:
STEP 11.: ENSURE Condensate inlet and outlet vavles for at least one LP heater String OPEN. STANDARD:
* High Pressure FW Heaters                                            -   UNSAT
Operator verfies LP Heater Inlet/Outlet valves OPEN, red light and green lights illuminated for 1-HS 2-46A, 66A, 56A, 55A, 65A and 75A. STEP 12.: ENSURE the following condensate pumps RUNNING:
* Intermediate Pressure FW Heaters STANDARD: Operator verifies all HP (M-3) and IP (M-2) heater string isolation valves are OPEN.
* 2 Hotwell pumps
STEP 18.:   IF starting MFW pump A, THEN PERFORM the following:                       -  SAT
* 1 CBP (suction valve open)
: a. ENSURE MFP a drain hand-switch [HS-46-14] in OPEN position        -  UNSAT
* 1 Injection water pump STANDARD:
: b. ENSURE the following vavles are OPEN:
Operator ensures 2 HW pumps, 1 CBP with suction valve open and 1 injection water pump running. STEP 13.: ENSURE MFPT Recirc Valves in MANUAL and CLOSED: STANDARD:
FCV-2-205  [M-2]
Operator ensures recirc valves for the MFP's are in manual and closed, 1-FIC-3-70 and 3-84. STEP 14.: ENSURE MFW reg controllers in MANUAL and CLOSED: STANDARD:
FCV-2-210  [M-2]
Operator ensures Main FRV are in manual and closed using 1-FIC-3-35, 48, 90, 103, and checks status lights green on 1-XX-3-35.
FCV-2-221  [M-2]
JPM # 34 Page 6 of 11 Rev 0 SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
FCV-3-67    [M-3]
STEP 1S.: ENSURE MFW bypass reg valves controllers in MANUAL and output ZERO. STANDARD:
STANDARD: OPERATOR ensures the MFPT condenser Inlet and Outlet Isolation valves are OPEN, FCV-2-20S and 210, and the MFP Inlet and Outlet isol Valves are open, FCV-2-221 and 3-67.
Operator ensures all MFW reg bypass valves are in Manual (amber light illuminated) and output ZERO using 1-LlC-3-3S, 48, 90-103. STEP 16.: IF a flowpath is not available through at least one Intermediate Heater string ...... STANDARD:
STEP 19.:   IF [VLV-1-611] MFP pump A HP steam Isolation .........                    -  SAT
Operator N/A's this step, flow path is available.
                                                                                      -  UNSAT CUE:      When operator dispatches personnel to open valve Inform them that VLV-1-611 is already open.
STEP 17.: ENSURE Inlet and outlet valves for at least one string of Intermediate and High Pressure Heaters OPEN:
STANDARD: Operator dispatches an operator to check valve open locally.
* High Pressure FW Heaters
 
* Intermediate Pressure FW Heaters STANDARD:
JPM # 34 Page 8 of 11 Rev 0 STEP 20.:   RESET MFPT A USING [HS-46-9A].                                        -    SAT
Operator verifies all HP (M-3) and IP (M-2) heater string isolation valves are OPEN. STEP 18.: IF starting MFW pump A, THEN PERFORM the following:
                                                                                  -    UNSAT STANDARD: Operator places HS in the reset position and verifies the red light illuminates green light is dark, alarm clears for MFP trip.         Critical Step STEP 21.:   PLACE MFPT A [SIC-46-20A] in MANUAL and with ZERO output.            -    SAT
: a. ENSURE MFP a drain hand-switch
                                                                                  -    UNSAT STANDARD: Operator places MFPT A SIC-46-20 to manual and sets output signal to O.                                                       Critical Step STEP 22.:  ENSURE MFPT A and B mater speed controller [PC-46-20] in              -   SAT MANUAL and with output at O.
[HS-46-14]
                                                                                  -   UNSAT STANDARD:  Operator places MFPT A and B mater speed controller [PC-46-20] in   Critical Step MANUAL and sets output at O.
in OPEN position b. ENSURE the following vavles are OPEN: FCV-2-205
STEP 23.:   DO NOT CONTINUE until section flow path established to MFP.           -    SAT
[M-2] FCV-2-210
                                                                                  -    UNSAT STANDARD: Operator verifies flow path is available to MFP suction.
[M-2] FCV-2-221
STEP 24.:   ENSURE [FIC-3-70] MFPTA recirc valve in MANUAL and OPEN.              -    SAT
[M-2] FCV-3-67 [M-3] STANDARD:
                                                                                  -    UNSAT STANDARD: Operator verifies the MFP A recirc valve is in manual, amberlight illuminated and opens valve.                                       Critical Step STEP 25.:   PLACE MFPT A speed controller rSIC-46-20A] in AUTO.                   -   SAT
OPERATOR ensures the MFPT condenser Inlet and Outlet Isolation valves are OPEN, FCV-2-20S and 210, and the MFP Inlet and Outlet isol Valves are open, FCV-2-221 and 3-67. STEP 19.: IF [VLV-1-611]
                                                                                  -   UNSAT STANDARD: Operator places MFPT A speed controller in AUTO.
MFP pump A HP steam Isolation
Critical Step
.........
 
CUE: When operator dispatches personnel to open valve Inform them that VLV-1-611 is already open. STANDARD:
JPM # 34 Page 9 of 11 Rev 0 STEP 26.:  VERIFY the governor valve positioner is indicating CLOSED.              -   SAT
Operator dispatches an operator to check valve open locally. JPM # 34 Page 7 of 11 Rev 0 SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -STEP 1S.: ENSURE MFW bypass reg valves controllers in MANUAL and output ZERO. STANDARD:
                                                                                    -   UNSAT STANDARD: Operator verifies 1-HS-46-13A green light illuminated and/or checks 1-ZI-46-138 (M-3) indicating O.
Operator ensures all MFW reg bypass valves are in Manual (amber light illuminated) and output ZERO using 1-LlC-3-3S, 48, 90-103. STEP 16.: IF a flowpath is not available through at least one Intermediate Heater string ...... STANDARD:
STEP 27.:   IF MFPT governor valve NOT indicating CLOSED, THEN ....                 -    SAT
Operator N/A's this step, flow path is available.
                                                                                    -    UNSAT STANDARD: Operator N/A's this step, valve is closed.
STEP 17.: ENSURE Inlet and outlet valves for at least one string of Intermediate and High Pressure Heaters OPEN:
STEP 28.:  OPEN MFPT A stop valves by placing HP stop valve switch                  -   SAT
* High Pressure FW Heaters
[HS-46-15Al to raise.
* Intermediate Pressure FW Heaters STANDARD:
                                                                                    -   UNSAT NOTE:    HP and LP stop valve will open when the HS is placed in raise.
Operator verifies all HP (M-3) and IP (M-2) heater string isolation valves are OPEN. STEP 18.: IF starting MFW pump A, THEN PERFORM the following:
Critical Step STANDARD: OPERATOR holds the HS-46-15A in raise position until the red light is illuminated and green light is dark.
: a. ENSURE MFP a drain hand-switch
STEP 29.:   RAISE MFPT A speed by PERFORMING one of the following:                  -    SAT
[HS-46-14]
: 1) IF MeR operation of governor vavle psoitioner is available, PLACE [HS-47-13Al to RAISE to open the steam chest vavles.     -    UNSAT Critical Step STANDARD: OPERATOR places HS-47-13A in RAISE to open GVwhile monitoring MFP loading. MFP speed should stabilize at 3300 rpm as sen on 1-SI-46-20A.
in OPEN position b. ENSURE the following vavles are OPEN: FCV-2-205
STEP 30.:   2) IF MCR operation of governor valve positioner unavailable, THEN ...   -   SAT
[M-2] FCV-2-210
                                                                                    -   UNSAT STANDARD: O-perator N/A's this step.
[M-2] FCV-2-221
 
[M-2] FCV-3-67 [M-3] STANDARD:
JPM # 34 Page 10 of 11 Rev 0 STEP 31.:   WHEN MFPT speed controller controlling MFPT speed, THEN                  -   SAT ENSURE governor valve positioner is fully raised.
OPERATOR ensures the MFPT condenser Inlet and Outlet Isolation valves are OPEN, FCV-2-20S and 210, and the MFP Inlet and Outlet isol Valves are open, FCV-2-221 and 3-67. STEP 19.: IF [VLV-1-611]
                                                                                    -   UNSAT NOTE:      MFPT speed controller takes over speed control when MFPT accelerates to - 3300 rpm on 1-SI-46-20A.                              Critical Step STANDARD: Operator ensures Governor Valves Positioner is fully raised, red light illuminated and green light dark.
MFP pump A HP steam Isolation
STEP 32.:   ADJUST MFPT speed USING Master Controller [PC-46-20J UNTIL              -   SAT feedwater header pressure is - 80 psid greater than steam header pressure.                                                               -    UNSAT NOTE:    Operator may use ICS to monitor delta P, Secondary Mimics,            Critical Step Feedwater.
.........
STANDARD:   Operator adjusts [PC-46-29J in manual to increase FW header pressure while monitoring PI-3-1, # 1 HTR Inlet Pressure, and PI-1-33, Main Steam Header Pressure.
CUE: When operator dispatches personnel to open valve Inform them that VLV-1-611 is already open. STANDARD:
STEP 33.:  IF starting MFP pump Boo ....                                           -    SAT
Operator dispatches an operator to check valve open locally. JPM # 34 Page 7 of 11 Rev 0 SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
                                                                                    -    UNSAT STANDARD: OPERATOR N/A's this step.
STEP 20.: RESET MFPT A USING [HS-46-9A].
STEP 34.:  IF RCS temperature is less than 550&deg;F,                                  -   SAT THEN GO TO Step 13.
STANDARD:
                                                                                    -   UNSAT STANDARD: OPERATOR verifies temperature is <550&deg;F and and continues with step 13.
Operator places HS in the reset position and verifies the red light illuminates green light is dark, alarm clears for MFP trip. STEP 21.: PLACE MFPT A [SIC-46-20A]
STEP 35.:   ADJUST MFW regulating bypass valve controller to establish required      -   SAT feed flow.
in MANUAL and with ZERO output. STANDARD:
                                                                                    -   UNSAT STANDARD: Operator adjust MFW reg bypass valve to establish feed water flow. Critical Step Monitors flow on FW flow Indicators on M-4. Operator notifies the US when FW flow has been established.
Operator places MFPT A SIC-46-20 to manual and sets output signal to O. STEP 22.: ENSURE MFPT A and B mater speed controller
 
[PC-46-20]
JPM # 34 Page 11 of 11 Rev 0 STEP 36.:   MONITOR Hotwell level and CONTROL as necessary.                     -    SAT NOTE:     If operator notified US that FW was established in previous step    -    UNSAT then this step is not required.
in MANUAL and with output at O. STANDARD:
STANDARD: Operator may state that they are monitoring HW level on 1-LR-2-12 (M-3), and using 1-LlC-2-3 and 1-LlC-2-9 for auto makeup and dumpback.
Operator places MFPT A and B mater speed controller
STEP 37.:   Inform the US/SRO when feedwater flow has been established.         -   SAT
[PC-46-20]
                                                                                -   UNSAT STANDARD: Operator informs the US/SRO FW flow has been established.
in MANUAL and sets output at O. STEP 23.: DO NOT CONTINUE until section flow path established to MFP. STANDARD:
Critical Step End of JPM
Operator verifies flow path is available to MFP suction. STEP 24.: ENSURE [FIC-3-70]
 
MFPTA recirc valve in MANUAL and OPEN. STANDARD:
READ TO OPERATOR Directions to Trainee:
Operator verifies the MFP A recirc valve is in manual, amberlight illuminated and opens valve. STEP 25.: PLACE MFPT A speed controller rSIC-46-20A]
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
in AUTO. STANDARD:
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Operator places MFPT A speed controller in AUTO. JPM # 34 Page 8 of 11 Rev 0 SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step STEP 20.: RESET MFPT A USING [HS-46-9A].
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
STANDARD:
INITIAL CONDITIONS:
Operator places HS in the reset position and verifies the red light illuminates green light is dark, alarm clears for MFP trip. STEP 21.: PLACE MFPT A [SIC-46-20A]
: 1.        Unit 1 has experienced a Reactor Trip due multiple dropped rods.
in MANUAL and with ZERO output. STANDARD:
: 2.        MDAFW pump A-A is tagged out for maintenance, MDAFW pump B-B tripped on electrical fault and the TDAFW pump tripped on electrical overspeed just after RX trip.
Operator places MFPT A SIC-46-20 to manual and sets output signal to O. STEP 22.: ENSURE MFPT A and B mater speed controller
: 3.        Unit has transitioned to ES-O.1 and are ready to perform the RNO for STEP 5.
[PC-46-20]
: 4.        All four S/G levels have been decreasing.
in MANUAL and with output at O. STANDARD:
: 5.        AFW Flow to the S/Gs can NOT be established.
Operator places MFPT A and B mater speed controller
INITIATING CUES:
[PC-46-20]
: 1.        You are the CRO and the US directed you to establish main feedwater flow USING EA-2-2, Establishing Secondary Heat sink Using Main Feedwater or Condensate System.
in MANUAL and sets output at O. STEP 23.: DO NOT CONTINUE until section flow path established to MFP. STANDARD:
: 2.       Inform the US when Main Feedwater or Condensate flow has been established.
Operator verifies flow path is available to MFP suction. STEP 24.: ENSURE [FIC-3-70]
 
MFPTA recirc valve in MANUAL and OPEN. STANDARD:
JPM #65 Page 1 of 13 Rev. 8 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 65 Re-establishment of Containment Pressure Control Following High Pressure Conditions PREPAREDI REVISED BY:                                                             Date/
Operator verifies the MFP A recirc valve is in manual, amberlight illuminated and opens valve. STEP 25.: PLACE MFPT A speed controller rSIC-46-20A]
VALIDATED BY:
in AUTO. STANDARD:
Operator places MFPT A speed controller in AUTO. JPM # 34 Page 8 of 11 Rev 0 SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step STEP 26.: VERIFY the governor valve positioner is indicating CLOSED. STANDARD:
Operator verifies 1-HS-46-13A green light illuminated and/or checks 1-ZI-46-138 (M-3) indicating O. STEP 27.: IF MFPT governor valve NOT indicating CLOSED, THEN .... STANDARD:
Operator N/A's this step, valve is closed. STEP 28.: OPEN MFPT A stop valves by placing HP stop valve switch [HS-46-15Al to raise. NOTE: HP and LP stop valve will open when the HS is placed in raise. STANDARD:
OPERATOR holds the HS-46-15A in raise position until the red light is illuminated and green light is dark. STEP 29.: RAISE MFPT A speed by PERFORMING one of the following:
: 1) IF MeR operation of governor vavle psoitioner is available, PLACE [HS-47-13Al to RAISE to open the steam chest vavles. STANDARD:
OPERATOR places HS-47-13A in RAISE to open GVwhile monitoring MFP loading. MFP speed should stabilize at 3300 rpm as sen on 1-SI-46-20A.
STEP 30.: 2) IF MCR operation of governor valve positioner unavailable, THEN ... STANDARD:
O-perator N/A's this step. JPM # 34 Page 9 of 11 Rev 0 SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -STEP 26.: VERIFY the governor valve positioner is indicating CLOSED. STANDARD:
Operator verifies 1-HS-46-13A green light illuminated and/or checks 1-ZI-46-138 (M-3) indicating O. STEP 27.: IF MFPT governor valve NOT indicating CLOSED, THEN .... STANDARD:
Operator N/A's this step, valve is closed. STEP 28.: OPEN MFPT A stop valves by placing HP stop valve switch [HS-46-15Al to raise. NOTE: HP and LP stop valve will open when the HS is placed in raise. STANDARD:
OPERATOR holds the HS-46-15A in raise position until the red light is illuminated and green light is dark. STEP 29.: RAISE MFPT A speed by PERFORMING one of the following:
: 1) IF MeR operation of governor vavle psoitioner is available, PLACE [HS-47-13Al to RAISE to open the steam chest vavles. STANDARD:
OPERATOR places HS-47-13A in RAISE to open GVwhile monitoring MFP loading. MFP speed should stabilize at 3300 rpm as sen on 1-SI-46-20A.
STEP 30.: 2) IF MCR operation of governor valve positioner unavailable, THEN ... STANDARD:
O-perator N/A's this step. JPM # 34 Page 9 of 11 Rev 0 SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -
STEP 31.: WHEN MFPT speed controller controlling MFPT speed, THEN ENSURE governor valve positioner is fully raised. NOTE: MFPT speed controller takes over speed control when MFPT accelerates to -3300 rpm on 1-SI-46-20A.
STANDARD:
Operator ensures Governor Valves Positioner is fully raised, red light illuminated and green light dark. STEP 32.: ADJUST MFPT speed USING Master Controller
[PC-46-20J UNTIL feedwater header pressure is -80 psid greater than steam header pressure.
NOTE: Operator may use ICS to monitor delta P, Secondary Mimics, Feedwater.
STANDARD:
Operator adjusts [PC-46-29J in manual to increase FW header pressure while monitoring PI-3-1, # 1 HTR Inlet Pressure, and PI-1-33, Main Steam Header Pressure.
STEP 33.: IF starting MFP pump Boo .... STANDARD:
OPERATOR N/A's this step. STEP 34.: IF RCS temperature is less than 550&deg;F, THEN GO TO Step 13. STANDARD:
OPERATOR verifies temperature is <550&deg;F and and continues with step 13. STEP 35.: ADJUST MFW regulating bypass valve controller to establish required feed flow. STANDARD:
Operator adjust MFW reg bypass valve to establish feed water flow. Monitors flow on FW flow Indicators on M-4. Operator notifies the US when FW flow has been established.
JPM # 34 Page 10 of 11 Rev 0 SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step STEP 31.: WHEN MFPT speed controller controlling MFPT speed, THEN ENSURE governor valve positioner is fully raised. NOTE: MFPT speed controller takes over speed control when MFPT accelerates to -3300 rpm on 1-SI-46-20A.
STANDARD:
Operator ensures Governor Valves Positioner is fully raised, red light illuminated and green light dark. STEP 32.: ADJUST MFPT speed USING Master Controller
[PC-46-20J UNTIL feedwater header pressure is -80 psid greater than steam header pressure.
NOTE: Operator may use ICS to monitor delta P, Secondary Mimics, Feedwater.
STANDARD:
Operator adjusts [PC-46-29J in manual to increase FW header pressure while monitoring PI-3-1, # 1 HTR Inlet Pressure, and PI-1-33, Main Steam Header Pressure.
STEP 33.: IF starting MFP pump Boo .... STANDARD:
OPERATOR N/A's this step. STEP 34.: IF RCS temperature is less than 550&deg;F, THEN GO TO Step 13. STANDARD:
OPERATOR verifies temperature is <550&deg;F and and continues with step 13. STEP 35.: ADJUST MFW regulating bypass valve controller to establish required feed flow. STANDARD:
Operator adjust MFW reg bypass valve to establish feed water flow. Monitors flow on FW flow Indicators on M-4. Operator notifies the US when FW flow has been established.
JPM # 34 Page 10 of 11 Rev 0 SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step STEP 36.: MONITOR Hotwell level and CONTROL as necessary.
NOTE: If operator notified US that FW was established in previous step then this step is not required.
STANDARD:
Operator may state that they are monitoring HW level on 1-LR-2-12 (M-3), and using 1-LlC-2-3 and 1-LlC-2-9 for auto makeup and dumpback.
STEP 37.: Inform the US/SRO when feedwater flow has been established.
STANDARD:
Operator informs the US/SRO FW flow has been established.
End of JPM JPM # 34 Page 11 of 11 Rev 0 SAT -UNSAT -SAT -UNSAT -Critical Step STEP 36.: MONITOR Hotwell level and CONTROL as necessary.
NOTE: If operator notified US that FW was established in previous step then this step is not required.
STANDARD:
Operator may state that they are monitoring HW level on 1-LR-2-12 (M-3), and using 1-LlC-2-3 and 1-LlC-2-9 for auto makeup and dumpback.
STEP 37.: Inform the US/SRO when feedwater flow has been established.
STANDARD:
Operator informs the US/SRO FW flow has been established.
End of JPM JPM # 34 Page 11 of 11 Rev 0 SAT -UNSAT -SAT -UNSAT -Critical Step READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1. Unit 1 has experienced a Reactor Trip due multiple dropped rods. 2. MDAFW pump A-A is tagged out for maintenance, MDAFW pump B-B tripped on electrical fault and the TDAFW pump tripped on electrical overspeed just after RX trip. 3. Unit has transitioned to ES-O.1 and are ready to perform the RNO for STEP 5. 4. All four S/G levels have been decreasing.
: 5. AFW Flow to the S/Gs can NOT be established.
INITIATING CUES: 1. You are the CRO and the US directed you to establish main feedwater flow USING EA-2-2, Establishing Secondary Heat sink Using Main Feedwater or Condensate System. 2. Inform the US when Main Feedwater or Condensate flow has been established.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1. Unit 1 has experienced a Reactor Trip due multiple dropped rods. 2. MDAFW pump A-A is tagged out for maintenance, MDAFW pump B-B tripped on electrical fault and the TDAFW pump tripped on electrical overspeed just after RX trip. 3. Unit has transitioned to ES-O.1 and are ready to perform the RNO for STEP 5. 4. All four S/G levels have been decreasing.
: 5. AFW Flow to the S/Gs can NOT be established.
INITIATING CUES: 1. You are the CRO and the US directed you to establish main feedwater flow USING EA-2-2, Establishing Secondary Heat sink Using Main Feedwater or Condensate System. 2. Inform the US when Main Feedwater or Condensate flow has been established.
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 65 JPM #65 Page 1 of 13 Rev. 8 Re-establishment of Containment Pressure Control Following High Pressure Conditions PREPAREDI REVISED BY: Date/ VALIDATED BY:
* Date/
* Date/
APPROVED BY: CONCURRED:
              --------------------------------~~=-----------
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
              ------------------------------------~----------
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
APPROVED BY:                                                           Date/
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 65 JPM #65 Page 1 of 13 Rev. 8 Re-establishment of Containment Pressure Control Following High Pressure Conditions PREPAREDI REVISED BY: Date/ VALIDATED BY:
(Operations Training Manager)
* Date/
CONCURRED:    **                                                       Date/
APPROVED BY: CONCURRED:
(Operations Representative)
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V NUMBER REVISION 5 Revised to incorporate changes in Y 0-SO-30-8.
 
Reformatted critical steps. pen/ink SO-30-8 revision had no impact N pen/ink Revised to incorporate changes in N 0-SO-30-8.
JPM #65 Page 2 of 13 Rev. 8 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                   DESCRIPTION OF                   V     DATE    PAGES    PREPARED/
Updated Rev level. pen/ink 0-SO-30-8 Rev chg. and corrected minor N format errors pen/ink 0-SO-30-8 Rev chg. N pen/ink Deleted Steps 32, 33, and 34 for returning EAM bistables to normal. These steps were deleted from the SO in REV 12. Also changed instructions and step 40 (previously  
NUMBER                         REVISION                                 AFFECTED REVISED BY:
: 43) appropriately.
5         Revised to incorporate changes in           Y   9/16/98    All    JP Kearney 0-SO-30-8. Reformatted critical steps.
6 Incorporated pen/ink changes; revised to N the latest revision of 0-SO-30-8; no impact on JPM flow pen/ink Made minor enhancement changes due N to performance feedback.
pen/ink     SO-30-8 revision had no impact               N   7/15/99    All    S.R. Taylor pen/ink     Revised to incorporate changes in           N   8/15/00    4,6,7    SR Taylor 0-SO-30-8. Updated Rev level.
Flow was not affected.
pen/ink     0-SO-30-8 Rev chg. and corrected minor       N   01/04/01    All  W. R. Ramsey format errors pen/ink     0-SO-30-8 Rev chg.                           N   09/05/01    All  W. R. Ramsey pen/ink     Deleted Steps 32, 33, and 34 for returning       9/17/01    ALL    SR Taylor EAM bistables to normal. These steps were deleted from the SO in REV 12.
7 Updated to latest revision of 0-SO-30-8 N and IC (Rad Monitor readings).
Also changed instructions and step 40 (previously 43) appropriately.
Create SCENS files to facilitate performance.
6         Incorporated pen/ink changes; revised to     N   8/20/02    All  J P Kearney the latest revision of 0-SO-30-8; no impact on JPM flow pen/ink     Made minor enhancement changes due           N   10/25/02    All  W. R. Ramsey to performance feedback. Flow was not affected.
Editorial Changes. 8 Updated to latest revision of 0-SO-30-8, Y reduced pressure spike reached in containment to between 0.5 and 0.7 psig, deleted requirement to perform section 5.1, since Containment Vacuum Relief Valves were not affected by the pressure increase in containment. V -Specify if the JPM change will require another validation.
7         Updated to latest revision of 0-SO-30-8     N     9/9/05    All    SR Taylor and IC (Rad Monitor readings). Create SCENS files to facilitate performance.
Editorial Changes.
8         Updated to latest revision of 0-SO-30-8,     Y   11/16/09    All    M Hankins reduced pressure spike reached in containment to between 0.5 and 0.7 psig, deleted requirement to perform section 5.1, since Containment Vacuum Relief Valves were not affected by the pressure increase in containment.
V - Specify if the JPM change will require another validation.
See cover sheet for criteria.
See cover sheet for criteria.
DATE 9/16/98 7/15/99 8/15/00 01/04/01 09/05/01 9/17/01 8/20/02 10/25/02 9/9/05 11/16/09 PAGES AFFECTED All All 4,6,7 All All ALL All All All All JPM #65 Page 2 of 13 Rev. 8 PREPARED/
 
REVISED BY: JP Kearney S.R. Taylor SR Taylor W. R. Ramsey W. R. Ramsey SR Taylor J P Kearney W. R. Ramsey SR Taylor M Hankins NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V NUMBER REVISION 5 Revised to incorporate changes in Y 0-SO-30-8.
JPM #65 Page 3 of 13 Rev. 8 SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task:
Reformatted critical steps. pen/ink SO-30-8 revision had no impact N pen/ink Revised to incorporate changes in N 0-SO-30-8.
Re-establishment of CNTMT Pressure Control Following High Pressure Condition JAITA task # : 00601801 (RO)
Updated Rev level. pen/ink 0-SO-30-8 Rev chg. and corrected minor N format errors pen/ink 0-SO-30-8 Rev chg. N pen/ink Deleted Steps 32, 33, and 34 for returning EAM bistables to normal. These steps were deleted from the SO in REV 12. Also changed instructions and step 40 (previously
KIA Ratings:
: 43) appropriately.
103A1.01 (3.7/4.1)     103A4.01 (3.2/3.3)      2.1.31 (4.2/3.9) 103A4.09 (3.1/3.7)     2.1.20 (4.3/4.2)
6 Incorporated pen/ink changes; revised to N the latest revision of 0-SO-30-8; no impact on JPM flow pen/ink Made minor enhancement changes due N to performance feedback.
Task Standard:
Flow was not affected.
Vent the containment pressure down to normal range (within -0.1 to +0.3 psig) and then place the containment automatic Pressure Control System in service.
7 Updated to latest revision of 0-SO-30-8 N and IC (Rad Monitor readings).
Evaluation Method:     Simulator -  X
Create SCENS files to facilitate performance.
Editorial Changes. 8 Updated to latest revision of 0-SO-30-8, Y reduced pressure spike reached in containment to between 0.5 and 0.7 psig, deleted requirement to perform section 5.1, since Containment Vacuum Relief Valves were not affected by the pressure increase in containment. V -Specify if the JPM change will require another validation.
See cover sheet for criteria.
DATE 9/16/98 7/15/99 8/15/00 01/04/01 09/05/01 9/17/01 8/20/02 10/25/02 9/9/05 11/16/09 PAGES AFFECTED All All 4,6,7 All All ALL All All All All JPM #65 Page 2 of 13 Rev. 8 PREPARED/
REVISED BY: JP Kearney S.R. Taylor SR Taylor W. R. Ramsey W. R. Ramsey SR Taylor J P Kearney W. R. Ramsey SR Taylor M Hankins SEQUOY AH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task: Re-establishment of CNTMT Pressure Control Following High Pressure Condition JAITA task # : 00601801 (RO) KIA Ratings: Task Standard:
103A1.01 (3.7/4.1) 103A4.09 (3.1/3.7) 103A4.01 (3.2/3.3) 2.1.20 (4.3/4.2) 2.1.31 (4.2/3.9)
JPM #65 Page 3 of 13 Rev. 8 Vent the containment pressure down to normal range (within -0.1 to +0.3 psig) and then place the containment automatic Pressure Control System in service. Evaluation Method: Simulator
_-,-X,,--_
_-,-X,,--_
In-Plant __ _ ==================================================================================
In-Plant _ __
==================================================================================
Performer:
Performer:
NAME Start time __ _ Performance Rating: SAT UNSAT Performance Time Finish time __ _ Evaluator:
NAME                                                   Start time _ __
SIGNATURE DATE ===================================================================================
Performance Rating: SAT             UNSAT           Performance Time                   Finish time _ __
COMMENTS SEQUOY AH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task: Re-establishment of CNTMT Pressure Control Following High Pressure Condition JAITA task # : 00601801 (RO) KIA Ratings: Task Standard:
Evaluator:     -----------~---~/_--
103A1.01 (3.7/4.1) 103A4.09 (3.1/3.7) 103A4.01 (3.2/3.3) 2.1.20 (4.3/4.2) 2.1.31 (4.2/3.9)
                --------------------------~/_--
JPM #65 Page 3 of 13 Rev. 8 Vent the containment pressure down to normal range (within -0.1 to +0.3 psig) and then place the containment automatic Pressure Control System in service. Evaluation Method: Simulator X --'-'---In-Plant __ _ ==================================================================================
SIGNATURE                  DATE
Performer:
===================================================================================
NAME Start time __ _ Performance Rating: SAT UNSAT Performance Time Finish time __ _ Evaluator:
COMMENTS
SIGNATURE DATE ===================================================================================
 
COMMENTS JPM #65 Page 4 of 13 Rev. 8 SPECIAL INSTRUCTIONS TO EVALUATOR:
JPM #65 Page 4 of 13 Rev. 8 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Any UNSAT requires comments.
: 1. Any UNSAT requires comments.
: 2. Acknowledge any associated alarms. 3. Initialize Simulator in IC: #116. 4. Set malfunctions CH01A, CH01B, CH01C, CH01D to 10, to fail the containment pressure indicators at -.5 to.7 psid. Override ZAOPDIR30133 to.5 to put PDIR-30-133 upscale. Override ZAOPDI30133 to 4.5 to put PDI-30-133 near top scale. (Run SCENS File JPM065a if available)
: 2. Acknowledge any associated alarms.
: 5. CLOSE FCV-30-46, 47, 48 and FREEZE simulator until turnover completed.
: 3. Initialize Simulator in IC: #116.
: 6. Note: A console operator will be needed for JPM step 24 to Delete malfunctions and overrides.
: 4. Set malfunctions CH01A, CH01B, CH01C, CH01D to 10, to fail the containment pressure indicators at -.5 to.7 psid. Override ZAOPDIR30133 to.5 to put PDIR-30-133 upscale. Override ZAOPDI30133 to 4.5 to put PDI-30-133 near top scale. (Run SCENS File JPM065a if available)
: 7. When the operator begins venting containment delete malfunctions CH01A, B, C, & D to return cntmt press to normal AND delete overrides on PDIR-30-133
: 5. CLOSE FCV-30-46, 47, 48 and FREEZE simulator until turnover completed.
& PDI-30-133. (Run SCENS file JPM065b if available to return values to normal over a 3 min ramp) 8. Ensure operator performs the following required actions for SELF-CHECKING;
: 6. Note: A console operator will be needed for JPM step 24 to Delete malfunctions and overrides.
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: 7. When the operator begins venting containment delete malfunctions CH01A, B, C, & D to return cntmt press to normal AND delete overrides on PDIR-30-133 & PDI-30-133. (Run SCENS file JPM065b if available to return values to normal over a 3 min ramp)
: c. Compares the actual response to the expected response.
: 8. Ensure operator performs the following required actions for SELF-CHECKING;
Validation Time: CR 25min Local ____ _ Tools/Equipment/Procedures Needed: 0-SO-30-8 Sections 3.0, 4.0, 5.1, 5.2, and 7.2 Reference Title Rev No. 0-SO-30-8 Containment Pressure Control 29 ============================================================================
: a. Identifies the correct unit, train, component, etc.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
: b. Reviews the intended action and expected response.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
Unit 1 is in Mode 1 recovering from an Air Line break in containment.
The air leak was discovered on a section of the header that allowed isolation without affecting any equipment.
During isolation efforts, containment pressure increased to approximately 0.5 to 0.7 psig. INITIATING CUES: 1. The US has directed you to vent containment using the normal flow path to within normal operating limits. 2. Inform the US when Containment has been vented and the Vacuum Control system is aligned NORMAL. 3. Precautions and Limitations and Prerequisite Actions are complete for 0-SO-30-8.
JPM #65 Page 4 of 13 Rev. 8 SPECIAL INSTRUCTIONS TO EVALUATOR:  
: 1. Any UNSAT requires comments.  
: 2. Acknowledge any associated alarms. 3. Initialize Simulator in IC: #116. 4. Set malfunctions CH01A, CH01B, CH01C, CH01D to 10, to fail the containment pressure indicators at -.5 to.7 psid. Override ZAOPDIR30133 to.5 to put PDIR-30-133 upscale. Override ZAOPDI30133 to 4.5 to put PDI-30-133 near top scale. (Run SCENS File JPM065a if available)  
: 5. CLOSE FCV-30-46, 47, 48 and FREEZE simulator until turnover completed.  
: 6. Note: A console operator will be needed for JPM step 24 to Delete malfunctions and overrides.  
: 7. When the operator begins venting containment delete malfunctions CH01A, B, C, & D to return cntmt press to normal AND delete overrides on PDIR-30-133  
& PDI-30-133. (Run SCENS file JPM065b if available to return values to normal over a 3 min ramp) 8. Ensure operator performs the following required actions for SELF-CHECKING;  
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.  
: c. Compares the actual response to the expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR 25min Local ____ _ Tools/Equipment/Procedures Needed: 0-SO-30-8 Sections 3.0, 4.0, 5.1, 5.2, and 7.2  
Validation Time: CR             25min                 Local _ _ _ __
Tools/Equipment/Procedures Needed:
0-SO-30-8 Sections 3.0, 4.0, 5.1, 5.2, and 7.2


==References:==
==References:==


Reference Title Rev No. 0-SO-30-8 Containment Pressure Control 29 ============================================================================
Reference                                           Title                         Rev No.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
0-SO-30-8                                   Containment Pressure Control                             29
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
  ============================================================================
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
READ TO OPERATOR Directions to Trainee:
Unit 1 is in Mode 1 recovering from an Air Line break in containment.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task.
The air leak was discovered on a section of the header that allowed isolation without affecting any equipment.
To indicate that you have completed your assigned task return the handout sheet I provided you.
During isolation efforts, containment pressure increased to approximately 0.5 to 0.7 psig. INITIATING CUES: 1. The US has directed you to vent containment using the normal flow path to within normal operating limits. 2. Inform the US when Containment has been vented and the Vacuum Control system is aligned NORMAL. 3. Precautions and Limitations and Prerequisite Actions are complete for 0-SO-30-8.
INITIAL CONDITIONS:
Job Performance Checklist:
Unit 1 is in Mode 1 recovering from an Air Line break in containment. The air leak was discovered on a section of the header that allowed isolation without affecting any equipment.
STEP/ST ANDARD STEP 1. OBTAIN the appropriate procedure STANDARD:
During isolation efforts, containment pressure increased to approximately 0.5 to 0.7 psig.
Operator obtains a copy of 0-SO-30-8, starting with Section 4.0. NOTE Operator may review Precautions and Limitations and Prerequisite actions, per initial conditions these sections have been completed STEP 2. ENSURE instruction to be used is a copy of the effective version. CUE: Tell the operator the procedure is the latest revision.
INITIATING CUES:
STANDARD:
: 1. The US has directed you to vent containment using the normal flow path to within normal operating limits.
Operator verifies procedure using BSL or hard copy from MCR. STEP 3. ENSURE Precaution and Limitation Section 3.0 has been reviewed.
: 2. Inform the US when Containment has been vented and the Vacuum Control system is aligned NORMAL.
STANDARD:
: 3. Precautions and Limitations and Prerequisite Actions are complete for 0-SO-30-8.
Operator reviews P & L and goes to next step. NOTE Operator may review Precautions and Limitations and Prerequisite actions, per initial conditions these sections have been completed STEP 4.: IF ventilation alignment changes are made which could impact door closure, THEN NOTIFY Fire Operations.
 
Cue: Play role of SRO, and state you will perform any required notifications.
JPM #65 Page 5 of 13 Rev. 8 Job Performance Checklist:
STANDARD:
STEP/STANDARD                                    SAT/UNSAT STEP 1.       OBTAIN the appropriate procedure                                         -    SAT
Operator informs the US/SRO that the ventilation changes may affect door closure which could be of a concern to Fire Ops. STEP 5.: ENSURE each performer documents their name and initials.
                                                                                          -    UNSAT STANDARD: Operator obtains a copy of 0-SO-30-8, starting with Section 4.0.
STANDARD:
Start Time- -
Operator prints name and initials.
NOTE     Operator may review Precautions and Limitations and Prerequisite actions, per initial conditions these sections have been completed STEP 2.         ENSURE instruction to be used is a copy of the effective                 -    SAT version.
STEP 6.: INDICATE section to be performed STANDARD:
                                                                                          -    UNSAT CUE:         Tell the operator the procedure is the latest revision.
Operator checks section 5.0 and 7.0 to be performed and goes to section 5.2.1. JPM #65 Page 5 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -Start Time --SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STANDARD: Operator verifies procedure using BSL or hard copy from MCR.
STEP/ST ANDARD STEP 1. OBTAIN the appropriate procedure STANDARD:
STEP 3.         ENSURE Precaution and Limitation Section 3.0 has been                     -    SAT reviewed.
Operator obtains a copy of 0-SO-30-8, starting with Section 4.0. NOTE Operator may review Precautions and Limitations and Prerequisite actions, per initial conditions these sections have been completed STEP 2. ENSURE instruction to be used is a copy of the effective version. CUE: Tell the operator the procedure is the latest revision.
                                                                                          -    UNSAT STANDARD: Operator reviews P & L and goes to next step.
STANDARD:
NOTE     Operator may review Precautions and Limitations and Prerequisite actions, per initial conditions these sections have been completed STEP 4.:       IF ventilation alignment changes are made which could impact             -    SAT door closure, THEN NOTIFY Fire Operations.
Operator verifies procedure using BSL or hard copy from MCR. STEP 3. ENSURE Precaution and Limitation Section 3.0 has been reviewed.
                                                                                          -    UNSAT Cue:       Play role of SRO, and state you will perform any required notifications.
STANDARD:
STANDARD: Operator informs the US/SRO that the ventilation changes may affect door closure which could be of a concern to Fire Ops.
Operator reviews P & L and goes to next step. NOTE Operator may review Precautions and Limitations and Prerequisite actions, per initial conditions these sections have been completed STEP 4.: IF ventilation alignment changes are made which could impact door closure, THEN NOTIFY Fire Operations.
STEP 5.:       ENSURE each performer documents their name and initials.                   -    SAT STANDARD: Operator prints name and initials.                                           -    UNSAT STEP 6.:         INDICATE section to be performed                                         -    SAT STANDARD: Operator checks section 5.0 and 7.0 to be performed and goes                 -    UNSAT to section 5.2.1.
Cue: Play role of SRO, and state you will perform any required notifications.
 
STANDARD:
JPM #65 Page 6 of 13 Rev. 8 Job Performance Checklist:
Operator informs the US/SRO that the ventilation changes may affect door closure which could be of a concern to Fire Ops. STEP 5.: ENSURE each performer documents their name and initials.
STEP/STANDARD                              SAT/UNSAT NOTE:      The following steps are from Section 5.2.1 of 0-50-30-8:          -   SAT STEP 7.:        ENSURE 1-30-8.02 power checklist complete.                        -   UNSAT Cue:      Power checklist 1-30-8.02 is complete with NO deviations.
STANDARD:
STANDARD: Operator checks configuration log to ensure power checklist 1-30-8.02 is complete.
Operator prints name and initials.
STEP 8.:        ENSURE the check valve portion of the containment vacuum          -  SAT relief assembly is capable of closing by observing monitor lights on panel (panel M-9).                                             -  UNSAT STANDARD: Operator checks monitor lights on panel (panel M-9) to ensure valves are closed, green lights ON.
STEP 6.: INDICATE section to be performed STANDARD:
STEP 9.:        IF the unit is in MODES 1, ,2 or 3, THEN                          -  SAT NOTIFY the US/SRO that the EAM will be placed in the Adverse
Operator checks section 5.0 and 7.0 to be performed and goes to section 5.2.1. JPM #65 Page 5 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -Start Time --SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
                                                                                  -  UNSAT Cue:     Play role of SRO and acknowledge EAM will be placed in Adverse Containment condition for venting containment.
Job Performance Checklist:
STANDARD: Operator informs the US/SRO that EAM's will be placed in the Adverse Cntmt condition for venting containment.
STEP/STANDARD NOTE: The following steps are from Section 5.2.1 of 0-50-30-8:
STEP 10.:       EVALUATE entry into LCO 3.6.6. Vacuum Relief Lines.              -  SAT Cue:      Play role of SRO and state you will evaluate the LCO.             -  UNSAT STANDARD:       Operator informs the US/SRO LCO 3.6.6, Vacuum Relief Lines needs to be evaluated.
STEP 7.: ENSURE 1-30-8.02 power checklist complete.
STEP..1.1.,:    IF the Unit is in Modes 1, 2, 3, THEN                            -   SAT PERFORM the following:
Cue: Power checklist 1-30-8.02 is complete with NO deviations.
: a. IF the EAM is not in the Adverse Cntmt condition, THEN        -   UNSAT PLACE OR DIRECT AUO to PLACE the EAM in the Adverse Cntmt condition by depressing the ACTUATE button in each rack.
STANDARD:
STANDARD: Operator recognizes the EAMs are in the Adverse Cntmt condition. Operator should N/A step [5.1] and complete [5.2]
Operator checks configuration log to ensure power checklist 1-30-8.02 is complete.
and [5.3].
STEP 8.: ENSURE the check valve portion of the containment vacuum relief assembly is capable of closing by observing monitor lights on panel (panel M-9). STANDARD:
STEP 12.:       ENSURE blue purge/vent operation permissive lights illuminated    -   SAT for each steam generator.
Operator checks monitor lights on panel (panel M-9) to ensure valves are closed, green lights ON. STEP 9.: IF the unit is in MODES 1, ,2 or 3, THEN NOTIFY the US/SRO that the EAM will be placed in the Adverse Cue: Play role of SRO and acknowledge EAM will be placed in Adverse Containment condition for venting containment.
                                                                                  -  UNSAT STANDARD: Operator verifies blue purge/vent permissive lights are illuminated for each S/G (M-4 above SG NR levels indicators).
STANDARD:
 
Operator informs the US/SRO that EAM's will be placed in the Adverse Cntmt condition for venting containment.
JPM #65 Page 7 of 13 Rev. 8 Job Performance Checklist:
STEP 10.: EVALUATE entry into LCO 3.6.6. Vacuum Relief Lines. Cue: Play role of SRO and state you will evaluate the LCO. STANDARD:
STEP/STANDARD                           SAT/UNSAT STEP 13.:      VERIFY window 30 "S/G Level Adverse Setpoint" illuminated on  -  SAT XA-55-3C.
Operator informs the US/SRO LCO 3.6.6, Vacuum Relief Lines needs to be evaluated.
                                                                              -  UNSAT STANDARD: Operator verifies XA-55-3C window 30 illuminated.
STEP ..1.1.,: IF the Unit is in Modes 1, 2, 3, THEN PERFORM the following:
STEP 14.:      IF the Unit is in Modes 1-4, THEN                              -   SAT VERIFY Radiochemical Laboratory has a current weekly performance of 0-SI-CEM-030-41 0.1 in progress.               -  UNSAT Cue:       SI-410.1 is in progress and signed by the SRO and Rad Chern Supervisor. Provide operator with current copy of 0-SI-CEM-030-410.1, containment vent to AB Exhaust.
: a. IF the EAM is not in the Adverse Cntmt condition, THEN PLACE OR DIRECT AUO to PLACE the EAM in the Adverse Cntmt condition by depressing the ACTUATE button in each rack. STANDARD:
STANDARD: Operator verifies SI-41 0.1 and approved by SRO and Radiochemical Laboratory Supervisor approval.
Operator recognizes the EAMs are in the Adverse Cntmt condition.
STEP 15.:       IF the noble gas countrate for lower containment radiation    -  SAT monitor has increased by more than 50% since the last sample time, THEN TRANSMIT the release permit to the Chem Lab to     -  UNSAT obtain another (noble gas and tritium) set of samples.
Operator should N/A step [5.1] and complete [5.2] and [5.3]. STEP 12.: ENSURE blue purge/vent operation permissive lights illuminated for each steam generator.
Cue:      SI-410.1 data shows RM-90-106        Gas  =1.0 E3 STANDARD: Operator reviews Initial countrate at time on sample in SI-410.0 and current reading on RM-90-106; determines that conditions have not changed by more than 50% and N/As this step.
STANDARD:
STEP 16.:       IF the lower containment noble gas radiation monitor is        -  SAT inoperable, THEN VERIFY from the Chemistry Shift Supervisor that grab sample form lower containment is analyzed to satisfy -  UNSAT ODCM 1.1.2.6.a Action 47, prior to each event.
Operator verifies blue purge/vent permissive lights are illuminated for each S/G (M-4 above SG NR levels indicators).
STANDARD: Operator looks at RM-90-106 and determines that monitor is operable and N/As this step.
JPM #65 Page 6 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP 17.:      ENSURE that the Shield Building Annulus Vacuum Control        -  SAT System is in service and maintaining a negative 5.0 inches of H20 as indicated on M-9, [PDI-30-126J or [PDI-30-127J OR      -    UNSAT EGTS in service OR EGTS testing in progress.
STEP/STANDARD NOTE: The following steps are from Section 5.2.1 of 0-50-30-8:
Cue:     If NOTE prior to step is addressed, state "Purge is not in progress".
STEP 7.: ENSURE 1-30-8.02 power checklist complete.
STANDARD: Operator obtains reading from PDI-30-126 or 127 on panel M-9.
Cue: Power checklist 1-30-8.02 is complete with NO deviations.
 
STANDARD:
JPM #65 Page 8 of 13 Rev. 8 Job Performance Checklist:
Operator checks configuration log to ensure power checklist 1-30-8.02 is complete.
STEP/STANDARD                             SAT/UNSAT STEP 18.:       VERIFY NO abnormal or unexplainable radiation levels exist        -  SAT inside containment.
STEP 8.: ENSURE the check valve portion of the containment vacuum relief assembly is capable of closing by observing monitor lights on panel (panel M-9). STANDARD:
                                                                                  -   UNSAT STANDARD: Operator checks RM-90-106 and 112 for abnormal radiation levels in containment.
Operator checks monitor lights on panel (panel M-9) to ensure valves are closed, green lights ON. STEP 9.: IF the unit is in MODES 1, ,2 or 3, THEN NOTIFY the US/SRO that the EAM will be placed in the Adverse Cue: Play role of SRO and acknowledge EAM will be placed in Adverse Containment condition for venting containment.
STEP 19.:       VERIFY that NO containment vent isolation signal exists.          -   SAT STANDARD: Operator checks XA-55-6C windows C5 & C6 to verify that a          -   UNSAT cntmt vent isolation signal is not present.
STANDARD:
STEP 20.:     ENSURE at least ONE of the following radiation monitors in service: -  SAT U-1 Containment              1-RM-90-130 Purge Exhaust Monitors      1-RM-90-131                      -  UNSAT CUE:        AB AUO reports the 1-RM-90-130 is liS.
Operator informs the US/SRO that EAM's will be placed in the Adverse Cntmt condition for venting containment.
STANDARD: Operator verifies the RM-90-130 is in service (No Alarms and Not Blocked).
STEP 10.: EVALUATE entry into LCO 3.6.6. Vacuum Relief Lines. Cue: Play role of SRO and state you will evaluate the LCO. STANDARD:
STEP 21.:       VERIFY that all personnel have been evacuated from the           -  SAT annulus and that all doors are closed.
Operator informs the US/SRO LCO 3.6.6, Vacuum Relief Lines needs to be evaluated.
                                                                                  -  UNSAT Cue:       Role playas NSS or Rad Con and state all personnel are out of the annulus and the doors are closed.
STEP ..1.1.,: IF the Unit is in Modes 1, 2, 3, THEN PERFORM the following:  
STANDARD: Operator calls Nuclear Security or Rad Con and verifies that all personnel have been evacuated from the annulus and that all doors are closed.
: a. IF the EAM is not in the Adverse Cntmt condition, THEN PLACE OR DIRECT AUO to PLACE the EAM in the Adverse Cntmt condition by depressing the ACTUATE button in each rack. STANDARD:
STEP 22.:       ENSURE at least one of the following radiation monitors in        -  SAT service for the appropriate unit::
Operator recognizes the EAMs are in the Adverse Cntmt condition.
                                                                                  -  UNSAT AB Vent:                        0-RM-90-1 01 B Upper Compartment:              1-RM-90-112 A. B Lower compartment:              1-RM-90-1 06 A. B STANDARD: Operator verifies the absence of applicable instrument malfunction alarms on 0-M-12.
Operator should N/A step [5.1] and complete [5.2] and [5.3]. STEP 12.: ENSURE blue purge/vent operation permissive lights illuminated for each steam generator.
 
STANDARD:
JPM #65 Page 9 of 13 Rev. 8 Job Performance Checklist:
Operator verifies blue purge/vent permissive lights are illuminated for each S/G (M-4 above SG NR levels indicators).
STEP/STANDARD                                      SAT/UNSAT STEP 23.:     ENSURE PROTECTED EQUIPMENT DO NOT INOP tags placed on the following radiation monitors block switches as appropriate: (N/A tags not  -    SAT placed).
JPM #65 Page 6 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
                                                                                          -    UNSAT BLOCK SWITCH            MONITOR O-HS-90-136A 1          1-RM-90-130 O-HS-90-136A2            1-RM-90-1 31 O-HS-90-136A3            O-RM-90-1 01 B Cue:       Extra Operator will place Protected Equipment tags.
Job Performance Checklist:
STANDARD: Operator places Do Not Inop (Protected Equipment) Tags on Rad Monitor Block Switches.
STEP/ST ANDARD STEP 13.: VERIFY window 30 "S/G Level Adverse Setpoint" illuminated on XA-55-3C.
STEP 24.:       IF aligning the lower compartment purge isolation valves using            -   SAT the NORMAL flow path, THEN PERFORM steps [a] thru [f].                                          -   UNSAT Cue:       US prefers normal flow path.
STANDARD:
STANDARD: None STEP 25.:      ENSURE [FCV-30-37] is CLOSED.                                            -   SAT STANDARD: Operator verifies green light ON for FCV-30-37                              -   UNSAT STEP 26.:       ENSURE [FCV-30-40] is CLOSED.                                             -   SAT STANDARD: Operator verifies green light ON for FCV-30-40                              -    UNSAT STEP 27.:      OPEN [FCV-30-14 & 56] with [HS-30-14].                                   -    SAT STANDARD: Operator places HS-30-14 in the OPEN position and places                    -    UNSAT HS-30-14 in the A-AUTO position.
Operator verifies XA-55-3C window 30 illuminated.
Critical Step STEP 28.:      VERIFY [FCV-30-14 & 56] OPEN.
STEP 14.: IF the Unit is in Modes 1-4, THEN VERIFY Radiochemical Laboratory has a current weekly performance of 0-SI-CEM-030-41 0.1 in progress.
                                                                                          -    SAT STANDARD: Operator verifies red lights illuminated ON [FCV-30-14 & 56].
Cue: SI-410.1 is in progress and signed by the SRO and Rad Chern Supervisor.
                                                                                          -    UNSAT STEP 29.:       OPEN [FCV-30-15 & 571 with HS-30-15                                      -    SAT
Provide operator with current copy of 0-SI-CEM-030-410.1, containment vent to AB Exhaust. STANDARD:
                                                                                          -    UNSAT STANDARD: Operator places HS-30-15 in the OPEN position and places HS-30-15 in the A-AUTO position.
Operator verifies SI-41 0.1 and approved by SRO and Radiochemical Laboratory Supervisor approval.
Critical Step
STEP 15.: IF the noble gas countrate for lower containment radiation monitor has increased by more than 50% since the last sample time, THEN TRANSMIT the release permit to the Chem Lab to obtain another (noble gas and tritium) set of samples. Cue: SI-410.1 data shows RM-90-106 Gas = 1.0 E3 STANDARD:
 
Operator reviews Initial countrate at time on sample in SI-410.0 and current reading on RM-90-106; determines that conditions have not changed by more than 50% and N/As this step. STEP 16.: IF the lower containment noble gas radiation monitor is inoperable, THEN VERIFY from the Chemistry Shift Supervisor that grab sample form lower containment is analyzed to satisfy ODCM 1.1.2.6.a Action 47, prior to each event. STANDARD:
JPM #65 Page 10 of 13 Rev. 8 Job Performance Checklist:
Operator looks at RM-90-106 and determines that monitor is operable and N/As this step. STEP 17.: ENSURE that the Shield Building Annulus Vacuum Control System is in service and maintaining a negative 5.0 inches of H20 as indicated on M-9, [PDI-30-126J or [PDI-30-127J OR EGTS in service OR EGTS testing in progress.
STEP/STANDARD                            SAT/UNSAT STEP 30.:       VERIFY FCV-30-15 & 57 OPEN.                                     -   SAT STANDARD: Operator verifies red lights illuminated for FCV-30-15 & 57 and    -    UNSAT places HS-30-15 in the A-AUTO position.
Cue: If NOTE prior to step is addressed, state "Purge is not in progress".
STEP 31.:       IF aligning the lower compartment purge isolation valves using  -   SAT the Alternate flow path THEN PERFORM steps [15.1] thru
STANDARD:
[15.8].                                                          -   UNSAT STANDARD: Operator should NA this step since the NORMAL flow path is being used.
Operator obtains reading from PDI-30-126 or 127 on panel M-9. JPM #65 Page 7 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP 32.:      OPEN Annulus exhaust isolation valve FCV-30-54 with              -   SAT HS-30-54.
STEP/ST ANDARD STEP 13.: VERIFY window 30 "S/G Level Adverse Setpoint" illuminated on XA-55-3C.
                                                                                -   UNSAT NOTE:    When operator opens FCV-30-54 modify malfunctions CH01A, S, C, & D AND modify overrides ZAOPDIR30133 and ZAOPD130133.
STANDARD:
Critical Step STANDARD: Operator opens FCV-30-54 with HS-30-54. Verifies valve open by observing red light ON.
Operator verifies XA-55-3C window 30 illuminated.
                                                                                -    SAT STEP 33.:      RECORD time purge isolation valves are OPENED.
STEP 14.: IF the Unit is in Modes 1-4, THEN VERIFY Radiochemical Laboratory has a current weekly performance of 0-SI-CEM-030-41 0.1 in progress.
TIME                                    -    UNSAT STANDARD: Operator records the time purge valves were opened.
Cue: SI-410.1 is in progress and signed by the SRO and Rad Chern Supervisor.
Critical Step STEP 34.:       IF the Annulus Vacuum Control System is in service and the       -    SAT standby Annulus Vacuum Control Fan is available, THEN PERFORM the following                                            -    UNSAT START the standby Annulus Vacuum Control Fan.
Provide operator with current copy of 0-SI-CEM-030-410.1, containment vent to AB Exhaust. STANDARD:
NOTE:    If NOTE 1 concerning 15 min to vent is addressed inform operator that some time compression is being used for the vent  r- 3 min to vent).
Operator verifies SI-41 0.1 and approved by SRO and Radiochemical Laboratory Supervisor approval.
STANDARD: Operator starts the standby Annulus Vacuum Control Fan.
STEP 15.: IF the noble gas countrate for lower containment radiation monitor has increased by more than 50% since the last sample time, THEN TRANSMIT the release permit to the Chem Lab to obtain another (noble gas and tritium) set of samples. Cue: SI-410.1 data shows RM-90-106 Gas = 1.0 E3 STANDARD:
STEP 35.:      IF annulus vacuum fan flow low alarm comes in on 0-M-28A        -    SAT during venting, THEN STOP the applicable Annulus Vacuum Control Fan                  -    UNSAT STANDARD: If alarm comes in operator should stop applicable fan.
Operator reviews Initial countrate at time on sample in SI-410.0 and current reading on RM-90-106; determines that conditions have not changed by more than 50% and N/As this step. STEP 16.: IF the lower containment noble gas radiation monitor is inoperable, THEN VERIFY from the Chemistry Shift Supervisor that grab sample form lower containment is analyzed to satisfy ODCM 1.1.2.6.a Action 47, prior to each event. STANDARD:
 
Operator looks at RM-90-106 and determines that monitor is operable and N/As this step. STEP 17.: ENSURE that the Shield Building Annulus Vacuum Control System is in service and maintaining a negative 5.0 inches of H20 as indicated on M-9, [PDI-30-126J or [PDI-30-127J OR EGTS in service OR EGTS testing in progress.
JPM #65 Page 11 of 13 Rev. 8 Job Performance Checklist:
Cue: If NOTE prior to step is addressed, state "Purge is not in progress".
STEP/STANDARD                              SAT/U NSAT STEP 36.:      IF a high radiation alarm occurs on any of the following            -    SAT Radiation Monitors, THEN ...
STANDARD:
                                                                                    -   UNSAT STANDARD: Operator addresses step and potential for action required if radiation levels increase.
Operator obtains reading from PDI-30-126 or 127 on panel M-9. JPM #65 Page 7 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
STEP 37.:      WHEN containment vent is completed, THEN perform [Section 7.2.1].   -    SAT
Job Performance Checklist:
                                                                                    -    UNSAT STANDARD: Operator monitors containment pressure by observing Pdl-30-133. When pressure differential within -0.1 and +0.3 psig, then go to Section 7.2.1.                                         Critical Step STEP 38.:      ENSURE log entry is made into Narrative Logs detailing the time    -    SAT and the valves which were opened for venting.
STEP/ST ANDARD STEP 18.: VERIFY NO abnormal or unexplainable radiation levels exist inside containment.
                                                                                    -    UNSAT STANDARD: Operator should describe the log entry that would be made including all valves which were opened for the Normal flowpath for venting and the time they were opened.
STANDARD:
NOTE: Operator transitions to Section 7.2.1 to shutdown vent.             -    SAT STEP 39.:       IF lower Compartment Purge Isolation Valves are aligned            -    UNSAT through the Normal Flowpath, THEN PERFORM the following steps:
Operator checks RM-90-106 and 112 for abnormal radiation levels in containment.
PLACE [HS-30-141 in the CLOSED position.                         Critical Step STANDARD: Operator places HS-30-14 in the closed STEP 40.:      PLACE [HS-30-15J in the CLOSED position                            -   SAT STANDARD: Operator places HS-30-15 in the closed position and Verifies          -   UNSAT FCV-30-15, -57 are closed, green light ON their respective indicating lights. Should request independent verification of action.                                                          Critical Step STEP 41.:       VERIFY [1-FCV-30-14J is CLOSED.                                     -    SAT STANDARD:       Operator verified FCV-30-14 is closed and green light is ON        -    UNSAT STEP 42.:       VERIFY [1-FCV-30-56] is CLOSED.                                     -    SAT STANDARD:       Operator verified FCV-30-56 is closed and green light is ON        -    UNSAT
STEP 19.: VERIFY that NO containment vent isolation signal exists. STANDARD:
 
Operator checks XA-55-6C windows C5 & C6 to verify that a cntmt vent isolation signal is not present. STEP 20.: ENSURE at least ONE of the following radiation monitors in service: U-1 Containment 1-RM-90-130 Purge Exhaust Monitors 1-RM-90-131 CUE: AB AUO reports the 1-RM-90-130 is liS. STANDARD:
JPM #65 Page 12 of 13 Rev. 8 Job Performance Checklist:
Operator verifies the RM-90-130 is in service (No Alarms and Not Blocked).
STEP/STANDARD                              SAT/UNSAT STEP 43.:       VERIFY [1-FCV-30-15] is CLOSED.                                    -    SAT STANDARD:      Operator verified FCV-30-15 is closed and green light is ON        -   UNSAT STEP 44.:       VERIFY [1-FCV-30-7] is CLOSED.                                     -    SAT STANDARD:       Operator verified FCV-30-57 is closed and green light is ON        -    UNSAT STEP 45.:       IF Lower Compartment Purge Isolation Valves are aligned            -    SAT through the ALTERNATE flow path, THEN ...
STEP 21.: VERIFY that all personnel have been evacuated from the annulus and that all doors are closed. Cue: Role playas NSS or Rad Con and state all personnel are out of the annulus and the doors are closed. STANDARD:
                                                                                  -    UNSAT STANDARD: Operator should N/A this step since the NORMAL flow path was used to vent containment.
Operator calls Nuclear Security or Rad Con and verifies that all personnel have been evacuated from the annulus and that all doors are closed. STEP 22.: ENSURE at least one of the following radiation monitors in service for the appropriate unit:: AB Vent: 0-RM-90-1 01 B Upper Compartment:
STEP 46.:       CLOSE the Annulus Exhaust isolation valve[FCV-30-541 with          -   SAT HS-30-54.
1-RM-90-112 A. B Lower compartment:
                                                                                  -   UNSAT STANDARD: Operator places HS-30-54 in the closed position and verifies green light ON.                                                  Critical Step STEP 47.:      RESTORE the Annulus Vacuum Pressure Control                        -    SAT per 0-SO-65-1 Section 8.1.
1-RM-90-1 06 A. B STANDARD:
                                                                                  -   UNSAT CUE:      Another operator will restore Annulus Vacuum Control per 0-50-65-1.
Operator verifies the absence of applicable instrument malfunction alarms on 0-M-12. JPM #65 Page 8 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STANDARD: Operator addresses restoration of Annulus Vacuum Pressure Control per 0-SO-65-1 .
STEP/ST ANDARD STEP 18.: VERIFY NO abnormal or unexplainable radiation levels exist inside containment.
STEP 48.:       IF both Annulus Vacuum Control Fans are running, THEN STOP        -    SAT one of the Annulus Vacuum Control Fans.
STANDARD:
                                                                                  -    UNSAT STANDARD: Operator stops one of the Annulus Vacuum Control Fans STEP 49.:      ENSURE log entry is made into Narrative Logs detailing the time    -   SAT and the valves which were closed for venting.
Operator checks RM-90-106 and 112 for abnormal radiation levels in containment.
                                                                                    -  UNSAT CUE:     After Operator describes what the log entry would state, then tell them the log entry has been made.
STEP 19.: VERIFY that NO containment vent isolation signal exists. STANDARD:
STANDARD: Operator discusses what would be written in the Narrative log detailing the time and the vavles that were closed in the normal flow path.
Operator checks XA-55-6C windows C5 & C6 to verify that a cntmt vent isolation signal is not present. STEP 20.: ENSURE at least ONE of the following radiation monitors in service: U-1 Containment 1-RM-90-130 Purge Exhaust Monitors 1-RM-90-131 CUE: AB AUO reports the 1-RM-90-130 is liS. STANDARD:
 
Operator verifies the RM-90-130 is in service (No Alarms and Not Blocked).
JPM #65 Page 13 of 13 Rev. 8 Job Performance Checklist:
STEP 21.: VERIFY that all personnel have been evacuated from the annulus and that all doors are closed. Cue: Role playas NSS or Rad Con and state all personnel are out of the annulus and the doors are closed. STANDARD:
STEP/STANDARD                          SAT/UNSAT STEP 50.:       IF Unit One is in Modes 1, 2, or 3, THEN PERFORM the          -   SAT following:
Operator calls Nuclear Security or Rad Con and verifies that all personnel have been evacuated from the annulus and that all doors are closed. STEP 22.: ENSURE at least one of the following radiation monitors in service for the appropriate unit:: AB Vent: 0-RM-90-1 01 B Upper Compartment:
RETURN the Environmental Allowance Monitor (EAM) to normal    -   UNSAT by pushing the RESET button in each rack as follow ...
1-RM-90-112 A. B Lower compartment:
CUE:       Another operator will ensure EAMs are returned to normal, perform IVs.
1-RM-90-1 06 A. B STANDARD:
STANDARD: Operator address EAM's and IV's will be performed by another operator and continues in section 7.2.1.
Operator verifies the absence of applicable instrument malfunction alarms on 0-M-12. JPM #65 Page 8 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
STEP 51.:       IF LCO 3.6.6 is to be exited, THEN                            -  SAT LOG time in the UO journal.
Job Performance Checklist:
                                                                              -   UNSAT STANDARD: Operator recognizes LCO 3.6.6 was not entered and N/A's this step.
STEP/STANDARD STEP 23.: ENSURE PROTECTED EQUIPMENT DO NOT INOP tags placed on the following radiation monitors block switches as appropriate: (N/A tags not placed). BLOCK SWITCH MONITOR O-HS-90-136A 1 1-RM-90-130 O-HS-90-136A2 1-RM-90-1 31 O-HS-90-136A3 O-RM-90-1 01 B Cue: Extra Operator will place Protected Equipment tags. STANDARD:
STEP 52.:       ENSURE PROTECTED EQUIPMENT DO NOT INOP tags                    -   SAT removed from the following Radiation Moniotrs block switches as appropriate: (N/A tags NOT removed)                        -   UNSAT STANDARD: Operator removes all Protected Equipment from RM's and checks tag removed.
Operator places Do Not Inop (Protected Equipment)
NOTE:      Next step is performed per the initiating cues.                -   SAT STEP 53.:      INFORM the US/SRO that the containment has been vented        -   UNSAT and that the automatic vacuum control system has been placed back in service.
Tags on Rad Monitor Block Switches.
Stop Time_ _
STEP 24.: IF aligning the lower compartment purge isolation valves using the NORMAL flow path, THEN PERFORM steps [a] thru [f]. Cue: US prefers normal flow path. STANDARD:
STANDARD: Operator informs the US/SRO that the containment has been vented and that the automatic vacuum control system has been placed back in service.
None STEP 25.: ENSURE [FCV-30-37]
 
is CLOSED. STANDARD:
READ TO OPERATOR Directions to Trainee:
Operator verifies green light ON for FCV-30-37 STEP 26.: ENSURE [FCV-30-40]
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task.
is CLOSED. STANDARD:
To indicate that you have completed your assigned task return the handout sheet I provided you.
Operator verifies green light ON for FCV-30-40 STEP 27.: OPEN [FCV-30-14
INITIAL CONDITIONS:
& 56] with [HS-30-14].
Unit 1 is in Mode 1 recovering from an Air Line break in containment. The air leak was discovered on a section of the header that allowed isolation without affecting any equipment.
STANDARD:
During isolation efforts, containment pressure increased to approximately 0.5 to 0.7 psig.
Operator places HS-30-14 in the OPEN position and places HS-30-14 in the A-AUTO position.
INITIATING CUES:
STEP 28.: VERIFY [FCV-30-14
: 4. The US has directed you to vent containment using the normal flow path to within normal operating limits.
& 56] OPEN. STANDARD:
: 5. Inform the US when Containment has been vented and the Vacuum Control system is aligned NORMAL.
Operator verifies red lights illuminated ON [FCV-30-14
: 6. Precautions and Limitations and Prerequisite Actions are complete for 0-SO-30-8.
& 56]. STEP 29.: OPEN [FCV-30-15
                                      /
& 571 with HS-30-15 STANDARD:
 
Operator places HS-30-15 in the OPEN position and places HS-30-15 in the A-AUTO position.
JPM #77-1AP Page 1 of 10 Rev.12 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 77-1AP Perform DIG Load Test on 18-8 DIG (with high crankcase press)
JPM #65 Page 9 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/STANDARD STEP 23.: ENSURE PROTECTED EQUIPMENT DO NOT INOP tags placed on the following radiation monitors block switches as appropriate: (N/A tags not placed). BLOCK SWITCH MONITOR O-HS-90-136A 1 1-RM-90-130 O-HS-90-136A2 1-RM-90-1 31 O-HS-90-136A3 O-RM-90-1 01 B Cue: Extra Operator will place Protected Equipment tags. STANDARD:
Operator places Do Not Inop (Protected Equipment)
Tags on Rad Monitor Block Switches.
STEP 24.: IF aligning the lower compartment purge isolation valves using the NORMAL flow path, THEN PERFORM steps [a] thru [f]. Cue: US prefers normal flow path. STANDARD:
None STEP 25.: ENSURE [FCV-30-37]
is CLOSED. STANDARD:
Operator verifies green light ON for FCV-30-37 STEP 26.: ENSURE [FCV-30-40]
is CLOSED. STANDARD:
Operator verifies green light ON for FCV-30-40 STEP 27.: OPEN [FCV-30-14
& 56] with [HS-30-14].
STANDARD:
Operator places HS-30-14 in the OPEN position and places HS-30-14 in the A-AUTO position.
STEP 28.: VERIFY [FCV-30-14
& 56] OPEN. STANDARD:
Operator verifies red lights illuminated ON [FCV-30-14
& 56]. STEP 29.: OPEN [FCV-30-15
& 571 with HS-30-15 STANDARD:
Operator places HS-30-15 in the OPEN position and places HS-30-15 in the A-AUTO position.
JPM #65 Page 9 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/ST ANDARD STEP 30.: VERIFY FCV-30-15
& 57 OPEN. STANDARD:
Operator verifies red lights illuminated for FCV-30-15
& 57 and places HS-30-15 in the A-AUTO position.
STEP 31.: IF aligning the lower compartment purge isolation valves using the Alternate flow path THEN PERFORM steps [15.1] thru [15.8]. STANDARD:
Operator should NA this step since the NORMAL flow path is being used. STEP 32.: OPEN Annulus exhaust isolation valve FCV-30-54 with HS-30-54.
NOTE: When operator opens FCV-30-54 modify malfunctions CH01A, S, C, & D AND modify overrides ZAOPDIR30133 and ZAOPD130133.
STANDARD:
Operator opens FCV-30-54 with HS-30-54.
Verifies valve open by observing red light ON. STEP 33.: RECORD time purge isolation valves are OPENED. TIME STANDARD:
Operator records the time purge valves were opened. STEP 34.: IF the Annulus Vacuum Control System is in service and the standby Annulus Vacuum Control Fan is available, THEN PERFORM the following START the standby Annulus Vacuum Control Fan. NOTE: If NOTE 1 concerning 15 min to vent is addressed inform operator that some time compression is being used for the vent r -3 min to vent). STANDARD:
Operator starts the standby Annulus Vacuum Control Fan. STEP 35.: IF annulus vacuum fan flow low alarm comes in on 0-M-28A during venting, THEN STOP the applicable Annulus Vacuum Control Fan STANDARD:
If alarm comes in operator should stop applicable fan. JPM #65 Page 10 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP/ST ANDARD STEP 30.: VERIFY FCV-30-15
& 57 OPEN. STANDARD:
Operator verifies red lights illuminated for FCV-30-15
& 57 and places HS-30-15 in the A-AUTO position.
STEP 31.: IF aligning the lower compartment purge isolation valves using the Alternate flow path THEN PERFORM steps [15.1] thru [15.8]. STANDARD:
Operator should NA this step since the NORMAL flow path is being used. STEP 32.: OPEN Annulus exhaust isolation valve FCV-30-54 with HS-30-54.
NOTE: When operator opens FCV-30-54 modify malfunctions CH01A, S, C, & D AND modify overrides ZAOPDIR30133 and ZAOPD130133.
STANDARD:
Operator opens FCV-30-54 with HS-30-54.
Verifies valve open by observing red light ON. STEP 33.: RECORD time purge isolation valves are OPENED. TIME STANDARD:
Operator records the time purge valves were opened. STEP 34.: IF the Annulus Vacuum Control System is in service and the standby Annulus Vacuum Control Fan is available, THEN PERFORM the following START the standby Annulus Vacuum Control Fan. NOTE: If NOTE 1 concerning 15 min to vent is addressed inform operator that some time compression is being used for the vent r -3 min to vent). STANDARD:
Operator starts the standby Annulus Vacuum Control Fan. STEP 35.: IF annulus vacuum fan flow low alarm comes in on 0-M-28A during venting, THEN STOP the applicable Annulus Vacuum Control Fan STANDARD:
If alarm comes in operator should stop applicable fan. JPM #65 Page 10 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -
Job Performance Checklist:
STEP/STANDARD STEP 36.: IF a high radiation alarm occurs on any of the following Radiation Monitors, THEN ... STANDARD:
Operator addresses step and potential for action required if radiation levels increase.
STEP 37.: WHEN containment vent is completed, THEN perform [Section 7.2.1]. STANDARD:
Operator monitors containment pressure by observing Pdl-30-133.
When pressure differential within -0.1 and +0.3 psig, then go to Section 7.2.1. STEP 38.: ENSURE log entry is made into Narrative Logs detailing the time and the valves which were opened for venting. STANDARD:
Operator should describe the log entry that would be made including all valves which were opened for the Normal flowpath for venting and the time they were opened. NOTE: Operator transitions to Section 7.2.1 to shutdown vent. STEP 39.: IF lower Compartment Purge Isolation Valves are aligned through the Normal Flowpath, THEN PERFORM the following steps: PLACE [HS-30-141 in the CLOSED position.
STANDARD:
Operator places HS-30-14 in the closed STEP 40.: PLACE [HS-30-15J in the CLOSED position STANDARD:
Operator places HS-30-15 in the closed position and Verifies FCV-30-15, -57 are closed, green light ON their respective indicating lights. Should request independent verification of action. STEP 41.: VERIFY [1-FCV-30-14J is CLOSED. STANDARD:
Operator verified FCV-30-14 is closed and green light is ON STEP 42.: VERIFY [1-FCV-30-56]
is CLOSED. STANDARD:
Operator verified FCV-30-56 is closed and green light is ON JPM #65 Page 11 of 13 Rev. 8 SAT/U N SAT SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD STEP 36.: IF a high radiation alarm occurs on any of the following Radiation Monitors, THEN ... STANDARD:
Operator addresses step and potential for action required if radiation levels increase.
STEP 37.: WHEN containment vent is completed, THEN perform [Section 7.2.1]. STANDARD:
Operator monitors containment pressure by observing Pdl-30-133.
When pressure differential within -0.1 and +0.3 psig, then go to Section 7.2.1. STEP 38.: ENSURE log entry is made into Narrative Logs detailing the time and the valves which were opened for venting. STANDARD:
Operator should describe the log entry that would be made including all valves which were opened for the Normal flowpath for venting and the time they were opened. NOTE: Operator transitions to Section 7.2.1 to shutdown vent. STEP 39.: IF lower Compartment Purge Isolation Valves are aligned through the Normal Flowpath, THEN PERFORM the following steps: PLACE [HS-30-141 in the CLOSED position.
STANDARD:
Operator places HS-30-14 in the closed STEP 40.: PLACE [HS-30-15J in the CLOSED position STANDARD:
Operator places HS-30-15 in the closed position and Verifies FCV-30-15, -57 are closed, green light ON their respective indicating lights. Should request independent verification of action. STEP 41.: VERIFY [1-FCV-30-14J is CLOSED. STANDARD:
Operator verified FCV-30-14 is closed and green light is ON STEP 42.: VERIFY [1-FCV-30-56]
is CLOSED. STANDARD:
Operator verified FCV-30-56 is closed and green light is ON JPM #65 Page 11 of 13 Rev. 8 SAT/U N SAT SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -
Job Performance Checklist:
STEP/ST ANDARD STEP 43.: VERIFY [1-FCV-30-15]
is CLOSED. STANDARD:
Operator verified FCV-30-15 is closed and green light is ON STEP 44.: VERIFY [1-FCV-30-7]
is CLOSED. STANDARD:
Operator verified FCV-30-57 is closed and green light is ON STEP 45.: IF Lower Compartment Purge Isolation Valves are aligned through the ALTERNATE flow path, THEN ... STANDARD:
Operator should N/A this step since the NORMAL flow path was used to vent containment.
STEP 46.: CLOSE the Annulus Exhaust isolation valve[FCV-30-541 with HS-30-54. , STANDARD:
Operator places HS-30-54 in the closed position and verifies green light ON. STEP 47.: RESTORE the Annulus Vacuum Pressure Control per 0-SO-65-1 Section 8.1. CUE: Another operator will restore Annulus Vacuum Control per 0-50-65-1.
STANDARD:
Operator addresses restoration of Annulus Vacuum Pressure Control per 0-SO-65-1 . STEP 48.: IF both Annulus Vacuum Control Fans are running, THEN STOP one of the Annulus Vacuum Control Fans. STANDARD:
Operator stops one of the Annulus Vacuum Control Fans STEP 49.: ENSURE log entry is made into Narrative Logs detailing the time and the valves which were closed for venting. CUE: After Operator describes what the log entry would state, then tell them the log entry has been made. STANDARD:
Operator discusses what would be written in the Narrative log detailing the time and the vavles that were closed in the normal flow path. JPM #65 Page 12 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP/ST ANDARD STEP 43.: VERIFY [1-FCV-30-15]
is CLOSED. STANDARD:
Operator verified FCV-30-15 is closed and green light is ON STEP 44.: VERIFY [1-FCV-30-7]
is CLOSED. STANDARD:
Operator verified FCV-30-57 is closed and green light is ON STEP 45.: IF Lower Compartment Purge Isolation Valves are aligned through the ALTERNATE flow path, THEN ... STANDARD:
Operator should N/A this step since the NORMAL flow path was used to vent containment.
STEP 46.: CLOSE the Annulus Exhaust isolation valve[FCV-30-541 with HS-30-54. , STANDARD:
Operator places HS-30-54 in the closed position and verifies green light ON. STEP 47.: RESTORE the Annulus Vacuum Pressure Control per 0-SO-65-1 Section 8.1. CUE: Another operator will restore Annulus Vacuum Control per 0-50-65-1.
STANDARD:
Operator addresses restoration of Annulus Vacuum Pressure Control per 0-SO-65-1 . STEP 48.: IF both Annulus Vacuum Control Fans are running, THEN STOP one of the Annulus Vacuum Control Fans. STANDARD:
Operator stops one of the Annulus Vacuum Control Fans STEP 49.: ENSURE log entry is made into Narrative Logs detailing the time and the valves which were closed for venting. CUE: After Operator describes what the log entry would state, then tell them the log entry has been made. STANDARD:
Operator discusses what would be written in the Narrative log detailing the time and the vavles that were closed in the normal flow path. JPM #65 Page 12 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
Job Performance Checklist:
STEP/ST ANDARD STEP 50.: IF Unit One is in Modes 1, 2, or 3, THEN PERFORM the following:
RETURN the Environmental Allowance Monitor (EAM) to normal by pushing the RESET button in each rack as follow ... CUE: Another operator will ensure EAMs are returned to normal, perform IVs. STANDARD:
Operator address EAM's and IV's will be performed by another operator and continues in section 7.2.1. STEP 51.: IF LCO 3.6.6 is to be exited, THEN LOG time in the UO journal. STANDARD:
Operator recognizes LCO 3.6.6 was not entered and N/A's this step. STEP 52.: ENSURE PROTECTED EQUIPMENT DO NOT INOP tags removed from the following Radiation Moniotrs block switches as appropriate: (N/A tags NOT removed) STANDARD:
Operator removes all Protected Equipment from RM's and checks tag removed. NOTE: Next step is performed per the initiating cues. STEP 53.: INFORM the US/SRO that the containment has been vented and that the automatic vacuum control system has been placed back in service. STANDARD:
Operator informs the US/SRO that the containment has been vented and that the automatic vacuum control system has been placed back in service. JPM #65 Page 13 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Stop Time __ Job Performance Checklist:
STEP/ST ANDARD STEP 50.: IF Unit One is in Modes 1, 2, or 3, THEN PERFORM the following:
RETURN the Environmental Allowance Monitor (EAM) to normal by pushing the RESET button in each rack as follow ... CUE: Another operator will ensure EAMs are returned to normal, perform IVs. STANDARD:
Operator address EAM's and IV's will be performed by another operator and continues in section 7.2.1. STEP 51.: IF LCO 3.6.6 is to be exited, THEN LOG time in the UO journal. STANDARD:
Operator recognizes LCO 3.6.6 was not entered and N/A's this step. STEP 52.: ENSURE PROTECTED EQUIPMENT DO NOT INOP tags removed from the following Radiation Moniotrs block switches as appropriate: (N/A tags NOT removed) STANDARD:
Operator removes all Protected Equipment from RM's and checks tag removed. NOTE: Next step is performed per the initiating cues. STEP 53.: INFORM the US/SRO that the containment has been vented and that the automatic vacuum control system has been placed back in service. STANDARD:
Operator informs the US/SRO that the containment has been vented and that the automatic vacuum control system has been placed back in service. JPM #65 Page 13 of 13 Rev. 8 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Stop Time __
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
Unit 1 is in Mode 1 recovering from an Air Line break in containment.
The air leak was discovered on a section of the header that allowed isolation without affecting any equipment.
During isolation efforts, containment pressure increased to approximately 0.5 to 0.7 psig. INITIATING CUES: 4. The US has directed you to vent containment using the normal flow path to within normal operating limits. 5. Inform the US when Containment has been vented and the Vacuum Control system is aligned NORMAL. 6. Precautions and Limitations and Prerequisite Actions are complete for 0-SO-30-8.
/ READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
Unit 1 is in Mode 1 recovering from an Air Line break in containment.
The air leak was discovered on a section of the header that allowed isolation without affecting any equipment.
During isolation efforts, containment pressure increased to approximately 0.5 to 0.7 psig. INITIATING CUES: 4. The US has directed you to vent containment using the normal flow path to within normal operating limits. 5. Inform the US when Containment has been vented and the Vacuum Control system is aligned NORMAL. 6. Precautions and Limitations and Prerequisite Actions are complete for 0-SO-30-8.
/
PREPARED/
PREPARED/
REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 77-1AP Perform DIG Load Test on 18-8 DIG (with high crankcase press) Date/ JPM #77-1AP Page 1 of 10 Rev.12 VALIDATED BY:
REVISED BY:                                                             Date/
VALIDATED BY:
* Date/
* Date/
APPROVED BY: CONCURRED:
              ----------------------------------~==------------
Date/ (Operations Training Manager) ** o ate/ (Operations Representative)
APPROVED BY:                                                            Date/
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
(Operations Training Manager)
PREPARED/
CONCURRED:    **                                                       oate/
REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 77-1AP Perform DIG Load Test on 18-8 DIG (with high crankcase press) Date/ JPM #77-1AP Page 1 of 10 Rev.12 VALIDATED BY:
(Operations Representative)
* Date/ APPROVED BY: CONCURRED:
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
--------------------------------------------------
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
Date/ (Operations Training Manager) ** o ate/ (Operations Representative)
 
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
JPM #77-1AP Page 2 of 10 Rev.12 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                     DESCRIPTION OF                 V     DATE   PAGES    PREPARED/
NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 8 Revised to reflect revision changes in SI-N 10/13/99 7B, changed critical steps for consistency with JPM 77-5AP reviewed/approved 4/20/99, corrected typos and incorporated comments from 1999 cycle 5 requal performances of JPM 77-2AP. Flow of the JPM is not affected.
NUMBER                           REVISION                                 AFFECTED REVISED BY:
pen/ink 0-AR-M26-B Rev chg only N 8/9/00 pen/ink Minor change to step 6, SO-83 Rev N 8/17/00 update. pen/ink 0-AR-M26-B Rev chg only N 8/28/00 pen/ink 1-SI-OPS-082-007.B Rev chg only N 6/21/01 pen/ink 1-SI-0PS-082-007.B rev 25 Update minor N 09/07/01 changes related to stopwatch usage pen/ink minor enhancement changes and N 03/21/02 1-SI-OPS-082-007.B Revision update 9 Incorporated pen/ink changes; updated to N 8/20/02 latest revisions of referenced documents; no impact on JPM flow 10 Updated references N 12/10/03 Revised remote functions/annunciator N overrides to conform to new simulator configurations.
8         Revised to reflect revision changes in SI-   N   10/13/99     All    SR Taylor 7B, changed critical steps for consistency with JPM 77-5AP reviewed/approved 4/20/99, corrected typos and incorporated comments from 1999 cycle 5 requal performances of JPM 77-2AP. Flow of the JPM is not affected.
11 Updated to current revisions and IC. N 8/11/04 12 Updated to current revision of procedure Y 12/03/09 v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
pen/ink       0-AR-M26-B Rev chg only                       N     8/9/00     4      SR Taylor pen/ink       Minor change to step 6, SO-83 Rev             N     8/17/00     4      SR Taylor update.
PAGES AFFECTED All 4 4 4 4 ALL ALL All 4 8,9 All ALL JPM #77-1AP Page 2 of 10 Rev.12 PREPARED/
pen/ink       0-AR-M26-B Rev chg only                       N     8/28/00     4      SR Taylor pen/ink       1-SI-OPS-082-007.B Rev chg only               N     6/21/01     4    WR Ramsey pen/ink       1-SI-0PS-082-007.B rev 25 Update minor       N   09/07/01   ALL    WR Ramsey changes related to stopwatch usage pen/ink       minor enhancement changes and                 N   03/21/02   ALL    WR Ramsey 1-SI-OPS-082-007.B Revision update 9         Incorporated pen/ink changes; updated to     N     8/20/02     All  J P Kearney latest revisions of referenced documents; no impact on JPM flow 10         Updated references                           N   12/10/03     4    JJ Tricoglou Revised remote functions/annunciator         N               8,9 overrides to conform to new simulator configurations.
REVISED BY: SR Taylor SR Taylor SR Taylor SR Taylor WR Ramsey WR Ramsey WR Ramsey J P Kearney JJ Tricoglou MG Croteau M Hankins NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 8 Revised to reflect revision changes in SI-N 10/13/99 7B, changed critical steps for consistency with JPM 77-5AP reviewed/approved 4/20/99, corrected typos and incorporated comments from 1999 cycle 5 requal performances of JPM 77-2AP. Flow of the JPM is not affected.
11         Updated to current revisions and IC.         N     8/11/04     All  MG Croteau 12         Updated to current revision of procedure     Y   12/03/09   ALL    M Hankins v - Specify if the JPM change will require another validation (Y or N).
pen/ink 0-AR-M26-B Rev chg only N 8/9/00 pen/ink Minor change to step 6, SO-83 Rev N 8/17/00 update. pen/ink 0-AR-M26-B Rev chg only N 8/28/00 pen/ink 1-SI-OPS-082-007.B Rev chg only N 6/21/01 pen/ink 1-SI-0PS-082-007.B rev 25 Update minor N 09/07/01 changes related to stopwatch usage pen/ink minor enhancement changes and N 03/21/02 1-SI-OPS-082-007.B Revision update 9 Incorporated pen/ink changes; updated to N 8/20/02 latest revisions of referenced documents; no impact on JPM flow 10 Updated references N 12/10/03 Revised remote functions/annunciator N overrides to conform to new simulator configurations.
See cover sheet for criteria.
11 Updated to current revisions and IC. N 8/11/04 12 Updated to current revision of procedure Y 12/03/09 v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
 
PAGES AFFECTED All 4 4 4 4 ALL ALL All 4 8,9 All ALL JPM #77-1AP Page 2 of 10 Rev.12 PREPARED/
JPM #77-1AP Page 3 of 10 Rev.12 SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task:
REVISED BY: SR Taylor SR Taylor SR Taylor SR Taylor WR Ramsey WR Ramsey WR Ramsey J P Kearney JJ Tricoglou MG Croteau M Hankins Task: SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Perform DIG Load Test on 1 B-B DIG JAITA task # : 0640020101 0640040101 0640060101 (RO) KIA Ratings: 064A4.01 (4.0/4.3) 064A4.02 (3.3/3.4) 064A2.09 (3.1/3.3)
Perform DIG Load Test on 1B-B DIG JAITA task # :
0640020101     0640040101       0640060101     (RO)
KIA Ratings:
064A4.01 (4.0/4.3)                064A1.04 (2.8/2.9) 064A4.02 (3.3/3.4)                064A4.03 (3.2/3.3) 064A2.09 (3.1/3.3)                064A3.06 (3.9/3.9)
Task Standard:
Task Standard:
064A1.04 (2.8/2.9) 064A4.03 (3.2/3.3) 064A3.06 (3.9/3.9)
Perform DIG Operability Test per 1-SI-OPS-082-007.B, specifically manually start the DIG. Emergency stop DIG on high crankcase pressure annunciation.
JPM #77-1AP Page 3 of 10 Rev.12 Perform DIG Operability Test per 1-SI-OPS-082-007.B, specifically manually start the DIG. Emergency stop DIG on high crankcase pressure annunciation.
Evaluation Method:     Simulator _~X~_
Evaluation Method: Simulator X _ -'-!.-_-In-Plant __ _ ===================================================================================
_   -X
                                      '-!.-_- In-Plant -_-__-
===================================================================================
Performer:
Performer:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
NAME                                                   Start Time _ __
______________
Performance Rating: SAT             UNSAT           Performance Time                 Finish Time _ __
1 __ _ SIGNATURE DATE ====================================================================================
Evaluator:     _
COMMENTS Task: SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Perform DIG Load Test on 1 B-B DIG JAITA task # : 0640020101 0640040101 0640060101 (RO) KIA Ratings: 064A4.01 (4.0/4.3) 064A4.02 (3.3/3.4) 064A2.09 (3.1/3.3)
                                            =_ -_--  _ -_ -11 SIGNATURE                       DATE
====================================================================================
COMMENTS
 
JPM #77-1AP Page 4 of 10 Rev.12 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Any UNSAT requires comments
: 2. Acknowledge any associated alarms.
: 3. Initialize Simulator in IC: #16.
: 4. A console operator will be needed to insert override and play role of AUO on Radio.
: 5. Operator will need assistance during DIG start (at step 5). An extra simulator operator or the console operator needs to be present to perform this timing.
: 6. When operator starts JPM step #25, prior to D/G breaker closure, insert IMF AN_ OV_958 f:2.
: 7. Ensure operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc.
: b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR      30 minutes        Local _ _ _ __
Tools/Equipment/Procedures Needed:
: 1.      1-SI-OPS-082-007.B, Through Section 6.1 and Appendix "C".
: 2.      "Signed off" copy of entire section 4.
: 3.      0-AR-M26-B window 0-2.
References' Reference                                        Title                          Rev No.
: 1. 1-SI-OPS-082-007.B                      Electrical Power System Diesel Generator 1B-B          50
: 2. 0-AR-M26-B                              Annunciator 0-XA-55-26B                                27
 
JPM #77-1AP Page 5 of 10 Rev.12 READ TO OPERATOR Directions to Trainee:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1.        Both units are at 100% RTP.
: 2.        All systems are OPERABLE, except for the 1B-B DIG, 0-GO-16 has been completed on all the A train equipment.
: 3.        Maintenance has been completed on the 1B-B DIG and the clearance has been removed.
: 4.        The DIG has been rolled and is in standby alignment using 0-SO-82-2.
: 5.        The AUO at the DIG building has completed Appendix A of 1-SI-OPS-082-007.B and all parameters are within limits.
: 6.        The U1 Control Room AUO has verified breaker 1934 is in the Disconnect position.
: 7.        SI-166.36 is NOT required.
: 8.        D/G-DAQ has been installed per Appendix J.
: 9.        Applicable steps of Appendix J, Monitoring the DIG Starting Air System, completed.
: 10.      Room fire protection is in service.
: 11.      Section 4.0 of 1-SI-OPS-082-007.B is complete.
INITIATING CUES:
: 1.        The U1 US/SRO has reviewed the completed work package for the 1B-B DIG, all that remains is to perform 1-SI-OPS-082-007.B for the PMT.
: 2.        You are an extra unit operator and have been assigned to perform the SI on 1B-B DIG.
: 3.        The PMT requires the AMBIENT MANUAL START method for testing.
: 4.        Notify the US when the test is complete.
 
JPM #77-1AP Page 6 of 10 Rev.12 Job Performance Checklist:
STEP/STANDARD                                        SAT/UNSAT STEP 1.:      Operator obtains a copy of the appropriate procedure.                        -    SAT NOTE:        Initial conditions cover steps up to transition to App "C".                  -    UNSAT STANDARD: Operator obtains a copy of 1-SI-OPS-082-007.B. Performance of task will        Start start with Appendix C.                                                      Time__
STEP 2.:      ENSURE 0-HS-82-48 1B-B DIG mode selector switch in the UNIT                  -    SAT position.
                                                                                            -    UNSAT STANDARD: 0-HS-82-48 in UNIT position on 0-M-26. Green light ON.
STEP 3.:      PLACE 1-HS-57-7 4 DIG 1B-B Synchronize Switch in the SYN position.            -    SAT NOTE:        O-EI-82-35 and O-XI-82-33 will indicate running voltage & frequency.          -    UNSAT STANDARD: 1-HS-57-74 in "SYN" position on 0-M-26 Critical Step STEP 4.        PERFORM the following to initiate DIG start signal:                          -    SAT IF the DIG DAQ is to be used, THEN NOTIFY D/G-DAQ Operator to START the D/G-DAQ                                  -    UNSAT NOTE:      Operator should coordinate the start of the D/G-DAQ just prior to D/G start actuation.
STANDARD: Operator notifies the D/G-DAQ operator to start the D/G-DAQ.
NOTE:        The operator will NOT be able to manipulate switches and stop watch          -    SAT alone, allow the console operator to time the starting of the D/G. Only one stopwatch is required when the DAC is used.                              -    UNSAT STEP 5.:      PROCEED with the countdown: 3,2,1, START, DEPRESS 0-HS-82-46A, DG 1B-B Emergency Start Switch AND                    Critical Step START Stopwatch(es).
STANDARD: 0-HS-82-46A momentarily depressed. Green light will go "out" and red light will come "on" above DIG mimic. [Not critical: DIG running alarm will ANN to indicate DIG> 40 rpm. Incoming voltage and frequency are verified on 0-EI-82-34 and 0-XI-82-32.]
STEP 6.:      When voltage >6800 volts and Frequency >58.8 HZ, THEN STOP                    -    SAT stopwatch.
                                                                                            -    UNSAT STANDARD: Stop stopwatch when voltage >6800 volts and Frequency >58.8 HZ.
Critical Step
 
JPM #77-1AP Page 7 of 10 Rev.12 Job Performance Checklist:
STEP/STANDARD                                  SAT/U NSAT STEP 7.:      ENSURE 1-FCV-67-67, ERCW cooling water supply valve is OPEN.              -    SAT STANDARD: ERCW valve 1-FCV-67-67 red light comes "on" and green light goes "out"      -    UNSAT on 0-M-27A panel.
Critical Step STEP 8.:      Record the time from the Stopwatches:                                    -    SAT CUE:                  STOP WATCH 1 TIME 9.48 SECONDS                                    -    UNSAT STEP 9.:      RECORD the steady state values for the following:                        -    SAT A. 0-EI-82-34, DG 18-8 incoming Voltage.
: 8. 0-XI-82-32, DG 18-8 incoming Frequency.                            -    UNSAT STANDARD: DIG voltage (as indicated on INC Voltage Gen 18-8 0-EI-34) is?: 6800 but:s. 7260 volts and frequency (as indicated on INC Freq Gen 18-8 0-XI-82-32) is ?: 58.8 Hz and :s. 61.2 Hz STEP 10.:      RECORD Voltage Regulator Control Current.                                -    SAT Cue:      Voltage Regulator Control Current is 1.8 dc amps.                        -    UNSAT STANDARD: Operator records Voltage Regulator Control Current.
STEP 11.:      ENSURE DIG 18-8 86 lOR red light NOT ILLUMINATED, at DIG local            -    SAT relay panel.
                                                                                        -    UNSAT Cue:      Role playas DIG operator - 86 LOR local red light is not illuminated.
STANDARD    Operator verifies red light on 86 LOR at DIG is not illuminated.
STEP 12.:      RESET 86 lOR lockout relay, on DIG local relay panel and                  -    SAT Cue:      When the DIG AUO is requested to reset 86l0R, the Console operator        -    UNSAT should insert IRF EGR08 f: 1 to reset 86l0R and then notify operator - 86 lOR is reset.
Critical Step STANDARD: 86 LOR is reset.
STEP 13.:      VERIFY reset by amber light 0-XI-82-49 illuminated on 0-M-26.            -    SAT STANDARD: Amber light on 0-M-26 is verified lit.                                      -    UNSAT
 
JPM #77-1AP Page 8 of 10 Rev.12 Job Performance Checklist:
STEP/STANDARD                                    SAT/U NSAT STEP 14.:      IF the D/G-DAQ was used, THEN                                              -    SAT RECORD the time required to achieve    ~ 58.8 HZ and  ~ 6800 Volts from the D/G-DAQ computer.                                                      -    UNSAT Cue:      Time was 9.5 seconds for D/G-DAQ.
STANDARD: Operator ensures the DG accelerates to at least 900 rpm and Voltage and Frequency are within limit within the required 10 seconds. (Evaluator can sign for DG-DAQ Operator)
STEP 15.:      IF step 1.0[6)) is <59.9 or >60.1, THEN INITIATE a PER.                    -    SAT
                                                                                          -    UNSAT STANDARD: Parameters in Step 1.0 [6] were within limits, no PER required, operator continues with procedure.
STEP 16.:      RECORD start as ambient in 0-SI-OPS-082-007.M.                              -    SAT NOTE:        Another operator will record DIG start in O-SI-OPS-082-007.M,              -    UNSAT Cue the operator to continue.
STANDARD: Operator addresses logging the start in 0-SI-OPS-082-007.M.
STEP 17.:      RETURN to Section 6.1, Step 10.                                            -    SAT
                                                                                          -    UNSAT STANDARD: Operator returns to the appropriate section and step of the procedure.
(Exits Appendix C)
STEP 18.:      PERFORM the following to wipe the Automatic Voltage Control Rheostat:      -    SAT RECORD voltage from 0-EI-82-24
                                                                                          -    UNSAT STANDARD: OPERATOR records voltage and continues with next step.
STEP 19.:      ENSURE O-HS-82-42, DG 18-8 voltage Regualtor Switch in the Pull-to          -    SAT P-AUTO position
                                                                                          -    UNSAT STANDARD: Operator ensures 0-HS-82-42 in the Pull To PAUTO position.        \
Critical Step STEP 20.:      DECREASE voltage to 6700 volts on 0-EI-82-34 B 0-HS-82-42.                  -    SAT
                                                                                          -    UNSAT STANDARD: Operator ensures voltage decreases to 6700 volts on EI-82-34.
Critical Step
 
JPM #77-1AP Page 9 of 10 Rev.12 Job Performance Checklist:
STEP/STANDARD                                        SAT/UNSAT STEP 21.:      INCREASE voltage to 6700 volts on 0-EI-82-34 B 0-HS-82-42.                    -    SAT
                                                                                            -    UNSAT STANDARD:      Operator ensures voltage increases to 7300 volts on EI-82-34.
Critical Step STEP 22.:      RETURN voltage to value recorded in 6.1 [10.1]                                -    SAT STANDARD:      Operator ensures voltage returned to reading recorded in step 6.1 [1 0.1]    -    UNSAT Critical Step STEP 23.:      PLACE 0-HS-82-48, DG 1B-B Mode Selector Switch, in PARALLEL                  -    SAT position.
                                                                                            -    UNSAT STANDARD: 0-HS-82-48 rotated to the PARALLEL position. Red light "on" & green light "off".                                                                      Critical Step STEP 24.:      ADJUST 0-HS-82-43 DG 1B-B Speed Control Switch to obtain a                    -    SAT synchroscope indication of slowly rotating in FAST direction.
                                                                                            -    UNSAT STANDARD: Operator adjusts speed control hand switch 0-HS-82-43 such that synchroscope (XI-82-31) is moving slowly in the fast direction (slowly      Critical Step clockwise ).
STEP 25.:      RESPOND TO annuciator panel 0-M-26B window D-2.                              -    SAT STANDARD: Operator pulls AR 0-M-26B and consults for window D-2, or depresses the          -    UNSAT emergency stop button for DIG 1B-B.
STEP 26.:      IF DIG running with no valid accident (blackout or SI) signal present, THEN  -    SAT ENSURE DIG shutdown by depressing emergency stop pushbutton 0-HS-82-4 7A.                                                                -    UNSAT STANDARD: Operator depresses emergency stop button for Diesel Generator 1B-B.           Critical Step STEP 27.:      DISPATCH personnel to DIG Bldg to verify alarm, AND CHECK crankcase            -  SAT trip device actuated [0-PS-82-5026/21 or [0-PS-82-5025/2].
                                                                                            -    UNSAT Cue:      AUO informs Unit Operator that crankcase pressure alarm is in on local panel and O-PS-82-5026/2 is actuated on engine 2.
STANDARD: Operator contacts AUO at the Diesel Generator Building to confirm crankcase pressure alarm.
 
JPM #77-1AP Page 10 of 10 Rev.12 Job Performance Checklist:
STEP/STANDARD                                SAT/UNSAT STEP 28.:      NOTIFY US/SRO of Emergency stop of Diesel Generator 18-8.              SAT US/SRO instructs operator to standby for further instructions.        UNSAT Stop STANDARD: Operator informs US/SRO of Emergency stop of Diesel Generator 18-8. Time__
 
READ TO OPERATOR Directions to Trainee:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1.        Both units are at 100% RTP.
: 2.        All systems are OPERABLE, except for the 1B-B DIG, 0-GO-16 has been completed on all the A train equipment.
: 3.        Maintenance has been completed on the 1B-B DIG and the clearance has been removed.
: 4.        The DIG has been rolled and is in standby alignment using 0-SO-82-2.
: 5.        The AUO at the DIG building has completed Appendix A of 1-SI-OPS-082-007.B and all parameters are within limits.
: 6.        The U1 Control Room AUO has verified breaker 1934 is in the Disconnect position.
: 7.        SI-166.36 is NOT required.
: 8.        D/G-DAQ has been installed per Appendix J.
: 9.        Applicable steps of Appendix J, Monitoring the DIG Starting Air System, completed.
: 10.      Room fire protection is in service.
: 11.      Section 4.0 of 1-SI-OPS-082-007.B is complete.
INITIATING CUES:
: 1.        The U1 US/SRO has reviewed the completed work package for the 1B-B DIG, all that remains is to perform 1-SI-OPS-082-007.B for the PMT.
: 2.        You are an extra unit operator and have been assigned to perform the SI on 1B-B DIG.
: 3.        The PMT requires the AMBIENT MANUAL START method for testing.
: 4.       Notify the US when the test is complete.
 
JPM21-1A Page 1 of9 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM21-1A Respond to a Failure of PRM N-41 PREPAREDI REVISED BY:                                                            Date/
VALIDATED BY:
* Date/
APPROVED BY:                                                            Date/
(Operations Training Manager)
CONCURRED:    **                                                        Date/
(Operations Representative)
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
 
JPM21-1A Page 2 of 9 Rev. 0 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                    DESCRIPTION OF                V      DATE    PAGES    PREPARED/
NUMBER                        REVISION                                    AFFECTED REVISED BY:
0        Initial Issue                                Y    12/02//09    All    M Hankins v - Specify if the JPM change will require another Validation (Y or N).
See cover sheet for criteria.
 
JPM21-1A Page 3 of 9 Rev. 0 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task:
Respond to a Failure of PRM N-41 Note: This JPM satisfies Simulator Manipulation "AA".
JA/TA task # : 3210140401      (RO)      0150050101      (RO)  0150040101      (RO)
KIA Ratings:
015A4.03 (3.8/3.9)                015A4.02 (3.9/3.6) 015A2.01 (3.5/3.9)                015A3.03 (3.9/3.9) 015A4.01 (3.6/3.6)               015A2.02 (3.1/3.5)
Task Standard:
Task Standard:
064A1.04 (2.8/2.9) 064A4.03 (3.2/3.3) 064A3.06 (3.9/3.9)
Recognize failure of Power Range Monitor, N-41, defeat its control functions, and prepare for its removal from service.
JPM #77-1AP Page 3 of 10 Rev.12 Perform DIG Operability Test per 1-SI-OPS-082-007.B, specifically manually start the DIG. Emergency stop DIG on high crankcase pressure annunciation.
Evaluation Method:     Simulator -_..:...X,,--_
Evaluation Method: Simulator In-Plant ---===================================================================================
X In-Plant _ __
===================================================================================
Performer:
Performer:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
NAME                                                     Start Time _ _ __
_____ ---:-____ ---=-----1---
Performance Rating:   SAT           UNSAT           Performance Time                   Finish Time _ __
SIGNATURE DATE ====================================================================================
Evaluator:     --------------------------~/_--
COMMENTS SPECIAL INSTRUCTIONS TO EVALUATOR:  
                - -------------_/_--
: 1. Any UNSAT requires comments 2. Acknowledge any associated alarms. 3. Initialize Simulator in IC: #16. 4. A console operator will be needed to insert override and play role of AUO on Radio. JPM #77-1AP Page 4 of 10 Rev.12 5. Operator will need assistance during DIG start (at step 5). An extra simulator operator or the console operator needs to be present to perform this timing. 6. When operator starts JPM step #25, prior to D/G breaker closure, insert IMF AN_ OV _958 f:2. 7. Ensure operator performs the following required actions for SELF-CHECKING;  
SIGNATURE                     DATE
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.  
===================================================================================
COMMENTS
 
JPM21-1A Page 4 of 9 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Any UNSAT requires comments.
: 2. Acknowledge any associated alarms.
: 3. Initialize simulator in IC #13.
: 4. Booth operator:
: a. Select N-41 on NR45.
: b. Verify Rx power <75% on PRNls, NR-45 and b:. T recorder, TR-68-2A
: 1. Approximately 1 minute after operator assumes shift, Activate IMF NI07A f:120.
: 2. Ensure operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc.
: b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR 30 minutes Local ____ _ Tools/Equipment/Procedures Needed: 1. 1-SI-OPS-082-007.B, Through Section 6.1 and Appendix "C". 2. "Signed off" copy of entire section 4. 3. 0-AR-M26-B window 0-2. References' Reference Title Rev No. 1. 1-SI-OPS-082-007.B Electrical Power System Diesel Generator 1 B-B 50 2. 0-AR-M26-B Annunciator 0-XA-55-26B 27 SPECIAL INSTRUCTIONS TO EVALUATOR:
Validation Time: CR. 9 mins           Local Tools/Equipment/Procedures Needed:
: 1. Any UNSAT requires comments 2. Acknowledge any associated alarms. 3. Initialize Simulator in IC: #16. 4. A console operator will be needed to insert override and play role of AUO on Radio. JPM #77-1AP Page 4 of 10 Rev.12 5. Operator will need assistance during DIG start (at step 5). An extra simulator operator or the console operator needs to be present to perform this timing. 6. When operator starts JPM step #25, prior to D/G breaker closure, insert IMF AN_ OV _958 f:2. 7. Ensure operator performs the following required actions for SELF-CHECKING;
AOP-1.01, Section 2.0 & 2.3, AR-M6-A
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR 30 minutes Local ____ _ Tools/Equipment/Procedures Needed: 1. 1-SI-OPS-082-007.B, Through Section 6.1 and Appendix "C". 2. "Signed off" copy of entire section 4. 3. 0-AR-M26-B window 0-2. References' Reference Title Rev No. 1. 1-SI-OPS-082-007.B Electrical Power System Diesel Generator 1 B-B 50 2. 0-AR-M26-B Annunciator 0-XA-55-26B 27 READ TO OPERATOR Directions to Trainee: JPM #77-1AP Page 5 of 10 Rev.12 I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1. Both units are at 100% RTP. 2. All systems are OPERABLE, except for the 1 B-B DIG, 0-GO-16 has been completed on all the A train equipment.
: 3. Maintenance has been completed on the 1 B-B DIG and the clearance has been removed. 4. The DIG has been rolled and is in standby alignment using 0-SO-82-2.
: 5. The AUO at the DIG building has completed Appendix A of 1-SI-OPS-082-007.B and all parameters are within limits. 6. The U1 Control Room AUO has verified breaker 1934 is in the Disconnect position.
: 7. SI-166.36 is NOT required.
: 8. D/G-DAQ has been installed per Appendix J. 9. Applicable steps of Appendix J, Monitoring the DIG Starting Air System, completed.
: 10. Room fire protection is in service. 11. Section 4.0 of 1-SI-OPS-082-007.B is complete.
INITIATING CUES: 1. The U1 US/SRO has reviewed the completed work package for the 1 B-B DIG, all that remains is to perform 1-SI-OPS-082-007.B for the PMT. 2. You are an extra unit operator and have been assigned to perform the SI on 1 B-B DIG. 3. The PMT requires the AMBIENT MANUAL START method for testing. 4. Notify the US when the test is complete.
READ TO OPERATOR Directions to Trainee: JPM #77-1AP Page 5 of 10 Rev.12 I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1. Both units are at 100% RTP. 2. All systems are OPERABLE, except for the 1 B-B DIG, 0-GO-16 has been completed on all the A train equipment.
: 3. Maintenance has been completed on the 1 B-B DIG and the clearance has been removed. 4. The DIG has been rolled and is in standby alignment using 0-SO-82-2.
: 5. The AUO at the DIG building has completed Appendix A of 1-SI-OPS-082-007.B and all parameters are within limits. 6. The U1 Control Room AUO has verified breaker 1934 is in the Disconnect position.
: 7. SI-166.36 is NOT required.
: 8. D/G-DAQ has been installed per Appendix J. 9. Applicable steps of Appendix J, Monitoring the DIG Starting Air System, completed.
: 10. Room fire protection is in service. 11. Section 4.0 of 1-SI-OPS-082-007.B is complete.
INITIATING CUES: 1. The U1 US/SRO has reviewed the completed work package for the 1 B-B DIG, all that remains is to perform 1-SI-OPS-082-007.B for the PMT. 2. You are an extra unit operator and have been assigned to perform the SI on 1 B-B DIG. 3. The PMT requires the AMBIENT MANUAL START method for testing. 4. Notify the US when the test is complete.
Job Performance Checklist:
STEP/STANDARD STEP 1.: Operator obtains a copy of the appropriate procedure.
NOTE: Initial conditions cover steps up to transition to App "C". STANDARD:
Operator obtains a copy of 1-SI-OPS-082-007.B.
Performance of task will start with Appendix C. STEP 2.: ENSURE 0-HS-82-48 1 B-B DIG mode selector switch in the UNIT position.
STANDARD:
0-HS-82-48 in UNIT position on 0-M-26. Green light ON. STEP 3.: PLACE 1-HS-57 -7 4 DIG 1 B-B Synchronize Switch in the SYN position.
NOTE: O-EI-82-35 and O-XI-82-33 will indicate running voltage & frequency.
STANDARD:
1-HS-57-74 in "SYN" position on 0-M-26 STEP 4. PERFORM the following to initiate DIG start signal: IF the DIG DAQ is to be used, THEN NOTIFY D/G-DAQ Operator to START the D/G-DAQ NOTE: Operator should coordinate the start of the D/G-DAQ just prior to D/G start actuation.
STANDARD:
Operator notifies the D/G-DAQ operator to start the D/G-DAQ. NOTE: The operator will NOT be able to manipulate switches and stop watch alone, allow the console operator to time the starting of the D/G. Only one stopwatch is required when the DAC is used. STEP 5.: PROCEED with the countdown:
3,2,1, START, DEPRESS 0-HS-82-46A, DG 1 B-B Emergency Start Switch AND START Stopwatch(es).
STANDARD:
0-HS-82-46A momentarily depressed.
Green light will go "out" and red light will come "on" above DIG mimic. [Not critical:
DIG running alarm will ANN to indicate DIG> 40 rpm. Incoming voltage and frequency are verified on 0-EI-82-34 and 0-XI-82-32.]
STEP 6.: When voltage >6800 volts and Frequency
>58.8 HZ, THEN STOP stopwatch.
STANDARD:
Stop stopwatch when voltage >6800 volts and Frequency
>58.8 HZ. JPM #77-1AP Page 6 of 10 Rev.12 SAT/UNSAT SAT -UNSAT -Start Time __ SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/STANDARD STEP 1.: Operator obtains a copy of the appropriate procedure.
NOTE: Initial conditions cover steps up to transition to App "C". STANDARD:
Operator obtains a copy of 1-SI-OPS-082-007.B.
Performance of task will start with Appendix C. STEP 2.: ENSURE 0-HS-82-48 1 B-B DIG mode selector switch in the UNIT position.
STANDARD:
0-HS-82-48 in UNIT position on 0-M-26. Green light ON. STEP 3.: PLACE 1-HS-57 -7 4 DIG 1 B-B Synchronize Switch in the SYN position.
NOTE: O-EI-82-35 and O-XI-82-33 will indicate running voltage & frequency.
STANDARD:
1-HS-57-74 in "SYN" position on 0-M-26 STEP 4. PERFORM the following to initiate DIG start signal: IF the DIG DAQ is to be used, THEN NOTIFY D/G-DAQ Operator to START the D/G-DAQ NOTE: Operator should coordinate the start of the D/G-DAQ just prior to D/G start actuation.
STANDARD:
Operator notifies the D/G-DAQ operator to start the D/G-DAQ. NOTE: The operator will NOT be able to manipulate switches and stop watch alone, allow the console operator to time the starting of the D/G. Only one stopwatch is required when the DAC is used. STEP 5.: PROCEED with the countdown:
3,2,1, START, DEPRESS 0-HS-82-46A, DG 1 B-B Emergency Start Switch AND START Stopwatch(es).
STANDARD:
0-HS-82-46A momentarily depressed.
Green light will go "out" and red light will come "on" above DIG mimic. [Not critical:
DIG running alarm will ANN to indicate DIG> 40 rpm. Incoming voltage and frequency are verified on 0-EI-82-34 and 0-XI-82-32.]
STEP 6.: When voltage >6800 volts and Frequency
>58.8 HZ, THEN STOP stopwatch.
STANDARD:
Stop stopwatch when voltage >6800 volts and Frequency
>58.8 HZ. JPM #77-1AP Page 6 of 10 Rev.12 SAT/UNSAT SAT -UNSAT -Start Time __ SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/ST ANDARD STEP 7.: ENSURE 1-FCV-67-67, ERCW cooling water supply valve is OPEN. STANDARD:
ERCW valve 1-FCV-67-67 red light comes "on" and green light goes "out" on 0-M-27 A panel. STEP 8.: Record the time from the Stopwatches:
CUE: STOP WATCH 1 TIME 9.48 SECONDS STEP 9.: RECORD the steady state values for the following:
A. 0-EI-82-34, DG 18-8 incoming Voltage. 8. 0-XI-82-32, DG 18-8 incoming Frequency.
STANDARD:
DIG voltage (as indicated on INC Voltage Gen 18-8 0-EI-34) is?: 6800 but:s. 7260 volts and frequency (as indicated on INC Freq Gen 18-8 0-XI-82-32) is ?: 58.8 Hz and :s. 61.2 Hz STEP 10.: RECORD Voltage Regulator Control Current. Cue: Voltage Regulator Control Current is 1.8 dc amps. STANDARD:
Operator records Voltage Regulator Control Current. STEP 11.: ENSURE DIG 18-8 86 lOR red light NOT ILLUMINATED, at DIG local relay panel. Cue: Role playas DIG operator -86 LOR local red light is not illuminated.
STANDARD Operator verifies red light on 86 LOR at DIG is not illuminated.
STEP 12.: RESET 86 lOR lockout relay, on DIG local relay panel and Cue: When the DIG AUO is requested to reset 86l0R, the Console operator should insert IRF EGR08 f: 1 to reset 86l0R and then notify operator -86 lOR is reset. STANDARD:
86 LOR is reset. STEP 13.: VERIFY reset by amber light 0-XI-82-49 illuminated on 0-M-26. STANDARD:
Amber light on 0-M-26 is verified lit. JPM #77-1AP Page 7 of 10 Rev.12 SAT/U N SAT SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Job Performance Checklist:
STEP/ST ANDARD STEP 7.: ENSURE 1-FCV-67-67, ERCW cooling water supply valve is OPEN. STANDARD:
ERCW valve 1-FCV-67-67 red light comes "on" and green light goes "out" on 0-M-27 A panel. STEP 8.: Record the time from the Stopwatches:
CUE: STOP WATCH 1 TIME 9.48 SECONDS STEP 9.: RECORD the steady state values for the following:
A. 0-EI-82-34, DG 18-8 incoming Voltage. 8. 0-XI-82-32, DG 18-8 incoming Frequency.
STANDARD:
DIG voltage (as indicated on INC Voltage Gen 18-8 0-EI-34) is?: 6800 but:s. 7260 volts and frequency (as indicated on INC Freq Gen 18-8 0-XI-82-32) is ?: 58.8 Hz and :s. 61.2 Hz STEP 10.: RECORD Voltage Regulator Control Current. Cue: Voltage Regulator Control Current is 1.8 dc amps. STANDARD:
Operator records Voltage Regulator Control Current. STEP 11.: ENSURE DIG 18-8 86 lOR red light NOT ILLUMINATED, at DIG local relay panel. Cue: Role playas DIG operator -86 LOR local red light is not illuminated.
STANDARD Operator verifies red light on 86 LOR at DIG is not illuminated.
STEP 12.: RESET 86 lOR lockout relay, on DIG local relay panel and Cue: When the DIG AUO is requested to reset 86l0R, the Console operator should insert IRF EGR08 f: 1 to reset 86l0R and then notify operator -86 lOR is reset. STANDARD:
86 LOR is reset. STEP 13.: VERIFY reset by amber light 0-XI-82-49 illuminated on 0-M-26. STANDARD:
Amber light on 0-M-26 is verified lit. JPM #77-1AP Page 7 of 10 Rev.12 SAT/U N SAT SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -
Job Performance Checklist:
STEP/ST ANDARD STEP 14.: IF the D/G-DAQ was used, THEN RECORD the time required to achieve 58.8 HZ and 6800 Volts from the D/G-DAQ computer.
Cue: Time was 9.5 seconds for D/G-DAQ. STANDARD:
Operator ensures the DG accelerates to at least 900 rpm and Voltage and Frequency are within limit within the required 10 seconds. (Evaluator can sign for DG-DAQ Operator)
STEP 15.: IF step 1.0[6]] is <59.9 or >60.1, THEN INITIATE a PER. STANDARD:
Parameters in Step 1.0 [6] were within limits, no PER required, operator continues with procedure.
STEP 16.: RECORD start as ambient in 0-SI-OPS-082-007.M.
NOTE: Another operator will record DIG start in O-SI-OPS-082-007.M, Cue the operator to continue.
STANDARD:
Operator addresses logging the start in 0-SI-OPS-082-007.M.
STEP 17.: RETURN to Section 6.1, Step 10. STANDARD:
Operator returns to the appropriate section and step of the procedure. (Exits Appendix C) STEP 18.: PERFORM the following to wipe the Automatic Voltage Control Rheostat:
RECORD voltage from 0-EI-82-24 STANDARD:
OPERA TOR records voltage and continues with next step. STEP 19.: ENSURE O-HS-82-42, DG 18-8 voltage Regualtor Switch in the Pull-to P-AUTO position STANDARD:
Operator ensures 0-HS-82-42 in the Pull To PAUTO position.
\ STEP 20.: DECREASE voltage to 6700 volts on 0-EI-82-34 B 0-HS-82-42.
STANDARD:
Operator ensures voltage decreases to 6700 volts on EI-82-34.
JPM #77-1AP Page 8 of 10 Rev.12 SAT/U N SAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/ST ANDARD STEP 14.: IF the D/G-DAQ was used, THEN RECORD the time required to achieve 58.8 HZ and 6800 Volts from the D/G-DAQ computer.
Cue: Time was 9.5 seconds for D/G-DAQ. STANDARD:
Operator ensures the DG accelerates to at least 900 rpm and Voltage and Frequency are within limit within the required 10 seconds. (Evaluator can sign for DG-DAQ Operator)
STEP 15.: IF step 1.0[6]] is <59.9 or >60.1, THEN INITIATE a PER. STANDARD:
Parameters in Step 1.0 [6] were within limits, no PER required, operator continues with procedure.
STEP 16.: RECORD start as ambient in 0-SI-OPS-082-007.M.
NOTE: Another operator will record DIG start in O-SI-OPS-082-007.M, Cue the operator to continue.
STANDARD:
Operator addresses logging the start in 0-SI-OPS-082-007.M.
STEP 17.: RETURN to Section 6.1, Step 10. STANDARD:
Operator returns to the appropriate section and step of the procedure. (Exits Appendix C) STEP 18.: PERFORM the following to wipe the Automatic Voltage Control Rheostat:
RECORD voltage from 0-EI-82-24 STANDARD:
OPERA TOR records voltage and continues with next step. STEP 19.: ENSURE O-HS-82-42, DG 18-8 voltage Regualtor Switch in the Pull-to P-AUTO position STANDARD:
Operator ensures 0-HS-82-42 in the Pull To PAUTO position.
\ STEP 20.: DECREASE voltage to 6700 volts on 0-EI-82-34 B 0-HS-82-42.
STANDARD:
Operator ensures voltage decreases to 6700 volts on EI-82-34.
JPM #77-1AP Page 8 of 10 Rev.12 SAT/U N SAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/STANDARD STEP 21.: INCREASE voltage to 6700 volts on 0-EI-82-34 B 0-HS-82-42.
STANDARD:
Operator ensures voltage increases to 7300 volts on EI-82-34.
STEP 22.: RETURN voltage to value recorded in 6.1 [10.1] STANDARD:
Operator ensures voltage returned to reading recorded in step 6.1 [1 0.1] STEP 23.: PLACE 0-HS-82-48, DG 1 B-B Mode Selector Switch, in PARALLEL position.
STANDARD:
0-HS-82-48 rotated to the PARALLEL position.
Red light "on" & green light "off". STEP 24.: ADJUST 0-HS-82-43 DG 1 B-B Speed Control Switch to obtain a synchroscope indication of slowly rotating in FAST direction.
STANDARD:
Operator adjusts speed control hand switch 0-HS-82-43 such that synchroscope (XI-82-31) is moving slowly in the fast direction (slowly clockwise
). STEP 25.: RESPOND TO annuciator panel 0-M-26B window D-2. STANDARD:
Operator pulls AR 0-M-26B and consults for window D-2, or depresses the emergency stop button for DIG 1 B-B. STEP 26.: IF DIG running with no valid accident (blackout or SI) signal present, THEN ENSURE DIG shutdown by depressing emergency stop pushbutton 0-HS-82-4 7 A. STANDARD:
Operator depresses emergency stop button for Diesel Generator 1 B-B. STEP 27.: DISPATCH personnel to DIG Bldg to verify alarm, AND CHECK crankcase trip device actuated [0-PS-82-5026/21 or [0-PS-82-5025/2].
Cue: AUO informs Unit Operator that crankcase pressure alarm is in on local panel and O-PS-82-5026/2 is actuated on engine 2. STANDARD:
Operator contacts AUO at the Diesel Generator Building to confirm crankcase pressure alarm. JPM #77-1AP Page 9 of 10 Rev.12 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD STEP 21.: INCREASE voltage to 6700 volts on 0-EI-82-34 B 0-HS-82-42.
STANDARD:
Operator ensures voltage increases to 7300 volts on EI-82-34.
STEP 22.: RETURN voltage to value recorded in 6.1 [10.1] STANDARD:
Operator ensures voltage returned to reading recorded in step 6.1 [1 0.1] STEP 23.: PLACE 0-HS-82-48, DG 1 B-B Mode Selector Switch, in PARALLEL position.
STANDARD:
0-HS-82-48 rotated to the PARALLEL position.
Red light "on" & green light "off". STEP 24.: ADJUST 0-HS-82-43 DG 1 B-B Speed Control Switch to obtain a synchroscope indication of slowly rotating in FAST direction.
STANDARD:
Operator adjusts speed control hand switch 0-HS-82-43 such that synchroscope (XI-82-31) is moving slowly in the fast direction (slowly clockwise
). STEP 25.: RESPOND TO annuciator panel 0-M-26B window D-2. STANDARD:
Operator pulls AR 0-M-26B and consults for window D-2, or depresses the emergency stop button for DIG 1 B-B. STEP 26.: IF DIG running with no valid accident (blackout or SI) signal present, THEN ENSURE DIG shutdown by depressing emergency stop pushbutton 0-HS-82-4 7 A. STANDARD:
Operator depresses emergency stop button for Diesel Generator 1 B-B. STEP 27.: DISPATCH personnel to DIG Bldg to verify alarm, AND CHECK crankcase trip device actuated [0-PS-82-5026/21 or [0-PS-82-5025/2].
Cue: AUO informs Unit Operator that crankcase pressure alarm is in on local panel and O-PS-82-5026/2 is actuated on engine 2. STANDARD:
Operator contacts AUO at the Diesel Generator Building to confirm crankcase pressure alarm. JPM #77-1AP Page 9 of 10 Rev.12 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -
Job Performance Checklist:
STEP/ST ANDARD STEP 28.: NOTIFY US/SRO of Emergency stop of Diesel Generator 18-8. US/SRO instructs operator to standby for further instructions.
STANDARD:
Operator informs US/SRO of Emergency stop of Diesel Generator 18-8. JPM #77-1AP Page 10 of 10 Rev.12 SAT/UNSAT SAT UNSAT Stop Time __ Job Performance Checklist:
STEP/ST ANDARD STEP 28.: NOTIFY US/SRO of Emergency stop of Diesel Generator 18-8. US/SRO instructs operator to standby for further instructions.
STANDARD:
Operator informs US/SRO of Emergency stop of Diesel Generator 18-8. JPM #77-1AP Page 10 of 10 Rev.12 SAT/UNSAT SAT UNSAT Stop Time __
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1. Both units are at 100% RTP. 2. All systems are OPERABLE, except for the 1 B-B DIG, 0-GO-16 has been completed on all the A train equipment.
: 3. Maintenance has been completed on the 1 B-B DIG and the clearance has been removed. 4. The DIG has been rolled and is in standby alignment using 0-SO-82-2.
: 5. The AUO at the DIG building has completed Appendix A of 1-SI-OPS-082-007.B and all parameters are within limits. 6. The U1 Control Room AUO has verified breaker 1934 is in the Disconnect position.
: 7. SI-166.36 is NOT required.
: 8. D/G-DAQ has been installed per Appendix J. 9. Applicable steps of Appendix J, Monitoring the DIG Starting Air System, completed.
: 10. Room fire protection is in service. 11. Section 4.0 of 1-SI-OPS-082-007.B is complete.
INITIATING CUES: 1. The U1 US/SRO has reviewed the completed work package for the 1 B-B DIG, all that remains is to perform 1-SI-OPS-082-007.B for the PMT. 2. You are an extra unit operator and have been assigned to perform the SI on 1 B-B DIG. 3. The PMT requires the AMBIENT MANUAL START method for testing. 4. Notify the US when the test is complete.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1. Both units are at 100% RTP. 2. All systems are OPERABLE, except for the 1 B-B DIG, 0-GO-16 has been completed on all the A train equipment.
: 3. Maintenance has been completed on the 1 B-B DIG and the clearance has been removed. 4. The DIG has been rolled and is in standby alignment using 0-SO-82-2.
: 5. The AUO at the DIG building has completed Appendix A of 1-SI-OPS-082-007.B and all parameters are within limits. 6. The U1 Control Room AUO has verified breaker 1934 is in the Disconnect position.
: 7. SI-166.36 is NOT required.
: 8. D/G-DAQ has been installed per Appendix J. 9. Applicable steps of Appendix J, Monitoring the DIG Starting Air System, completed.
: 10. Room fire protection is in service. 11. Section 4.0 of 1-SI-OPS-082-007.B is complete.
INITIATING CUES: 1. The U1 US/SRO has reviewed the completed work package for the 1 B-B DIG, all that remains is to perform 1-SI-OPS-082-007.B for the PMT. 2. You are an extra unit operator and have been assigned to perform the SI on 1 B-B DIG. 3. The PMT requires the AMBIENT MANUAL START method for testing. 4. Notify the US when the test is complete.
PREPAREDI REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:
* ** SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM21-1A Respond to a Failure of PRM N-41 Date/ Date/ Date/ (Operations Training Manager) Date/ (Operations Representative)
JPM21-1A Page 1 of9 Rev. 0
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
PREPAREDI REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:
* ** SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM21-1A Respond to a Failure of PRM N-41 Date/ Date/ Date/ (Operations Training Manager) Date/ (Operations Representative)
JPM21-1A Page 1 of9 Rev. 0
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Initial Issue Y 12/02//09 v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
PAGES AFFECTED All JPM21-1A Page 2 of 9 Rev. 0 PREPARED/
REVISED BY: M Hankins NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Initial Issue Y 12/02//09 v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
PAGES AFFECTED All JPM21-1A Page 2 of 9 Rev. 0 PREPARED/
REVISED BY: M Hankins Task: SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Respond to a Failure of PRM N-41 Note: This JPM satisfies Simulator Manipulation "AA". JA/TA task # : 3210140401 KIA Ratings: 015A4.03 (3.8/3.9) 015A2.01 (3.5/3.9) 015A4.01 (3.6/3.6)
Task Standard: (RO) 0150050101 (RO) 0150040101 (RO) 015A4.02 (3.9/3.6) 015A3.03 (3.9/3.9) 015A2.02 (3.1/3.5)
JPM21-1A Page 3 of 9 Rev. 0 Recognize failure of Power Range Monitor, N-41, defeat its control functions, and prepare for its removal from service. Evaluation Method: Simulator
_..:...X,,--_
In-Plant __ _ ===================================================================================
Performer:
NAME Start Time ___ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
--------------_/_--
SIGNATURE DATE ===================================================================================
COMMENTS Task: SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Respond to a Failure of PRM N-41 Note: This JPM satisfies Simulator Manipulation "AA". JA/TA task # : 3210140401 KIA Ratings: 015A4.03 (3.8/3.9) 015A2.01 (3.5/3.9) 015A4.01 (3.6/3.6)
Task Standard: (RO) 0150050101 (RO) 0150040101 (RO) 015A4.02 (3.9/3.6) 015A3.03 (3.9/3.9) 015A2.02 (3.1/3.5)
JPM21-1A Page 3 of 9 Rev. 0 Recognize failure of Power Range Monitor, N-41, defeat its control functions, and prepare for its removal from service. Evaluation Method: Simulator X -..::..:---
In-Plant __ _ ===================================================================================
Performer:
NAME Start Time ___ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
SIGNATURE DATE ===================================================================================
COMMENTS SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Any UNSAT requires comments.
: 2. Acknowledge any associated alarms. 3. Initialize simulator in IC #13. 4. Booth operator:
: a. Select N-41 on NR45. b. Verify Rx power <75% on PRNls, NR-45 and b:. T recorder, TR-68-2A 1. Approximately 1 minute after operator assumes shift, Activate IMF NI07A f:120. 2. Ensure operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR. 9 mins Local Tools/Equipment/Procedures Needed: AOP-1.01, Section 2.0 & 2.3, AR-M6-A  


==References:==
==References:==


Reference Title 1. AOP-1.01 Nuclear Instrument Malfunction  
Reference                                           Title                         Rev No.
: 2. 1-AR-M6-A Reactor Protection and Safeguards JPM21-1A Page 4 of 9 Rev. 0 Rev No. 9 15 =================================================================================
: 1. AOP-1.01                                     Nuclear Instrument Malfunction                           9
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
: 2. 1-AR-M6-A                                   Reactor Protection and Safeguards                         15
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
=================================================================================
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
READ TO OPERATOR Directions to Trainee:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is operating at -46% reactor power, all controls are in AUTOMATIC.
Unit 1 is operating at -46% reactor power, all controls are in AUTOMATIC.
INITIATING CUES: 1. You are the OATC and are to monitor the control board and respond per licensed duties to operating conditions.  
INITIATING CUES:
: 2. You will be required to respond, as a single performer, to any abnormality that occurs. 3. When any required actions/procedures have been completed notify the SM. SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1.         You are the OATC and are to monitor the control board and respond per licensed duties to operating conditions.
: 1. Any UNSAT requires comments.
: 2.         You will be required to respond, as a single performer, to any abnormality that occurs.
: 2. Acknowledge any associated alarms. 3. Initialize simulator in IC #13. 4. Booth operator:
: 3.         When any required actions/procedures have been completed notify the SM.
: a. Select N-41 on NR45. b. Verify Rx power <75% on PRNls, NR-45 and b:. T recorder, TR-68-2A 1. Approximately 1 minute after operator assumes shift, Activate IMF NI07A f:120. 2. Ensure operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR. 9 mins Local Tools/Equipment/Procedures Needed: AOP-1.01, Section 2.0 & 2.3, AR-M6-A
 
==References:==


Reference Title 1. AOP-1.01 Nuclear Instrument Malfunction
JPM # 21-1A Page 5 of 9 Rev. 0 STEP/STANDARD                                     SAT/U NSAT STEP 1.:       Operator performs Immediate Operator action in AOP-C.01 to place rods in manual and Check Rod Motion stopped.
: 2. 1-AR-M6-A Reactor Protection and Safeguards JPM21-1A Page 4 of 9 Rev. 0 Rev No. 9 15 =================================================================================
AOP-C.01
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
[2] CHECK reactor power and T-avg STABLE.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
STANDARD: Operator determines reactor power and T-avg are stable.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
[3] CHECK for Instrument Malfunction:
Unit 1 is operating at -46% reactor power, all controls are in AUTOMATIC.
INITIATING CUES: 1. You are the OATC and are to monitor the control board and respond per licensed duties to operating conditions.
: 2. You will be required to respond, as a single performer, to any abnormality that occurs. 3. When any required actions/procedures have been completed notify the SM.
STEP/STANDARD STEP 1.: Operator performs Immediate Operator action in AOP-C.01 to place rods in manual and Check Rod Motion stopped. AOP-C.01 [2] CHECK reactor power and T-avg STABLE. STANDARD:
Operator determines reactor power and T-avg are stable. [3] CHECK for Instrument Malfunction:  
: a. CHECK nuclear instrumentation OPERABLE.
: a. CHECK nuclear instrumentation OPERABLE.
STANDARD:
STANDARD:   Operator determines N-41 has failed high and goes to the RNO column.
Operator determines N-41 has failed high and goes to the RNO column. a. (RNO) GO TO AOP-I.01, Nuclear Instrument Malfunction.
: a. (RNO) GO TO AOP-I.01, Nuclear Instrument Malfunction.
OR 1-AR-M6-A Respond to alarm on XA-M6-A window B-1 or D-1 AND: Window B-1: IF no reactor trip, PLACE rod control in Man. Checks for dropped rod (rod bottom lights LIT or RPls on bottom. Checks 1-XX-55-5 trip status panel for tripped bistables.
OR 1-AR-M6-A                                                                   -    SAT
Evaluate reactor trip criteria with SRO. Evaluates failed power range channel, goes to AOP-I.01 WindowD-1:
                                                                                        -    UNSAT Respond to alarm on XA-M6-A window B-1 or D-1 AND:
IF alarm due to instrument failure, THEN PLACE Rod control in MANUAL, AND GO TO AOP-I.01, Nuclear Instrument Malfunction STANDARD:
Window B-1:
Operator responds to either alarm, places rod control in Man, checks for dropped rods, checks bistable trip status, evaluates no reactor trip required and GOES TO AOP-I.01.
IF no reactor trip, PLACE rod control in Man.
Checks for dropped rod (rod bottom lights LIT or RPls on bottom.                                                                     Start Time Checks 1-XX-55-5 trip status panel for tripped bistables.
Evaluate reactor trip criteria with SRO.                                 Critical Step Evaluates failed power range channel, goes to AOP-I.01 WindowD-1:
IF alarm due to instrument failure, THEN PLACE Rod control in MANUAL, AND GO TO AOP-I.01, Nuclear Instrument Malfunction STANDARD:       Operator responds to either alarm, places rod control in Man, checks for dropped rods, checks bistable trip status, evaluates no reactor trip required and GOES TO AOP-I.01.
COMMENTS:
COMMENTS:
STEP 2.: Obtains a copy of AOP-I.01and determines the appropriate section. Cue: After operator locates AOP-I.01 procedure provide operator a copy STANDARD:
STEP 2.:       Obtains a copy of AOP-I.01and determines the appropriate section.
Operator obtains a copy of AOP-I.01 and determines appropriate section to be 2.3 COMMENTS:
After operator locates AOP-I.01 procedure provide operator a copy             SAT Cue:                                                                                   -
JPM # 21-1A Page 5 of 9 Rev. 0 SAT/U N SAT SAT -UNSAT -Start Time Critical Step SAT -UNSAT -STEP/STANDARD STEP 1.: Operator performs Immediate Operator action in AOP-C.01 to place rods in manual and Check Rod Motion stopped. AOP-C.01 [2] CHECK reactor power and T-avg STABLE. STANDARD:
Operator obtains a copy of AOP-I.01 and determines appropriate           -    UNSAT STANDARD:
Operator determines reactor power and T-avg are stable. [3] CHECK for Instrument Malfunction:
section to be 2.3 COMMENTS:
: a. CHECK nuclear instrumentation OPERABLE.
 
STANDARD:
JPM # 21-1A Page 6 of 9 Rev. 0 STEP/STANDARD                                    SAT/UNSAT STEP 3.: 2.3 [1] PLACE rod control in Man.
Operator determines N-41 has failed high and goes to the RNO column. a. (RNO) GO TO AOP-I.01, Nuclear Instrument Malfunction.
NOTE:   The rods may have been already placed in Manual in accordance
OR 1-AR-M6-A Respond to alarm on XA-M6-A window B-1 or D-1 AND: Window B-1: IF no reactor trip, PLACE rod control in Man. Checks for dropped rod (rod bottom lights LIT or RPls on bottom. Checks 1-XX-55-5 trip status panel for tripped bistables.
                                                                              -     SAT with AOP-C.01, 1-AR-M6-A, or as a prudent operator action.
Evaluate reactor trip criteria with SRO. Evaluates failed power range channel, goes to AOP-I.01 WindowD-1:
                                                                              -     UNSAT STANDARD: Operator places HS-85-511 0 to manual, or states Rods have already been placed in manual.
IF alarm due to instrument failure, THEN PLACE Rod control in MANUAL, AND GO TO AOP-I.01, Nuclear Instrument Malfunction STANDARD:
Operator responds to either alarm, places rod control in Man, checks for dropped rods, checks bistable trip status, evaluates no reactor trip required and GOES TO AOP-I.01.
COMMENTS:
COMMENTS:
STEP 2.: Obtains a copy of AOP-I.01and determines the appropriate section. Cue: After operator locates AOP-I.01 procedure provide operator a copy STANDARD:
STEP 4.: 2.3 [2] STABILIZE reactor power at current level.
Operator obtains a copy of AOP-I.01 and determines appropriate section to be 2.3 COMMENTS:
                                                                              -    SAT STANDARD: Operator checks other power range instruments and determines that
JPM # 21-1A Page 5 of 9 Rev. 0 SAT/U N SAT SAT -UNSAT -Start Time Critical Step SAT -UNSAT -
                                                                              -     UNSAT reactor is stable.
STEP/STANDARD STEP 3.: 2.3 [1] PLACE rod control in Man. NOTE: The rods may have been already placed in Manual in accordance with AOP-C.01, 1-AR-M6-A, or as a prudent operator action. STANDARD:
Operator places HS-85-511 0 to manual, or states Rods have already been placed in manual. COMMENTS:
STEP 4.: 2.3 [2] STABILIZE reactor power at current level. STANDARD:
Operator checks other power range instruments and determines that reactor is stable. COMMENTS:
STEP 5.: 2.3 [3] EVALUATE the following Tech Specs for applicability:
Cue: SM will evaluate Tech Specs. STANDARD:
Operator requests SM to evaluate Tech Specs COMMENTS:
STEP 6.: 2.3 [4] PLACE the following switches located on the Detector Current Comparator drawer [M-13, N50] in position corresponding to failed power Range Channel:
* UPPER SECTION STANDARD:
Detector Current comparator "Upper Section" switch in the PRN-41 position.
Channel defeat light on. COMMENTS:
JPM # 21-1A Page 6 of 9 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step STEP/STANDARD STEP 3.: 2.3 [1] PLACE rod control in Man. NOTE: The rods may have been already placed in Manual in accordance with AOP-C.01, 1-AR-M6-A, or as a prudent operator action. STANDARD:
Operator places HS-85-511 0 to manual, or states Rods have already been placed in manual. COMMENTS:
STEP 4.: 2.3 [2] STABILIZE reactor power at current level. STANDARD:
Operator checks other power range instruments and determines that reactor is stable. COMMENTS:
STEP 5.: 2.3 [3] EVALUATE the following Tech Specs for applicability:
Cue: SM will evaluate Tech Specs. STANDARD:
Operator requests SM to evaluate Tech Specs COMMENTS:
STEP 6.: 2.3 [4] PLACE the following switches located on the Detector Current Comparator drawer [M-13, N50] in position corresponding to failed power Range Channel:
* UPPER SECTION STANDARD:
Detector Current comparator "Upper Section" switch in the PRN-41 position.
Channel defeat light on. COMMENTS:
JPM # 21-1A Page 6 of 9 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step STEP/STANDARD STEP 7.: 2.3 [4] PLACE ....
* LOWER SECTION STANDARD:
Detector Current comparator "Lower Section" switch in the PRN-41 position.
Channel defeat light on. COMMENTS:
STEP 8.: 2.3 [4] PLACE ... Appropriate ROD STOP BYPASS STANDARD:
Rod Stop Bypass switch in "BYPASS PRN-41" position.
COMMENTS:
COMMENTS:
STEP 9.: Appropriate Power Mismatch Bypass switch (XX-92-5037)
STEP 5.:  2.3 [3] EVALUATE the following Tech Specs for applicability:
STANDARD:
                                                                              -    SAT Cue:    SM will evaluate Tech Specs.
Power Mismatch Bypass switch in the "Bypass PRN-41" position.
                                                                              -    UNSAT STANDARD: Operator requests SM to evaluate Tech Specs COMMENTS:
STEP 6.: 2.3 [4] PLACE the following switches located on the Detector Current Comparator drawer [M-13, N50] in position corresponding to failed    -    SAT power Range Channel:                                                      UNSAT
* UPPER SECTION STANDARD:        Detector Current comparator "Upper Section" switch in the PRN-41 position. Channel defeat light on.
Critical Step COMMENTS:
 
JPM # 21-1A Page 7 of 9 Rev. 0 STEP/STANDARD                                SAT/UNSAT STEP 7.:  2.3 [4] PLACE ....
                                                                            -     SAT
* LOWER SECTION
                                                                            -    UNSAT STANDARD: Detector Current comparator "Lower Section" switch in the PRN-41 position. Channel defeat light on.
COMMENTS:
COMMENTS:
STEP 10.: 2.3 [5] DEFEAT failed Power Range channel Using Comparator Channel defeat switch:
Critical Step STEP 8.: 2.3 [4] PLACE ...                                                 -     SAT Appropriate ROD STOP BYPASS                                       -    UNSAT STANDARD: Rod Stop Bypass switch in "BYPASS PRN-41" position.
* Comparator and Rate Drawer [M-13, N37] STANDARD:
Comparator Channel Defeat switch in the N-41 position.
Comparator defeat light on. COMMENTS:
JPM # 21-1A Page 7 of 9 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step STEP/STANDARD STEP 7.: 2.3 [4] PLACE ....
* LOWER SECTION STANDARD:
Detector Current comparator "Lower Section" switch in the PRN-41 position.
Channel defeat light on. COMMENTS:
STEP 8.: 2.3 [4] PLACE ... Appropriate ROD STOP BYPASS STANDARD:
Rod Stop Bypass switch in "BYPASS PRN-41" position.
COMMENTS:
COMMENTS:
STEP 9.: Appropriate Power Mismatch Bypass switch (XX-92-5037)
Critical Step
STANDARD:
                                                                            -    SAT STEP 9.: Appropriate Power Mismatch Bypass switch (XX-92-5037)
Power Mismatch Bypass switch in the "Bypass PRN-41" position.
                                                                            -    UNSAT STANDARD: Power Mismatch Bypass switch in the "Bypass PRN-41" position.
COMMENTS:
COMMENTS:
STEP 10.: 2.3 [5] DEFEAT failed Power Range channel Using Comparator Channel defeat switch:
Critical Step STEP 10.: 2.3 [5] DEFEAT failed Power Range channel Using Comparator Channel defeat switch:                                           -    SAT
* Comparator and Rate Drawer [M-13, N37] STANDARD:
* Comparator and Rate Drawer [M-13, N37]                     -    UNSAT STANDARD: Comparator Channel Defeat switch in the N-41 position. Comparator defeat light on.
Comparator Channel Defeat switch in the N-41 position.
COMMENTS:                                                                   Critical Step
Comparator defeat light on. COMMENTS:
 
JPM # 21-1A Page 7 of 9 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step STEP/STANDARD STEP 11.: 2.3 [6] RESTORE T -avg to within 1.5&deg;F of T -ref USING one of the following:
JPM # 21-1A Page 8 of9 Rev. 0 STEP/STANDARD                                  SAT/UNSAT STEP 11.: 2.3 [6] RESTORE T -avg to within 1.5&deg;F of T -ref USING one of the following:
Cue: CRO will is evaluating Tavg and Tref deviation and restoration.
                                                                                -  SAT Cue:   CRO will is evaluating Tavg and Tref deviation and restoration.
STANDARD:
                                                                                -  Ut:-JSAT STANDARD: Operator acknowledges CRO will perform this step and continues with procedure.
Operator acknowledges CRO will perform this step and continues with procedure.
COMMENTS:
COMMENTS:
STEP 12.: 2.3 [7] ENSURE OPERABLE Power Range channel selected to the following:
STEP 12.: 2.3 [7] ENSURE OPERABLE Power Range channel selected to the following:
* Nuclear Power Recorder [M4, NR-35]
* Nuclear Power Recorder [M4, NR-35]
* Nuclear Power Recorder [M4, NR-35] (ill) STANDARD:
* Nuclear Power Recorder [M4, NR-35] (ill)                     -  SAT STANDARD: Operator Uses Touch Screen to ensure the recorder is not selected     -  UNSAT for PR Channel I or Lli Channel 1. Operator should select the highest operable power range channel.
Operator Uses Touch Screen to ensure the recorder is not selected for PR Channel I or Lli Channel 1. Operator should select the highest operable power range channel. COMMENTS:
STEP 13.: 2.3 [7] ENSURE RCS Temp LlT recorder (green pen) [M-5, XS68-2B] STANDARD:
Operator checks position of XS-68-2B.
Ensures it is NOT selected for LOOP ONE. COMMENTS:
STEP 14.: 2.3 [8] RETURN rod control to AUTO if desired. Cue: CRO will perform this step. STANDARD:
Operator acknowledges this step is being addressed by the CRO and continues with procedure.
COMMENTS:
COMMENTS:
JPM # 21-1A Page 8 of9 Rev. 0 SAT/UNSAT SAT --Ut:-JSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -STEP/STANDARD STEP 11.: 2.3 [6] RESTORE T -avg to within 1.5&deg;F of T -ref USING one of the following:
STEP 13.: 2.3 [7] ENSURE RCS Temp LlT recorder (green pen) [M-5, XS68-2B]
Cue: CRO will is evaluating Tavg and Tref deviation and restoration.
                                                                                -   SAT STANDARD: Operator checks position of XS-68-2B. Ensures it is NOT selected for  -   UNSAT LOOP ONE.
STANDARD:
COMMENTS:
Operator acknowledges CRO will perform this step and continues with procedure.
STEP 14.: 2.3 [8] RETURN rod control to AUTO if desired.
Cue:   CRO will perform this step.                                           -  SAT STANDARD: Operator acknowledges this step is being addressed by the CRO and     -  UNSAT continues with procedure.
COMMENTS:
COMMENTS:
STEP 12.: 2.3 [7] ENSURE OPERABLE Power Range channel selected to the following:
 
* Nuclear Power Recorder [M4, NR-35]
JPM # 21-1A Page 9 of 9 Rev. 0 STEP/STANDARD                                    SAT/UNSAT STEP 15.: 2.3 [9] CHECK reactor power greater than 75%.
* Nuclear Power Recorder [M4, NR-35] (ill) STANDARD:
                                                                                -   SAT STANDARD: Operator verifies power less than 75% (current power is - 46%), goes
Operator Uses Touch Screen to ensure the recorder is not selected for PR Channel I or Lli Channel 1. Operator should select the highest operable power range channel. COMMENTS:
                                                                                -   UNSAT to RNO and to appropriate step.
STEP 13.: 2.3 [7] ENSURE RCS Temp LlT recorder (green pen) [M-5, XS68-2B] STANDARD:
Operator checks position of XS-68-2B.
Ensures it is NOT selected for LOOP ONE. COMMENTS:
STEP 14.: 2.3 [8] RETURN rod control to AUTO if desired. Cue: CRO will perform this step. STANDARD:
Operator acknowledges this step is being addressed by the CRO and continues with procedure.
COMMENTS:
COMMENTS:
JPM # 21-1A Page 8 of9 Rev. 0 SAT/UNSAT SAT --Ut:-JSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
STEP/STANDARD STEP 15.: 2.3 [9] CHECK reactor power greater than 75%. STANDARD:
Operator verifies power less than 75% (current power is -46%), goes to RNO and to appropriate step. COMMENTS:
STEP 16.: 2.3[11] NOTIFY 1M to remove failed power range channel from service USING appropriate Appendix:
STEP 16.: 2.3[11] NOTIFY 1M to remove failed power range channel from service USING appropriate Appendix:
Cue: Role playas MSS or 1M, inform operator that a crew will be to the MeR within the hour to perform Appendix "A" of AOP-1.01.
                                                                                -  SAT Cue:   Role playas MSS or 1M, inform operator that a crew will be to the
STANDARD:
                                                                                -  UNSAT MeR within the hour to perform Appendix "A" of AOP-1.01.
Operator communicates with IMs or MSS to request performance of Appendix "A" of AOP-I.01 for removal of N-41 from service. COMMENTS:
STANDARD: Operator communicates with IMs or MSS to request performance of Appendix "A" of AOP-I.01 for removal of N-41 from service.
STEP 17.: NOTIFY SM that N-41 failed, its control functions have been defeated, IMs have been notified to remove it from service. STANDARD:
COMMENTS:
Operator informs SM. COMMENTS:
                                                                                -  SAT STEP 17.: NOTIFY SM that N-41 failed, its control functions have been defeated,
End of JPM JPM # 21-1A Page 9 of 9 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Stop Time STEP/STANDARD STEP 15.: 2.3 [9] CHECK reactor power greater than 75%. STANDARD:
                                                                                -   UNSAT IMs have been notified to remove it from service.
Operator verifies power less than 75% (current power is -46%), goes to RNO and to appropriate step. COMMENTS:
STANDARD: Operator informs SM.
STEP 16.: 2.3[11] NOTIFY 1M to remove failed power range channel from service USING appropriate Appendix:
COMMENTS:
Cue: Role playas MSS or 1M, inform operator that a crew will be to the MeR within the hour to perform Appendix "A" of AOP-1.01.
Stop Time End of JPM
STANDARD:
 
Operator communicates with IMs or MSS to request performance of Appendix "A" of AOP-I.01 for removal of N-41 from service. COMMENTS:
READ TO OPERATOR Directions to Trainee:
STEP 17.: NOTIFY SM that N-41 failed, its control functions have been defeated, IMs have been notified to remove it from service. STANDARD:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Operator informs SM. COMMENTS:
INITIAL CONDITIONS:
End of JPM JPM # 21-1A Page 9 of 9 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Stop Time READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
Unit 1 is operating at -46% reactor power, all controls are in AUTOMATIC.
Unit 1 is operating at -46% reactor power, all controls are in AUTOMATIC.
INITIATING CUES: 1. You are the OATC and are to monitor the control board and respond per licensed duties to operating conditions.  
INITIATING CUES:
: 2. You will be required to respond, as a single performer, to any abnormality that occurs. 3. When any required actions/procedures have been completed notify the SM. READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
: 1. You are the OATC and are to monitor the control board and respond per licensed duties to operating conditions.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 2. You will be required to respond, as a single performer, to any abnormality that occurs.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 3. When any required actions/procedures have been completed notify the SM.
Unit 1 is operating at -46% reactor power, all controls are in AUTOMATIC.
 
INITIATING CUES: 1. You are the OATC and are to monitor the control board and respond per licensed duties to operating conditions.  
JPM # 189AP Page 1 of 9 Rev. 1 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 189AP Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release (Alternate Path)
: 2. You will be required to respond, as a single performer, to any abnormality that occurs. 3. When any required actions/procedures have been completed notify the SM.
PREPAREDI REVISED BY:                                                             Datel VALIDATED BY:
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 189AP JPM # 189AP Page 1 of 9 Rev. 1 Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release (Alternate Path) PREPAREDI REVISED BY: Datel VALIDATED BY:
* Datel
* Datel APPROVED BY: CONCURRED:
              --------------------------------~==-----------
Datel (Operations Training Manager) ** Datel (Operations Representative)
              ----------------------------------~-----------
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
APPROVED BY:                                                           Datel (Operations Training Manager)
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 189AP JPM # 189AP Page 1 of 9 Rev. 1 Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release (Alternate Path) PREPAREDI REVISED BY: Datel VALIDATED BY:
CONCURRED:    **                                                       Datel (Operations Representative)
* Datel APPROVED BY: CONCURRED:
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Datel (Operations Training Manager) ** Datel (Operations Representative)
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
 
NUCLEAR TRAINING REVISION/USAGE LOG REVISION V DATE NUMBER 0 Initial Issue Y 1/19/04 1 Revised to update to latest procedure Y 12/07/09 revision v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
JPM # 189AP Page 2 of 9 Rev. 1 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                                                   V     DATE   PAGES    PREPARED/
PAGES AFFECTED All ALL JPM # 189AP Page 2 of 9 Rev. 1 PREPARED/
NUMBER                                                                   AFFECTED REVISED BY:
REVISED BY: S. Poteet M. Hankins NUCLEAR TRAINING REVISION/USAGE LOG REVISION V DATE NUMBER 0 Initial Issue Y 1/19/04 1 Revised to update to latest procedure Y 12/07/09 revision v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
0         Initial Issue                               Y     1/19/04     All    S. Poteet Revised to update to latest procedure 1
PAGES AFFECTED All ALL JPM # 189AP Page 2 of 9 Rev. 1 PREPARED/
revision Y     12/07/09   ALL    M. Hankins v - Specify if the JPM change will require another Validation (Y or N).
REVISED BY: S. Poteet M. Hankins Task: SEQUOYAH NUCLEAR PLANT AUOIROISRO JOB PERFORMANCE MEASURE Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release. JAiTA TASK #: 0690100104 KIA Ratings: AA 1.01 (3.5/3.5) 2.3.11 (2.7/3.2) 068 K6.1 0 (2.5/2.9)
See cover sheet for criteria.
 
JPM # 189AP Page 3 of 9 Rev. 1 SEQUOYAH NUCLEAR PLANT AUOIROISRO JOB PERFORMANCE MEASURE Task:
Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release.
JAiTA TASK #: 0690100104 KIA Ratings:
AA 1.01 (3.5/3.5) 2.3.11 (2.7/3.2)                073 K4.02 (3.3/3.9) 068 K6.1 0 (2.5/2.9)
Task Standard:
Task Standard:
073 K4.02 (3.3/3.9)
The operator completes flushing of 0-RE-90-122 after isolation due to high radiation.
JPM # 189AP Page 3 of 9 Rev. 1 The operator completes flushing of 0-RE-90-122 after isolation due to high radiation.
Evaluation Method:       Simulator - - -     In-Plant _~X_ _
Evaluation Method: Simulator  
===================================================================================
---In-Plant __ ===================================================================================
Performer:
Performer:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
NAME                                                     Start Time _ __
SIGNATURE DATE ===================================================================================
Performance Rating: SAT             UNSAT           Performance Time                     Finish Time _ __
COMMENTS Task: SEQUOYAH NUCLEAR PLANT AUOIROISRO JOB PERFORMANCE MEASURE Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release. JAiTA TASK #: 0690100104 KIA Ratings: AA 1.01 (3.5/3.5) 2.3.11 (2.7/3.2) 068 K6.1 0 (2.5/2.9)
Evaluator:       ------------------------~/_--
Task Standard:
SIGNATURE                   DATE
073 K4.02 (3.3/3.9)
===================================================================================
JPM # 189AP Page 3 of 9 Rev. 1 The operator completes flushing of 0-RE-90-122 after isolation due to high radiation.
COMMENTS
Evaluation Method: Simulator
 
---In-Plant __ ===================================================================================
JPM # 189AP Page 4 of 9 Rev. 1 SPECIAL INSTRUCTIONS TO EVALUATOR:
Performer:
: 1. Critical steps identified.
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
: 2. Any UNSAT requires comments
SIGNATURE DATE ===================================================================================
: 3. Ensure operator performs the following required actions for SELF-CHECKING;
COMMENTS SPECIAL INSTRUCTIONS TO EVALUATOR:  
: a. Identifies the correct unit, train, component, etc.
: 1. Critical steps identified.  
: b. Reviews the intended action and expected response.
: 2. Any UNSAT requires comments 3. Ensure operator performs the following required actions for SELF-CHECKING;  
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.  
: c. Compares the actual response to the expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR. Local 30 minutes Tools/Equipment/Procedures Needed 0-SO-77-1 Section 8.2  
Validation Time: CR.                                 Local 30 minutes Tools/Equipment/Procedures Needed 0-SO-77-1 Section 8.2


==References:==
==References:==


Reference Title 0-SO-77-1 Waste Disposal System JPM # 189AP Page 4 of 9 Rev. 1 Rev No. 47 =============================================================================
Reference                                           Title                           Rev No.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
0-SO-77-1                                   Waste Disposal System                                     47
All steps shall be simulated for this JPM. I will provide initiating cues and indicate any steps to be discussed.
=============================================================================
When you complete the task successfully, the objective for this job performance measure will be satisfied.
READ TO OPERATOR Directions to Trainee:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 1. A release from the CDCT has just been initiated using 0-SO-77-1 Waste Disposal System and O-SI-CEM-077  
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
-400.1 Liquid Waste Effluent Batch Release. 2. The calculated high radiation trip setpoint for 0-RM-90-122 is 8.59 E+04 cpm, per O-SI-CEM-077  
INITIAL CONDITIONS:
-400.1, Liquid Waste Effluent Batch Release. 3. A high radiation signal on 0-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release. 4. 0-RCV-77-43 has been verified CLOSED. 5. All Prerequisite Actions are complete (Section 4.0) INITIATING CUES: You are the RadWaste AUO and have been directed by the Unit 1 SRO to perform Section 8.2 of 0-SO-77-1 to flush 0-RE-90-122 after the High Radiation Isolation.
: 1.       A release from the CDCT has just been initiated using 0-SO-77-1 Waste Disposal System and O-SI-CEM-077 -400.1 Liquid Waste Effluent Batch Release.
Inform the Unit 1 SRO when Section 8.2 is complete.
: 2.       The calculated high radiation trip setpoint for 0-RM-90-122 is 8.59 E+04 cpm, per O-SI-CEM-077 -400.1, Liquid Waste Effluent Batch Release.
SPECIAL INSTRUCTIONS TO EVALUATOR:
: 3.       A high radiation signal on 0-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release.
: 1. Critical steps identified.
: 4.       0-RCV-77-43 has been verified CLOSED.
: 2. Any UNSAT requires comments 3. Ensure operator performs the following required actions for SELF-CHECKING;
: 5.       All Prerequisite Actions are complete (Section 4.0)
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
INITIATING CUES:
: c. Compares the actual response to the expected response.
You are the RadWaste AUO and have been directed by the Unit 1 SRO to perform Section 8.2 of 0-SO-77-1 to flush 0-RE-90-122 after the High Radiation Isolation. Inform the Unit 1 SRO when Section 8.2 is complete.
Validation Time: CR. Local 30 minutes Tools/Equipment/Procedures Needed 0-SO-77-1 Section 8.2 Reference Title 0-SO-77-1 Waste Disposal System JPM # 189AP Page 4 of 9 Rev. 1 Rev No. 47 =============================================================================
 
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
JPM 189AP Page 5 of9 Rev. 1 Job Performance Checklist:
All steps shall be simulated for this JPM. I will provide initiating cues and indicate any steps to be discussed.
STEP/STANDARD                                 SAT/UNSAT STEP 1.:       Obtain a copy of the appropriate procedure.                             -    SAT STANDARD: The operator obtains a copy of O-SO-77-1, Section 8.2                     -    UNSAT Start Time STEP 2.:     Section 4.0 Prerequisite Actions Cue: If asked, state all prerequisite actions are complete per initial conditions.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1. A release from the CDCT has just been initiated using 0-SO-77-1 Waste Disposal System and O-SI-CEM-077
-400.1 Liquid Waste Effluent Batch Release. 2. The calculated high radiation trip setpoint for 0-RM-90-122 is 8.59 E+04 cpm, per O-SI-CEM-077
-400.1, Liquid Waste Effluent Batch Release. 3. A high radiation signal on 0-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release. 4. 0-RCV-77-43 has been verified CLOSED. 5. All Prerequisite Actions are complete (Section 4.0) INITIATING CUES: You are the RadWaste AUO and have been directed by the Unit 1 SRO to perform Section 8.2 of 0-SO-77-1 to flush 0-RE-90-122 after the High Radiation Isolation.
Inform the Unit 1 SRO when Section 8.2 is complete.
Job Performance Checklist:
STEP/STANDARD STEP 1.: Obtain a copy of the appropriate procedure.
STANDARD:
The operator obtains a copy of O-SO-77-1, Section 8.2 STEP 2.: Section 4.0 Prerequisite Actions Cue: If asked, state all prerequisite actions are complete per initial conditions.
STANDARD Operator may review Prerequisite Actions, but all steps have already been complete.
STANDARD Operator may review Prerequisite Actions, but all steps have already been complete.
STEP 3.: [1] ENSURE [0-RCV-77-43J Radiation Control Valve is CLOSED. Cue: If asked, state O-RCV-77-43 is closed per the Initial Conditions.
STEP 3.:       [1] ENSURE [0-RCV-77-43J Radiation Control Valve is CLOSED.             -    SAT Cue:         If asked, state O-RCV-77-43 is closed per the Initial Conditions.       -    UNSAT STANDARD: Operator verifies that valve is closed by reviewing INITIAL CONDITIONS portion of JPM.
STANDARD:
STEP 4.:       [2] ENSURE [0-77-689Al Radiation Monitor Inlet isolation Valve is     -    SAT OPEN.
Operator verifies that valve is closed by reviewing INITIAL CONDITIONS portion of JPM. STEP 4.: [2] ENSURE [0-77-689Al Radiation Monitor Inlet isolation Valve is OPEN. Cue: Inform the operator that the HW for [0-77-689Al is snug. STANDARD Operator OPENS [0-77-689A]
                                                                                      -    UNSAT Cue:     Inform the operator that the HW for [0-77-689Al is snug.
Radiation Monitor Inlet isolation Valve by turning HW in the CCW direction until HW is snug. STEP 5.: [3] OPEN [0-77-6898]
STANDARD     Operator OPENS [0-77-689A] Radiation Monitor Inlet isolation Valve by turning HW in the CCW direction until HW is snug.
Discharge to FDCT Isolation Valve. Cue: Inform the operator that the HW for [0-77-68981 moves in the counter clockwise direction until snug. STANDARD Operator OPENS [0-77-6898]
STEP 5.:       [3] OPEN [0-77-6898] Discharge to FDCT Isolation Valve.                 -    SAT Cue:       Inform the operator that the HW for [0-77-68981 moves in the           -    UNSAT counter clockwise direction until snug.
Discharge to FDCT Isolation Valve by turning HW in the CCW direction until HW is snug. STEP 6.: [4] CLOSE [0-77-689C]
STANDARD     Operator OPENS [0-77-6898] Discharge to FDCT Isolation Valve by     Critical Step turning HW in the CCW direction until HW is snug.
Radiation Monitor Return to Release Header Isolation Valve. Cue: Inform the operator that the HW for [0-77-689C1 moves in the clockwise direction until snug. STANDARD:
STEP 6.:       [4] CLOSE [0-77-689C] Radiation Monitor Return to Release Header       -    SAT Isolation Valve.
Operator CLOSES [0-77-689C]
                                                                                        -    UNSAT Cue:       Inform the operator that the HW for [0-77-689C1 moves in the clockwise direction until snug.
Radiation Monitor Return to Release Header Isolation Valve by turning HW in the CW direction until HW is snug. JPM 189AP Page 5 of9 Rev. 1 SAT/UNSAT SAT -UNSAT -Start Time SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist:
STANDARD: Operator CLOSES [0-77-689C] Radiation Monitor Return to Release         Critical Step Header Isolation Valve by turning HW in the CW direction until HW is snug.
STEP/STANDARD STEP 1.: Obtain a copy of the appropriate procedure.
 
STANDARD:
JPM 189AP Page 6 of9 Rev. 1 Job Performance Checklist:
The operator obtains a copy of O-SO-77-1, Section 8.2 STEP 2.: Section 4.0 Prerequisite Actions Cue: If asked, state all prerequisite actions are complete per initial conditions.
STEP/STANDARD                                    SAT/UNSAT STEP 7.:      [5] VERIFY [O-RE-90-122] radiation monitor pump is running.              -   SAT
STANDARD Operator may review Prerequisite Actions, but all steps have already been complete.
                                                                                        -   UNSAT Cue:        0-HS-90-1228 RED light ON; GREEN light OFF.
STEP 3.: [1] ENSURE [0-RCV-77-43J Radiation Control Valve is CLOSED. Cue: If asked, state O-RCV-77-43 is closed per the Initial Conditions.
STANDARD:      Operator verifies that [0-RE-90-122] radiation monitor pump is running.
STANDARD:
STEP 8.:       [6] ALLOW [O-RE-90-122] Radiation Monitor to flush to FDCT for            -   SAT 5 minutes.
Operator verifies that valve is closed by reviewing INITIAL CONDITIONS portion of JPM. STEP 4.: [2] ENSURE [0-77-689Al Radiation Monitor Inlet isolation Valve is OPEN. Cue: Inform the operator that the HW for [0-77-689Al is snug. STANDARD Operator OPENS [0-77-689A]
                                                                                        -    UNSAT Cue:       Inform operator that 5 minutes have elapsed.
Radiation Monitor Inlet isolation Valve by turning HW in the CCW direction until HW is snug. STEP 5.: [3] OPEN [0-77-6898]
STANDARD:      Operator allows flush for at least 5 minutes prior to proceding to next step.
Discharge to FDCT Isolation Valve. Cue: Inform the operator that the HW for [0-77-68981 moves in the counter clockwise direction until snug. STANDARD Operator OPENS [0-77-6898]
STEP 9.:       [7] OPEN [O-77-689C]                                                      -   SAT Cue:       Inform the operator that the HW for [0-77-689C1 moves in the             -    UNSAT counter clockwise direction until snug.
Discharge to FDCT Isolation Valve by turning HW in the CCW direction until HW is snug. STEP 6.: [4] CLOSE [0-77-689C]
STANDARD:     Operator OPENS [0-77-689C] Radiation Monitor Return to Release          Critical Step Header Isolation Valve by turning HW in the CCW direction until HW is snug.
Radiation Monitor Return to Release Header Isolation Valve. Cue: Inform the operator that the HW for [0-77-689C1 moves in the clockwise direction until snug. STANDARD:
STEP *10.:    [8] CLOSE [0-77-689B]                                                    -    SAT Cue:       Inform the operator that the HW for [0-77-68981 moves in the              -    UNSAT clockwise direction until snug.
Operator CLOSES [0-77-689C]
STANDARD: Operator CLOSES [0-77-6898] Discharge to FDCT Isolation Valve by           Critical Step turning HW in the CW direction until HW is snug.
Radiation Monitor Return to Release Header Isolation Valve by turning HW in the CW direction until HW is snug. JPM 189AP Page 5 of9 Rev. 1 SAT/UNSAT SAT -UNSAT -Start Time SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist:
STEP 11.:     [9] RECORD 0-RE-90-122 reading:                                          -    SAT 0-RE-90-122 Reading                          cpm                        -    UNSAT NOTE:        ALTERNATE PATH BEGINS HERE.
STEP/ST ANDARD STEP 7.: [5] VERIFY [O-RE-90-122]
Cue:       Inform operator that 0-RE-90-122 is reading 9.00 E+04 cpm STANDARD: Operator enters 0-RE-90-122 data.
radiation monitor pump is running. Cue: 0-HS-90-1228 RED light ON; GREEN light OFF. STANDARD:
 
Operator verifies that [0-RE-90-122]
JPM 189AP Page 70f9 Rev. 1 Job Performance Checklist:
radiation monitor pump is running. STEP 8.: [6] ALLOW [O-RE-90-122]
STEP/STANDARD                                        SAT/UNSAT STEP
Radiation Monitor to flush to FDCT for 5 minutes. Cue: Inform operator that 5 minutes have elapsed. STANDARD:
* 12.:   [10] IF the reading in step [9] is below the trip setpoint. THEN              -   SAT RETURN to instruction where exited
Operator allows flush for at least 5 minutes prior to proceding to next step. STEP 9.: [7] OPEN [O-77-689C]
                                                                                            -   UNSAT NOTE:      Setpoint was provided in the INITIAL CONDITIONS.
Cue: Inform the operator that the HW for [0-77-689C1 moves in the counter clockwise direction until snug. STANDARD:
Critical Step STANDARD: Operator determines that the current 0-RE-90-122 reading remained greater than the trip setpoint and continues to step [11]
Operator OPENS [0-77-689C]
STEP 13.:      [11 ] IF the reading obtained in step [9] is still above the trip setpoint,  -    SAT THEN PERFORM the following steps to lower the radiation monitoring reading:                                                  -   UNSAT
Radiation Monitor Return to Release Header Isolation Valve by turning HW in the CCW direction until HW is snug. STEP *10.: [8] CLOSE [0-77-689B]
[a] CLOSE applicable tank isolation valve from release header.
Cue: Inform the operator that the HW for [0-77-68981 moves in the clockwise direction until snug. STANDARD:
(N/A tanks not aligned)
Operator CLOSES [0-77-6898]
Cask Decon Collector Tank Cue:       Inform the operator that the HW for [0-77-6791 moves in the clockwise direction until snug.
Discharge to FDCT Isolation Valve by turning HW in the CW direction until HW is snug. STEP 11.: [9] RECORD 0-RE-90-122 reading: 0-RE-90-122 Reading cpm NOTE: ALTERNATE PATH BEGINS HERE. Cue: Inform operator that 0-RE-90-122 is reading 9.00 E+04 cpm STANDARD:
NOTE:      Valve is located in CDCT room Critical Step STANDARD:     Operator CLOSES [0-77-679] Cask Decon Collector Tank by turning HW in the CW direction until HW is snug. Operator enters an "N/A" for the Monitor Tank.
Operator enters 0-RE-90-122 data. JPM 189AP Page 6 of9 Rev. 1 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Job Performance Checklist:
STEP14.:               [b] OPEN [O-VLV-59-735] Demin Flush To Radwaste Isol.                 -    SAT Cue:       Inform the operator that the handle for [0- VL V-59-7351 moves in            -   UNSAT the counter clockwise direction until handle is in line with pipe.
STEP/ST ANDARD STEP 7.: [5] VERIFY [O-RE-90-122]
NOTE:     Valve is located in CDCT room Critical Step STANDARD:     Operator OPENS [0-VLV-59-735] Demin Flush To Radwaste Isol by turning handle in the CCW direction until handle is in line with pipe.
radiation monitor pump is running. Cue: 0-HS-90-1228 RED light ON; GREEN light OFF. STANDARD:
STEP15.:              [c] OPEN [0-77-6898] Discharge to FDCT Isolation Valve.              -    SAT Cue:       Inform the operator that the HW for [0-77-68981 moves in the                 -    UNSAT counter clockwise direction until snug.
Operator verifies that [0-RE-90-122]
STANDARD:     Operator OPENS [0-77-6898] Discharge to FDCT Isolation Valve by             Critical Step turning HW in theCCW direction until HW is snug.
radiation monitor pump is running. STEP 8.: [6] ALLOW [O-RE-90-122]
 
Radiation Monitor to flush to FDCT for 5 minutes. Cue: Inform operator that 5 minutes have elapsed. STANDARD:
JPM 189AP Page 8 of 9 Rev. 1 Job Performance Checklist:
Operator allows flush for at least 5 minutes prior to proceding to next step. STEP 9.: [7] OPEN [O-77-689C]
STEP/STANDARD                                  SAT/UNSAT STEP 16.:              [d] CLOSE rO-77-689C] Radiation Monitor Return to Release      -    SAT Header Isolation Valve.
Cue: Inform the operator that the HW for [0-77-689C1 moves in the counter clockwise direction until snug. STANDARD:
                                                                                      -    UNSAT Cue:       Inform the operator that the HW for [0-77-689C1 moves in the clockwise direction until snug.
Operator OPENS [0-77-689C]
STANDARD: Operator CLOSES [0-77-689C] Radiation Monitor Return to Release        Critical Step Header Isolation Valve by turning HW in the CW direction until HW is snug.
Radiation Monitor Return to Release Header Isolation Valve by turning HW in the CCW direction until HW is snug. STEP *10.: [8] CLOSE [0-77-689B]
STEP 17.:             [e] WHEN count rate on [O-RE-90-122J decreases to its          -    SAT minimum value, THEN
Cue: Inform the operator that the HW for [0-77-68981 moves in the clockwise direction until snug. STANDARD:
                                                                                      -    UNSAT Cue:       0-R&#xa3;-90-122 is indicating 8.00 &#xa3;+02 cpm.
Operator CLOSES [0-77-6898]
STANDARD: Operator reads count rate on 0-RE-90-122.
Discharge to FDCT Isolation Valve by turning HW in the CW direction until HW is snug. STEP 11.: [9] RECORD 0-RE-90-122 reading: 0-RE-90-122 Reading cpm NOTE: ALTERNATE PATH BEGINS HERE. Cue: Inform operator that 0-RE-90-122 is reading 9.00 E+04 cpm STANDARD:
STEP 18.:                    [1] OPEN [O-77-689CJ Radiation Monitor Return to        -   SAT Release Header Isolation Valve.
Operator enters 0-RE-90-122 data. JPM 189AP Page 6 of9 Rev. 1 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -
                                                                                      -   UNSAT Cue:      Inform the operator that the HW for [0-77-689C1 moves in the counterclockwise direction until snug.
Job Performance Checklist:
Critical Step STANDARD: Operator OPENS [O-77-689C] Radiation Monitor Return to Release Header Isolation Valve by turning HW in the CCW direction until HW is snug.
STEP/ST ANDARD STEP
STEP 19.:                     [2] CLOSE [0-77-68961 Discharge to FDCT Isolation      -    SAT Valve.
* 12.: [10] IF the reading in step [9] is below the trip setpoint.
                                                                                      -    UNSAT Cue:       Inform the operator that the HW for [0-77-68981 moves in the clockwise direction until snug.
THEN RETURN to instruction where exited NOTE: Setpoint was provided in the INITIAL CONDITIONS.
Critical Step STANDARD: Operator CLOSES [0-77-6898] Discharge to FDCT Isolation Valve by turning HW in the CCW direction until HW is snug.
STANDARD:
 
Operator determines that the current 0-RE-90-122 reading remained greater than the trip setpoint and continues to step [11] STEP 13.: [11 ] IF the reading obtained in step [9] is still above the trip setpoint, THEN PERFORM the following steps to lower the radiation monitoring reading: [a] CLOSE applicable tank isolation valve from release header. (N/A tanks not aligned) Cask Decon Collector Tank Cue: Inform the operator that the HW for [0-77-6791 moves in the clockwise direction until snug. NOTE: Valve is located in CDCT room STANDARD:
JPM 189AP Page 9 of9 Rev. 1 Job Performance Checklist:
Operator CLOSES [0-77-679]
STEP/STANDARD                                SAT/UNSAT STEP 20.:            [f] CLOSE [O-VLV-59-735] Demin Flush To Radwaste Isol.          -    SAT Cue:     Inform the operator that the handle for [0- VL V-59-7351 moves in       -    UNSAT the clockwise direction until perpendicular with pipe.
Cask Decon Collector Tank by turning HW in the CW direction until HW is snug. Operator enters an "N/A" for the Monitor Tank. STEP14.: [b] OPEN [O-VLV-59-735]
STANDARD:     Operator CLOSES [0-VLV-59-735] Demin Flush To Radwaste Isol by       Critical Step turning handle in theCCW direction until handle is perpendicular with pipe.
Demin Flush To Radwaste Isol. Cue: Inform the operator that the handle for [0-VL V-59-7351 moves in the counter clockwise direction until handle is in line with pipe. NOTE: Valve is located in CDCT room STANDARD:
STEP 21.:             [g] OPEN Cask Decon Collector tank isolation valve [0-77-679]   -    SAT Cue:     Inform the operator that the HW for [0-77-6791 moves in the             -    UNSAT counter clockwise direction until snug.
Operator OPENS [0-VLV-59-735]
STANDARD: Operator OPENS [0-77-679] Cask Decon Collector Tank by turning           Critical Step HW in the CCW direction until HW is snug.
Demin Flush To Radwaste Isol by turning handle in the CCW direction until handle is in line with pipe. STEP15.: [c] OPEN [0-77-6898]
STEP 22.:             [h] IF hi radiation alarm will not clear, THEN NOTIFY the        -    SAT appropriate US/SRO that alarm will not clear.
Discharge to FDCT Isolation Valve. Cue: Inform the operator that the HW for [0-77-68981 moves in the counter clockwise direction until snug. STANDARD:
                                                                                      -    UNSAT Cue:          0-RE-90-122 high radiation alarm is clear (Provide appropriate feedback based on method used). If asked, rad monitor 0-RE                122 is still reading B.OO E+2 cpm.
Operator OPENS [0-77-6898]
STANDARD: Operator determines that 0-RE-90-122 alarm has cleared by observing NO red lights LIT OR verifying XA-55-L2C Window C-3 DARK in Radwaste AUO shack OR Calling Main Control Room for alarm information.
Discharge to FDCT Isolation Valve by turning HW in theCCW direction until HW is snug. JPM 189AP Page 70f9 Rev. 1 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist:
STEP 23.:      [12] RETURN to instruction where exited.                                -    SAT
STEP/ST ANDARD STEP
                                                                                      -    UNSAT STANDARD: Operator informs Unit 1 US/SRO that 0-SO-77-1 is complete End Time__
* 12.: [10] IF the reading in step [9] is below the trip setpoint.
End of JPM
THEN RETURN to instruction where exited NOTE: Setpoint was provided in the INITIAL CONDITIONS.
 
STANDARD:
READ TO OPERATOR Directions to Trainee:
Operator determines that the current 0-RE-90-122 reading remained greater than the trip setpoint and continues to step [11] STEP 13.: [11 ] IF the reading obtained in step [9] is still above the trip setpoint, THEN PERFORM the following steps to lower the radiation monitoring reading: [a] CLOSE applicable tank isolation valve from release header. (N/A tanks not aligned) Cask Decon Collector Tank Cue: Inform the operator that the HW for [0-77-6791 moves in the clockwise direction until snug. NOTE: Valve is located in CDCT room STANDARD:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Operator CLOSES [0-77-679]
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Cask Decon Collector Tank by turning HW in the CW direction until HW is snug. Operator enters an "N/A" for the Monitor Tank. STEP14.: [b] OPEN [O-VLV-59-735]
INITIAL CONDITIONS:
Demin Flush To Radwaste Isol. Cue: Inform the operator that the handle for [0-VL V-59-7351 moves in the counter clockwise direction until handle is in line with pipe. NOTE: Valve is located in CDCT room STANDARD:
1      A release from the CDCT has just been initiated using 0-SO-77-1 Waste Disposal System and 0-SI-CEM-077-400.1 Liquid Waste Effluent Batch Release.
Operator OPENS [0-VLV-59-735]
: 2.      The calculated high radiation trip setpoint for 0-RM-90-122 is 8.59 E+04 cpm, per 0-SI-CEM-077-400.1, Liquid Waste Effluent Batch Release.
Demin Flush To Radwaste Isol by turning handle in the CCW direction until handle is in line with pipe. STEP15.: [c] OPEN [0-77-6898]
: 3.     A high radiation signal on 0-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release.
Discharge to FDCT Isolation Valve. Cue: Inform the operator that the HW for [0-77-68981 moves in the counter clockwise direction until snug. STANDARD:
: 4.      0-RCV-77-43 has been verified CLOSED.
Operator OPENS [0-77-6898]
5      All Prerequisite Actions are complete (Section 4.0)
Discharge to FDCT Isolation Valve by turning HW in theCCW direction until HW is snug. JPM 189AP Page 70f9 Rev. 1 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist:
INITIATING CUES:
STEP/STANDARD STEP 16.: [d] CLOSE rO-77-689C]
You are the RadWaste AUO and have been directed by the Unit 1 SRO to perform Section 8.2 of 0-SO-77-1 to flush 0-RE-90-122 after the High Radiation Isolation. Inform the Unit 1 SRO when Section 8.2 is complete.
Radiation Monitor Return to Release Header Isolation Valve. Cue: Inform the operator that the HW for [0-77-689C1 moves in the clockwise direction until snug. STANDARD:
 
Operator CLOSES [0-77-689C]
JPM44 Page 1 of 7 REV. 7 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM #44 Venting the A-A RHR Pump due to Cavitation While in Mid-Loop Operation Original Signatures on File PREPARED!
Radiation Monitor Return to Release Header Isolation Valve by turning HW in the CW direction until HW is snug. STEP 17.: [e] WHEN count rate on [O-RE-90-122J decreases to its minimum value, THEN Cue: 0-R&#xa3;-90-122 is indicating 8.00 &#xa3;+02 cpm. STANDARD:
REVISED BY:                                                             Date/
Operator reads count rate on 0-RE-90-122.
VALIDATED BY:
STEP 18.: [1] OPEN [O-77-689CJ Radiation Monitor Return to Release Header Isolation Valve. Cue: Inform the operator that the HW for [0-77-689C1 moves in the counterclockwise direction until snug. STANDARD:
* Date/
Operator OPENS [O-77-689C]
APPROVED BY:                                                             Date/
Radiation Monitor Return to Release Header Isolation Valve by turning HW in the CCW direction until HW is snug. STEP 19.: [2] CLOSE [0-77-68961 Discharge to FDCT Isolation Valve. Cue: Inform the operator that the HW for [0-77-68981 moves in the clockwise direction until snug. STANDARD:
(Operations Training Manager)
Operator CLOSES [0-77-6898]
CONCURRED:    **                                                        Date/
Discharge to FDCT Isolation Valve by turning HW in the CCW direction until HW is snug. JPM 189AP Page 8 of 9 Rev. 1 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist:
(Operations Representative)
STEP/STANDARD STEP 16.: [d] CLOSE rO-77-689C]
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
Radiation Monitor Return to Release Header Isolation Valve. Cue: Inform the operator that the HW for [0-77-689C1 moves in the clockwise direction until snug. STANDARD:
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
Operator CLOSES [0-77-689C]
 
Radiation Monitor Return to Release Header Isolation Valve by turning HW in the CW direction until HW is snug. STEP 17.: [e] WHEN count rate on [O-RE-90-122J decreases to its minimum value, THEN Cue: 0-R&#xa3;-90-122 is indicating 8.00 &#xa3;+02 cpm. STANDARD:
JPM44 Page 2 of 7 REV. 7 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                    DESCRIPTION OF                  V      DATE    PAGES    PREPARED/
Operator reads count rate on 0-RE-90-122.
NUMBER                          REVISION                                    AFFECTED REVISED BY:
STEP 18.: [1] OPEN [O-77-689CJ Radiation Monitor Return to Release Header Isolation Valve. Cue: Inform the operator that the HW for [0-77-689C1 moves in the counterclockwise direction until snug. STANDARD:
1          Transfer from WP. Minor enhancements.       N     8/31/95    All      HJ Birch 2          Incorp prev pen/ink which chgd              N      3/5/96  3,4,5    HJ Birch performance time from 20 to 24. AOP-R03 replaced AOI-14. Minor JPM chgs to match new procedure pen/ink      AOP-R03 Rev chg. Procedure step 14d          N      6/8/96  4,5,8    HJ Birch referenced in JPM became 15d.
Operator OPENS [O-77-689C]
pen/ink      AOP-R03 Rev chg added train                  N      2/6/97    4,5      HJ Birch designation to valves. For JPM to save confusion: added a note that valves in ( )
Radiation Monitor Return to Release Header Isolation Valve by turning HW in the CCW direction until HW is snug. STEP 19.: [2] CLOSE [0-77-68961 Discharge to FDCT Isolation Valve. Cue: Inform the operator that the HW for [0-77-68981 moves in the clockwise direction until snug. STANDARD:
are B Train.
Operator CLOSES [0-77-6898]
AOP-R03 Rev chg only                        N      8/12/97    4      HJ Birch penlink      requal comment - FCV is normally            N      5/13/98    4      HJ Birch blocked. Chg cue to block fell off.
Discharge to FDCT Isolation Valve by turning HW in the CCW direction until HW is snug. JPM 189AP Page 8 of 9 Rev. 1 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist:
pen/ink      AOP R03 revision had no impact.              N      8/13/98    All    JP Kearney Revised KIA ratings. Reformatted critical steps.
STEP/STANDARD STEP 20.: [f] CLOSE [O-VLV-59-735]
pen/ink      AOP-R03 revision had no impact.               N      9/25/98    2,4    JP Kearney Updated procedure revision only pen/ink      AOP Rev Change only                          N      9/22/99    4      SR Taylor pen/ink      Corrected proceduredstep number              N      8/21/00  4,5,8    SR Taylor references in initiating cues and in JPM steps 1 & 14 due to AOP Rev Change and updated rev level.
Demin Flush To Radwaste Isol. Cue: Inform the operator that the handle for [0-VL V-59-7351 moves in the clockwise direction until perpendicular with pipe. STANDARD:
pen/ink      Added item 7 to initial conditions to         N    08/02/01    4    WR Ramsey eliminate confusion during performance.
Operator CLOSES [0-VLV-59-735]
3          Incorporated pen/ink changes; revised per    N      8/20/02    4    J P Kearney recent changes to AOP-R03; No impact on JPM flow 4          Updated to current revision.                 N      9/15/04    All    MG Croteau 5        Updated to current revision.                 N    10/03/05    All    MG Croteau 6        Proc chg eliminated several vlv              Y      2/9/09    All      H J Birch manipulation steps.
Demin Flush To Radwaste Isol by turning handle in theCCW direction until handle is perpendicular with pipe. STEP 21.: [g] OPEN Cask Decon Collector tank isolation valve [0-77-679]
7        Update to divide JPM steps to reflect        Y    11/3/2009    All    M Hankins current procedure revision V - Specify if the JPM change will require another validation (Y or N).
Cue: Inform the operator that the HW for [0-77-6791 moves in the counter clockwise direction until snug. STANDARD:
See cover sheet for criteria.
Operator OPENS [0-77-679]
 
Cask Decon Collector Tank by turning HW in the CCW direction until HW is snug. STEP 22.: [h] IF hi radiation alarm will not clear, THEN NOTIFY the appropriate US/SRO that alarm will not clear. Cue: 0-RE-90-122 high radiation alarm is clear (Provide appropriate feedback based on method used). If asked, rad monitor 0-RE-90-122 is still reading B.OO E+2 cpm. STANDARD:
JPM44 Page 3 of 7 REV. 7 SEQUOYAH NUCLEAR PLANT AUO/RO/SRO JOB PERFORMANCE MEASURE Task:
Operator determines that 0-RE-90-122 alarm has cleared by observing NO red lights LIT OR verifying XA-55-L2C Window C-3 DARK in Radwaste AUO shack OR Calling Main Control Room for alarm information.
Venting the A-A RHR Pump due to Cavitation while in Mid-Loop Operation JAfTA TASK #: 0000830501 (RO) 0050140104 (AUO)
STEP 23.: [12] RETURN to instruction where exited. STANDARD:
KIA Ratings:
Operator informs Unit 1 US/SRO that 0-SO-77-1 is complete End of JPM JPM 189AP Page 9 of9 Rev. 1 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -End Time __ Job Performance Checklist:
025 AA1.10 (3.1/2.9) 005K2.03 (2.9/3.1 )                  025AA 1.03 (3.4/3.3) 2.1.20 (4.3/4.2)                      2.1.23 (3.9/4.0)
STEP/STANDARD STEP 20.: [f] CLOSE [O-VLV-59-735]
Task Standard:         The A-A RHR pump is vented in preparation to return to service per AOP-R.03.
Demin Flush To Radwaste Isol. Cue: Inform the operator that the handle for [0-VL V-59-7351 moves in the clockwise direction until perpendicular with pipe. STANDARD:
Evaluation Method:     Simulator -__ -_-  In-Plant _--,X,->--_
Operator CLOSES [0-VLV-59-735]
_ _,-,-X__
Demin Flush To Radwaste Isol by turning handle in theCCW direction until handle is perpendicular with pipe. STEP 21.: [g] OPEN Cask Decon Collector tank isolation valve [0-77-679]
===================================================================================
Cue: Inform the operator that the HW for [0-77-6791 moves in the counter clockwise direction until snug. STANDARD:
Operator OPENS [0-77-679]
Cask Decon Collector Tank by turning HW in the CCW direction until HW is snug. STEP 22.: [h] IF hi radiation alarm will not clear, THEN NOTIFY the appropriate US/SRO that alarm will not clear. Cue: 0-RE-90-122 high radiation alarm is clear (Provide appropriate feedback based on method used). If asked, rad monitor 0-RE-90-122 is still reading B.OO E+2 cpm. STANDARD:
Operator determines that 0-RE-90-122 alarm has cleared by observing NO red lights LIT OR verifying XA-55-L2C Window C-3 DARK in Radwaste AUO shack OR Calling Main Control Room for alarm information.
STEP 23.: [12] RETURN to instruction where exited. STANDARD:
Operator informs Unit 1 US/SRO that 0-SO-77-1 is complete End of JPM JPM 189AP Page 9 of9 Rev. 1 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -End Time __
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All steps shall be simulated for this JPM. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: 1 A release from the CDCT has just been initiated using 0-SO-77-1 Waste Disposal System and 0-SI-CEM-077-400.1 Liquid Waste Effluent Batch Release. 2. The calculated high radiation trip setpoint for 0-RM-90-122 is 8.59 E+04 cpm, per 0-SI-CEM-077
-400.1, Liquid Waste Effluent Batch Release. 3. A high radiation signal on 0-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release. 4. 0-RCV-77-43 has been verified CLOSED. 5 All Prerequisite Actions are complete (Section 4.0) INITIATING CUES: You are the RadWaste AUO and have been directed by the Unit 1 SRO to perform Section 8.2 of 0-SO-77-1 to flush 0-RE-90-122 after the High Radiation Isolation.
Inform the Unit 1 SRO when Section 8.2 is complete.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All steps shall be simulated for this JPM. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: 1 A release from the CDCT has just been initiated using 0-SO-77-1 Waste Disposal System and 0-SI-CEM-077-400.1 Liquid Waste Effluent Batch Release. 2. The calculated high radiation trip setpoint for 0-RM-90-122 is 8.59 E+04 cpm, per 0-SI-CEM-077
-400.1, Liquid Waste Effluent Batch Release. 3. A high radiation signal on 0-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release. 4. 0-RCV-77-43 has been verified CLOSED. 5 All Prerequisite Actions are complete (Section 4.0) INITIATING CUES: You are the RadWaste AUO and have been directed by the Unit 1 SRO to perform Section 8.2 of 0-SO-77-1 to flush 0-RE-90-122 after the High Radiation Isolation.
Inform the Unit 1 SRO when Section 8.2 is complete.
PREPARED!
REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM #44 Venting the A-A RHR Pump due to Cavitation While in Mid-Loop Operation Original Signatures on File Date/
* Date/ Date/ (Operations Training Manager) ** Date/ (Operations Representative)
JPM44 Page 1 of 7 REV. 7
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
PREPARED!
REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM #44 Venting the A-A RHR Pump due to Cavitation While in Mid-Loop Operation Original Signatures on File Date/
* Date/ Date/ (Operations Training Manager) ** Date/ (Operations Representative)
JPM44 Page 1 of 7 REV. 7
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 1 Transfer from WP. Minor enhancements.
N 8/31/95 2 Incorp prev pen/ink which chgd N 3/5/96 performance time from 20 to 24. AOP-R03 replaced AOI-14. Minor JPM chgs to match new procedure pen/ink AOP-R03 Rev chg. Procedure step 14d N 6/8/96 referenced in JPM became 15d. pen/ink AOP-R03 Rev chg added train N 2/6/97 designation to valves. For JPM to save confusion:
added a note that valves in ( ) are B Train. AOP-R03 Rev chg only N 8/12/97 penlink requal comment -FCV is normally N 5/13/98 blocked. Chg cue to block fell off. pen/ink AOP R03 revision had no impact. N 8/13/98 Revised KIA ratings. Reformatted critical steps. pen/ink AOP-R03 revision had no impact. N 9/25/98 Updated procedure revision only pen/ink AOP Rev Change only N 9/22/99 pen/ink Corrected proceduredstep number N 8/21/00 references in initiating cues and in JPM steps 1 & 14 due to AOP Rev Change and updated rev level. pen/ink Added item 7 to initial conditions to N 08/02/01 eliminate confusion during performance.
3 Incorporated pen/ink changes; revised per N 8/20/02 recent changes to AOP-R03; No impact on JPM flow 4 Updated to current revision.
N 9/15/04 5 Updated to current revision.
N 10/03/05 6 Proc chg eliminated several vlv Y 2/9/09 manipulation steps. 7 Update to divide JPM steps to reflect Y 11/3/2009 current procedure revision V -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
PAGES AFFECTED All 3,4,5 4,5,8 4,5 4 4 All 2,4 4 4,5,8 4 4 All All All All JPM44 Page 2 of 7 REV. 7 PREPARED/
REVISED BY: HJ Birch HJ Birch HJ Birch HJ Birch HJ Birch HJ Birch JP Kearney JP Kearney SR Taylor SR Taylor WR Ramsey J P Kearney MG Croteau MG Croteau H J Birch M Hankins NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 1 Transfer from WP. Minor enhancements.
N 8/31/95 2 Incorp prev pen/ink which chgd N 3/5/96 performance time from 20 to 24. AOP-R03 replaced AOI-14. Minor JPM chgs to match new procedure pen/ink AOP-R03 Rev chg. Procedure step 14d N 6/8/96 referenced in JPM became 15d. pen/ink AOP-R03 Rev chg added train N 2/6/97 designation to valves. For JPM to save confusion:
added a note that valves in ( ) are B Train. AOP-R03 Rev chg only N 8/12/97 penlink requal comment -FCV is normally N 5/13/98 blocked. Chg cue to block fell off. pen/ink AOP R03 revision had no impact. N 8/13/98 Revised KIA ratings. Reformatted critical steps. pen/ink AOP-R03 revision had no impact. N 9/25/98 Updated procedure revision only pen/ink AOP Rev Change only N 9/22/99 pen/ink Corrected proceduredstep number N 8/21/00 references in initiating cues and in JPM steps 1 & 14 due to AOP Rev Change and updated rev level. pen/ink Added item 7 to initial conditions to N 08/02/01 eliminate confusion during performance.
3 Incorporated pen/ink changes; revised per N 8/20/02 recent changes to AOP-R03; No impact on JPM flow 4 Updated to current revision.
N 9/15/04 5 Updated to current revision.
N 10/03/05 6 Proc chg eliminated several vlv Y 2/9/09 manipulation steps. 7 Update to divide JPM steps to reflect Y 11/3/2009 current procedure revision V -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
PAGES AFFECTED All 3,4,5 4,5,8 4,5 4 4 All 2,4 4 4,5,8 4 4 All All All All JPM44 Page 2 of 7 REV. 7 PREPARED/
REVISED BY: HJ Birch HJ Birch HJ Birch HJ Birch HJ Birch HJ Birch JP Kearney JP Kearney SR Taylor SR Taylor WR Ramsey J P Kearney MG Croteau MG Croteau H J Birch M Hankins Task: SEQUOYAH NUCLEAR PLANT AUO/RO/SRO JOB PERFORMANCE MEASURE Venting the A-A RHR Pump due to Cavitation while in Mid-Loop Operation JAfTA TASK #: 0000830501 (RO) 0050140104 (AUO) KIA Ratings: 025 AA1.10 (3.1/2.9) 005K2.03 (2.9/3.1 ) 2.1.20 (4.3/4.2) 025AA 1.03 (3.4/3.3) 2.1.23 (3.9/4.0)
JPM44 Page 3 of 7 REV. 7 Task Standard:
The A-A RHR pump is vented in preparation to return to service per AOP-R.03.
Evaluation Method: Simulator
---In-Plant __ ,-,-X __ ===================================================================================
Performer:
Performer:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:  
NAME                                                   Start Time _ __
-------------_/_--
Performance Rating: SAT             UNSAT       Performance Time                     Finish Time ___
SIGNATURE DATE ===================================================================================
Evaluator:     --------~--~---~/~--
COMMENTS Task: SEQUOYAH NUCLEAR PLANT AUO/RO/SRO JOB PERFORMANCE MEASURE Venting the A-A RHR Pump due to Cavitation while in Mid-Loop Operation JAfTA TASK #: 0000830501 (RO) 0050140104 (AUO) KIA Ratings: 025 AA1.10 (3.1/2.9) 005K2.03 (2.9/3.1 ) 2.1.20 (4.3/4.2) 025AA 1.03 (3.4/3.3) 2.1.23 (3.9/4.0)
                  ------------_/_--
JPM44 Page 3 of 7 REV. 7 Task Standard:
SIGNATURE                DATE
The A-A RHR pump is vented in preparation to return to service per AOP-R.03.
Evaluation Method: Simulator
__ _ In-Plant _--,X,->--_  
===================================================================================
===================================================================================
Performer:
COMMENTS
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time ___ __ Evaluator:
 
SIGNATURE DATE ===================================================================================
JPM44 Page 4 of 7 REV. 7 SPECIAL INSTRUCTIONS TO EVALUATOR:
COMMENTS JPM44 Page 4 of 7 REV. 7 SPECIAL INSTRUCTIONS TO EVALUATOR:  
: 1. Any UNSAT requires comments
: 1. Any UNSAT requires comments 2. This JPM may be performed on either unit. You MUST clearly specify which unit the task is to be performed on when reading the initial conditions and initiating cues. 3. IF the A train pump room, THEN have operator perform this JPM on train B, numbers in parentheses.  
: 2. This JPM may be performed on either unit. You MUST clearly specify which unit the task is to be performed on when reading the initial conditions and initiating cues.
: 4. Ensure operator performs the following required actions for SELF-CHECKING;  
: 3. IF the A train pump room, THEN have operator perform this JPM on train B, numbers in parentheses.
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.  
: 4. Ensure operator performs the following required actions for SELF-CHECKING;
: c. Compares the actual response to the expected response.  
: a. Identifies the correct unit, train, component, etc.
: b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
: 5. If a ladder is needed to operate any equipment the trainee should locate a ladder and state that they would use the ladder to operate the valve, it is not necessary to bring the ladder to the work location.
: 5. If a ladder is needed to operate any equipment the trainee should locate a ladder and state that they would use the ladder to operate the valve, it is not necessary to bring the ladder to the work location.
Validation Time: CR. Local 15 mins Tools Needed: AOP-R.03, Section 2.1 step 14. Reference Rev No. AOP-R.03 2 ==================================================================================
Validation Time: CR.                                   Local   15 mins Tools Needed:
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
AOP-R.03, Section 2.1 step 14.
All steps shall be simulated.
Reference                                                                           Rev No.
I will provide initiating cues and indicate any steps to be discussed.
AOP-R.03                                                                                                 2
When you complete the task successfully, the objective for this job performance measure will be satisfied.
==================================================================================
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  
READ TO OPERATOR Directions to Trainee:
: 1) Unit _ is in Mode 5 following a refueling outage. 2) The RCS is at Mid-loop with the A-A (8-8) RHR pump in service. 3) The 8-8 (A-A) RHR pump is tagged for maintenance on the pump seal package. It is expected to be ready for service within the next 4 hours. 4) The block on discharge valve FCV-74-16 (74-32) on the A-A (8-8) RHR Hx fell off and the FCV failed full open, causing vortexing in the RCS loop, resulting in air being drawn into the A-A (8-8) RHR pump suction and pump casing. 5) Rad Con techs are standing by to support the venting operation.  
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated.
: 6) The A-A (8-8) RHR pump is in the Pull-to-Lock position.  
I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 7) Emergency repairs have been completed on FCV-74-16 (74-32) and the valve is now functional.
INITIAL CONDITIONS:
INITIATING CUES: 1) The operators in the MCR have unsuccessfully attempted to get the A-A (8-8) RHR pump back in service. 2) You are the Unit_ Aux. 8ldg. AUO. You have been directed to locally vent the A-A (8-8) RHR pump using AOP-R.03 using Appendix J. 3) When you have completed the local venting notify the CRO on the unit. JPM44 Page 4 of 7 REV. 7 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1)       Unit _ is in Mode 5 following a refueling outage.
: 1. Any UNSAT requires comments 2. This JPM may be performed on either unit. You MUST clearly specify which unit the task is to be performed on when reading the initial conditions and initiating cues. 3. IF the A train pump room, THEN have operator perform this JPM on train B, numbers in parentheses.
: 2)       The RCS is at Mid-loop with the A-A (8-8) RHR pump in service.
: 4. Ensure operator performs the following required actions for SELF-CHECKING;
: 3)       The 8-8 (A-A) RHR pump is tagged for maintenance on the pump seal package. It is expected to be ready for service within the next 4 hours.
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: 4)         The block on discharge valve FCV-74-16 (74-32) on the A-A (8-8) RHR Hx fell off and the FCV failed full open, causing vortexing in the RCS loop, resulting in air being drawn into the A-A (8-8) RHR pump suction and pump casing.
: c. Compares the actual response to the expected response.
: 5)       Rad Con techs are standing by to support the venting operation.
: 5. If a ladder is needed to operate any equipment the trainee should locate a ladder and state that they would use the ladder to operate the valve, it is not necessary to bring the ladder to the work location.
: 6)       The A-A (8-8) RHR pump is in the Pull-to-Lock position.
Validation Time: CR. Local 15 mins Tools Needed: AOP-R.03, Section 2.1 step 14. Reference Rev No. AOP-R.03 2 ==================================================================================
: 7)       Emergency repairs have been completed on FCV-74-16 (74-32) and the valve is now functional.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
INITIATING CUES:
All steps shall be simulated.
: 1)       The operators in the MCR have unsuccessfully attempted to get the A-A (8-8) RHR pump back in service.
I will provide initiating cues and indicate any steps to be discussed.
: 2)       You are the Unit_ Aux. 8ldg. AUO. You have been directed to locally vent the A-A (8-8)
When you complete the task successfully, the objective for this job performance measure will be satisfied.
RHR pump using AOP-R.03 using Appendix J.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 3)       When you have completed the local venting notify the CRO on the unit.
: 1) Unit _ is in Mode 5 following a refueling outage. 2) The RCS is at Mid-loop with the A-A (8-8) RHR pump in service. 3) The 8-8 (A-A) RHR pump is tagged for maintenance on the pump seal package. It is expected to be ready for service within the next 4 hours. 4) The block on discharge valve FCV-74-16 (74-32) on the A-A (8-8) RHR Hx fell off and the FCV failed full open, causing vortexing in the RCS loop, resulting in air being drawn into the A-A (8-8) RHR pump suction and pump casing. 5) Rad Con techs are standing by to support the venting operation.
 
: 6) The A-A (8-8) RHR pump is in the Pull-to-Lock position.
JPM44 Page 5 of 7 REV. 7 Job Performance Checklist:
: 7) Emergency repairs have been completed on FCV-74-16 (74-32) and the valve is now functional.
STEP/STANDARD                           SAT/U NSAT STEP 1.:       Obtain a copy of the appropriate procedure                 -    SAT NOTE:     After giving operator a copy of the procedure have them     -    UNSAT explains how and where to obtain the key. Inform him he/she has the key.                                       Start Time_ _
INITIATING CUES: 1) The operators in the MCR have unsuccessfully attempted to get the A-A (8-8) RHR pump back in service. 2) You are the Unit_ Aux. 8ldg. AUO. You have been directed to locally vent the A-A (8-8) RHR pump using AOP-R.03 using Appendix J. 3) When you have completed the local venting notify the CRO on the unit.
STANDARD: Operator obtains a copy of AOP-R.03, Appendix J STEP 2.       OBTAIN M-5 key and radio.                                   - - SAT Cue:     After explaining how to obtain M-5 Key and radios,         - - UNSAT inform operator that they have both.
Job Performance Checklist:
STANDARD: Operator explains how to obtain M-5 Key and radios, procedure contains note stating keys may be obtained from AOP-C.04 cabinet, radios made be obtained from AUO work station (OFO), MCR,SM office or MCR.
STEP/STANDARD STEP 1.: Obtain a copy of the appropriate procedure NOTE: After giving operator a copy of the procedure have them explains how and where to obtain the key. Inform him he/she has the key. STANDARD:
STEP 3.       IDENTIFY applicable unit:                                   - - SAT
Operator obtains a copy of AOP-R.03, Appendix J STEP 2. OBTAIN M-5 key and radio. Cue: After explaining how to obtain M-5 Key and radios, inform operator that they have both. STANDARD:
* Unit 1 - -
Operator explains how to obtain M-5 Key and radios, procedure contains note stating keys may be obtained from AOP-C.04 cabinet, radios made be obtained from AUO work station (OFO), MCR,SM office or MCR. STEP 3. IDENTIFY applicable unit:
* Unit 2 - -                                         - - UNSAT STANDARD: Operator identifies proper unit as determined from the initiating cues STEP 4.       IDENTIFY RHR Pump(s) to be vented (specified by MCR).       - - SAT
* Unit 1 --* Unit 2 --STANDARD:
* Train A - -
Operator identifies proper unit as determined from the initiating cues STEP 4. IDENTIFY RHR Pump(s) to be vented (specified by MCR).
* Train B - -                                       - - UNSAT STANDARD: Operator identifies proper RHR pump as determined from the initiating cues STEP 5.:       UNLOCK and CLOSE pump discharge valve on affected           -    SAT train: [RHR pump Room, 653']
* Train A --* Train B --STANDARD:
* 74-520 (Train A)                             -     UNSAT OR
Operator identifies proper RHR pump as determined from the initiating cues STEP 5.: UNLOCK and CLOSE pump discharge valve on affected train: [RHR pump Room, 653']
* 74-520 (Train A) OR
* 74-521 (Train B) Cue: Lock is removed; HW turned several times in the CW direction and is now snug. STANDARD:
Operator locates VLV-74-520 (74-521), unlocks and turns the HW in the CW direction until snug. JPM44 Page 5 of 7 REV. 7 SAT/U N SAT SAT -UNSAT -Start Time __ SAT --UNSAT --SAT --UNSAT --SAT --UNSAT --SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/STANDARD STEP 1.: Obtain a copy of the appropriate procedure NOTE: After giving operator a copy of the procedure have them explains how and where to obtain the key. Inform him he/she has the key. STANDARD:
Operator obtains a copy of AOP-R.03, Appendix J STEP 2. OBTAIN M-5 key and radio. Cue: After explaining how to obtain M-5 Key and radios, inform operator that they have both. STANDARD:
Operator explains how to obtain M-5 Key and radios, procedure contains note stating keys may be obtained from AOP-C.04 cabinet, radios made be obtained from AUO work station (OFO), MCR,SM office or MCR. STEP 3. IDENTIFY applicable unit:
* Unit 1 --* Unit 2 --STANDARD:
Operator identifies proper unit as determined from the initiating cues STEP 4. IDENTIFY RHR Pump(s) to be vented (specified by MCR).
* Train A --* Train B --STANDARD:
Operator identifies proper RHR pump as determined from the initiating cues STEP 5.: UNLOCK and CLOSE pump discharge valve on affected train: [RHR pump Room, 653']
* 74-520 (Train A) OR
* 74-521 (Train B) Cue: Lock is removed; HW turned several times in the CW direction and is now snug. STANDARD:
Operator locates VLV-74-520 (74-521), unlocks and turns the HW in the CW direction until snug. JPM44 Page 5 of 7 REV. 7 SAT/U N SAT SAT -UNSAT -Start Time __ SAT --UNSAT --SAT --UNSAT --SAT --UNSAT --SAT -UNSAT -Critical Step Job Performance Checklist:
STEP 6.: STEP/STANDARD UNLOCK and OPEN pump discharge vent on affected train: [RHR pump room]
* 74-516 (Train A) OR
* 74-517 (Train B) Cue: Lock is removed; HW turned several times in the CCW direction and is now snug. STANDARD:
Operator locates VLV-74-516 (74-517), unlocks and turns the HW in the CCW direction until snug and states that the valve will be open for approximately 10 minutes. STEP 7.: VENT for 10 minutes. Cue: 10 minutes have elapsed. STANDARD:
Operator states that once the valve is open they will vent for 10 minutes. STEP 8.: CLOSE RHR pump discharge vent valve on affected train:
* 74-516 (Train A) OR
* 74-517 (Train B) The HW turned several times in the CW direction and is now snug. STANDARD:
Operator locates valve 74-516 (74-517) turns the HW in the CW direction until snug. STEP 9.: OPEN RHR pump discharge valve on affected train.
* 74-520 (Train A) OR
* 74-521 (Train B)
* 74-521 (Train B)
* The HW turned several times in the CCW direction and is now snug. STANDARD:
Critical Step Cue:      Lock is removed; HW turned several times in the CW direction and is now snug.
Operator locates VLV-74-520 (74-521), turns the HW in the CCW direction until snug. JPM44 Page 6 of 7 REV. 7 SAT/UNSAT SAT UNSAT Critical Step SAT _UNSAT Critical Step _SAT UNSAT Critical Step SAT UNSAT Critical Step Job Performance Checklist:
STANDARD: Operator locates VLV-74-520 (74-521), unlocks and turns the HW in the CW direction until snug.
STEP 6.: STEP/STANDARD UNLOCK and OPEN pump discharge vent on affected train: [RHR pump room]
 
* 74-516 (Train A) OR
JPM44 Page 6 of 7 REV. 7 Job Performance Checklist:
* 74-517 (Train B) Cue: Lock is removed; HW turned several times in the CCW direction and is now snug. STANDARD:
STEP/STANDARD                              SAT/UNSAT STEP 6.:       UNLOCK and OPEN pump discharge vent on affected train:           SAT
Operator locates VLV-74-516 (74-517), unlocks and turns the HW in the CCW direction until snug and states that the valve will be open for approximately 10 minutes. STEP 7.: VENT for 10 minutes. Cue: 10 minutes have elapsed. STANDARD:
[RHR pump room]
Operator states that once the valve is open they will vent for 10 minutes. STEP 8.: CLOSE RHR pump discharge vent valve on affected train:
* 74-516 (Train A)                                         UNSAT OR
* 74-516 (Train A) OR
* 74-517 (Train B)
* 74-517 (Train B) The HW turned several times in the CW direction and is now snug. STANDARD:
Critical Step Cue:     Lock is removed; HW turned several times in the CCW direction and is now snug.
Operator locates valve 74-516 (74-517) turns the HW in the CW direction until snug. STEP 9.: OPEN RHR pump discharge valve on affected train.
STANDARD: Operator locates VLV-74-516 (74-517), unlocks and turns the HW in the CCW direction until snug and states that the valve will be open for approximately 10 minutes.
* 74-520 (Train A) OR
STEP 7.:       VENT for 10 minutes.                                             SAT
_UNSAT Cue:       10 minutes have elapsed.
STANDARD:   Operator states that once the valve is open they will vent Critical Step for 10 minutes.
STEP 8.:       CLOSE RHR pump discharge vent valve on affected train:       _SAT
* 74-516 (Train A)
OR                                                       UNSAT
* 74-517 (Train B)
The HW turned several times in the CW direction and is   Critical Step now snug.
STANDARD:   Operator locates valve 74-516 (74-517) turns the HW in the CW direction until snug.
STEP 9.:       OPEN RHR pump discharge valve on affected train.                 SAT
* 74-520 (Train A)
OR                                             UNSAT
* 74-521 (Train B)
* 74-521 (Train B)
* The HW turned several times in the CCW direction and is now snug. STANDARD:
The HW turned several times in the CCW direction and     Critical Step is now snug.
Operator locates VLV-74-520 (74-521), turns the HW in the CCW direction until snug. JPM44 Page 6 of 7 REV. 7 SAT/UNSAT SAT UNSAT Critical Step SAT _UNSAT Critical Step _SAT UNSAT Critical Step SAT UNSAT Critical Step Job Performance Checklist:
STANDARD:   Operator locates VLV-74-520 (74-521), turns the HW in the CCW direction until snug.
STEP/STANDARD STEP 10.: FULLY OPEN pressure transmitter instrument drain valve for 5 minutes on affected train: [Racks outside RHR pump room]
 
* PT-74-13 (Train A) OR
JPM44 Page 7 of 7 REV. 7 Job Performance Checklist:
* PT-47-26 (Train B) Cue: HW turned CCW until snug, 5 minutes have elapsed. STANDARD:
STEP/STANDARD                             SAT/UNSAT STEP 10.:     FULLY OPEN pressure transmitter instrument drain valve     -    SAT for 5 minutes on affected train:
Operator locates drain valve for PT-74-13 (26), turns HW in the CCW direction until snug, leaves open for 5 minutes. STEP 11.: CLOSE pressure transmitter instrument drain valve on affected train:
[Racks outside RHR pump room]                               -    UNSAT
* PT-74-13 (Train A) OR
* PT-74-13 (Train A)
* PT-47-26 (Train B) Cue: HW turned CW until snug. STANDARD:
OR
Operator turns HW in the CW direction until snug. STEP 12.: NOTIFY MCR that RHR pump Venting is complete on the affected train. Cue: Acknowledge report and instruct operator to resume normal duties. STANDARD:
* PT-47-26 (Train B)                               Critical Step Cue:     HW turned CCW until snug, 5 minutes have elapsed.
Operator communicates with the UO in the MCR and informs him/her that the A-A (B-B) RHR pump has been vented in accordance with Appendix J of AOP-R.03.
STANDARD: Operator locates drain valve for PT-74-13 (26), turns HW in the CCW direction until snug, leaves open for 5 minutes.
JPM44 Page 7 of 7 REV. 7 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Stop Time __ Job Performance Checklist:
STEP 11.:     CLOSE pressure transmitter instrument drain valve on       -    SAT affected train:
STEP/STANDARD STEP 10.: FULLY OPEN pressure transmitter instrument drain valve for 5 minutes on affected train: [Racks outside RHR pump room]
* PT-74-13 (Train A)                                 -    UNSAT OR
* PT-74-13 (Train A) OR
* PT-47-26 (Train B)
* PT-47-26 (Train B) Cue: HW turned CCW until snug, 5 minutes have elapsed. STANDARD:
Critical Step Cue:     HW turned CW until snug.
Operator locates drain valve for PT-74-13 (26), turns HW in the CCW direction until snug, leaves open for 5 minutes. STEP 11.: CLOSE pressure transmitter instrument drain valve on affected train:
STANDARD: Operator turns HW in the CW direction until snug.
* PT-74-13 (Train A) OR
STEP 12.:     NOTIFY MCR that RHR pump Venting is complete on the         -    SAT affected train.
* PT-47-26 (Train B) Cue: HW turned CW until snug. STANDARD:
                                                                                -    UNSAT Cue:     Acknowledge report and instruct operator to resume normal duties.
Operator turns HW in the CW direction until snug. STEP 12.: NOTIFY MCR that RHR pump Venting is complete on the affected train. Cue: Acknowledge report and instruct operator to resume normal duties. STANDARD:
Stop Time_ _
Operator communicates with the UO in the MCR and informs him/her that the A-A (B-B) RHR pump has been vented in accordance with Appendix J of AOP-R.03.
STANDARD: Operator communicates with the UO in the MCR and informs him/her that the A-A (B-B) RHR pump has been vented in accordance with Appendix J of AOP-R.03.
JPM44 Page 7 of 7 REV. 7 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Stop Time __
 
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
READ TO OPERATOR Directions to Trainee:
All steps shall be simulated.
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated.
I will provide initiating cues and indicate any steps to be discussed.
I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1)       Unit _ is in Mode 5 following a refueling outage.
: 1) Unit _ is in Mode 5 following a refueling outage. 2) The RCS is at Mid-loop with the A-A (B-B) RHR pump in service. 3) The B-B (A-A) RHR pump is tagged for maintenance on the pump seal package. It is expected to be ready for service within the next 4 hours. 4) The block on discharge valve FCV-74-16 (74-32) on the A-A (B-B) RHR Hx fell off and the FCV failed full open, causing vortexing in the RCS loop, resulting in air being drawn into the A-A (B-B) RHR pump suction and pump casing. 5) Rad Con techs are standing by to support the venting operation.  
: 2)        The RCS is at Mid-loop with the A-A (B-B) RHR pump in service.
: 6) The A-A (B-B) RHR pump is in the PUIl-to-Lock position.  
: 3)        The B-B (A-A) RHR pump is tagged for maintenance on the pump seal package. It is expected to be ready for service within the next 4 hours.
: 7) Emergency repairs have been completed on FCV-74-16 (74-32) and the valve is now functional.
: 4)       The block on discharge valve FCV-74-16 (74-32) on the A-A (B-B) RHR Hx fell off and the FCV failed full open, causing vortexing in the RCS loop, resulting in air being drawn into the A-A (B-B) RHR pump suction and pump casing.
INITIATING CUES: 1) The operators in the MCR have unsuccessfully attempted to get the A-A (B-B) RHR pump back in service. 2) You are the Unit_ Aux. Bldg. AUO. You have been directed to locally vent the A-A (B-B) RHR pump using AOP-R.03 using Appendix J. 4) When you have completed the local venting notify the CRO on the unit. READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
: 5)        Rad Con techs are standing by to support the venting operation.
All steps shall be simulated.
: 6)        The A-A (B-B) RHR pump is in the PUIl-to-Lock position.
I will provide initiating cues and indicate any steps to be discussed.
: 7)        Emergency repairs have been completed on FCV-74-16 (74-32) and the valve is now functional.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIATING CUES:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1)        The operators in the MCR have unsuccessfully attempted to get the A-A (B-B) RHR pump back in service.
: 1) Unit _ is in Mode 5 following a refueling outage. 2) The RCS is at Mid-loop with the A-A (B-B) RHR pump in service. 3) The B-B (A-A) RHR pump is tagged for maintenance on the pump seal package. It is expected to be ready for service within the next 4 hours. 4) The block on discharge valve FCV-74-16 (74-32) on the A-A (B-B) RHR Hx fell off and the FCV failed full open, causing vortexing in the RCS loop, resulting in air being drawn into the A-A (B-B) RHR pump suction and pump casing. 5) Rad Con techs are standing by to support the venting operation.
: 2)        You are the Unit_ Aux. Bldg. AUO. You have been directed to locally vent the A-A (B-B)
: 6) The A-A (B-B) RHR pump is in the PUIl-to-Lock position.
RHR pump using AOP-R.03 using Appendix J.
: 7) Emergency repairs have been completed on FCV-74-16 (74-32) and the valve is now functional.
: 4)       When you have completed the local venting notify the CRO on the unit.
INITIATING CUES: 1) The operators in the MCR have unsuccessfully attempted to get the A-A (B-B) RHR pump back in service. 2) You are the Unit_ Aux. Bldg. AUO.
 
You have been directed to locally vent the A-A (B-B) RHR pump using AOP-R.03 using Appendix J. 4) When you have completed the local venting notify the CRO on the unit.
JPM91AP Page 1 of 14 REV. 1 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 91AP Transfer Controls to the Auxiliary Mode Per Checklist 3 (SD Bd De-Energized)
PREPAREDI REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 91AP Transfer Controls to the Auxiliary Mode Per Checklist 3 (SD Bd De-Energized)
PREPAREDI REVISED BY:                                                              Date/
Date/ JPM91AP Page 1 of 14 REV. 1 VALIDATED BY:
VALIDATED BY:
* Date/ APPROVED BY: CONCURRED:
* Date/
------------------------------------------------
APPROVED BY:                                                            Date/
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
(Operations Training Manager)
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
CONCURRED:    **                                                        Date/
PREPAREDI REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 91AP Transfer Controls to the Auxiliary Mode Per Checklist 3 (SD Bd De-Energized)
(Operations Representative)
Date/ JPM91AP Page 1 of 14 REV. 1 VALIDATED BY:
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
* Date/ APPROVED BY: CONCURRED:
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
------------------------------------------------
 
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
JPM91AP Page 2 of 14 REV. 1 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                  DESCRIPTION OF                    V    DATE    PAGES    PREPARED/
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
NUMBER                        REVISION                                    AFFECTED REVISED BY:
NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 New JPM, SO Bd deenergized requires Y 2/09/09 operator closure of OG breaker 1 Revised to update steps to latest Y 12/05/09 procedure revision, revised steps concerning Time Critical Action Clock starts as addressed AOP-N .01 . v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
0        New JPM, SO Bd deenergized requires            Y    2/09/09      All    HJ Birch operator closure of OG breaker 1        Revised to update steps to latest            Y    12/05/09    ALL    M Hankins procedure revision, revised steps concerning Time Critical Action Clock starts as addressed AOP-N .01 .
PAGES AFFECTED All ALL JPM91AP Page 2 of 14 REV. 1 PREPARED/
v - Specify if the JPM change will require another validation (Y or N).
REVISED BY: HJ Birch M Hankins NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 New JPM, SO Bd deenergized requires Y 2/09/09 operator closure of OG breaker 1 Revised to update steps to latest Y 12/05/09 procedure revision, revised steps concerning Time Critical Action Clock starts as addressed AOP-N .01 . v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
See cover sheet for criteria.
PAGES AFFECTED All ALL JPM91AP Page 2 of 14 REV. 1 PREPARED/
 
REVISED BY: HJ Birch M Hankins Task: SEQUOY AH NUCLEAR PLANT AUOIUOISRO JOB PERFORMANCE MEASURE Transfer Controls to the Auxiliary Mode per Checklist AOP-C.04 checklist
JPM91AP Page 3 of 14 REV. 1 SEQUOYAH NUCLEAR PLANT AUOIUOISRO JOB PERFORMANCE MEASURE Task:
: 3. JAITA TASK #: 0000680501 (RO) KIA Ratings: 068AK2.01 (3.9/4.0) 068AK3.18 (4.2/4.5) 068AA1.12 (4.4/4.4) 0620090104 (AUO) 068AK3.09 (3.9/4.4) 068AA 1.21 (3.9/4.1)
Transfer Controls to the Auxiliary Mode per Checklist AOP-C.04 checklist 3.
JPM91AP Page 3 of 14 REV. 1 Task Standard:
JAITA TASK #: 0000680501 (RO)            0620090104      (AUO)
The required controls located on the 480V and 6.9kV Shutdown Boards and the 6.9kV Logic Panels are transferred to the AUXILIARY mode. Evaluation Method: Simulator
KIA Ratings:
__ _ In-Plant X ===================================================================================
068AK2.01 (3.9/4.0)               068AK3.09 (3.9/4.4) 068AK3.18 (4.2/4.5)              068AA 1.21 (3.9/4.1) 068AA1.12 (4.4/4.4)
Task Standard:        The required controls located on the 480V and 6.9kV Shutdown Boards and the 6.9kV Logic Panels are transferred to the AUXILIARY mode.
Evaluation Method:     Simulator _ __          In-Plant        X
===================================================================================
Performer:
Performer:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
NAME                                                 Start Time _ __
SIGNATURE DATE ===================================================================================
Performance Rating: SAT             UNSAT           Performance Time               Finish Time _ __
COMMENTS Task: SEQUOY AH NUCLEAR PLANT AUOIUOISRO JOB PERFORMANCE MEASURE Transfer Controls to the Auxiliary Mode per Checklist AOP-C.04 checklist
Evaluator:     -----~~~~~---_/_--
: 3. JAITA TASK #: 0000680501 (RO) KIA Ratings: 068AK2.01 (3.9/4.0) 068AK3.18 (4.2/4.5) 068AA1.12 (4.4/4.4) 0620090104 (AUO) 068AK3.09 (3.9/4.4) 068AA 1.21 (3.9/4.1)
              ---------~---_/----
JPM91AP Page 3 of 14 REV. 1 Task Standard:
SIGNATURE                     DATE
The required controls located on the 480V and 6.9kV Shutdown Boards and the 6.9kV Logic Panels are transferred to the AUXILIARY mode. Evaluation Method: Simulator
===================================================================================
__ _ In-Plant X ===================================================================================
COMMENTS
Performer:
 
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
JPM91AP Page 4 of 14 REV. 1 SPECIAL INSTRUCTIONS TO EVALUATOR:
SIGNATURE DATE ===================================================================================
: 1. Any UNSAT requires comments
COMMENTS JPM91AP Page 4 of 14 REV. 1 SPECIAL INSTRUCTIONS TO EVALUATOR:  
: 2. The SHUTDOWN BOARD LOGIC CABINETS are not locked, it will NOT be necessary to open the cabinet, having the operator locate the correct cabinet and describing his/her actions will suffice.
: 1. Any UNSAT requires comments 2. The SHUTDOWN BOARD LOGIC CABINETS are not locked, it will NOT be necessary to open the cabinet, having the operator locate the correct cabinet and describing his/her actions will suffice. 3. The AOP-C.04 cabinet is locked. It is not necessary to open the cabinet and retrieve the key. Having the operator locate the cabinet and discuss his/her actions will suffice. 4. Get SM permission to enter Trip Hazard Zone while performing JPM. 5. Ensure PPE requirements are met. 6. Timing for Time Critical Actions will start one minute prior to the operator being notified to perform the checklist.
: 3. The AOP-C.04 cabinet is locked. It is not necessary to open the cabinet and retrieve the key. Having the operator locate the cabinet and discuss his/her actions will suffice.
Operator should be allowed a few minutes to review checklist prior to checklist performance.  
: 4. Get SM permission to enter Trip Hazard Zone while performing JPM.
: 7. Ensure operator performs the following required actions for SELF-CHECKING;  
: 5. Ensure PPE requirements are met.
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.  
: 6. Timing for Time Critical Actions will start one minute prior to the operator being notified to perform the checklist. Operator should be allowed a few minutes to review checklist prior to checklist performance.
: 7. Ensure operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc.
: b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR. Local 35 minutes Tools Needed: AOP-C.04 Checklist 3 Reference Title Rev No. AOP-C.04 Control Room Inaccessibilit 18 ==============================================================================
Validation Time: CR.                                 Local 35 minutes Tools Needed:
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
AOP-C.04 Checklist 3
All steps shall be simulated.
WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. DO NOT OPEN ANY COMPARTMENTS.
I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1) Both units were operating at 100% power when a fire in the spreader room required abandonment of the Main Control Room. 2) Both units were tripped as required by AOP-C.04.
The control room has been abandoned.
INITIATING CUES: 1) You are the Control Room AUO. You have been assigned checklist
: 3. 2) Parts of this checklist are time critical.
Timing for Time Critical Actions begins when the decision to enter AOP-C.04, SO from the ACR, is determined in AOP-N.01 Plant Fires. 3) NOTIFY the ACR when control is transferred on Checklist
: 3. JPM91AP Page 4 of 14 REV. 1 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Any UNSAT requires comments 2. The SHUTDOWN BOARD LOGIC CABINETS are not locked, it will NOT be necessary to open the cabinet, having the operator locate the correct cabinet and describing his/her actions will suffice. 3. The AOP-C.04 cabinet is locked. It is not necessary to open the cabinet and retrieve the key. Having the operator locate the cabinet and discuss his/her actions will suffice. 4. Get SM permission to enter Trip Hazard Zone while performing JPM. 5. Ensure PPE requirements are met. 6. Timing for Time Critical Actions will start one minute prior to the operator being notified to perform the checklist.
Operator should be allowed a few minutes to review checklist prior to checklist performance.
: 7. Ensure operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR. Local 35 minutes Tools Needed: AOP-C.04 Checklist 3  


==References:==
==References:==


Reference Title Rev No. AOP-C.04 Control Room Inaccessibilit 18 ==============================================================================
Reference                                           Title                           Rev No.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
AOP-C.04                                   Control Room Inaccessibilit                                 18
All steps shall be simulated.
==============================================================================
WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. DO NOT OPEN ANY COMPARTMENTS.
READ TO OPERATOR Directions to Trainee:
I will provide initiating cues and indicate any steps to be discussed.
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. DO NOT OPEN ANY COMPARTMENTS. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  
INITIAL CONDITIONS:
: 1) Both units were operating at 100% power when a fire in the spreader room required abandonment of the Main Control Room. 2) Both units were tripped as required by AOP-C.04.
: 1) Both units were operating at 100% power when a fire in the spreader room required abandonment of the Main Control Room.
The control room has been abandoned.
: 2) Both units were tripped as required by AOP-C.04. The control room has been abandoned.
INITIATING CUES: 1) You are the Control Room AUO. You have been assigned checklist  
INITIATING CUES:
: 3. 2) Parts of this checklist are time critical.
: 1) You are the Control Room AUO. You have been assigned checklist 3.
Timing for Time Critical Actions begins when the decision to enter AOP-C.04, SO from the ACR, is determined in AOP-N.01 Plant Fires. 3) NOTIFY the ACR when control is transferred on Checklist  
: 2) Parts of this checklist are time critical. Timing for Time Critical Actions begins when the decision to enter AOP-C.04, SO from the ACR, is determined in AOP-N.01 Plant Fires.
: 3.
: 3) NOTIFY the ACR when control is transferred on Checklist 3.
Job Performance Checklist:
 
NOTE 1 NOTE 2 STEP 1.: STEP/STANDARD This checklist has Time Critical Actions. Time limits are identified at applicable steps. All times start from point at which the MCR determines that ay AOP-C.04 entry condition is met. For JPM performance the timing for Time Critical Actions starts one minute before the operator is notified to perform checklist.
JPM91AP Page 5 of 14 REV. 1 Job Performance Checklist:
Obtain a copy of the appropriate checklist(s).
STEP/STANDARD                                 SAT/U NSAT NOTE 1        This checklist has Time Critical Actions. Time limits are identified       SAT at applicable steps. All times start from point at which the MCR determines that ay AOP-C.04 entry condition is met.                     _UNSAT NOTE 2        For JPM performance the timing for Time Critical Actions starts one minute before the operator is notified to perform checklist. Start Time_ _
STANDARD:
STEP 1.:      Obtain a copy of the appropriate checklist(s).
Operator obtains a copy of AOP-C.04 checklist  
STANDARD: Operator obtains a copy of AOP-C.04 checklist 3.
: 3. STEP 2.: STEP 3.: [1] OBTAIN the following from AOP-C.04 Cabinet:
STEP 2.:       [1] OBTAIN the following from AOP-C.04 Cabinet:                         _SAT
* C415A Key
* C415A Key UNSAT
* flashlight The evaluator may utilize a copy of Checklists 3 to monitor and document the performer's actions. Operator is notified AOP-C.04 has been entered b the MCR, Timing for Time Critical Actions started one minute ago. CUE: Cue OPERA TOR that timing for time Critical Actions started one minute ago. Cue as necessary to give feedback on actions taken by the performer.
* flashlight STEP 3.:      The evaluator may utilize a copy of Checklists 3 to monitor and     Record time document the performer's actions. Operator is notified AOP-C.04     AOP-C.04 was has been entered b the MCR, Timing for Time Critical Actions         entered in started one minute ago.                                             MCR CUE:       Cue OPERA TOR that timing for time Critical Actions started one minute ago. Cue as necessary to give feedback on                 This time actions taken by the performer.                                     starts the clock for Time STANDARD: N/A.                                                                   Critical Actions STEP 4.       [2] ATTEMPT to STOP both Unit 1 CCPS by ..... (5 minutes)               __ SAT
STANDARD:
* PLACE CCP transfer switch in AUX (Lift Lever below switch to break seal and allow transfer switch operation)               UNSAT
N/A. STEP 4. CUE: [2] ATTEMPT to STOP both Unit 1 CCPS by ..... (5 minutes)
* ATTEMPT to STOP CCP using HS on Bkr cmpt 1M CCP Transfer Sw 1-XS-62-108                               Critical Step 1M CCP Control Switch 1-HS-62-1 08C 1BB CCP Transfer switch 1-XS-62-1 04 1BB CCP Control Switch 1-HS-62-104C                         Time CUE:      1st Shutdown Bd -
* PLACE CCP transfer switch in AUX (Lift Lever below switch to break seal and allow transfer switch operation)
* Lever is up and Switch Transferred.
* ATTEMPT to STOP CCP using HS on Bkr cmpt 1M CCP Transfer Sw 1-XS-62-108 1 M CCP Control Switch 1-HS-62-1 08C 1 BB CCP Transfer switch 1-XS-62-1 04 1 BB CCP Control Switch 1-HS-62-104C 1 st Shutdown Bd -* Lever is up and Switch Transferred.
* Initially CCP has Red Light ON - Green Light OFF.               A minutes
* Initially CCP has Red Light ON -Green Light OFF.
* After operator places HS to Stop Cue: bkr has green light       from AOP-C.04 ON Red Light OFF.                                               entry CUE:       2nd Shutdown Bd -
* After operator places HS to Stop Cue: bkr has green light ON Red Light OFF. CUE: 2nd Shutdown Bd -* Lever is up and Switch Transferred.
* Lever is up and Switch Transferred.
* CCP has Green Light ON -Red Light OFF. STANDARD:
* CCP has Green Light ON - Red Light OFF.
Operator places BOTH Xfr switches in AUX and Ensures BOTH CCP are OFF. Critical time 5 minutes from time given Cklist. JPM91AP Page 5 of 14 REV. 1 SAT/U N SAT SAT _UNSAT Start Time __ _SAT UNSAT Record time AOP-C.04 was entered in MCR This time starts the clock for Time Critical Actions __ SAT UNSAT Critical Step Time A minutes from AOP-C.04 entry Job Performance Checklist:
STANDARD: Operator places BOTH Xfr switches in AUX and Ensures BOTH CCP are OFF. Critical time 5 minutes from time given Cklist.
NOTE 1 NOTE 2 STEP 1.: STEP/STANDARD This checklist has Time Critical Actions. Time limits are identified at applicable steps. All times start from point at which the MCR determines that ay AOP-C.04 entry condition is met. For JPM performance the timing for Time Critical Actions starts one minute before the operator is notified to perform checklist.
 
Obtain a copy of the appropriate checklist(s).
JPM91AP Page 6 of 14 REV. 1 Job Performance Checklist:
STANDARD:
STEP/STANDARD                                SAT/U NSAT STEP 5.         [3] ENSURE [0-XS-82-122] GEN 1B-B Transfer switch in AUX            - - SAT CONT RM position. [inside SO Bd 1B-B Logic Cabinet panel 4, bottom row]                                                          - - UNSAT NOTE:       DO NOT ALLOW OPERATOR TO OPEN PANEL DOOR-operator can explain process                                      Critical Step Cue:        Switch is in the AUX position STANDARD: Operator places DG 1B-B Transfer Switch to AUX STEP 6.         [4] CHECK if 6.9KV Shutdown Board 1B-B is Energized-                - - SAT Voltmeter cmpt 12
Operator obtains a copy of AOP-C.04 checklist
                                                                                    - - UNSAT CUE:        Voltage is as indicated (or cue -7000 V)
: 3. STEP 2.: STEP 3.: [1] OBTAIN the following from AOP-C.04 Cabinet:
STANDARD: Operator checks to see if SO Bd 1B is energized STEP 7.         [5] IF6.9KV Shutdown Bd 1B-B is NOT energized ...                    - - SAT
* C415A Key
                                                                                    - - UNSAT STANDARD: Operator will N/A this step.
* flashlight The evaluator may utilize a copy of Checklists 3 to monitor and document the performer's actions. Operator is notified AOP-C.04 has been entered b the MCR, Timing for Time Critical Actions started one minute ago. CUE: Cue OPERA TOR that timing for time Critical Actions started one minute ago. Cue as necessary to give feedback on actions taken by the performer.
STEP 8.        [6] PLACE the following transfer switches in AUX position on        - - SAT 6.9KV Shutdown Bd 1B-B:
STANDARD:
                                                                                    - - UNSAT Equipment                  Compt            Switch          Position ALT brk 6.9 UB 10 1728                16          1-XS-57-71          AUX Nor Supply Brk 6.0 UB 1C 1726            11          1-XS-57-68          AUX ERCW Pump N-B                      9          0-XS-67-452          AUX    Critical Step ERCW Pump L-B                      8          0-XS-67-440          AUX Emerg Supply Brk 1BB 1914              6          1-XS-57-73          AUX CUE 1:     Latch lifted, XS rotated clockwise, and indicates in the AUX.
N/A. STEP 4. CUE: [2] ATTEMPT to STOP both Unit 1 CCPS by ..... (5 minutes)
position.
* PLACE CCP transfer switch in AUX (Lift Lever below switch to break seal and allow transfer switch operation)
STANDARD: All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.
* ATTEMPT to STOP CCP using HS on Bkr cmpt 1M CCP Transfer Sw 1-XS-62-108 1 M CCP Control Switch 1-HS-62-1 08C 1 BB CCP Transfer switch 1-XS-62-1 04 1 BB CCP Control Switch 1-HS-62-104C 1 st Shutdown Bd -* Lever is up and Switch Transferred.
 
* Initially CCP has Red Light ON -Green Light OFF.
JPM91AP Page 7 of 14 REV. 1 Job Performance Checklist:
* After operator places HS to Stop Cue: bkr has green light ON Red Light OFF. CUE: 2nd Shutdown Bd -* Lever is up and Switch Transferred.
STEP/STANDARD                                  SAT/UNSAT NOTE          The following step ensures one ERCW pump will sequence                - SAT on following a blackout. If ERCW pump L-B or N-B is already running (breaker closed), the running pump should be                  - UNSAT selected.
* CCP has Green Light ON -Red Light OFF. STANDARD:
STEP 9.:      [7] PLACE breaker control switch for ERCW pump L-8 OR N-8 in      Critical Step START momentarily (18 SD 8D cm pt 8 or 9) [If a pump is running the running pump should be selected CUE:      L-B Pump Red Light ON N-B Pump Green Light ON HS for L-B pump has been placed to START and returned to Normal STANDARD: Operator ensures one ERCW pump HS on 18-8 6.9KV shutdown board has been placed to start momentarily. [If N-B pump is started this should be a comment not an Unsat]
Operator places BOTH Xfr switches in AUX and Ensures BOTH CCP are OFF. Critical time 5 minutes from time given Cklist. JPM91AP Page 5 of 14 REV. 1 SAT/U N SAT SAT _UNSAT Start Time __ _SAT UNSAT Record time AOP-C.04 was entered in MCR This time starts the clock for Time Critical Actions __ SAT UNSAT Critical Step Time A minutes from AOP-C.04 entry Job Performance Checklist:
STEP 10.       [8] CHECK if 6.9KV Shutdown 80ard 18-8 is Energized -                  - - SAT Voltmeter cmpt 12
STEP/ST ANDARD STEP 5. [3] ENSURE [0-XS-82-122]
                                                                                      - - UNSAT CUE:      Voltage is as indicated (-7000 Volts)
GEN 1 B-B Transfer switch in AUX CONT RM position.
STANDARD: Operator checks to see if SD 8d 18 is energized STEP 11.       [9] IF 6.9KV Shutdown 8d 18-8 is NOT energized                        - - SAT
[inside SO Bd 1 B-B Logic Cabinet panel 4, bottom row] NOTE: DO NOT ALLOW OPERATOR TO OPEN PANEL DOOR-operator can explain process Cue: Switch is in the AUX position STANDARD:
                                                                                      - - UNSAT STANDARD: Operator N/A's this step.
Operator places DG 1 B-B Transfer Switch to AUX STEP 6. [4] CHECK if 6.9KV Shutdown Board 1 B-B is Energized-Voltmeter cmpt 12 CUE: Voltage is as indicated (or cue -7000 V) STANDARD:
NOTE        AUO performing checklist 5 notifies operator performing checklist,    - - SAT 3, by face to face communication, that CCP suction is aligned to the RWST.                                                             - - UNSAT STEP 12.      [10] WHEN Unit 1 CCP suction has been aligned to the RWST, THEN PERFORM the following [13 minutes]
Operator checks to see if SO Bd 1 B is energized STEP 7. [5] IF6.9KV Shutdown Bd 1 B-B is NOT energized
* IF CCP 1A-A is NOT running THEN START CCP 18-8                  CRITICAL
... STANDARD:
[cmpt 18]                                                  STEP Cue 1:    AUO with Checklist 5 has opened FCV-62-135 Time NOTE:     Operator ensured both CCPs were off earlier and may state this, or may verify 1A-A is not running IJ. minutes Cue 2:     If checked - 1A-A CCP Green Light only                            from AOP-C.04 When Operator goes to "START" with 1B-B HS state Red              entry Light ON- Green Light OFF [- 32 Amps indicated]
Operator will N/A this step. STEP 8. [6] PLACE the following transfer switches in AUX position on 6.9KV Shutdown Bd 1 B-B: Equipment Compt Switch Position ALT brk 6.9 UB 10 1728 16 1-XS-57-71 AUX Nor Supply Brk 6.0 UB 1 C 1726 11 1-XS-57-68 AUX ERCW Pump N-B 9 0-XS-67 -452 AUX ERCW Pump L-B 8 0-XS-67 -440 AUX Emerg Supply Brk 1BB 1914 6 1-XS-57-73 AUX CUE 1: Latch lifted, XS rotated clockwise, and indicates in the AUX. position.
STANDARD: Operator STARTS 18-8 CCP.
STANDARD:
TIME Critical Action 13 minutes
All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.
 
JPM91AP Page 6 of 14 REV. 1 SAT/U N SAT SAT --UNSAT --Critical Step SAT --UNSAT --SAT --UNSAT --SAT --UNSAT --Critical Step Job Performance Checklist:
JPM91AP Page 8 of 14 REV. 1 Job Performance Checklist:
STEP/ST ANDARD STEP 5. [3] ENSURE [0-XS-82-122]
STEP/STANDARD                                SAT/UNSAT STEP 13.       [11] [a] ENSURE Contmnt Spray pump 1BB STOPPED:                      - - SAT PLACE 1-XS-72-10, Cntmt Spray pump 1B-B transfer switch in AUX position. [6.9KV Shutdown Bd 1B-B Compt 13                      - - UNSAT CUE 1:      Latch lifted, XS rotated clockwise, and indicates in the AUX position.                                                         Critical Step STANDARD: Operator places 1-XS-72-10 in AUX position STEP 14.       [11] [b] ENSURE Cntmt Spray pump 1B-B breaker OPEN [cmpt            - - SAT 13]
GEN 1 B-B Transfer switch in AUX CONT RM position.  
                                                                                    - - UNSAT Cue:        Cntmt Spray Green light ON STANDARD: Operator ensures Cntmt Spay pump 1B-B breaker open STEP 15.       [12] PLACE [0-XS-82-121] GEN 1A-A Transfer switch in AUX             - - SAT position. [inside SD Bd 1A-A Logic Cabinet panel 4]
[inside SO Bd 1 B-B Logic Cabinet panel 4, bottom row] NOTE: DO NOT ALLOW OPERATOR TO OPEN PANEL DOOR-operator can explain process Cue: Switch is in the AUX position STANDARD:
                                                                                    - - UNSAT NOTE:      DO NOT ALLOW OPERATOR TO OPEN PANEL DOOR-operator can explain process Cue:        Switch is in the AUX position                                      Critical Step STANDARD: Operator places DG 1A-A Transfer Switch to AUX STEP 16.        [13] PLACE the following transfer switches in AUX position on        - - SAT 6.9KV Shutdown Bd 1A-A.
Operator places DG 1 B-B Transfer Switch to AUX STEP 6. [4] CHECK if 6.9KV Shutdown Board 1 B-B is Energized-Voltmeter cmpt 12 CUE: Voltage is as indicated (or cue -7000 V) STANDARD:
Equipment                    Compt            Switch          Position  - - UNSAT Emerg Supply Brk from DIG              6           1-XS-57-46          AUX 1M 1912 ERCW Pump J-A                    8          0-XS-67-432          AUX ERCW Pump Q-A                      9          0-XS-67 -460        AUX    Critical Step Nor Supply Brk 6.0 UB 1B 1718          11          1-XS-57-44          AUX ALT Supply Brk 6.0 UB 1A 1716            16          1-XS-57-41          AUX CUE 1:      Latch lifted, XS rotated clockwise, and indicates in the AUX position.
Operator checks to see if SO Bd 1 B is energized STEP 7. [5] IF6.9KV Shutdown Bd 1 B-B is NOT energized  
STANDARD: All NorlAux switches, addressed, are correctly placed in the Auxiliary position.
... STANDARD:
 
Operator will N/A this step. STEP 8. [6] PLACE the following transfer switches in AUX position on 6.9KV Shutdown Bd 1 B-B: Equipment Compt Switch Position ALT brk 6.9 UB 10 1728 16 1-XS-57-71 AUX Nor Supply Brk 6.0 UB 1 C 1726 11 1-XS-57-68 AUX ERCW Pump N-B 9 0-XS-67 -452 AUX ERCW Pump L-B 8 0-XS-67 -440 AUX Emerg Supply Brk 1BB 1914 6 1-XS-57-73 AUX CUE 1: Latch lifted, XS rotated clockwise, and indicates in the AUX. position.
JPM91AP Page 9 of 14 REV. 1 Job Performance Checklist:
STANDARD:
STEP/STANDARD                          SAT/UNSAT NOTE:        The following step will ensure an ERCW pump starts when        -    SAT the SDSD is re-energized.
All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.
                                                                              -   UNSAT STEP 17.:      [14] PLACE breaker control switch for ERCW pump J-A or Q-A in START momentarily (1A SD BD cmpt 8 or 9)
JPM91AP Page 6 of 14 REV. 1 SAT/U N SAT SAT --UNSAT --Critical Step SAT --UNSAT --SAT --UNSAT --SAT --UNSAT --Critical Step Job Performance Checklist:
[If a pump is running the running pump should be selected]   Critical Step NOTE:      For this JPM, 1A-A SDSD is de-energized. This will be checked in the next step.
STEP/ST ANDARD NOTE The following step ensures one ERCW pump will sequence on following a blackout.
CUE 1:    J-A Pump Green Light ON Q-A Pump Green Light ON CUE 1:    If operator tries to start Either ERCW pump state "HS for J-A (Q-A) pump has been placed to START -No breaker closing noise heard - Green light still ON STANDARD: Operator ensures one ERCW pump HS on 1A-A 6.9KV shutdown board has been placed to start momentarily.
If ERCW pump L-B or N-B is already running (breaker closed), the running pump should be selected.
STEP 18.      [15] CHECK if 6.9KV Shutdown Board 1A-A is Energized -         - - SAT Voltmeter cmpt 12
STEP 9.: [7] PLACE breaker control switch for ERCW pump L-8 OR N-8 in START momentarily (18 SD 8D cm pt 8 or 9) [If a pump is running the running pump should be selected CUE: L-B Pump Red Light ON N-B Pump Green Light ON HS for L-B pump has been placed to START and returned to Normal STANDARD:
                                                                              - - UNSAT CUE:       Voltage indicated is ZERO STANDARD: Operator checks "NO" for board energized STEP 19.       [16] IF 6.9KV Shutdown Bd 1A-A is NOT energized THEN GO TO      - - SAT step [19]
Operator ensures one ERCW pump HS on 18-8 6.9KV shutdown board has been placed to start momentarily.  
                                                                              - - UNSAT STANDARD: Operator will go to Step [19].
[If N-B pump is started this should be a comment not an Unsat] STEP 10. [8] CHECK if 6.9KV Shutdown 80ard 18-8 is Energized
 
-Voltmeter cmpt 12 CUE: Voltage is as indicated
JPM91AP Page 10 of 14 REV. 1 Job Performance Checklist:
(-7000 Volts) STANDARD:
STEP/STANDARD                              SAT/UNSAT STEP 20.      [19] IF the 6.9 KV SDBD 1M or 1BB is DE-ENERGIZED.                    - - SAT THEN PERFORM the following to energize the affected board from DIG:                                                            - - UNSAT
Operator checks to see if SD 8d 1 8 is energized STEP 11. [9] IF 6.9KV Shutdown 8d 18-8 is NOT energized STANDARD:
[a] ENSURE transfer switches on affected 6.9KV Shutdown Board in AUX position:
Operator N/A's this step. NOTE AUO performing checklist 5 notifies operator performing checklist, 3, by face to face communication, that CCP suction is aligned to the RWST. STEP 12. [10] WHEN Unit 1 CCP suction has been aligned to the RWST, THEN PERFORM the following
CUE 1:    1. Cmpts 6,8,9, 11, 16, have previously been transferred.          Critical Step CUE operator Switches already in AUX for these Cmpts
[13 minutes]
: 2. For other Cmpts: Latch lifted, XS rotated clockwise, and indicates in the AUX. position.
* IF CCP 1 A-A is NOT running THEN START CCP 18-8 [cmpt 18] Cue 1: AUO with Checklist 5 has opened FCV-62-135 NOTE: Operator ensured both CCPs were off earlier and may state this, or may verify 1A-A is not running Cue 2: If checked -1A-A CCP Green Light only When Operator goes to "START" with 1B-B HS state Red Light ON-Green Light OFF [-32 Amps indicated]
CUE 2:     After the operator has described/demonstrated transfer of &
STANDARD:
least THREE breakers to Aux control: CUE him/her that the board is complete. This will expedite the JPM.
Operator STARTS 18-8 CCP. TIME Critical Action 13 minutes JPM91AP Page 7 of 14 REV. 1 SAT/UNSAT SAT -UNSAT -Critical Step SAT --UNSAT --SAT --UNSAT --SAT --UNSAT --CRITICAL STEP Time IJ. minutes from AOP-C.04 entry Job Performance Checklist:
STANDARD:    1. Operator locates all boards/panels listed.
STEP/ST ANDARD NOTE The following step ensures one ERCW pump will sequence on following a blackout.
: 2. All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.
If ERCW pump L-B or N-B is already running (breaker closed), the running pump should be selected.
(A minimum of 3 switches per board have been properly transferred to auxiliary. IF less than 3 switches on the board, then all are required)
STEP 9.: [7] PLACE breaker control switch for ERCW pump L-8 OR N-8 in START momentarily (18 SD 8D cm pt 8 or 9) [If a pump is running the running pump should be selected CUE: L-B Pump Red Light ON N-B Pump Green Light ON HS for L-B pump has been placed to START and returned to Normal STANDARD:
STANDARD: Operator ensures the listed transfer switches are in Aux on 6.9KV Shutdown Bd 1A-A (NOTE: 1B-B is not affected and its switches should not be checked at this time).
Operator ensures one ERCW pump HS on 18-8 6.9KV shutdown board has been placed to start momentarily.  
STEP 21.       [b] REMOVE control power fuse blocks for CCP on affected              - - SAT board [cmpt 18]
[If N-B pump is started this should be a comment not an Unsat] STEP 10. [8] CHECK if 6.9KV Shutdown 80ard 18-8 is Energized  
                                                                                    - - UNSAT CUE:       fuses removed STANDARD: Operator identifies fuse location (above the bkr) and removes          Critical Step fuses STEP 22.      [c] ENSURE shutdown board ALTERNATE supply bkr OPEN                  - - SAT USING control switch on SDBD [cmpt 16]
-Voltmeter cmpt 12 CUE: Voltage is as indicated
                                                                                    - - UNSAT CUE:      Green light ON - Red Light OFF STANDARD: Operator verifies breaker is Open STEP 23.       [d] ENSURE shutdown board NORMAL supply bkr OPEN USING                - - SAT control on shutdown board [cmpt 11]
(-7000 Volts) STANDARD:
                                                                                    - - UNSAT CUE:      Green light ON - Red Light OFF STANDARD: Operator verifies breaker is Open
Operator checks to see if SD 8d 1 8 is energized STEP 11. [9] IF 6.9KV Shutdown 8d 18-8 is NOT energized STANDARD:
 
Operator N/A's this step. NOTE AUO performing checklist 5 notifies operator performing checklist, 3, by face to face communication, that CCP suction is aligned to the RWST. STEP 12. [10] WHEN Unit 1 CCP suction has been aligned to the RWST, THEN PERFORM the following
JPM91AP Page 11 of 14 REV. 1 Job Performance Checklist:
[13 minutes]
STEP/STANDARD                                SAT/UNSAT STEP 24.      [e] IF voltage NOT available from DIG (using voltmeter at Cmpt 6)      - - SAT THEN ...
* IF CCP 1 A-A is NOT running THEN START CCP 18-8 [cmpt 18] Cue 1: AUO with Checklist 5 has opened FCV-62-135 NOTE: Operator ensured both CCPs were off earlier and may state this, or may verify 1A-A is not running Cue 2: If checked -1A-A CCP Green Light only When Operator goes to "START" with 1B-B HS state Red Light ON-Green Light OFF [-32 Amps indicated]
                                                                                      - - UNSAT CUE:        Volt meter indicates 6950 volts STANDARD: Operator NIAs this step since voltage is available STEP 25.       [f] VERIFY voltage available from DIG [cmpt 6]                         - - SAT CUE:       Volt meter indicates 6950 volts                                      - - UNSAT STANDARD: Operator verifies voltage available from DIG.
STANDARD:
STEP 26.      [g] CLOSE DIG breaker USING control switch on cmpt 6 door              - - SAT CUE:       HS go to close, breaker slams, indication goes from Green to           - - UNSAT Red.
Operator STARTS 18-8 CCP. TIME Critical Action 13 minutes JPM91AP Page 7 of 14 REV. 1 SAT/UNSAT SAT -UNSAT -Critical Step SAT --UNSAT --SAT --UNSAT --SAT --UNSAT --CRITICAL STEP Time IJ. minutes from AOP-C.04 entry Job Performance Checklist:
STANDARD: Operator closes DIG breaker                                            Critical Step STEP 27.       [h] VERIFY affected 6.9KV Shutdown Bd Energized [cmpt 12]              - - SAT CUE:       Volt meter indicates 6950 volts                                      - - UNSAT STANDARD: Operator verifies board is energized STEP 28.       [i] ENSURE one ERCW pump on affected board Running                    - - SAT
STEP/STANDARD STEP 13. [11] [a] ENSURE Contmnt Spray pump 1 BB STOPPED: PLACE 1-XS-72-10, Cntmt Spray pump 1B-B transfer switch in AUX position.  
[cmpt 8 or 9]
[6.9KV Shutdown Bd 1 B-B Compt 13 CUE 1: Latch lifted, XS rotated clockwise, and indicates in the AUX position.
                                                                                      - - UNSAT CUE:      Breaker closes - Red Light ON STANDARD: Operator starts one ERCW pump                                          Critical Step STEP 29.       mIF any Unit 1 CCP is already running THEN GO TO substep L            - - SAT STANDARD: Operator goes to substep L. One CCP was started in an earlier            - - UNSAT step Operator MUST NOT start this pump -                                 Critical Step Caution 2 (earlier in procedure) indicates this could result in High suction tem perature.
STANDARD:
STEP 30.      [I] NOTIFY ACR that affected shutdown board is energized              - - SAT
Operator places 1-XS-72-10 in AUX position STEP 14. [11] [b] ENSURE Cntmt Spray pump 1 B-B breaker OPEN [cmpt 13] Cue: Cntmt Spray Green light ON STANDARD:
                                                                                      - - UNSAT STANDARD: Operator notifies the ACR
Operator ensures Cntmt Spay pump 1 B-B breaker open STEP 15. [12] PLACE [0-XS-82-121]
 
GEN 1 A-A Transfer switch in AUX position.
JPM91AP Page 12 of 14 REV. 1 Job Performance Checklist:
[inside SD Bd 1 A-A Logic Cabinet panel 4] NOTE: DO NOT ALLOW OPERATOR TO OPEN PANEL DOOR-operator can explain process Cue: Switch is in the AUX position STANDARD:
STEP/STANDARD                                SAT/U NSAT STEP 31.        [20] CONTACT ACR to determine required AFW pump actions              - - SAT CUE:         Both MDAFW pumps are running and we wish to keep them                - - UNSAT running STANDARD: Operator checks with UO in ACR to determine what should be done with the MDAFW pumps.
Operator places DG 1 A-A Transfer Switch to AUX STEP 16. [13] PLACE the following transfer switches in AUX position on 6.9KV Shutdown Bd 1 A-A. Equipment Compt Switch Position Emerg Supply Brk from DIG 6 1-XS-57-46 AUX 1M 1912 ERCW Pump J-A 8 0-XS-67 -432 AUX ERCW Pump Q-A 9 0-XS-67 -460 AUX Nor Supply Brk 6.0 UB 1 B 1718 11 1-XS-57-44 AUX AL T Supply Brk 6.0 UB 1 A 1716 16 1-XS-57-41 AUX CUE 1: Latch lifted, XS rotated clockwise, and indicates in the AUX position.
NOTE:       This will allow the operator to continue on in the procedure, Steps [21] and [22] will be performed when needed and operator is notified by the MCR.
STANDARD:
STEP 32.        [21]    IF ACR directs stopping Unit 1 MD AFW ......                 - - SAT STANDARD: Operator N/A's this step.                                                  - - UNSAT STEP 33.         [22]   WHEN ACR directs starting U 1 MDAFW ........                  - - SAT STANDARD: Operator continues with procedure and stops pumps when                    - - UNSAT directed by ACR.
All NorlAux switches, addressed, are correctly placed in the Auxiliary position.
STEP 34.         [23] ENSURE the following transfer switches in AUX position on        - - SAT 6.9KV Shutdown Bd 1B-B:
JPM91AP Page 8 of 14 REV. 1 SAT/UNSAT SAT --UNSAT --Critical Step SAT --UNSAT --SAT --UNSAT --Critical Step SAT --UNSAT --Critical Step Job Performance Checklist:
Equipment                    Compt            Switch          Position  - - UNSAT PZR HTR Group 1C                    21          1-XS-68-341 H        AUX PZR HTR Group 1BB                    20          1-XS-68-341 D        AUX Safety Injection Pump 1 BB            15          1-XS-63-15          AUX   Critical Step RHR pump 1BB                      14          1-XS-74-20          AUX AFWP 1BB                      10          1-XS-3-128          AUX CUE:        Latch lifted, XS rotated clockwise, and indicates in the AUX position.
STEP/STANDARD STEP 13. [11] [a] ENSURE Contmnt Spray pump 1 BB STOPPED: PLACE 1-XS-72-10, Cntmt Spray pump 1B-B transfer switch in AUX position.
STANDARD: 1. Operator locates all boards/panels listed.
[6.9KV Shutdown Bd 1 B-B Compt 13 CUE 1: Latch lifted, XS rotated clockwise, and indicates in the AUX position.
: 2. All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.
STANDARD:
 
Operator places 1-XS-72-10 in AUX position STEP 14. [11] [b] ENSURE Cntmt Spray pump 1 B-B breaker OPEN [cmpt 13] Cue: Cntmt Spray Green light ON STANDARD:
JPM91AP Page 13 of 14 REV. 1 Job Performance Checklist:
Operator ensures Cntmt Spay pump 1 B-B breaker open STEP 15. [12] PLACE [0-XS-82-121]
STEP/STANDARD                                    SAT/UNSAT STEP 35.        [24] ENSURE the following transfer switches in AUX position on            - - SAT 6.9KV Shutdown Bd 1A-A:
GEN 1 A-A Transfer switch in AUX position.  
                                                                                          - - UNSAT Equipment                    Compt            Switch            Position AFWP 1AA                        10          1-XS-3-118            AUX RHRj)ump RHR pump 1AA                        14          1-XS-74-10            AUX    Critical Step Safety Injection Pump 1AA                15          1-XS-63-10            AUX PZR HTR Group 1AA                      20          1-XS-68-341 A          AUX PZR HTR Group 1D                      21          1-XS-68-341 F          AUX NOTE:          Operator may state that these switches were previously placed in AUX position in step 19 (procedure) step 20 (JPM)
[inside SD Bd 1 A-A Logic Cabinet panel 4] NOTE: DO NOT ALLOW OPERATOR TO OPEN PANEL DOOR-operator can explain process Cue: Switch is in the AUX position STANDARD:
CUE 1:       Latch lifted, XS rotated clockwise, and indicates in the AUX.
Operator places DG 1 A-A Transfer Switch to AUX STEP 16. [13] PLACE the following transfer switches in AUX position on 6.9KV Shutdown Bd 1 A-A. Equipment Compt Switch Position Emerg Supply Brk from DIG 6 1-XS-57-46 AUX 1M 1912 ERCW Pump J-A 8 0-XS-67 -432 AUX ERCW Pump Q-A 9 0-XS-67 -460 AUX Nor Supply Brk 6.0 UB 1 B 1718 11 1-XS-57-44 AUX AL T Supply Brk 6.0 UB 1 A 1716 16 1-XS-57-41 AUX CUE 1: Latch lifted, XS rotated clockwise, and indicates in the AUX position.
position.
STANDARD:
STANDARD: 1. Operator locates all boards/panels listed.
All NorlAux switches, addressed, are correctly placed in the Auxiliary position.
: 2. All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.
JPM91AP Page 8 of 14 REV. 1 SAT/UNSAT SAT --UNSAT --Critical Step SAT --UNSAT --SAT --UNSAT --Critical Step SAT --UNSAT --Critical Step Job Performance Checklist:
STEP 36.         [25] IF smoke is entering Shutdown Board room area                        - - SAT CUE:         NO smoke can be seen in the area                                          - - UNSAT STANDARD: Operator will N/A step.
STEP/STANDARD NOTE: The following step will ensure an ERCW pump starts when the SDSD is re-energized.
STEP 37.:        [26] ENSURE the following transfer switches in AUX position:              -    SAT CCS pump 1AA Compt 6 1-XS-70-46 AUXon 480 V SDBD 1A1A                                                  -   UNSAT CUE:        XS rotated clockwise, and indicates in the AUX. position.
STEP 17.: [14] PLACE breaker control switch for ERCW pump J-A or Q-A in START momentarily (1A SD BD cmpt 8 or 9) [If a pump is running the running pump should be selected]
Critical Step STANDARD:       Nor/Aux switch is correctly placed in the Auxiliary position.
NOTE: For this JPM, 1A-A SDSD is de-energized.
STEP 38.:        [27] IF CCS pump 1AA is Stopped                                          -   SAT THEN ATTEMPT to start CCS pump 1AA USING 1-HS-70-46C                                                              -     UNSAT
This will be checked in the next step. CUE 1: J-A Pump Green Light ON Q-A Pump Green Light ON CUE 1: If operator tries to start Either ERCW pump state "HS for J-A (Q-A) pump has been placed to START -No breaker closing noise heard -Green light still ON STANDARD:
[480V SDBD 1A1A Compt 6]
Operator ensures one ERCW pump HS on 1 A-A 6.9KV shutdown board has been placed to start momentarily.
CUE:          When HS is placed to start, tell operator pump started, red light illuminated, green light dark.
STEP 18. [15] CHECK if 6.9KV Shutdown Board 1 A-A is Energized
STANDARD:       Operator starts 1AA CCS pump.
-Voltmeter cmpt 12 CUE: Voltage indicated is ZERO STANDARD:
 
Operator checks "NO" for board energized STEP 19. [16] IF 6.9KV Shutdown Bd 1 A-A is NOT energized THEN GO TO step [19] STANDARD:
JPM91AP Page 14 of 14 REV. 1 Job Performance Checklist:
Operator will go to Step [19]. JPM91AP Page 9 of 14 REV. 1 SAT/UNSAT SAT -UNSAT -Critical Step SAT --UNSAT --SAT --UNSAT --Job Performance Checklist:
STEP/STANDARD                          SAT/U NSAT STEP 39.:      [28] ENSURE the following transfer switches in AUX position:
STEP/STANDARD NOTE: The following step will ensure an ERCW pump starts when the SDSD is re-energized.
480V SDBD 1A2A AA Fire/Flood Mode Pmp Compt 6 0-XS-26-1        - SAT 480V SDBD 1B2B BB CCS Pmp Compt 6 0-XS-70-38
STEP 17.: [14] PLACE breaker control switch for ERCW pump J-A or Q-A in START momentarily (1A SD BD cmpt 8 or 9) [If a pump is running the running pump should be selected]
                                                                              - UNSAT CUE:       XS rotated clockwise, and indicates in the AUX. position.
NOTE: For this JPM, 1A-A SDSD is de-energized.
STANDARD:       Nor/Aux switch is correctly placed in the Auxiliary position.
This will be checked in the next step. CUE 1: J-A Pump Green Light ON Q-A Pump Green Light ON CUE 1: If operator tries to start Either ERCW pump state "HS for J-A (Q-A) pump has been placed to START -No breaker closing noise heard -Green light still ON STANDARD:
                                                                              -  SAT STEP 40.:     [29] IF CCS pump 1BB is STOPPED THEN ATTEMPT to start CCS pump 1BB USING                      -  UNSAT 1-HS-70-38C
Operator ensures one ERCW pump HS on 1 A-A 6.9KV shutdown board has been placed to start momentarily.
[480V SDBD 1B1 B Compt 6]
STEP 18. [15] CHECK if 6.9KV Shutdown Board 1 A-A is Energized
CUE:       When HS is placed to start, tell operator pump started, red light illuminated, green light dark.
-Voltmeter cmpt 12 CUE: Voltage indicated is ZERO STANDARD:
STANDARD:      Operator starts 1BB CCS pump
Operator checks "NO" for board energized STEP 19. [16] IF 6.9KV Shutdown Bd 1 A-A is NOT energized THEN GO TO step [19] STANDARD:
                                                                              -  SAT STEP 41.:      [30] ENSURE the following transfer switches in AUX position:
Operator will go to Step [19]. JPM91AP Page 9 of 14 REV. 1 SAT/UNSAT SAT -UNSAT -Critical Step SAT --UNSAT --SAT --UNSAT --
480V SDBD 1B2B MT TGOP Compt 6 1-XS-47-61                      -   UNSAT 480V SDBD 1B2B SDBD Water Chiller PKG BB compt 6 0-XS-31 C-338 CUE:      XS rotated clockwise, and indicates in the AUX. position.
Job Performance Checklist:
STANDARD:       Nor/Aux switch is correctly placed in the Auxiliary position.
STEP/STANDARD STEP 20. [19] IF the 6.9 KV SDBD 1M or 1BB is DE-ENERGIZED.
STEP 42.:      [31] NOTIFY ACR that control is transferred on Checklist 3.   -   SAT CUE:       If operator continues in Checklist 3, state that another AUO  -   UNSAT will perform the remainder of the checklist STANDARD: Operator calls ACR and reports status.
THEN PERFORM the following to energize the affected board from DIG: [a] ENSURE transfer switches on affected 6.9KV Shutdown Board in AUX position:
End of JPM
CUE 1: 1. Cmpts 6,8,9, 11, 16, have previously been transferred.
 
CUE operator Switches already in AUX for these Cmpts 2. For other Cmpts: Latch lifted, XS rotated clockwise, and indicates in the AUX. position.
READ TO OPERATOR Directions to Trainee:
CUE 2: After the operator has described/demonstrated transfer of & least THREE breakers to Aux control: CUE him/her that the board is complete.
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated.
This will expedite the JPM. STANDARD:
WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. DO NOT OPEN ANY COMPARTMENTS. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 1. Operator locates all boards/panels listed. 2. All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position. (A minimum of 3 switches per board have been properly transferred to auxiliary.
INITIAL CONDITIONS:
IF less than 3 switches on the board, then all are required)
: 1) Both units were operating at 100% power when a fire in the spreader room required abandonment of the Main Control Room.
STANDARD:
: 2) Both units were tripped as required by AOP-C.04. The control room has been abandoned.
Operator ensures the listed transfer switches are in Aux on 6.9KV Shutdown Bd 1 A-A (NOTE: 1 B-B is not affected and its switches should not be checked at this time). STEP 21. [b] REMOVE control power fuse blocks for CCP on affected board [cmpt 18] CUE: fuses removed STANDARD:
INITIATING CUES:
Operator identifies fuse location (above the bkr) and removes fuses STEP 22. [c] ENSURE shutdown board ALTERNATE supply bkr OPEN USING control switch on SDBD [cmpt 16] CUE: Green light ON -Red Light OFF STANDARD:
: 1) You are the Control Room AUO. You have been assigned checklist 3.
Operator verifies breaker is Open STEP 23. [d] ENSURE shutdown board NORMAL supply bkr OPEN USING control on shutdown board [cmpt 11] CUE: Green light ON -Red Light OFF STANDARD:
: 2) Parts of this checklist are time critical. Timing for Time Critical Actions begins when the decision to enter AOP-C.04, SO from the ACR, is determined in AOP-N.01 Plant Fires.
Operator verifies breaker is Open JPM91AP Page 10 of 14 REV. 1 SAT/UNSAT SAT --UNSAT --Critical Step SAT --UNSAT --Critical Step SAT --UNSAT --SAT --UNSAT --Job Performance Checklist:
: 3) NOTIFY the ACR when control is transferred on Checklist 3.}}
STEP/STANDARD STEP 20. [19] IF the 6.9 KV SDBD 1M or 1BB is DE-ENERGIZED.
THEN PERFORM the following to energize the affected board from DIG: [a] ENSURE transfer switches on affected 6.9KV Shutdown Board in AUX position:
CUE 1: 1. Cmpts 6,8,9, 11, 16, have previously been transferred.
CUE operator Switches already in AUX for these Cmpts 2. For other Cmpts: Latch lifted, XS rotated clockwise, and indicates in the AUX. position.
CUE 2: After the operator has described/demonstrated transfer of & least THREE breakers to Aux control: CUE him/her that the board is complete.
This will expedite the JPM. STANDARD:
: 1. Operator locates all boards/panels listed. 2. All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position. (A minimum of 3 switches per board have been properly transferred to auxiliary.
IF less than 3 switches on the board, then all are required)
STANDARD:
Operator ensures the listed transfer switches are in Aux on 6.9KV Shutdown Bd 1 A-A (NOTE: 1 B-B is not affected and its switches should not be checked at this time). STEP 21. [b] REMOVE control power fuse blocks for CCP on affected board [cmpt 18] CUE: fuses removed STANDARD:
Operator identifies fuse location (above the bkr) and removes fuses STEP 22. [c] ENSURE shutdown board ALTERNATE supply bkr OPEN USING control switch on SDBD [cmpt 16] CUE: Green light ON -Red Light OFF STANDARD:
Operator verifies breaker is Open STEP 23. [d] ENSURE shutdown board NORMAL supply bkr OPEN USING control on shutdown board [cmpt 11] CUE: Green light ON -Red Light OFF STANDARD:
Operator verifies breaker is Open JPM91AP Page 10 of 14 REV. 1 SAT/UNSAT SAT --UNSAT --Critical Step SAT --UNSAT --Critical Step SAT --UNSAT --SAT --UNSAT --
Job Performance Checklist:
STEP/STANDARD STEP 24. [e] IF voltage NOT available from DIG (using voltmeter at Cmpt 6) THEN ... CUE: Volt meter indicates 6950 volts STANDARD:
Operator NIAs this step since voltage is available STEP 25. [f] VERIFY voltage available from DIG [cmpt 6] CUE: Volt meter indicates 6950 volts STANDARD:
Operator verifies voltage available from DIG. STEP 26. [g] CLOSE DIG breaker USING control switch on cmpt 6 door CUE: HS go to close, breaker slams, indication goes from Green to Red. STANDARD:
Operator closes DIG breaker STEP 27. [h] VERIFY affected 6.9KV Shutdown Bd Energized
[cmpt 12] CUE: Volt meter indicates 6950 volts STANDARD:
Operator verifies board is energized STEP 28. [i] ENSURE one ERCW pump on affected board Running [cmpt 8 or 9] CUE: Breaker closes -Red Light ON STANDARD:
Operator starts one ERCW pump STEP 29. m IF any Unit 1 CCP is already running THEN GO TO substep L STANDARD:
Operator goes to substep L. One CCP was started in an earlier step Operator MUST NOT start this pump -Caution 2 (earlier in procedure) indicates this could result in High suction tem perature.
STEP 30. [I] NOTIFY ACR that affected shutdown board is energized STANDARD:
Operator notifies the ACR JPM91AP Page 11 of 14 REV. 1 SAT/UNSAT SAT ----UNSAT SAT --UNSAT --SAT --UNSAT --Critical Step SAT --UNSAT --SAT --UNSAT --Critical Step SAT --UNSAT --Critical Step SAT --UNSAT --Job Performance Checklist:
STEP/STANDARD STEP 24. [e] IF voltage NOT available from DIG (using voltmeter at Cmpt 6) THEN ... CUE: Volt meter indicates 6950 volts STANDARD:
Operator NIAs this step since voltage is available STEP 25. [f] VERIFY voltage available from DIG [cmpt 6] CUE: Volt meter indicates 6950 volts STANDARD:
Operator verifies voltage available from DIG. STEP 26. [g] CLOSE DIG breaker USING control switch on cmpt 6 door CUE: HS go to close, breaker slams, indication goes from Green to Red. STANDARD:
Operator closes DIG breaker STEP 27. [h] VERIFY affected 6.9KV Shutdown Bd Energized
[cmpt 12] CUE: Volt meter indicates 6950 volts STANDARD:
Operator verifies board is energized STEP 28. [i] ENSURE one ERCW pump on affected board Running [cmpt 8 or 9] CUE: Breaker closes -Red Light ON STANDARD:
Operator starts one ERCW pump STEP 29. m IF any Unit 1 CCP is already running THEN GO TO substep L STANDARD:
Operator goes to substep L. One CCP was started in an earlier step Operator MUST NOT start this pump -Caution 2 (earlier in procedure) indicates this could result in High suction tem perature.
STEP 30. [I] NOTIFY ACR that affected shutdown board is energized STANDARD:
Operator notifies the ACR JPM91AP Page 11 of 14 REV. 1 SAT/UNSAT SAT ----UNSAT SAT --UNSAT --SAT --UNSAT --Critical Step SAT --UNSAT --SAT --UNSAT --Critical Step SAT --UNSAT --Critical Step SAT --UNSAT --
Job Performance Checklist:
STEP/ST ANDARD STEP 31. [20] CONTACT ACR to determine required AFW pump actions CUE: Both MDAFW pumps are running and we wish to keep them running STANDARD:
Operator checks with UO in ACR to determine what should be done with the MDAFW pumps. NOTE: This will allow the operator to continue on in the procedure, Steps [21] and [22] will be performed when needed and operator is notified by the MCR. STEP 32. [21] IF ACR directs stopping Unit 1 MD AFW ...... STANDARD:
Operator N/A's this step. STEP 33. [22] WHEN ACR directs starting U 1 MDAFW ........ STANDARD:
Operator continues with procedure and stops pumps when directed by ACR. STEP 34. [23] ENSURE the following transfer switches in AUX position on 6.9KV Shutdown Bd 1 B-B: Equipment Compt Switch Position PZR HTR Group 1 C 21 1-XS-68-341 H AUX PZR HTR Group 1 BB 20 1-XS-68-341 D AUX Safety Injection Pump 1 BB 15 1-XS-63-15 AUX RHR pump 1BB 14 1-XS-74-20 AUX AFWP 1BB 10 1-XS-3-128 AUX CUE: Latch lifted, XS rotated clockwise, and indicates in the AUX position.
STANDARD:
: 1. Operator locates all boards/panels listed. 2. All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.
JPM91AP Page 12 of 14 REV. 1 SAT/U N SAT SAT --UNSAT --SAT --UNSAT --SAT --UNSAT --SAT --UNSAT --Critical Step Job Performance Checklist:
STEP/ST ANDARD STEP 31. [20] CONTACT ACR to determine required AFW pump actions CUE: Both MDAFW pumps are running and we wish to keep them running STANDARD:
Operator checks with UO in ACR to determine what should be done with the MDAFW pumps. NOTE: This will allow the operator to continue on in the procedure, Steps [21] and [22] will be performed when needed and operator is notified by the MCR. STEP 32. [21] IF ACR directs stopping Unit 1 MD AFW ...... STANDARD:
Operator N/A's this step. STEP 33. [22] WHEN ACR directs starting U 1 MDAFW ........ STANDARD:
Operator continues with procedure and stops pumps when directed by ACR. STEP 34. [23] ENSURE the following transfer switches in AUX position on 6.9KV Shutdown Bd 1 B-B: Equipment Compt Switch Position PZR HTR Group 1 C 21 1-XS-68-341 H AUX PZR HTR Group 1 BB 20 1-XS-68-341 D AUX Safety Injection Pump 1 BB 15 1-XS-63-15 AUX RHR pump 1BB 14 1-XS-74-20 AUX AFWP 1BB 10 1-XS-3-128 AUX CUE: Latch lifted, XS rotated clockwise, and indicates in the AUX position.
STANDARD:
: 1. Operator locates all boards/panels listed. 2. All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.
JPM91AP Page 12 of 14 REV. 1 SAT/U N SAT SAT --UNSAT --SAT --UNSAT --SAT --UNSAT --SAT --UNSAT --Critical Step Job Performance Checklist:
STEP/STANDARD STEP 35. [24] ENSURE the following transfer switches in AUX position on 6.9KV Shutdown Bd 1 A-A: Equipment Compt Switch Position AFWP 1AA 10 1-XS-3-118 AUX RHRj)ump 1AA 14 1-XS-74-10 AUX Safety Injection Pump 1AA 15 1-XS-63-10 AUX PZR HTR Group 1 AA 20 1-XS-68-341 A AUX PZR HTR Group 1 D 21 1-XS-68-341 F AUX NOTE: Operator may state that these switches were previously placed in AUX position in step 19 (procedure) step 20 (JPM) CUE 1: Latch lifted, XS rotated clockwise, and indicates in the AUX. position.
STANDARD:
: 1. Operator locates all boards/panels listed. 2. All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.
STEP 36. [25] IF smoke is entering Shutdown Board room area CUE: NO smoke can be seen in the area STANDARD:
Operator will N/A step. STEP 37.: [26] ENSURE the following transfer switches in AUX position:
CCS pump 1AA Compt 6 1-XS-70-46 AUXon 480 V SDBD 1A1A CUE: XS rotated clockwise, and indicates in the AUX. position.
STANDARD:
Nor/Aux switch is correctly placed in the Auxiliary position.
STEP 38.: [27] IF CCS pump 1AA is Stopped THEN ATTEMPT to start CCS pump 1AA USING 1-HS-70-46C
[480V SDBD 1A1A Compt 6] CUE: When HS is placed to start, tell operator pump started, red light illuminated, green light dark. STANDARD:
Operator starts 1AA CCS pump. JPM91AP Page 13 of 14 REV. 1 SAT/UNSAT SAT --UNSAT --Critical Step SAT --UNSAT --SAT -UNSAT -Critical Step SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD STEP 35. [24] ENSURE the following transfer switches in AUX position on 6.9KV Shutdown Bd 1 A-A: Equipment Compt Switch Position AFWP 1AA 10 1-XS-3-118 AUX RHR pump 1AA 14 1-XS-74-10 AUX Safety Injection Pump 1AA 15 1-XS-63-10 AUX PZR HTR Group 1 AA 20 1-XS-68-341 A AUX PZR HTR Group 1 D 21 1-XS-68-341 F AUX NOTE: Operator may state that these switches were previously placed in AUX position in step 19 (procedure) step 20 (JPM) CUE 1: Latch lifted, XS rotated clockwise, and indicates in the AUX. position.
STANDARD:
: 1. Operator locates all boards/panels listed. 2. All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.
STEP 36. [25] IF smoke is entering Shutdown Board room area CUE: NO smoke can be seen in the area STANDARD:
Operator will N/A step. STEP 37.: [26] ENSURE the following transfer switches in AUX position:
CCS pump 1AA Compt 6 1-XS-70-46 AUXon 480 V SDBD 1A1A CUE: XS rotated clockwise, and indicates in the AUX. position.
STANDARD:
Nor/Aux switch is correctly placed in the Auxiliary position.
STEP 38.: [27] IF CCS pump 1AA is Stopped THEN ATTEMPT to start CCS pump 1AA USING 1-HS-70-46C
[480V SDBD 1A1A Compt 6] CUE: When HS is placed to start, tell operator pump started, red light illuminated, green light dark. STANDARD:
Operator starts 1AA CCS pump. JPM91AP Page 13 of 14 REV. 1 SAT/UNSAT SAT --UNSAT --Critical Step SAT --UNSAT --SAT -UNSAT -Critical Step SAT -UNSAT -
Job Performance Checklist:
STEP/STANDARD STEP 39.: [28] ENSURE the following transfer switches in AUX position:
480V SDBD 1A2A AA Fire/Flood Mode Pmp Compt 6 0-XS-26-1 480V SDBD 1B2B BB CCS Pmp Compt 6 0-XS-70-38 CUE: XS rotated clockwise, and indicates in the AUX. position.
STANDARD:
Nor/Aux switch is correctly placed in the Auxiliary position.
STEP 40.: [29] IF CCS pump 1 BB is STOPPED THEN ATTEMPT to start CCS pump 1 BB USING 1-HS-70-38C
[480V SDBD 1 B1 B Compt 6] CUE: When HS is placed to start, tell operator pump started, red light illuminated, green light dark. STANDARD:
Operator starts 1 BB CCS pump STEP 41.: [30] ENSURE the following transfer switches in AUX position:
480V SDBD 1B2B MT TGOP Compt 6 1-XS-47-61 480V SDBD 1 B2B SDBD Water Chiller PKG BB compt 6 0-XS-31 C-338 CUE: XS rotated clockwise, and indicates in the AUX. position.
STANDARD:
Nor/Aux switch is correctly placed in the Auxiliary position.
STEP 42.: [31] NOTIFY ACR that control is transferred on Checklist
: 3. CUE: If operator continues in Checklist 3, state that another AUO will perform the remainder of the checklist STANDARD:
Operator calls ACR and reports status. End of JPM JPM91AP Page 14 of 14 REV. 1 SAT/U N SAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD STEP 39.: [28] ENSURE the following transfer switches in AUX position:
480V SDBD 1A2A AA Fire/Flood Mode Pmp Compt 6 0-XS-26-1 480V SDBD 1B2B BB CCS Pmp Compt 6 0-XS-70-38 CUE: XS rotated clockwise, and indicates in the AUX. position.
STANDARD:
Nor/Aux switch is correctly placed in the Auxiliary position.
STEP 40.: [29] IF CCS pump 1 BB is STOPPED THEN ATTEMPT to start CCS pump 1 BB USING 1-HS-70-38C
[480V SDBD 1 B1 B Compt 6] CUE: When HS is placed to start, tell operator pump started, red light illuminated, green light dark. STANDARD:
Operator starts 1 BB CCS pump STEP 41.: [30] ENSURE the following transfer switches in AUX position:
480V SDBD 1B2B MT TGOP Compt 6 1-XS-47-61 480V SDBD 1 B2B SDBD Water Chiller PKG BB compt 6 0-XS-31 C-338 CUE: XS rotated clockwise, and indicates in the AUX. position.
STANDARD:
Nor/Aux switch is correctly placed in the Auxiliary position.
STEP 42.: [31] NOTIFY ACR that control is transferred on Checklist
: 3. CUE: If operator continues in Checklist 3, state that another AUO will perform the remainder of the checklist STANDARD:
Operator calls ACR and reports status. End of JPM JPM91AP Page 14 of 14 REV. 1 SAT/U N SAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All steps shall be simulated.
WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. DO NOT OPEN ANY COMPARTMENTS.
I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1) Both units were operating at 100% power when a fire in the spreader room required abandonment of the Main Control Room. 2) Both units were tripped as required by AOP-C.04.
The control room has been abandoned.
INITIATING CUES: 1) You are the Control Room AUO. You have been assigned checklist
: 3. 2) Parts of this checklist are time critical.
Timing for Time Critical Actions begins when the decision to enter AOP-C.04, SO from the ACR, is determined in AOP-N.01 Plant Fires. 3) NOTIFY the ACR when control is transferred on Checklist
: 3. READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All steps shall be simulated.
WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. DO NOT OPEN ANY COMPARTMENTS.
I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1) Both units were operating at 100% power when a fire in the spreader room required abandonment of the Main Control Room. 2) Both units were tripped as required by AOP-C.04.
The control room has been abandoned.
INITIATING CUES: 1) You are the Control Room AUO. You have been assigned checklist
: 3. 2) Parts of this checklist are time critical.
Timing for Time Critical Actions begins when the decision to enter AOP-C.04, SO from the ACR, is determined in AOP-N.01 Plant Fires. 3) NOTIFY the ACR when control is transferred on Checklist 3.}}

Latest revision as of 18:06, 21 March 2020

Initial Exam 2010-301 Draft Sim/In-Plant JPMs
ML101230148
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/03/2010
From:
NRC/RGN-II
To:
Tennessee Valley Authority
References
50-327/10-301, 50-328/10-301
Download: ML101230148 (118)


Text

JPMI-AP Page 1 of9 Rev 21 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 1-AP Emergency Boration (Stuck Rods)

PREPARED!

REVISED BY: Date/

VALIDATED BY:

  • Date/

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date!

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPMI-AP Page 2 of9 Rev 21 NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

8 Transfer from WP. Minor enhancements. N 8/12/94 All HJ Birch 9 Boron Conc. changes N 9/16/94 All HJ Birch 10 Chg due to Rev B procedure. Y 9/9/95 All HJ Birch 11 Incorp previous pen/inks: which corrected N 1/19/96 6 HJ Birch step 10 to continue with procedure instead of transition (JPM performance comment.

Moved T ave cue from step 14 to 17 added step to determine fully inserted, 12 steps.

Latest EA-68-4 & ES-0.1 Rev Chgd 'rods full out' to 'rods >12 steps', added step to use the com puter to verify Rods position 12 Major flow change for the start of EA-68-4 Y 2/2/98 All HJ Birch 13 Revision to ES-0.1 had no impact. Made N 9/23/98 All JP Kearney step 28 a critical step. Revised KIA ratings.

Reformatted critical steps.

pen/ink ES-0.1 procedure revision had no impact N 8/22/00 4 S. R. Taylor pen/ink Minor clarification N 11/27/01 4,6,7,9 L. Pauley 14 Incorporated change to EA-68-4. Change N 8/12/02 All J P Kearney was editorial in nature 15 Incorporated REV. 1C changes to ES-0.1 Y 9/8/03 All G S Poteet and EA-68-4 16 Incorporated comments N 3/30/04 All G.S. Poteet 17 Made minor editorial changes throughout. N 7/27/04 All MG Croteau Updated to current revisions of EA-68-4 and ES-0.1.

18 Updated to current revisions of EA-68-4 and Y 9/20/2005 All JJ Tricoglou ES-0.1. Made minor editorial changes throughout.

19 Revised format and updated IC. Added N 11/21/07 All R Putnam candidate cue sheet and minor revisions to match procedure references.

20 Added H3 auto generate of Handout. N 7/15/08 5, 7, 9 H J Birch Remove handout page. Minor step chgs base on previous procedure changes.

21 Updated procedure revisions, deleted steps Y 11/30/09 All M Hankins to realign Emergency Boration, validation time change to 15 minutes.

v - Specify If the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPMI-AP Page 3 of9 Rev 21 SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task:

Emergency Boration (Stuck Rods)

Note: This JPM satisfies Simulator Manipulation "T".

JAiTA task # : 0000980501 (RO)

KIA Ratings:

005AA2.03 (3.5/4.4) 024AA 1.17 (3.9/3.9) 005AK3.01 (4.0/4.3) 024AA 1.18 (3.7/3.6) 005AK3.06 (3.9/4.2) 024AA1.15 (3.1/2.9) 005AA2.03 (3.5/4.4)

Task Standard:

.::: 5040 (or amount determined per 0-SI-NUC-000-038.0 and TI-44) gallons of boric acid injected into the reactor coolant system using the normal boration path.

Evaluation Method: Simulator -~--

X In-Plant _ __

========================================================================

Performer:

NAME Start Time _ __

Performance Rating: SAT UNSAT Performance Time Finish Time _ __

Evaluator: ----------~~~~~------~/_---


/----

SIGNATURE DATE

========================================================================

COMMENTS

lPM1-AP Page 4 of9 Rev 21 SPECIAL INSTRUCTIONS TO EVALUATOR:

1 . Sequenced steps identified by an "s"

2. Any UNSAT requires comments
3. Initialize the simulator in IC-11S.
4. Insert the following:
a. IMF RD13A f:1
b. IMF RD13E f:1
c. Override lOR ZDIHS6213SA f:O
d. IMF RD07C5 (F-S)
e. IMF RD07DS (H-14)
f. IMF AN_OV_325 CPU alarm for Control Rods Dev & Seq- Nuisance alarm
5. INITIATE a reactor trip.
6. Close TDAFW valves and freeze the simulator after you have acknowledged the control board alarms.
7. The Console operator can be used to acknowledge alarms not associated with the JPM.
8. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Validation Time: CR. 15 mins Local _ _ _ __

Tools/Equipment/Procedures Needed:

1. EA-68-4,
2. ES-O.1

REFERENCES:

Reference Title Rev No.

A. EA-68-4 Emergency Boration 10 B. ES-0.1 Reactor Trip Response 32

===========================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. The reactor has tripped with no safety injection and the Immediate Actions of E-O, Reactor Trip or Safety Injection, were completed.
2. The transition was made to ES-O.1 "Reactor Trip Response".

INITIATING CUES:

1. You are directed to PERFORM step 6 of ES-O.1.
2. NOTIFY the US/SRO when you have completed all actions required by Step 6 of ES-O.1.

JPM1-AP Page 5 of9 Rev 21 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT STEP 1.: OBTAIN the appropriate procedure(s). SAT UNSAT STANDARD: Operator obtains a copy of ES-O.1 (and EA-68-4 at step 3 of JPM)

Start Time_ _

NOTE: The next three steps of the JPM are from ES-O.1. SAT STEP 2. 6. CHECK if emergency boration required: UNSAT

a. VERIFY all control rods fully inserted STANDARD: Determinre that two rods F8 and H14 are indicating full out by checkin g rod Critical Step bottom lights and rod position indicators for control rod position. Enters Step 6.a RNO.

STEP 3. IF all rod bottom lights are de-energized, THEN - SAT RESTORE power to RPls by switching Instrument Rack B Transfer Switch to ALTERNATE. [M-7, lower switch] - UNSAT STANDARD: Operator determines this step N/A since power is available.

STEP 4. IF any of the following conditions exists: - SAT

  • two or more RPI's indicate greater than 12 steps OR - UNSAT
  • two or more control rod positions CANNOT be determined, THEN EMERGENCY BORATE USING EA-68-4, EMERGENCY BORATION STANDARD: Operator transitions to EA-68-4, Emergency Boration STEP 5. IF entering this instruction from any of the following: - SAT

- UNSAT STANDARD: Operator determines this step is N/A, since procedure entry was from ES-O.1, Reactor Trip Response.

JPM1-AP Page 6 of9 Rev 21 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 6. IF entering this instruction from ES-O.1 AND any of the following - SAT conditions are met:

  • RCS temperature less than 540°F AND core burnup is greater than - UNSAT 12,000 MWD/MTU OR
  • RCS temperature less than 530°F Cue: If checked, cue that RCS temperature reads 547 degrees on all loops.

STANDARD: Operator recognizes that emergency boration is not required based on temperature.

L STEP 7. IF rod positions CANNOT be verified due to RP,S de-energized, - SAT

- UNSAT STANDARD: Operator determines this step is N/A, since procedure entry was from ES-0.1, Reactor Trip Response due to two stuck rods, continue with next step.

STEP 8. IF entering this instruction from ES-0.1 AND any of the following conditions - SAT are met:

  • Two or more rod positions CANNOT be determined due to RPls unavailable THEN PERFORM the following:
a. IF using BAT as a boration source GO TO Section 4.2, Emergency Boration from BAT
b. IF using RWST as a boration source GO TO Section 4.3, Emergency Boration from RWST NOTE: Since section 4.3 is an acceptable path, if the operator chooses this path give the following cue:

Cue: If the operator chooses to go to section 4.3, role playas US and state that the preferred boration method is via the SA T.

STANDARD: Operator selects Section 4.2.

JPM1-AP Page 7 of9 Rev 21 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT NOTE: The following steps are from Section 4.2. _SAT STEP 9.: PLACE boric acid transfer pumps to fast speed. UNSAT IF asked, BA T "A" is aligned to unit 1 via the 1A pump.

NOTE: Standard 1 and 2 can be done in any order.

STANDARD: 1) Pump(s) stopped. Green light on HS

2) Speed selector switch placed on "FAST" position Critical Step
3) Pump(s) restarted, Red light on right comes on for fast speed.
4) (Starting only 1A pump is acceptable)

STEP 10.: ADJUST emergency borate valve [FCV-62-1381 to maintain flow between _SAT 35 and 150 gpm on [FI-62-137Al.

UNSAT NOTE: FCV-62-138 will not operate.

STANDARD: Operator recognizes that FCV-62-138 will not operate. Operator continues with procedure.

STEP 11.: MONITOR emergency boration flow: _SAT

a. CHECK emergency boration flow established on [FI-62-137Al.
b. IF boric acid flow less than 35 gpm, THEN CLOSE recirculation UNSAT valve for the BAT aligned to the blender:
  • [1-FCV-62-2371 for BAT A.

NOTE: Since FCV-62-138 will not operate, this step will have no affect on flow.

Operator continues to next step.

Cue: If asked, BA T A is aligned to unit 1.

STANDARD: Operator determines FCV-62-138 will not open and no flow is available.

Continues to next step STEP 12.: IF emergency boration flow NOT established, THEN ALIGN normal SAT boration path:

UNSAT

a. VERIFY VCT outlet valves [LCV-62-1321 and [LCV-62-1331 OPEN STANDARD: Control board positions indicator lights for LCV-62-132 and 133 indicate open by red lights.

JPM1-AP Page 8 of9 Rev 21 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 13.: b. ALIGN normal boration to VCT outlet: - SAT

  • OPEN [FCV-62-140J . - UNSAT
  • OPEN [FCV-62-144J.

STANDARD: Operator verifies FCV-62-140 is OPEN and ensures FCV-62-144 OPEN and Critical Step verifies control board indicator lights for FCV-62-140 and 144 indicate open by RED lights illuminated.

STEP 14.: c. CHECK boration flow greater than 35 gpm on [FI-62-139J. - SAT NOTE: Flow should be kept on scale, less than or equal to 50 gpm, to allow - UNSAT calculation of total flow. Flow rate may be controlled by throttling 1-HIC-62-237, 1A BAT recirc valve.

CUE: If operator notifies the SRO that emergency boration has been established acknowledge flow has been established.

STANDARD: Operator ensures flow rate is greater than 35 gpm. May notify SRO that emergency boration flow has been established.

STEP 15.: IF boration flow NOT established, THEN PERFORM one of - SAT the following ...

- UNSAT STANDARD: Operator N/A's this step.

STEP 16.: VERIFY charging flow established. - SAT STANDARD: Operator verifies charging flow established. - UNSAT STEP 17.: MAINTAIN boric acid flow between 35 and 150 gpm. - SAT STANDARD: Operator monitors flow and ensures it remains between 35 and 150 gpm. - UNSAT STEP 18.: Monitor BAT level. - SAT STANDARD: Operator monitors BAT level. - UNSAT STEP 19.: IF FR-S.1 ATWS or FR-S.2 Loss of core Shutdown condition exists, - SAT THEN ....

- UNSAT STANDARD: Operator N/A's this step.

JPM1-AP Page 9 of9 Rev 21 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT STEP 20.: IF emergency boration required for RCS cooldown, THEN DETERMINE SAT required boric acid volume based on RCS Temperature UNSAT STANDARD: Operator N/As this step.

STEP 21.: IF any of the following conditions are met: SAT

  • 2 or more control rods positions CANNOT be determined THEN PERFORM one of the following:

Critical Step

  • CALCULATE required boric acid volume USING 0-SI-NUC-000-038.0 and TI-44.

STANDARD: Operator Determines boric acid volume using table and determines that 5040 gallons of boric acid are required. [If 0-SI-NUC-000-038.0 is used and a different number is obtained using correctly from the SI, this is acceptable.]

STEP 22.: CALCULATE time to inject boric acid volume determined in EA-68-4 SAT step 11 at established flow rate:

UNSAT NOTE: 5040/ (flow indicated by FI-62-139) =___ minutes STANDARD: Operator determines the time required to inject 5040 gallons of boric acid Critical Step based on the flow rate they establish. 5040 gall 35 gpm = 144 minutes Max time to inject, 5040 gall 35 gpm =101 minutes min time to inject.

  • NOTE: If 0-SI-NUC-OOO-038.0 and TI-44 were used instead of table to determine boration amount, substitute value determined using these procedures.

STEP 23.: WHEN either of the following conditions exists: SAT

  • FR-O Subcriticality Status Tree is GREEN AND UNSAT
  • Required Boric Acid Volume has been injected to RCS OR Adequate SDM verified OR Conditions which require Emergency Boration no longer exist, THEN GO TO Section 4.4 for Termination of Boron.

Cue: When the operator determines the time, cue them that the JPM is complete.

STANDARD: Operator notifies the US that boration has been established to RCS.

End ofJPM

JPM13AP1 Page 1 of 10 Rev. 6 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM13AP1 Transfer to Hot Leg Recirculation PREPARED/

REVISED BY: Date/

VALIDATED BY:

  • Date/

~~----------

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM13AP1 Page 2 of 10 Rev. 6 NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

0 Transfer from Word Perfect N 1994 All HJ Birch 1 Add cover sheep and Incorporate Rev B Y 9/12/95 All HJ Birch minor changes. Chgd performance time to based on validation.

pen/ink Chg intiat cue to since time of event to N 1/25/96 4 HJ Birch match ES-1.3. Comment from student.

pen/ink Chg due to procedure revision and chg N 03/19/02 4 WR Ramsey recirc criteria from 12 hr to 5.5 hr 2 Incorporated penfink changes N 8/22/02 4 J P Kearney 3 Updated to current revision of EOP. N 9/22/03 All MG Croteau 4 Corrected IC. Corrected typos. 5 vice 5.5 N 8/2/04 All MG Croteau hours.

5 Corrected IC. Revised JPM to conform to Y 9/30/2005 All JJ Tricoglou latest revision of ES-1.4.

6 Updated special instructions to the Y 11/30/09 4 M Hankins Evaluator, deleted extra page for directions to trainee

\

v - Specify if the JPM change will require another Validation (Y or N).

See cover sheet for criteria.

JPM13AP1 Page 3 of 10 Rev. 6 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task:

Transfer to Hot Leg Recirculation JAITA Task # : 0000790501 (RO)

KIA Ratings:

194001 A1.02 (4.1/3.9) 194001 A1.13 (4.3/4.1) 000011 EA1.11 (4.2/4.2) 000011 EA1.13 (4.1/4.2) 006020 A4.01 (3.7/3.6) 000011 EA1.05 (4.3/3.9) 006020 A4.02 (3.9/3.8)

Task Standard:

Realign RHR to cold leg injection and BOTH trains of safety injection to hot leg recirculation flow path. (RHR hot leg injection valve fails to open)

Evaluation Method: Simulator -~-- X

_-'-X"'---_ In-Plant _ __

=======================================================================

Performer:

NAME Start Time _ __

Performance Rating: SAT UNSAT Performance Time Finish Time _ __

Evaluator: ------~----~

______~~~--~ _ __ __ __ _I_~~

_--I _ _-

SIGNATURE DATE

=======================================================================

COMMENTS

JPM13AP1 Page 4 of 10 Rev. 6 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps identified.
2. Any UNSAT requires comments.
3. Initialize Simulator to IC #24, after automatic containment sump swapover is initiated, perform required alignment of ECCS to Containment Sump per ES-1.3. Insert the following remote functions:
a. IRF RHR14 f:1
b. IRF SIR06 f:O)
c. lOR ZDIHS63172A f:O (Fails FCV-63-172 closed)
5. If sump recirc IC is not available, then initialize to IC #16 and complete the following setup:
a. Insert IMF TH01A f:10 (10% LOCA on Loop #1 Hot Leg) and trip RCPs.
b. After automatic containment sump swapover is initiated, perform required alignment of ECCS to containment sump per ES-1.3.
c. Place operating power on FCV-63-1 (remote function IRF RHR14 f:1).
d. When RWST level decreases to 8% realign containment spray pump suction to containment sump per ES-1.3.
e. Place operating power on FCV-63-22 (remote function IRF SIR06 f:O).
f. Insert override lOR ZDIHS63172A f:O (Fails [FCV-63-172J CLOSED)
g. Acknowledge and clear ALL alarms.
h. Freeze simulator after realignment of containment spray suction to containment sump.
6. Insert overrides to silence following nuisance alarms:
a. IMF AN_OV_304 f:3 (Saturation Margin Trouble)
b. IMF AN_OV_420 f:3 (Lower Compt Moisture High)
c. IMF AN_OV_96 f:3 (Turbine Zero Speed)
d. Change plaque next to FCV-63-22 to indicate power restored to valve.
7. Ensure Operator performs the following required actions for SELF-CHECKING;
a. Reviews the intended action and expected response.
b. Compares the actual response to the expected response.

Validation Time: CR. 15 mins Local _ _ _ __

Tools/Equipment/Procedures Needed:

ES-1.4, Transfer to Hot Leg Recirculation

References:

Reference Title Rev No.

ES-1.4 Transfer to Hot Le Recirculation 5 READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. All ECCS components and Containment Spray pumps are aligned and taking suction from containment sump per ES-1.3, Transfer To RHR Containment Sump.
2. RCS pressure is less than 180 psig. RHR spray is NOT in service.
3. Both RHR pumps are in service.

INITIATING CUES:

1. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> have elapsed since the time of the event.
2. As the OATC, you are directed to transfer to hot leg recirculation in accordance with ES-1.4, Transfer To Hot Leg Recirculation.
3. Notify the US/SRO when you have completed ES-1.4.

JPM 13AP1 Page 5 of 10 Rev. 6 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT STEP 1: Obtain a copy of the appropriate procedure. - SAT STANDARD: Operator obtains a copy of ES-1.4. - UNSAT COMMENTS:

Start Time_ _

STEP 2: 1. DETERMINE if RHR spray should be isolated: - SAT

a. CHECK RHR spray IN SERVICE:
  • Train A RHR spray valve FCV-72-40 OPEN - UNSAT OR
  • Train B RHR spray valve FCV-72-41 OPEN .

STANDARD: Operator determines FCV-72-40 and FCV-72-41 closed, verifies green lights ON and red lights OFF for both valves.

Operator goes to step 2.

COMMENTS:

STEP 3: 2. CHECK RHR pump A-A RUNNING. - SAT STANDARD: Operator checks RHR pump A-A running, verifies red light ON and - UNSAT green light OFF.

Operator may also verify pump amps normal.

COMMENTS:

STEP *4: 3. ALIGN RHR Train A for hot leg recirculation: - SAT

a. CLOSE RHR Train A cold leg isolation valve FCV-63-93.

- UNSAT STANDARD: Operator places FCV-63-93 to Close, verifies green light ON and red light OFF.

Critical Step COMMENTS:

STEP 5: 3. ALIGN RHR Train A for hot leg recirculation: - SAT

b. ENSURE RHR Train B discharge crosstie valve FCV-74-35 CLOSED. - UNSAT STANDARD: Operator ensures FCV-74-35 Closed, verifies green light ON and red light OFF.

COMMENTS:

JPM 13AP1 Page 6 of 10 Rev. 6 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP *6: 3. ALIGN RHR Train A for hot leg recirculation: SAT

c. OPEN RHR Train A discharge crosstie valve FCV-74-33.

- UNSAT STANDARD: Operator places FCV-74-33 to Open, verifies red light ON and green light OFF.

Critical Step COMMENTS:

STEP *7: 3. ALIGN RHR Train A for hot leg recirculation: SAT

d. OPEN RHR HL injection valve FCV-63-172.

- UNSAT NOTE: FCV-63-172 fails to open. Operator must transition to RNO Column and realign RHR trains to cold legs.

Critical Step STANDARD: Operator places FCV-63-172 to Open.

Operator determines FCV-63-172 will NOT open, verifies green light remains ON. .

Operator goes to RNO Column. ~  ;

(

COMMENTS:

NOTE: Begin alternate path steps. - SAT STEP 8: 1) ENSURE RHR hot leg injection valve FCV-63-172 CLOSED. - UNSAT STANDARD: Operator ensures FCV-63-172 Closed, verifies green light ON and red light OFF.

COMMENTS:

STEP *9: 2) ENSURE RHR Train A discharge crosstie valve FCV-74-33 - SAT CLOSED.

- UNSAT STANDARD: Operator places FCV-74-33 to Close, verifies green light ON and red light OFF.

Critical Step COMMENTS:

JPM 13AP1 Page 7 of 10 Rev. 6 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT STEP *10: 3) ENSURE RHR Train A cold leg isolation valve FCV-63-93 - SAT OPEN.

- UNSAT STANDARD: Operator places FCV-63-93 to Open, verifies red light ON and green light OFF.

Critical Step COMMENTS:

STEP 11: 4) IF FCV-63-172 is NOT capable of opening from MCR, THEN - SAT GO TO Step 11 .

- UNSAT STANDARD: Operator determines FCV-63-172 not able to be opened and goes to Step 11.

COMMENTS:

STEP 12: 11. CHECK SI pump A-A RUNNING. - SAT STANDARD: Operator checks SI pump A-A running, verifies red light ON and green light - UNSAT OFF.

Operator may also verify pump amps normal.

COMMENTS:

STEP *13: 12. ALIGN SI pump A-A for hot leg recirculation: - SAT

a. ENSURE SI pump A-A STOPPED.

- UNSAT STANDARD: Operator places SI pump A-A to Stop, verifies green light ON and red light OFF (HS-63-10A).

Critical Step COMMENTS:

STEP *14: 12. ALIGN SI pump A-A for hot leg recirculation: - SAT

b. CLOSE SI Train A crosstie valve FCV-63-152.

- UNSAT STANDARD: Operator places FCV-63-152 to Close, verifies green light ON and red light OFF.

Critical Step COMMENTS:

JPM 13AP1 Page 8 of 10 Rev. 6 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP *15: 12. ALIGN SI pump A-A for hot leg recirculation: - SAT

c. WHEN FCV-63-152 closed, THEN PERFORM the following:
1) OPEN SI Train A hot leg injection FCV-63-156. - UNSAT STANDARD: Operator places FCV-63-156 to Open, verifies red light ON and green light OFF. Critical Step COMMENTS:

STEP *16: 12. ALIGN SI pump A-A for hot leg recirculation: SAT

c. WHEN FCV-63-152 closed, THEN PERFORM the following:
2) START SI pump A-A. - UNSAT STANDARD: Operator places SI pump A-A to Start, verifies red light ON and green light OFF (HS-63-10A). Critical Step COMMENTS:

STEP 17: 13. VERIFY SI Train A discharge flow on FI-63-151. SAT STANDARD: Operator verifies SI Train A discharge flow indicated on FI-63-151. - UNSAT COMMENTS:

STEP 18: 14. CHECK SI pump 8-8 RUNNING. - SAT STANDARD: Operator checks SI pump 8-8 running, verifies red light ON and green light - UNSAT OFF.

Operator may also verify pump amps normal.

COMMENTS:

STEP *19: 15. ALIGN SI pump 8-8 for hot leg recirculation: - SAT

a. STOP SI pump 8-8.

- UNSAT STANDARD: Operator places SI pump 8-8 to Stop, verifies green light ON and red light OFF (HS-63-15A).

Critical Step COMMENTS:

JPM 13AP1 Page 9 of 10 Rev. 6 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP *20: 15. ALIGN SI pump 8-8 for hot leg recirculation: - SAT

b. CLOSE SI Train 8 crosstie FCV-63-153.

- UNSAT STANDARD: Operator places FCV-63-153 to Close, verifies green light ON and red light OFF.

Critical Step COMMENTS:

STEP *21: 15. ALIGN SI pump 8-8 for hot leg recirculation: - SAT

c. WHEN FCV-63-153 closed, THEN PERFORM the following:
1) OPEN SI Train 8 hot leg injection FCV-63-157. - UNSAT STANDARD: Operator places FCV-63-157 to Open, verifies red light ON and green light OFF. Critical Step COMMENTS:

STEP *22: 15. ALIGN SI pump 8-8 for hot leg recirculation: - SAT

c. WHEN FCV-63-153 closed, THEN PERFORM the following:
2) START SI pump 8-8. - UNSAT STANDARD: Operator places SI pump 8-8 to Start, verifies red light ON and green light OFF (HS-63-1SA). Critical Step COMMENTS:

STEP 23: 16. VERIFY SI Train 8 discharge flow on FI-63-20. - SAT STANDARD: Operator verifies SI Train 8 discharge flow indicated on FI-63-20. - UNSAT COMMENTS:

STEP 24: 17. ISOLATESI pump flow to cold legs: - SAT

a. CHECK 80TH SI pumps ALIGNED for hot leg recirculation.

- UNSAT STANDARD: Operator checks both SI pumps aligned for hot leg recirculation per previous steps.

COMMENTS:

JPM 13AP1 Page 10 of 10 Rev. 6 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 25: 17. ISOLATE SI pump flow to cold legs: - SAT

b. CHECK power AVAILABLE to SI pump cold leg injection valve FCV-63-22. - UNSAT NOTE: Console Operator insert IRF SIR06 f:O to place power on FCV-63-22.

Cue: Inform Operator that power is restored to FCV-63-22.

STANDARD: Operator contacts AUO to restore power to FCV-63-22.

COMMENTS:

STEP 26: 17. ISOLATE SI pump flow to cold legs: - SAT

c. CLOSE SI pump cold leg injection valve FCV-63-22.

- UNSAT STANDARD: Operator checks FCV-63-22 Closed, verifies green light ON and red light OFF.

COMMENTS:

.5TEP 27: Notify US/SRO that ES-1.4 is completed with hot leg recirculation - SAT established.

- UNSAT STANDARD: Operator notifies US/SRO that ES-1.4 is completed.

COMMENTS:

Stop Time_ _

End ofJPM

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. All ECCS components and Containment Spray pumps are aligned and taking suction from containment sump per ES-1.3, Transfer To RHR Containment Sump.
2. RCS pressure is less than 180 psig. RHR spray is NOT in service.
3. Both RHR pumps are in service.

INITIATING CUES:

1. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> have elapsed since the time of the event.
2. As the OATC, you are directed to transfer to hot leg recirculation in accordance with ES-1.4, Transfer To Hot Leg Recirculation.
3. Notify the US/SRO when you have completed ES-1.4.

JPM 2 RO/SRO Page 1 of 7 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 2 RO/SRO Remove Excess Letdown from Service PREPAREDI REVISED BY: Date/

VALIDATED BY:

  • Date/

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM 2 RO/SRO Page 2 of 7 Rev. 0 NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

0 Initial Issue Y 11/30109 All M. Hankins v - Specify if the JPM change will require another Validation (Y or N).

See cover sheet for criteria.

JPM 2 RO/SRO Page 3 of 7 Rev. 0 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task JAiTA task #

Place excess letdown in service to the VCT IRCDT 0040160101 KIA Ratings:

004 A4.06 (3.6/3.1) 004 A4.05 (3.6/3.1)

A4.06 (3.6/3.1)

Task Standard: Remove Excess letdown from service in accordance with 1-S0-62-6, Excess Letdown, section 7.0 Evaluation Method: Simulator _ X _ _ In-Plant _ __

========================================================================

Performer:

NAME Start time _ __

Performance Rating: SAT UNSAT Performance Time Finish time _

Evaluator: /_ _ _ __ __ ___

SIGNATURE DATE

========================================================================

COMMENTS

JPM 2 RO/SRO Page 4 of 7 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. A Critical step is identified bold type in the SAT/UNSAT column.
2. Any UNSAT requires comments
3. Task should begin at the IC198, B CCP liS, Excess LD liS, LD liS at -73 gpm.
5. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Validation Time: CR 7 min Local _ _ _ __

Tools/Equipment/Procedures Needed:

REFERENCES:

Procedure Title Rev No.

1-S0-62-6 Excess Letdown 17 1-AR-M5-B Annunciator Response 36 I Task Number Task Title ContTRN 0040160101 Place excess letdown in service to the VCT /RCDT

=================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. All steps shall be performed for this task When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The Unit is operating at 100% power. After repair of a leaking valve, normal letdown has been restored to service. Excess letdown had been placed in service while the repairs were made. Excess letdown temperature is -207°F and 45 psig on 1-PI-62-57.

Normal Letdown has been restored to service in accordance with 1-S0-62-1.

INITIATING CUES:

You are the U-1 OATC. You have been directed to remove excess letdown from service using 1-S0-62-6. Report to Unit supervisor when excess letdown has been removed from service.

JPM 2 RO/SRO Page 5 of 7 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 1.: IF letdown is to be placed in service, THEN RETURN to service - SAT per 1-S0-62-1 .

- UNSAT STANDARD: Operator verifies letdown is in service. Initial conditions stated STEP 2.: CLOSE [1-FCV-62-561 Excess Letdown Heat Exchanger outlet - SAT valve.

- UNSAT STANDARD: Operator verifies valve closes, green light illuminated and red CRITICAL light dark; and temperature and pressure decrease on TI-62-58 STEP and PI-62-57.

STEP 3.: VERIFY [1-FCV-62-59J Excess Letdown 3-way valve in - SAT NORMAL.

- UNSAT STANDARD: Operator verifies the HS for FCV-62-59 is in NORMAL.

STEP 4.: CLOSE [1-FCV-62-55] Excess Letdown containment isolation - SAT valve.

- UNSAT STANDARD: Operator places HS in closed and verifies green light illuminated and red light dark STEP 5.: CLOSE [1-FCV-62-541 COLD LEG Loop #3 Excess Letdown - SAT valve.

- UNSAT STANDARD: Operator places HS to close and verifies green light illuminated CRITICAL and red light dark STEP

JPM 2 RO/SRO Page 6 of 7 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 6.: IF charging is in service, THEN - SAT ADJUST seal injection flow to 6-11 gpm using [1-FCV-62-891

- UNSAT STANDARD: Operator checks seal injection flow between 6-11 gpm and makes adjustments as required.

STEP 7.: IF auto operation is desired and system conditions will allow it, - SAT THEN PLACE [1-FCV-62-931 in AUTO. - UNSAT STANDARD: Operator should adjust Pressurizer level, if needed, prior to placing charging in automatic.

STEP 8.: NOTIFY RADCON that Excess Letdown is REMOVED from - SAT SERVICE.

- UNSAT CUE: Acknowledge as RADCON that Excess Letdown has been removed from service.

STANDARD: Operator should call RADCON and notify them Excess Letdown has been removed from service on Unit 1.

STEP 9.: ENSURE [1-FCV-70-85J Excess Letdown HX CCS FCV is - SAT CLOSED.

NOTE Operator should address the need to have a CV (Concurrent - UNSAT Verifier) present prior to operating the valve.

CRITICAL STANDARD: Operator takes the HS for 1-FCV-70-85 to CLOSE position and STEP verfies green light illuminated and red light dark.

STEP 10.: ENSURE [1-HS-70-85Al is in the A-Auto position. - SAT NOTE Operator should address the need to have a CV (Concurrent - UNSAT Verifier) present prior to operating the valve.

CRITICAL STANDARD: Operator places the HS in the A-Auto position. STEP

JPM 2 RO/SRO Page 7 of 7 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 11.: INDEPENDENTLY VERIFy .... - SAT

- UNSAT NOTE The next four steps are independent verification of manipulations previously made by the operator CUE: Tell the operator the independent verifications were performed by another operator.

STANDARD: Operator requests an independent verification for previous manipulations.

STEP 12.: IF operation at greater than 200°F has occurred, THEN - SAT CO NTACT Systems Engineering to evaluate Grinnell Valve maintenance requirements. - UNSAT STANDARD: Operator notifies the US that excess letdown temperature exceeded 200°F, therefore System Engineering must be notified to evaluate Grinell Valve maintenance requirements.

End OfJPM

Directions to Trainee:

I will explain the initial conditions, and state the task to be perfonned. I will provide initiating cues and reports on other actions when directed by you. All steps shall be perfonned for this task When you complete the task successfully, the objective for this job perfonnance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The Unit is operating at 100% power. After repair of a leaking valve, nonnal letdown has been restored to service. Excess letdown had been placed in service while the repairs were made. Excess letdown temperature is ~207°F and 45 psig on I-PI-62-57.

Nonnal Letdown has been restored to service in accordance with I-SO-62-1.

INITIATING CUES:

You are the U-l OATe. You have been directed to remove excess letdown from service using I-SO-62-6. Report to Unit supervisor when excess letdown has been removed from service.

JPM 152-1 Page 1 of 8 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 152-1 Swap RHR Pumps (Train B to Train A)

With Level in the Pressurizer PREPARED!

REVISED BY: Datel VALIDATED BY:

  • Datel APPROVED BY: Datel (Operations Training Manager)

CONCURRED: ** Datel (Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM 152-1 Page 2 of 8 Rev. 0 NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

0 New JPM based on JPM 152, changed to Y 12/03/09 All M Hankins swap from Train B to Train A RHR pump.

v - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM 1S2-1 Page 3 of 8 Rev. 0 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task: Swap RHR Pumps (Train B to JAITA task # : 00S0030101 (RO)

Train A) with Level in the 00S0080101 (RO)

Pressurizer KIA Ratings:

00SK4.03 (2.9/3.2) 00SA1.01 (3.S/3.6) 00SA4.02 (3.4/3.1) 00SK4.10 (3.1/3.1) OOSA 1 .02 (3.3/3.4) 00SA4.01 (3.6/3.4) 00SA4.01 (3.6/3.4)

Task Standard:

'A' Train RHR is placed in service injecting to Loops 2 & 3.

Evaluation Method: Simulator _--'X~_

_-'X'-'---_ In-Plant _ __

========================================================================

Performer:

NAME Start time _ __

Performance Rating: SAT UNSAT Performance Time Finish time _ __

Evaluator: 1_ _ _,,--__

/- -----

SIGNATURE DATE

========================================================================

COMMENTS

JPM 152-1 Page 4 of 8 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Initialize IC-197. Ensure Train B RHR is in service with flow aligned through FCV-63-94 to Loops 1 & 4.
2. An extra operator will be required to acknowledge alarms and monitor S/G levels, RCS temp, RCS press.
3. Any UNSAT requires comments
4. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

d.

Validation Time: CR. 15 minutes Local -

Tools/Equipment/Procedures Needed:

0-SO-74-1, Section 8.

3.1 REFERENCES

Reference Title Rev No.

0-SO-74-1 Residual Heat Removal S stem 69

=================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you and to indicate completion of your answer to a knowledge question return the written copy of the question to me.

INITIAL CONDITIONS:

1. Unit 1 had been in Mode 5 for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to repair a leak on the #1 Steam Line.
2. RCS boron is 1400 ppm and the previous shift determined that Train A RHR boron concentration is 1450 ppm.
3. Shutdown margin required boron concentration is 1200 ppm.
4. Train B RHR pump needs to be shutdown to allow Maintenance to add oil to the motor.
5. Train A RHR has been checked out locally by the Auxiliary Bldg. AUO and is ready for service.

The AUO is standing by in the Auxiliary Building INITIATING CUES:

You are the Unit 1 OATC and the SRO has directed you to place Train A RHR in service and remove Train B RHR from service. Align Train A injection flowpath to loops 2 & 3.

Notify the SRO when you have Train A RHR in service.

JPM 152-1 Page 5 of 8 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 1.: Obtain copy of 0-SO-74-1 and determine appropriate section - SAT

- UNSAT STANDARD: Operator obtains a copy of 0-SO-74-1 and determines Section 8.3.1 is the section for Placing Train A RHR liS. Start Time_ _

STEP 2.: IF adjustment is required on CCS flow through RHR Hxs, THEN - SAT ENSURE [FCV-70-1561 RHR Hx B CCS outlet is THROTTLED.

- UNSAT NOTE: Operator may decide to keep FCV-70-156 Open STANDARD: Operator ensures HS-70-156 has a RED & GREEN light LIT with flow indicated on O-M-27A.

STEP 3.: ENSURE [FCV-74-161 RHR Hx A Outlet is CLOSED. - SAT

- UNSAT STANDARD: Operator ensures FCV-74-16 RHR Hx A Outlet CLOSED, HIC-74-28 @ 100%.

STEP 4.: START RHR Pump A-A with [HS-74-10AJ. - SAT

- UNSAT STANDARD: Operator should address making a plant announcement prior to starting 1A-A RHR Pump, Starts pump and verifies RED light LIT on Critical Step HS, verifies amps.

STEP 5.: VERIFY [FCV-74-121 RHR Pump A-A miniflow OPENS or greater than - SAT 500 gpm in indicated on FI-74-12.

- UNSAT Cue: IF dispatched: FI-74-12 indicates >500 gpm.

STANDARD: Operator verifies FCV-74-24 is open by Red light LIT on handswitch or checks with AUO locally to verify >500 gpm flow indicated on local flow indicator FI-4 7-24.

STEP 6.: IF aligning Train A RHR cooling to loops 2 and 3, THEN - SAT PERFORM the following:

[a] ENSURE [FCV-63-93] OPEN. - UNSAT STANDARD: Operator ensures FCV-63-93 OPEN, red light illuminated, green light dark.

Critical Step

JPM 152-1 Page 6 of 8 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 7.: [b] ADJUST [FCV-74-16] to establish flow from train B RHR. - SAT

- UNSAT STANDARD: Operator adjusts FCV-74-16 RHR Hx A Outlet OPEN, using HIC-74-28.

Critical Step STEP 8.: [c] ADJUST [FCV-74-281 AND [FCV-74-321 to reduce - SAT Train B RHR flow.

- UNSAT STANDARD: Operator closes FCV-74-28 RHR Hx B Outlet, place HIC-74-28 to 0%.

Critical Step STEP 9.: [d] VERIFY [FCV-74-241 RHR Pump B-B miniflow OPENS or greater - SAT than 500 gpm in indicated on FI-74-12.

- UNSAT Cue: IF dispatched: FI-74-24 indicates >500 gpm.

STANDARD: Operator verifies FCV-74-24 is open by Red light LIT on handswitch or checks with AUO locally to verify >500 gpm flow indicated on local flow indicator FI-47-24.

STEP 10.: [e] CLOSE [FCV-74-351 RHR Hx B Outlet. - SAT

- UNSAT STANDARD: Operator closes FCV-74-35, green light illuminated, red light dark.

Critical Step STEP 11.: [f] ENSURE [FCV-74-331 RHR Hx A Outlet OPEN. - SAT STANDARD: Operator ensures FCV-74-33 RHR Hx A Outlet OPEN, red light - UNSAT illuminated, green light dark.

STEP 12.: [g] OPEN [VLV-74-530J RHR Hx A to Letdown Hx. - SAT NOTE: Console operator needs to modify remote function RHR03 to 100. - UNSAT Cue: AUO reports that VLV-74-530 has been opened locally, operator should dicuss the need for cv. Critical Step STANDARD: Operator directs an AUO to OPEN VLV-74-530 RHR Hx A to Letdown Hx.

JPM 152-1 Page 7 of 8 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 13.: [h] STOP RHR Pump B-B with [HS-74-20Al. - SAT

- UNSAT STANDARD: Operator stops RHR pump 1A-A, verifies GREEN light on handswitch.

Critical Step STEP 14.: [i] OPEN [HCV-74-36] RHR Hx A Bypass. - SAT NOTE: Console operator needs to modify remote function RHR06 to 100. - UNSAT Cue: Open HCV-74-36 as an AUO locally (including IV).

Critical Step STANDARD: Operator directs an AUO to OPEN HCV-74-37 RHR Hx B Bypass.

STEP 15.: [j] CLOSE [HCV-74-37] RHR Hx B Bypass. - SAT NOTE: Console operator needs to modify remote function RHR07 to O. - UNSAT Cue: AUO reports HCV-74-37 has been closed locally (including CV).

Critical Step STANDARD: Operator directs an AUO to CLOSE HCV-74-37 RHR Hx B Bypass.

STEP 16.: [k] CLOSE rVLV-74-5311 RHR Hx B-B to Letdown Hx. - SAT NOTE: Console operator needs to modify remote function RHR04 to O. - UNSAT Cue: AUO report s VLV-74-531 has been closed an AUO locally (including CV).

STANDARD: Operator directs an AUO to close HCV-74-531.

STEP 17.: [I] ENSURE (FCV-63-941 CLOSED. - SAT

- UNSAT STANDARD: Operator ensures FCV-63-94 CLOSED, green light illuminated, red light dark Critical Step STEP 18.: IF aligning RHR cooling to loops 1 and 4, THEN ENSURE the following - SAT valves are in the required position.

- UNSAT NOTE: Step is NA'd, initiating Cues direct alignment to loops 2 & 3.

STANDARD: Operator NA's the step.

JPM 152-1 Page 8 of 8 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 19.: THROTTLE one or both of the following to maintain desired cooling - SAT rate:

FCV-74-16, RHR Hx A Outlet, AND/OR - UNSAT FCV-74-32, RHR Hx Bypass.

STANDARD: Operator throttles open FCV-74-16 and/or FCV-74-32 to stabilize RCS Critical Step temperature and establish RHR flowrates at approximately the same values that were present prior to the flowpath realignment.

STEP 20.: WHEN injection flow is> 1250 gpm, THEN VERIFY £FCV-74-12J RHR - SAT Pump A-A miniflow is CLOSED.

- UNSAT STANDARD: Operator verifies FCV-74-24 closed, GREEN light LIT on handswitch.

STEP 21.: IF cooling water is to be removed from Train B Hx, THEN - SAT CLOSE £FCV-70-153].

- UNSAT Cue: Leave cooling water aligned to Train B at its current flowrate.

STANDARD: Operator NA's step.

STEP 22.: NOTIFY U1 US that Train A of RHR is in service to loops 2 & 3 and - SAT Train B of RHR has been removed from service.

- UNSAT STANDARD: None. Stop Time_ _

End of JPM

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you and to indicate completion of your answer to a knowledge question return the written copy of the question to me.

INITIAL CONDITIONS:

1. Unit 1 had been in Mode 5 for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to repair a leak on the #1 Steam Line.
2. RCS boron is 1400 ppm and the previous shift determined that Train A RHR boron concentration is 1450 ppm.
3. Shutdown margin required boron concentration is 1200 ppm.
4. Train B RHR pump needs to be shutdown to allow Maintenance to add oil to the motor.
5. Train A RHR has been checked out locally by the Auxiliary Bldg. AUO and is ready for service.

The AUO is standing by in the Auxiliary Building INITIATING CUES:

You aJe the Unit 1 OATC and the SRO has directed you to place Train A RHR in service and remove Train~B.IjR from service. Align Train A injection flowpath to loops 2 & 3.

Notify the SRO when you have Train A RHR in service.

JPM # 34-1 Page 1 of 11 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 34-1 Establishing Secondary Heat Sink Using Main Feedwater or Condensate PREPARED!

REVISED BY: Date!

VALIDATED BY: _**_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _---=D=-:a::..:;te==-! Date! _ _ _ _ __


~~=-----------

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM # 34-1 Page 2 of 11 NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

0 Initial issue Y 12/03/09 All M Hankins v - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM # 34-1 Page 3 of 11 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task: Establishing Secondary Heat sink using Main Feedwater or Condensate System JA/TAtask#: 3110060601 (RO) 0100040101 (RO)

KIA Ratings:

WE05 EA2.1 (3.4/4.4)

Task Standard:

Loss of Secondary Heat Sink, Establish Secondary Heat Sink Using Main Feedwater or Condensate System Evaluation Method: Simulator _~X~_

X

-~--

In-Plant -

========================================================================

Performer:

NAME Start Time _ __

Performance Rating: SAT UNSAT Performance Time Finish Time _

Evaluator: ------------------~------~/_--


~~-=~~--------/-=-=~

SIGNATURE DATE

========================================================================

COMMENTS

JPM # 34-1 Page 4 of 11 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified.
2. Any UNSAT requires comments
3. Acknowledge any associated alarms.
4. Initialize simulator in IC: 119 Steam Dump Pressure Mode Setpoint-968 psig All AFW pumps are shutdown, MDAFW A-A tagged, TDAFW pump and MDAFW 8-8 trip on Reactor Trip. RX trip due Rod control problems (multiple rod drops), adjust steam dumps in pressure mode to control Tavg 544-546°F.
5. Allow S/G narrow range levels are <-20%. (allow SD to steam off to reduce S/G level if necessary)
6. Console operator will role playas CRO and acknowledge/clear alarms as needed.
7. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Validation Time: CR. 30 mins _-

Local - __ -_ -_-

Tools/Equipment/Procedures Needed:

EA-2-2

References:

Reference Title Rev No.

1. EA-2-2 Establishing Secondary Heat sink using Main 8 Feedwater or Condensate
========================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 has experienced a Reactor Trip due multiple dropped rods.
2. MDAFW pump A-A is tagged out for maintenance, MDAFW pump 8-8 tripped on electrical fault and the TDAFW pump tripped on electrical overs peed just after RX trip.
3. Unit has transitioned to ES-O.1 and are ready to perform the RNO for STEP 5.
4. All four S/G levels have been decreasing.
5. AFW Flow to the S/Gs can NOT be established.

INITIATING CUES:

1. You are the eRO and the US directed you to establish main feedwater flow USING EA-2-2, Establishing Secondary Heat sink Using Main Feedwater or Condensate System.
2. Inform the US when Main Feedwater or Condensate flow has been established.

JPM # 34 Page 5 of 11 Rev 0 STEP 1.: Obtain copy of the appropriate procedure. - SAT

- UNSAT STANDARD: Operator may obtain a copy of ES-O.1 and review step 5 RNO.

Start Time_ _

STEP 2.: IF directed by ES-0.1, Reactor Trip Response, to establish main - SAT Feedwater flow, THEN PERFORM Section 4.2.

- UNSAT STANDARD: Operator recognizes Section 4.2 is the correct section for performance.

Critical Step STEP 3. REFER TO the following EAPs to attempt to restore AFW flow in parallel with this procedure:

  • EA-3-9, establishing TDAFW flow

- UNSAT CUE: Maintenance and Ops personnel have been dispatched to restore MDAFW pumps A and B and the TDAFWP, EA-3-10 and EA-3-9 are in progress.

STANDARD: Operator contacts the US and or the MSS to have personnel dispatched to establish AFW flow.

STEP 4.: CLOSE MFW Regulating valves. - SAT

- UNSAT STANDARD: Operator ensures the MFW reg valves output signal is zero, on 1-FIC 3-35, 48, 90 and 103 and check lights for MFW reg valves on 1-XX-3-35.

STEP 5.: ENSURE MFW regulating bypass valves CLOSED. - SAT STANDARD: Operator ensures MFW bypass valves CLOSED using - UNSAT 1-LlC-3-35, 48, 90, 103 STEP 6.: CYCLE Reactor Trip breakers. - SAT STANDARD: Operator places 1-HS-99-7 in the CLOSE position, and places 1-RT-1 - UNSAT in the trip position. Rx trip breaker lights turn red and then green.

Critical Step STEP 7.: RESET FW Isolation signal. - SAT

- UNSAT STANDARD: Operator depresses push buttons 1-HS-3-99A and 99B, and Annunciator Window 1-XA-55-6B, LOW Tavg Reactor Trip MFW Critical Step Vales Actuated alarm clears.

JPM # 34 Page 6 of 11 Rev 0 STEP 8.: OPEN FW isolation vavles for S/G's to be fed. SAT

- UNSAT STANDARD: Operator opens applicable FWI valves, using 1-HS-3-33A, 47A, 87A and 100A. Critical Step STEP 9.: PERFORM Section 4.4 to establish manin feedwater flow to S/G's. - SAT

- UNSAT STANDARD: Operator transitions to Section 4.4.

STEP 10.: DISPATCH operator to PERFROM Appendix A, Part I to remove fuses - SAT to disable intermediate heater string Isolation.

- UNSAT Cue Respond as an AUO and tell operator you will perform Appendix A to remove fuses to disable intermediate heater string isolation.

STANDARD:

STEP 11.: ENSURE Condensate inlet and outlet vavles for at least one LP heater - SAT String OPEN.

- UNSAT STANDARD: Operator verfies LP Heater Inlet/Outlet valves OPEN, red light and green lights illuminated for 1-HS 2-46A, 66A, 56A, 55A, 65A and 75A.

STEP 12.: ENSURE the following condensate pumps RUNNING: - SAT

  • 2 Hotwell pumps
  • 1 CBP (suction valve open) - UNSAT
  • 1 Injection water pump STANDARD: Operator ensures 2 HW pumps, 1 CBP with suction valve open and 1 injection water pump running.

STEP 13.: ENSURE MFPT Recirc Valves in MANUAL and CLOSED: - SAT STANDARD: Operator ensures recirc valves for the MFP's are in manual and closed, - UNSAT 1-FIC-3-70 and 3-84.

STEP 14.: ENSURE MFW reg controllers in MANUAL and CLOSED: - SAT STANDARD: Operator ensures Main FRV are in manual and closed using 1-FIC - UNSAT 35, 48, 90, 103, and checks status lights green on 1-XX-3-35.

JPM # 34 Page 7 of 11 Rev 0 STEP 1S.: ENSURE MFW bypass reg valves controllers in MANUAL and output - SAT ZERO.

- UNSAT STANDARD: Operator ensures all MFW reg bypass valves are in Manual (amber light illuminated) and output ZERO using 1-LlC-3-3S, 48,90-103.

STEP 16.: IF a flowpath is not available through at least one Intermediate Heater - SAT string ......

- UNSAT STANDARD: Operator N/A's this step, flow path is available.

STEP 17.: ENSURE Inlet and outlet valves for at least one string of Intermediate - SAT and High Pressure Heaters OPEN:

  • High Pressure FW Heaters - UNSAT
  • Intermediate Pressure FW Heaters STANDARD: Operator verifies all HP (M-3) and IP (M-2) heater string isolation valves are OPEN.

STEP 18.: IF starting MFW pump A, THEN PERFORM the following: - SAT

a. ENSURE MFP a drain hand-switch [HS-46-14] in OPEN position - UNSAT
b. ENSURE the following vavles are OPEN:

FCV-2-205 [M-2]

FCV-2-210 [M-2]

FCV-2-221 [M-2]

FCV-3-67 [M-3]

STANDARD: OPERATOR ensures the MFPT condenser Inlet and Outlet Isolation valves are OPEN, FCV-2-20S and 210, and the MFP Inlet and Outlet isol Valves are open, FCV-2-221 and 3-67.

STEP 19.: IF [VLV-1-611] MFP pump A HP steam Isolation ......... - SAT

- UNSAT CUE: When operator dispatches personnel to open valve Inform them that VLV-1-611 is already open.

STANDARD: Operator dispatches an operator to check valve open locally.

JPM # 34 Page 8 of 11 Rev 0 STEP 20.: RESET MFPT A USING [HS-46-9A]. - SAT

- UNSAT STANDARD: Operator places HS in the reset position and verifies the red light illuminates green light is dark, alarm clears for MFP trip. Critical Step STEP 21.: PLACE MFPT A [SIC-46-20A] in MANUAL and with ZERO output. - SAT

- UNSAT STANDARD: Operator places MFPT A SIC-46-20 to manual and sets output signal to O. Critical Step STEP 22.: ENSURE MFPT A and B mater speed controller [PC-46-20] in - SAT MANUAL and with output at O.

- UNSAT STANDARD: Operator places MFPT A and B mater speed controller [PC-46-20] in Critical Step MANUAL and sets output at O.

STEP 23.: DO NOT CONTINUE until section flow path established to MFP. - SAT

- UNSAT STANDARD: Operator verifies flow path is available to MFP suction.

STEP 24.: ENSURE [FIC-3-70] MFPTA recirc valve in MANUAL and OPEN. - SAT

- UNSAT STANDARD: Operator verifies the MFP A recirc valve is in manual, amberlight illuminated and opens valve. Critical Step STEP 25.: PLACE MFPT A speed controller rSIC-46-20A] in AUTO. - SAT

- UNSAT STANDARD: Operator places MFPT A speed controller in AUTO.

Critical Step

JPM # 34 Page 9 of 11 Rev 0 STEP 26.: VERIFY the governor valve positioner is indicating CLOSED. - SAT

- UNSAT STANDARD: Operator verifies 1-HS-46-13A green light illuminated and/or checks 1-ZI-46-138 (M-3) indicating O.

STEP 27.: IF MFPT governor valve NOT indicating CLOSED, THEN .... - SAT

- UNSAT STANDARD: Operator N/A's this step, valve is closed.

STEP 28.: OPEN MFPT A stop valves by placing HP stop valve switch - SAT

[HS-46-15Al to raise.

- UNSAT NOTE: HP and LP stop valve will open when the HS is placed in raise.

Critical Step STANDARD: OPERATOR holds the HS-46-15A in raise position until the red light is illuminated and green light is dark.

STEP 29.: RAISE MFPT A speed by PERFORMING one of the following: - SAT

1) IF MeR operation of governor vavle psoitioner is available, PLACE [HS-47-13Al to RAISE to open the steam chest vavles. - UNSAT Critical Step STANDARD: OPERATOR places HS-47-13A in RAISE to open GVwhile monitoring MFP loading. MFP speed should stabilize at 3300 rpm as sen on 1-SI-46-20A.

STEP 30.: 2) IF MCR operation of governor valve positioner unavailable, THEN ... - SAT

- UNSAT STANDARD: O-perator N/A's this step.

JPM # 34 Page 10 of 11 Rev 0 STEP 31.: WHEN MFPT speed controller controlling MFPT speed, THEN - SAT ENSURE governor valve positioner is fully raised.

- UNSAT NOTE: MFPT speed controller takes over speed control when MFPT accelerates to - 3300 rpm on 1-SI-46-20A. Critical Step STANDARD: Operator ensures Governor Valves Positioner is fully raised, red light illuminated and green light dark.

STEP 32.: ADJUST MFPT speed USING Master Controller [PC-46-20J UNTIL - SAT feedwater header pressure is - 80 psid greater than steam header pressure. - UNSAT NOTE: Operator may use ICS to monitor delta P, Secondary Mimics, Critical Step Feedwater.

STANDARD: Operator adjusts [PC-46-29J in manual to increase FW header pressure while monitoring PI-3-1, # 1 HTR Inlet Pressure, and PI-1-33, Main Steam Header Pressure.

STEP 33.: IF starting MFP pump Boo .... - SAT

- UNSAT STANDARD: OPERATOR N/A's this step.

STEP 34.: IF RCS temperature is less than 550°F, - SAT THEN GO TO Step 13.

- UNSAT STANDARD: OPERATOR verifies temperature is <550°F and and continues with step 13.

STEP 35.: ADJUST MFW regulating bypass valve controller to establish required - SAT feed flow.

- UNSAT STANDARD: Operator adjust MFW reg bypass valve to establish feed water flow. Critical Step Monitors flow on FW flow Indicators on M-4. Operator notifies the US when FW flow has been established.

JPM # 34 Page 11 of 11 Rev 0 STEP 36.: MONITOR Hotwell level and CONTROL as necessary. - SAT NOTE: If operator notified US that FW was established in previous step - UNSAT then this step is not required.

STANDARD: Operator may state that they are monitoring HW level on 1-LR-2-12 (M-3), and using 1-LlC-2-3 and 1-LlC-2-9 for auto makeup and dumpback.

STEP 37.: Inform the US/SRO when feedwater flow has been established. - SAT

- UNSAT STANDARD: Operator informs the US/SRO FW flow has been established.

Critical Step End of JPM

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 has experienced a Reactor Trip due multiple dropped rods.
2. MDAFW pump A-A is tagged out for maintenance, MDAFW pump B-B tripped on electrical fault and the TDAFW pump tripped on electrical overspeed just after RX trip.
3. Unit has transitioned to ES-O.1 and are ready to perform the RNO for STEP 5.
4. All four S/G levels have been decreasing.
5. AFW Flow to the S/Gs can NOT be established.

INITIATING CUES:

1. You are the CRO and the US directed you to establish main feedwater flow USING EA-2-2, Establishing Secondary Heat sink Using Main Feedwater or Condensate System.
2. Inform the US when Main Feedwater or Condensate flow has been established.

JPM #65 Page 1 of 13 Rev. 8 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 65 Re-establishment of Containment Pressure Control Following High Pressure Conditions PREPAREDI REVISED BY: Date/

VALIDATED BY:

  • Date/

~~=-----------


~----------

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM #65 Page 2 of 13 Rev. 8 NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

5 Revised to incorporate changes in Y 9/16/98 All JP Kearney 0-SO-30-8. Reformatted critical steps.

pen/ink SO-30-8 revision had no impact N 7/15/99 All S.R. Taylor pen/ink Revised to incorporate changes in N 8/15/00 4,6,7 SR Taylor 0-SO-30-8. Updated Rev level.

pen/ink 0-SO-30-8 Rev chg. and corrected minor N 01/04/01 All W. R. Ramsey format errors pen/ink 0-SO-30-8 Rev chg. N 09/05/01 All W. R. Ramsey pen/ink Deleted Steps 32, 33, and 34 for returning 9/17/01 ALL SR Taylor EAM bistables to normal. These steps were deleted from the SO in REV 12.

Also changed instructions and step 40 (previously 43) appropriately.

6 Incorporated pen/ink changes; revised to N 8/20/02 All J P Kearney the latest revision of 0-SO-30-8; no impact on JPM flow pen/ink Made minor enhancement changes due N 10/25/02 All W. R. Ramsey to performance feedback. Flow was not affected.

7 Updated to latest revision of 0-SO-30-8 N 9/9/05 All SR Taylor and IC (Rad Monitor readings). Create SCENS files to facilitate performance.

Editorial Changes.

8 Updated to latest revision of 0-SO-30-8, Y 11/16/09 All M Hankins reduced pressure spike reached in containment to between 0.5 and 0.7 psig, deleted requirement to perform section 5.1, since Containment Vacuum Relief Valves were not affected by the pressure increase in containment.

V - Specify if the JPM change will require another validation.

See cover sheet for criteria.

JPM #65 Page 3 of 13 Rev. 8 SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task:

Re-establishment of CNTMT Pressure Control Following High Pressure Condition JAITA task # : 00601801 (RO)

KIA Ratings:

103A1.01 (3.7/4.1) 103A4.01 (3.2/3.3) 2.1.31 (4.2/3.9) 103A4.09 (3.1/3.7) 2.1.20 (4.3/4.2)

Task Standard:

Vent the containment pressure down to normal range (within -0.1 to +0.3 psig) and then place the containment automatic Pressure Control System in service.

Evaluation Method: Simulator - X

_-,-X,,--_

In-Plant _ __

======================================================================

Performer:

NAME Start time _ __

Performance Rating: SAT UNSAT Performance Time Finish time _ __

Evaluator: -----------~---~/_--


~/_--

SIGNATURE DATE

=======================================================================

COMMENTS

JPM #65 Page 4 of 13 Rev. 8 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Any UNSAT requires comments.
2. Acknowledge any associated alarms.
3. Initialize Simulator in IC: #116.
4. Set malfunctions CH01A, CH01B, CH01C, CH01D to 10, to fail the containment pressure indicators at -.5 to.7 psid. Override ZAOPDIR30133 to.5 to put PDIR-30-133 upscale. Override ZAOPDI30133 to 4.5 to put PDI-30-133 near top scale. (Run SCENS File JPM065a if available)
5. CLOSE FCV-30-46, 47, 48 and FREEZE simulator until turnover completed.
6. Note: A console operator will be needed for JPM step 24 to Delete malfunctions and overrides.
7. When the operator begins venting containment delete malfunctions CH01A, B, C, & D to return cntmt press to normal AND delete overrides on PDIR-30-133 & PDI-30-133. (Run SCENS file JPM065b if available to return values to normal over a 3 min ramp)
8. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Validation Time: CR 25min Local _ _ _ __

Tools/Equipment/Procedures Needed:

0-SO-30-8 Sections 3.0, 4.0, 5.1, 5.2, and 7.2

References:

Reference Title Rev No.

0-SO-30-8 Containment Pressure Control 29

================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task.

To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is in Mode 1 recovering from an Air Line break in containment. The air leak was discovered on a section of the header that allowed isolation without affecting any equipment.

During isolation efforts, containment pressure increased to approximately 0.5 to 0.7 psig.

INITIATING CUES:

1. The US has directed you to vent containment using the normal flow path to within normal operating limits.
2. Inform the US when Containment has been vented and the Vacuum Control system is aligned NORMAL.
3. Precautions and Limitations and Prerequisite Actions are complete for 0-SO-30-8.

JPM #65 Page 5 of 13 Rev. 8 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 1. OBTAIN the appropriate procedure - SAT

- UNSAT STANDARD: Operator obtains a copy of 0-SO-30-8, starting with Section 4.0.

Start Time- -

NOTE Operator may review Precautions and Limitations and Prerequisite actions, per initial conditions these sections have been completed STEP 2. ENSURE instruction to be used is a copy of the effective - SAT version.

- UNSAT CUE: Tell the operator the procedure is the latest revision.

STANDARD: Operator verifies procedure using BSL or hard copy from MCR.

STEP 3. ENSURE Precaution and Limitation Section 3.0 has been - SAT reviewed.

- UNSAT STANDARD: Operator reviews P & L and goes to next step.

NOTE Operator may review Precautions and Limitations and Prerequisite actions, per initial conditions these sections have been completed STEP 4.: IF ventilation alignment changes are made which could impact - SAT door closure, THEN NOTIFY Fire Operations.

- UNSAT Cue: Play role of SRO, and state you will perform any required notifications.

STANDARD: Operator informs the US/SRO that the ventilation changes may affect door closure which could be of a concern to Fire Ops.

STEP 5.: ENSURE each performer documents their name and initials. - SAT STANDARD: Operator prints name and initials. - UNSAT STEP 6.: INDICATE section to be performed - SAT STANDARD: Operator checks section 5.0 and 7.0 to be performed and goes - UNSAT to section 5.2.1.

JPM #65 Page 6 of 13 Rev. 8 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT NOTE: The following steps are from Section 5.2.1 of 0-50-30-8: - SAT STEP 7.: ENSURE 1-30-8.02 power checklist complete. - UNSAT Cue: Power checklist 1-30-8.02 is complete with NO deviations.

STANDARD: Operator checks configuration log to ensure power checklist 1-30-8.02 is complete.

STEP 8.: ENSURE the check valve portion of the containment vacuum - SAT relief assembly is capable of closing by observing monitor lights on panel (panel M-9). - UNSAT STANDARD: Operator checks monitor lights on panel (panel M-9) to ensure valves are closed, green lights ON.

STEP 9.: IF the unit is in MODES 1, ,2 or 3, THEN - SAT NOTIFY the US/SRO that the EAM will be placed in the Adverse

- UNSAT Cue: Play role of SRO and acknowledge EAM will be placed in Adverse Containment condition for venting containment.

STANDARD: Operator informs the US/SRO that EAM's will be placed in the Adverse Cntmt condition for venting containment.

STEP 10.: EVALUATE entry into LCO 3.6.6. Vacuum Relief Lines. - SAT Cue: Play role of SRO and state you will evaluate the LCO. - UNSAT STANDARD: Operator informs the US/SRO LCO 3.6.6, Vacuum Relief Lines needs to be evaluated.

STEP..1.1.,: IF the Unit is in Modes 1, 2, 3, THEN - SAT PERFORM the following:

a. IF the EAM is not in the Adverse Cntmt condition, THEN - UNSAT PLACE OR DIRECT AUO to PLACE the EAM in the Adverse Cntmt condition by depressing the ACTUATE button in each rack.

STANDARD: Operator recognizes the EAMs are in the Adverse Cntmt condition. Operator should N/A step [5.1] and complete [5.2]

and [5.3].

STEP 12.: ENSURE blue purge/vent operation permissive lights illuminated - SAT for each steam generator.

- UNSAT STANDARD: Operator verifies blue purge/vent permissive lights are illuminated for each S/G (M-4 above SG NR levels indicators).

JPM #65 Page 7 of 13 Rev. 8 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 13.: VERIFY window 30 "S/G Level Adverse Setpoint" illuminated on - SAT XA-55-3C.

- UNSAT STANDARD: Operator verifies XA-55-3C window 30 illuminated.

STEP 14.: IF the Unit is in Modes 1-4, THEN - SAT VERIFY Radiochemical Laboratory has a current weekly performance of 0-SI-CEM-030-41 0.1 in progress. - UNSAT Cue: SI-410.1 is in progress and signed by the SRO and Rad Chern Supervisor. Provide operator with current copy of 0-SI-CEM-030-410.1, containment vent to AB Exhaust.

STANDARD: Operator verifies SI-41 0.1 and approved by SRO and Radiochemical Laboratory Supervisor approval.

STEP 15.: IF the noble gas countrate for lower containment radiation - SAT monitor has increased by more than 50% since the last sample time, THEN TRANSMIT the release permit to the Chem Lab to - UNSAT obtain another (noble gas and tritium) set of samples.

Cue: SI-410.1 data shows RM-90-106 Gas =1.0 E3 STANDARD: Operator reviews Initial countrate at time on sample in SI-410.0 and current reading on RM-90-106; determines that conditions have not changed by more than 50% and N/As this step.

STEP 16.: IF the lower containment noble gas radiation monitor is - SAT inoperable, THEN VERIFY from the Chemistry Shift Supervisor that grab sample form lower containment is analyzed to satisfy - UNSAT ODCM 1.1.2.6.a Action 47, prior to each event.

STANDARD: Operator looks at RM-90-106 and determines that monitor is operable and N/As this step.

STEP 17.: ENSURE that the Shield Building Annulus Vacuum Control - SAT System is in service and maintaining a negative 5.0 inches of H20 as indicated on M-9, [PDI-30-126J or [PDI-30-127J OR - UNSAT EGTS in service OR EGTS testing in progress.

Cue: If NOTE prior to step is addressed, state "Purge is not in progress".

STANDARD: Operator obtains reading from PDI-30-126 or 127 on panel M-9.

JPM #65 Page 8 of 13 Rev. 8 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 18.: VERIFY NO abnormal or unexplainable radiation levels exist - SAT inside containment.

- UNSAT STANDARD: Operator checks RM-90-106 and 112 for abnormal radiation levels in containment.

STEP 19.: VERIFY that NO containment vent isolation signal exists. - SAT STANDARD: Operator checks XA-55-6C windows C5 & C6 to verify that a - UNSAT cntmt vent isolation signal is not present.

STEP 20.: ENSURE at least ONE of the following radiation monitors in service: - SAT U-1 Containment 1-RM-90-130 Purge Exhaust Monitors 1-RM-90-131 - UNSAT CUE: AB AUO reports the 1-RM-90-130 is liS.

STANDARD: Operator verifies the RM-90-130 is in service (No Alarms and Not Blocked).

STEP 21.: VERIFY that all personnel have been evacuated from the - SAT annulus and that all doors are closed.

- UNSAT Cue: Role playas NSS or Rad Con and state all personnel are out of the annulus and the doors are closed.

STANDARD: Operator calls Nuclear Security or Rad Con and verifies that all personnel have been evacuated from the annulus and that all doors are closed.

STEP 22.: ENSURE at least one of the following radiation monitors in - SAT service for the appropriate unit::

- UNSAT AB Vent: 0-RM-90-1 01 B Upper Compartment: 1-RM-90-112 A. B Lower compartment: 1-RM-90-1 06 A. B STANDARD: Operator verifies the absence of applicable instrument malfunction alarms on 0-M-12.

JPM #65 Page 9 of 13 Rev. 8 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 23.: ENSURE PROTECTED EQUIPMENT DO NOT INOP tags placed on the following radiation monitors block switches as appropriate: (N/A tags not - SAT placed).

- UNSAT BLOCK SWITCH MONITOR O-HS-90-136A 1 1-RM-90-130 O-HS-90-136A2 1-RM-90-1 31 O-HS-90-136A3 O-RM-90-1 01 B Cue: Extra Operator will place Protected Equipment tags.

STANDARD: Operator places Do Not Inop (Protected Equipment) Tags on Rad Monitor Block Switches.

STEP 24.: IF aligning the lower compartment purge isolation valves using - SAT the NORMAL flow path, THEN PERFORM steps [a] thru [f]. - UNSAT Cue: US prefers normal flow path.

STANDARD: None STEP 25.: ENSURE [FCV-30-37] is CLOSED. - SAT STANDARD: Operator verifies green light ON for FCV-30-37 - UNSAT STEP 26.: ENSURE [FCV-30-40] is CLOSED. - SAT STANDARD: Operator verifies green light ON for FCV-30-40 - UNSAT STEP 27.: OPEN [FCV-30-14 & 56] with [HS-30-14]. - SAT STANDARD: Operator places HS-30-14 in the OPEN position and places - UNSAT HS-30-14 in the A-AUTO position.

Critical Step STEP 28.: VERIFY [FCV-30-14 & 56] OPEN.

- SAT STANDARD: Operator verifies red lights illuminated ON [FCV-30-14 & 56].

- UNSAT STEP 29.: OPEN [FCV-30-15 & 571 with HS-30-15 - SAT

- UNSAT STANDARD: Operator places HS-30-15 in the OPEN position and places HS-30-15 in the A-AUTO position.

Critical Step

JPM #65 Page 10 of 13 Rev. 8 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 30.: VERIFY FCV-30-15 & 57 OPEN. - SAT STANDARD: Operator verifies red lights illuminated for FCV-30-15 & 57 and - UNSAT places HS-30-15 in the A-AUTO position.

STEP 31.: IF aligning the lower compartment purge isolation valves using - SAT the Alternate flow path THEN PERFORM steps [15.1] thru

[15.8]. - UNSAT STANDARD: Operator should NA this step since the NORMAL flow path is being used.

STEP 32.: OPEN Annulus exhaust isolation valve FCV-30-54 with - SAT HS-30-54.

- UNSAT NOTE: When operator opens FCV-30-54 modify malfunctions CH01A, S, C, & D AND modify overrides ZAOPDIR30133 and ZAOPD130133.

Critical Step STANDARD: Operator opens FCV-30-54 with HS-30-54. Verifies valve open by observing red light ON.

- SAT STEP 33.: RECORD time purge isolation valves are OPENED.

TIME - UNSAT STANDARD: Operator records the time purge valves were opened.

Critical Step STEP 34.: IF the Annulus Vacuum Control System is in service and the - SAT standby Annulus Vacuum Control Fan is available, THEN PERFORM the following - UNSAT START the standby Annulus Vacuum Control Fan.

NOTE: If NOTE 1 concerning 15 min to vent is addressed inform operator that some time compression is being used for the vent r- 3 min to vent).

STANDARD: Operator starts the standby Annulus Vacuum Control Fan.

STEP 35.: IF annulus vacuum fan flow low alarm comes in on 0-M-28A - SAT during venting, THEN STOP the applicable Annulus Vacuum Control Fan - UNSAT STANDARD: If alarm comes in operator should stop applicable fan.

JPM #65 Page 11 of 13 Rev. 8 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT STEP 36.: IF a high radiation alarm occurs on any of the following - SAT Radiation Monitors, THEN ...

- UNSAT STANDARD: Operator addresses step and potential for action required if radiation levels increase.

STEP 37.: WHEN containment vent is completed, THEN perform [Section 7.2.1]. - SAT

- UNSAT STANDARD: Operator monitors containment pressure by observing Pdl-30-133. When pressure differential within -0.1 and +0.3 psig, then go to Section 7.2.1. Critical Step STEP 38.: ENSURE log entry is made into Narrative Logs detailing the time - SAT and the valves which were opened for venting.

- UNSAT STANDARD: Operator should describe the log entry that would be made including all valves which were opened for the Normal flowpath for venting and the time they were opened.

NOTE: Operator transitions to Section 7.2.1 to shutdown vent. - SAT STEP 39.: IF lower Compartment Purge Isolation Valves are aligned - UNSAT through the Normal Flowpath, THEN PERFORM the following steps:

PLACE [HS-30-141 in the CLOSED position. Critical Step STANDARD: Operator places HS-30-14 in the closed STEP 40.: PLACE [HS-30-15J in the CLOSED position - SAT STANDARD: Operator places HS-30-15 in the closed position and Verifies - UNSAT FCV-30-15, -57 are closed, green light ON their respective indicating lights. Should request independent verification of action. Critical Step STEP 41.: VERIFY [1-FCV-30-14J is CLOSED. - SAT STANDARD: Operator verified FCV-30-14 is closed and green light is ON - UNSAT STEP 42.: VERIFY [1-FCV-30-56] is CLOSED. - SAT STANDARD: Operator verified FCV-30-56 is closed and green light is ON - UNSAT

JPM #65 Page 12 of 13 Rev. 8 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 43.: VERIFY [1-FCV-30-15] is CLOSED. - SAT STANDARD: Operator verified FCV-30-15 is closed and green light is ON - UNSAT STEP 44.: VERIFY [1-FCV-30-7] is CLOSED. - SAT STANDARD: Operator verified FCV-30-57 is closed and green light is ON - UNSAT STEP 45.: IF Lower Compartment Purge Isolation Valves are aligned - SAT through the ALTERNATE flow path, THEN ...

- UNSAT STANDARD: Operator should N/A this step since the NORMAL flow path was used to vent containment.

STEP 46.: CLOSE the Annulus Exhaust isolation valve[FCV-30-541 with - SAT HS-30-54.

- UNSAT STANDARD: Operator places HS-30-54 in the closed position and verifies green light ON. Critical Step STEP 47.: RESTORE the Annulus Vacuum Pressure Control - SAT per 0-SO-65-1 Section 8.1.

- UNSAT CUE: Another operator will restore Annulus Vacuum Control per 0-50-65-1.

STANDARD: Operator addresses restoration of Annulus Vacuum Pressure Control per 0-SO-65-1 .

STEP 48.: IF both Annulus Vacuum Control Fans are running, THEN STOP - SAT one of the Annulus Vacuum Control Fans.

- UNSAT STANDARD: Operator stops one of the Annulus Vacuum Control Fans STEP 49.: ENSURE log entry is made into Narrative Logs detailing the time - SAT and the valves which were closed for venting.

- UNSAT CUE: After Operator describes what the log entry would state, then tell them the log entry has been made.

STANDARD: Operator discusses what would be written in the Narrative log detailing the time and the vavles that were closed in the normal flow path.

JPM #65 Page 13 of 13 Rev. 8 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 50.: IF Unit One is in Modes 1, 2, or 3, THEN PERFORM the - SAT following:

RETURN the Environmental Allowance Monitor (EAM) to normal - UNSAT by pushing the RESET button in each rack as follow ...

CUE: Another operator will ensure EAMs are returned to normal, perform IVs.

STANDARD: Operator address EAM's and IV's will be performed by another operator and continues in section 7.2.1.

STEP 51.: IF LCO 3.6.6 is to be exited, THEN - SAT LOG time in the UO journal.

- UNSAT STANDARD: Operator recognizes LCO 3.6.6 was not entered and N/A's this step.

STEP 52.: ENSURE PROTECTED EQUIPMENT DO NOT INOP tags - SAT removed from the following Radiation Moniotrs block switches as appropriate: (N/A tags NOT removed) - UNSAT STANDARD: Operator removes all Protected Equipment from RM's and checks tag removed.

NOTE: Next step is performed per the initiating cues. - SAT STEP 53.: INFORM the US/SRO that the containment has been vented - UNSAT and that the automatic vacuum control system has been placed back in service.

Stop Time_ _

STANDARD: Operator informs the US/SRO that the containment has been vented and that the automatic vacuum control system has been placed back in service.

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task.

To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is in Mode 1 recovering from an Air Line break in containment. The air leak was discovered on a section of the header that allowed isolation without affecting any equipment.

During isolation efforts, containment pressure increased to approximately 0.5 to 0.7 psig.

INITIATING CUES:

4. The US has directed you to vent containment using the normal flow path to within normal operating limits.
5. Inform the US when Containment has been vented and the Vacuum Control system is aligned NORMAL.
6. Precautions and Limitations and Prerequisite Actions are complete for 0-SO-30-8.

/

JPM #77-1AP Page 1 of 10 Rev.12 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 77-1AP Perform DIG Load Test on 18-8 DIG (with high crankcase press)

PREPARED/

REVISED BY: Date/

VALIDATED BY:

  • Date/

~==------------

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** oate/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM #77-1AP Page 2 of 10 Rev.12 NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

8 Revised to reflect revision changes in SI- N 10/13/99 All SR Taylor 7B, changed critical steps for consistency with JPM 77-5AP reviewed/approved 4/20/99, corrected typos and incorporated comments from 1999 cycle 5 requal performances of JPM 77-2AP. Flow of the JPM is not affected.

pen/ink 0-AR-M26-B Rev chg only N 8/9/00 4 SR Taylor pen/ink Minor change to step 6, SO-83 Rev N 8/17/00 4 SR Taylor update.

pen/ink 0-AR-M26-B Rev chg only N 8/28/00 4 SR Taylor pen/ink 1-SI-OPS-082-007.B Rev chg only N 6/21/01 4 WR Ramsey pen/ink 1-SI-0PS-082-007.B rev 25 Update minor N 09/07/01 ALL WR Ramsey changes related to stopwatch usage pen/ink minor enhancement changes and N 03/21/02 ALL WR Ramsey 1-SI-OPS-082-007.B Revision update 9 Incorporated pen/ink changes; updated to N 8/20/02 All J P Kearney latest revisions of referenced documents; no impact on JPM flow 10 Updated references N 12/10/03 4 JJ Tricoglou Revised remote functions/annunciator N 8,9 overrides to conform to new simulator configurations.

11 Updated to current revisions and IC. N 8/11/04 All MG Croteau 12 Updated to current revision of procedure Y 12/03/09 ALL M Hankins v - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM #77-1AP Page 3 of 10 Rev.12 SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task:

Perform DIG Load Test on 1B-B DIG JAITA task # :

0640020101 0640040101 0640060101 (RO)

KIA Ratings:

064A4.01 (4.0/4.3) 064A1.04 (2.8/2.9) 064A4.02 (3.3/3.4) 064A4.03 (3.2/3.3) 064A2.09 (3.1/3.3) 064A3.06 (3.9/3.9)

Task Standard:

Perform DIG Operability Test per 1-SI-OPS-082-007.B, specifically manually start the DIG. Emergency stop DIG on high crankcase pressure annunciation.

Evaluation Method: Simulator _~X~_

_ -X

'-!.-_- In-Plant -_-__-

=======================================================================

Performer:

NAME Start Time _ __

Performance Rating: SAT UNSAT Performance Time Finish Time _ __

Evaluator: _

=_ -_-- _ -_ -11 SIGNATURE DATE

========================================================================

COMMENTS

JPM #77-1AP Page 4 of 10 Rev.12 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Any UNSAT requires comments
2. Acknowledge any associated alarms.
3. Initialize Simulator in IC: #16.
4. A console operator will be needed to insert override and play role of AUO on Radio.
5. Operator will need assistance during DIG start (at step 5). An extra simulator operator or the console operator needs to be present to perform this timing.
6. When operator starts JPM step #25, prior to D/G breaker closure, insert IMF AN_ OV_958 f:2.
7. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Validation Time: CR 30 minutes Local _ _ _ __

Tools/Equipment/Procedures Needed:

1. 1-SI-OPS-082-007.B, Through Section 6.1 and Appendix "C".
2. "Signed off" copy of entire section 4.
3. 0-AR-M26-B window 0-2.

References' Reference Title Rev No.

1. 1-SI-OPS-082-007.B Electrical Power System Diesel Generator 1B-B 50
2. 0-AR-M26-B Annunciator 0-XA-55-26B 27

JPM #77-1AP Page 5 of 10 Rev.12 READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Both units are at 100% RTP.
2. All systems are OPERABLE, except for the 1B-B DIG, 0-GO-16 has been completed on all the A train equipment.
3. Maintenance has been completed on the 1B-B DIG and the clearance has been removed.
4. The DIG has been rolled and is in standby alignment using 0-SO-82-2.
5. The AUO at the DIG building has completed Appendix A of 1-SI-OPS-082-007.B and all parameters are within limits.
6. The U1 Control Room AUO has verified breaker 1934 is in the Disconnect position.
7. SI-166.36 is NOT required.
8. D/G-DAQ has been installed per Appendix J.
9. Applicable steps of Appendix J, Monitoring the DIG Starting Air System, completed.
10. Room fire protection is in service.
11. Section 4.0 of 1-SI-OPS-082-007.B is complete.

INITIATING CUES:

1. The U1 US/SRO has reviewed the completed work package for the 1B-B DIG, all that remains is to perform 1-SI-OPS-082-007.B for the PMT.
2. You are an extra unit operator and have been assigned to perform the SI on 1B-B DIG.
3. The PMT requires the AMBIENT MANUAL START method for testing.
4. Notify the US when the test is complete.

JPM #77-1AP Page 6 of 10 Rev.12 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 1.: Operator obtains a copy of the appropriate procedure. - SAT NOTE: Initial conditions cover steps up to transition to App "C". - UNSAT STANDARD: Operator obtains a copy of 1-SI-OPS-082-007.B. Performance of task will Start start with Appendix C. Time__

STEP 2.: ENSURE 0-HS-82-48 1B-B DIG mode selector switch in the UNIT - SAT position.

- UNSAT STANDARD: 0-HS-82-48 in UNIT position on 0-M-26. Green light ON.

STEP 3.: PLACE 1-HS-57-7 4 DIG 1B-B Synchronize Switch in the SYN position. - SAT NOTE: O-EI-82-35 and O-XI-82-33 will indicate running voltage & frequency. - UNSAT STANDARD: 1-HS-57-74 in "SYN" position on 0-M-26 Critical Step STEP 4. PERFORM the following to initiate DIG start signal: - SAT IF the DIG DAQ is to be used, THEN NOTIFY D/G-DAQ Operator to START the D/G-DAQ - UNSAT NOTE: Operator should coordinate the start of the D/G-DAQ just prior to D/G start actuation.

STANDARD: Operator notifies the D/G-DAQ operator to start the D/G-DAQ.

NOTE: The operator will NOT be able to manipulate switches and stop watch - SAT alone, allow the console operator to time the starting of the D/G. Only one stopwatch is required when the DAC is used. - UNSAT STEP 5.: PROCEED with the countdown: 3,2,1, START, DEPRESS 0-HS-82-46A, DG 1B-B Emergency Start Switch AND Critical Step START Stopwatch(es).

STANDARD: 0-HS-82-46A momentarily depressed. Green light will go "out" and red light will come "on" above DIG mimic. [Not critical: DIG running alarm will ANN to indicate DIG> 40 rpm. Incoming voltage and frequency are verified on 0-EI-82-34 and 0-XI-82-32.]

STEP 6.: When voltage >6800 volts and Frequency >58.8 HZ, THEN STOP - SAT stopwatch.

- UNSAT STANDARD: Stop stopwatch when voltage >6800 volts and Frequency >58.8 HZ.

Critical Step

JPM #77-1AP Page 7 of 10 Rev.12 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT STEP 7.: ENSURE 1-FCV-67-67, ERCW cooling water supply valve is OPEN. - SAT STANDARD: ERCW valve 1-FCV-67-67 red light comes "on" and green light goes "out" - UNSAT on 0-M-27A panel.

Critical Step STEP 8.: Record the time from the Stopwatches: - SAT CUE: STOP WATCH 1 TIME 9.48 SECONDS - UNSAT STEP 9.: RECORD the steady state values for the following: - SAT A. 0-EI-82-34, DG 18-8 incoming Voltage.

8. 0-XI-82-32, DG 18-8 incoming Frequency. - UNSAT STANDARD: DIG voltage (as indicated on INC Voltage Gen 18-8 0-EI-34) is?: 6800 but:s. 7260 volts and frequency (as indicated on INC Freq Gen 18-8 0-XI-82-32) is ?: 58.8 Hz and :s. 61.2 Hz STEP 10.: RECORD Voltage Regulator Control Current. - SAT Cue: Voltage Regulator Control Current is 1.8 dc amps. - UNSAT STANDARD: Operator records Voltage Regulator Control Current.

STEP 11.: ENSURE DIG 18-8 86 lOR red light NOT ILLUMINATED, at DIG local - SAT relay panel.

- UNSAT Cue: Role playas DIG operator - 86 LOR local red light is not illuminated.

STANDARD Operator verifies red light on 86 LOR at DIG is not illuminated.

STEP 12.: RESET 86 lOR lockout relay, on DIG local relay panel and - SAT Cue: When the DIG AUO is requested to reset 86l0R, the Console operator - UNSAT should insert IRF EGR08 f: 1 to reset 86l0R and then notify operator - 86 lOR is reset.

Critical Step STANDARD: 86 LOR is reset.

STEP 13.: VERIFY reset by amber light 0-XI-82-49 illuminated on 0-M-26. - SAT STANDARD: Amber light on 0-M-26 is verified lit. - UNSAT

JPM #77-1AP Page 8 of 10 Rev.12 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT STEP 14.: IF the D/G-DAQ was used, THEN - SAT RECORD the time required to achieve ~ 58.8 HZ and ~ 6800 Volts from the D/G-DAQ computer. - UNSAT Cue: Time was 9.5 seconds for D/G-DAQ.

STANDARD: Operator ensures the DG accelerates to at least 900 rpm and Voltage and Frequency are within limit within the required 10 seconds. (Evaluator can sign for DG-DAQ Operator)

STEP 15.: IF step 1.0[6)) is <59.9 or >60.1, THEN INITIATE a PER. - SAT

- UNSAT STANDARD: Parameters in Step 1.0 [6] were within limits, no PER required, operator continues with procedure.

STEP 16.: RECORD start as ambient in 0-SI-OPS-082-007.M. - SAT NOTE: Another operator will record DIG start in O-SI-OPS-082-007.M, - UNSAT Cue the operator to continue.

STANDARD: Operator addresses logging the start in 0-SI-OPS-082-007.M.

STEP 17.: RETURN to Section 6.1, Step 10. - SAT

- UNSAT STANDARD: Operator returns to the appropriate section and step of the procedure.

(Exits Appendix C)

STEP 18.: PERFORM the following to wipe the Automatic Voltage Control Rheostat: - SAT RECORD voltage from 0-EI-82-24

- UNSAT STANDARD: OPERATOR records voltage and continues with next step.

STEP 19.: ENSURE O-HS-82-42, DG 18-8 voltage Regualtor Switch in the Pull-to - SAT P-AUTO position

- UNSAT STANDARD: Operator ensures 0-HS-82-42 in the Pull To PAUTO position. \

Critical Step STEP 20.: DECREASE voltage to 6700 volts on 0-EI-82-34 B 0-HS-82-42. - SAT

- UNSAT STANDARD: Operator ensures voltage decreases to 6700 volts on EI-82-34.

Critical Step

JPM #77-1AP Page 9 of 10 Rev.12 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 21.: INCREASE voltage to 6700 volts on 0-EI-82-34 B 0-HS-82-42. - SAT

- UNSAT STANDARD: Operator ensures voltage increases to 7300 volts on EI-82-34.

Critical Step STEP 22.: RETURN voltage to value recorded in 6.1 [10.1] - SAT STANDARD: Operator ensures voltage returned to reading recorded in step 6.1 [1 0.1] - UNSAT Critical Step STEP 23.: PLACE 0-HS-82-48, DG 1B-B Mode Selector Switch, in PARALLEL - SAT position.

- UNSAT STANDARD: 0-HS-82-48 rotated to the PARALLEL position. Red light "on" & green light "off". Critical Step STEP 24.: ADJUST 0-HS-82-43 DG 1B-B Speed Control Switch to obtain a - SAT synchroscope indication of slowly rotating in FAST direction.

- UNSAT STANDARD: Operator adjusts speed control hand switch 0-HS-82-43 such that synchroscope (XI-82-31) is moving slowly in the fast direction (slowly Critical Step clockwise ).

STEP 25.: RESPOND TO annuciator panel 0-M-26B window D-2. - SAT STANDARD: Operator pulls AR 0-M-26B and consults for window D-2, or depresses the - UNSAT emergency stop button for DIG 1B-B.

STEP 26.: IF DIG running with no valid accident (blackout or SI) signal present, THEN - SAT ENSURE DIG shutdown by depressing emergency stop pushbutton 0-HS-82-4 7A. - UNSAT STANDARD: Operator depresses emergency stop button for Diesel Generator 1B-B. Critical Step STEP 27.: DISPATCH personnel to DIG Bldg to verify alarm, AND CHECK crankcase - SAT trip device actuated [0-PS-82-5026/21 or [0-PS-82-5025/2].

- UNSAT Cue: AUO informs Unit Operator that crankcase pressure alarm is in on local panel and O-PS-82-5026/2 is actuated on engine 2.

STANDARD: Operator contacts AUO at the Diesel Generator Building to confirm crankcase pressure alarm.

JPM #77-1AP Page 10 of 10 Rev.12 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 28.: NOTIFY US/SRO of Emergency stop of Diesel Generator 18-8. SAT US/SRO instructs operator to standby for further instructions. UNSAT Stop STANDARD: Operator informs US/SRO of Emergency stop of Diesel Generator 18-8. Time__

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Both units are at 100% RTP.
2. All systems are OPERABLE, except for the 1B-B DIG, 0-GO-16 has been completed on all the A train equipment.
3. Maintenance has been completed on the 1B-B DIG and the clearance has been removed.
4. The DIG has been rolled and is in standby alignment using 0-SO-82-2.
5. The AUO at the DIG building has completed Appendix A of 1-SI-OPS-082-007.B and all parameters are within limits.
6. The U1 Control Room AUO has verified breaker 1934 is in the Disconnect position.
7. SI-166.36 is NOT required.
8. D/G-DAQ has been installed per Appendix J.
9. Applicable steps of Appendix J, Monitoring the DIG Starting Air System, completed.
10. Room fire protection is in service.
11. Section 4.0 of 1-SI-OPS-082-007.B is complete.

INITIATING CUES:

1. The U1 US/SRO has reviewed the completed work package for the 1B-B DIG, all that remains is to perform 1-SI-OPS-082-007.B for the PMT.
2. You are an extra unit operator and have been assigned to perform the SI on 1B-B DIG.
3. The PMT requires the AMBIENT MANUAL START method for testing.
4. Notify the US when the test is complete.

JPM21-1A Page 1 of9 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM21-1A Respond to a Failure of PRM N-41 PREPAREDI REVISED BY: Date/

VALIDATED BY:

  • Date/

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM21-1A Page 2 of 9 Rev. 0 NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

0 Initial Issue Y 12/02//09 All M Hankins v - Specify if the JPM change will require another Validation (Y or N).

See cover sheet for criteria.

JPM21-1A Page 3 of 9 Rev. 0 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task:

Respond to a Failure of PRM N-41 Note: This JPM satisfies Simulator Manipulation "AA".

JA/TA task # : 3210140401 (RO) 0150050101 (RO) 0150040101 (RO)

KIA Ratings:

015A4.03 (3.8/3.9) 015A4.02 (3.9/3.6) 015A2.01 (3.5/3.9) 015A3.03 (3.9/3.9) 015A4.01 (3.6/3.6) 015A2.02 (3.1/3.5)

Task Standard:

Recognize failure of Power Range Monitor, N-41, defeat its control functions, and prepare for its removal from service.

Evaluation Method: Simulator -_..:...X,,--_

X In-Plant _ __

=======================================================================

Performer:

NAME Start Time _ _ __

Performance Rating: SAT UNSAT Performance Time Finish Time _ __

Evaluator: --------------------------~/_--

- -------------_/_--

SIGNATURE DATE

=======================================================================

COMMENTS

JPM21-1A Page 4 of 9 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Any UNSAT requires comments.
2. Acknowledge any associated alarms.
3. Initialize simulator in IC #13.
4. Booth operator:
a. Select N-41 on NR45.
b. Verify Rx power <75% on PRNls, NR-45 and b:. T recorder, TR-68-2A
1. Approximately 1 minute after operator assumes shift, Activate IMF NI07A f:120.
2. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Validation Time: CR. 9 mins Local Tools/Equipment/Procedures Needed:

AOP-1.01, Section 2.0 & 2.3, AR-M6-A

References:

Reference Title Rev No.

1. AOP-1.01 Nuclear Instrument Malfunction 9
2. 1-AR-M6-A Reactor Protection and Safeguards 15
=====================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is operating at -46% reactor power, all controls are in AUTOMATIC.

INITIATING CUES:

1. You are the OATC and are to monitor the control board and respond per licensed duties to operating conditions.
2. You will be required to respond, as a single performer, to any abnormality that occurs.
3. When any required actions/procedures have been completed notify the SM.

JPM # 21-1A Page 5 of 9 Rev. 0 STEP/STANDARD SAT/U NSAT STEP 1.: Operator performs Immediate Operator action in AOP-C.01 to place rods in manual and Check Rod Motion stopped.

AOP-C.01

[2] CHECK reactor power and T-avg STABLE.

STANDARD: Operator determines reactor power and T-avg are stable.

[3] CHECK for Instrument Malfunction:

a. CHECK nuclear instrumentation OPERABLE.

STANDARD: Operator determines N-41 has failed high and goes to the RNO column.

a. (RNO) GO TO AOP-I.01, Nuclear Instrument Malfunction.

OR 1-AR-M6-A - SAT

- UNSAT Respond to alarm on XA-M6-A window B-1 or D-1 AND:

Window B-1:

IF no reactor trip, PLACE rod control in Man.

Checks for dropped rod (rod bottom lights LIT or RPls on bottom. Start Time Checks 1-XX-55-5 trip status panel for tripped bistables.

Evaluate reactor trip criteria with SRO. Critical Step Evaluates failed power range channel, goes to AOP-I.01 WindowD-1:

IF alarm due to instrument failure, THEN PLACE Rod control in MANUAL, AND GO TO AOP-I.01, Nuclear Instrument Malfunction STANDARD: Operator responds to either alarm, places rod control in Man, checks for dropped rods, checks bistable trip status, evaluates no reactor trip required and GOES TO AOP-I.01.

COMMENTS:

STEP 2.: Obtains a copy of AOP-I.01and determines the appropriate section.

After operator locates AOP-I.01 procedure provide operator a copy SAT Cue: -

Operator obtains a copy of AOP-I.01 and determines appropriate - UNSAT STANDARD:

section to be 2.3 COMMENTS:

JPM # 21-1A Page 6 of 9 Rev. 0 STEP/STANDARD SAT/UNSAT STEP 3.: 2.3 [1] PLACE rod control in Man.

NOTE: The rods may have been already placed in Manual in accordance

- SAT with AOP-C.01, 1-AR-M6-A, or as a prudent operator action.

- UNSAT STANDARD: Operator places HS-85-511 0 to manual, or states Rods have already been placed in manual.

COMMENTS:

STEP 4.: 2.3 [2] STABILIZE reactor power at current level.

- SAT STANDARD: Operator checks other power range instruments and determines that

- UNSAT reactor is stable.

COMMENTS:

STEP 5.: 2.3 [3] EVALUATE the following Tech Specs for applicability:

- SAT Cue: SM will evaluate Tech Specs.

- UNSAT STANDARD: Operator requests SM to evaluate Tech Specs COMMENTS:

STEP 6.: 2.3 [4] PLACE the following switches located on the Detector Current Comparator drawer [M-13, N50] in position corresponding to failed - SAT power Range Channel: UNSAT

  • UPPER SECTION STANDARD: Detector Current comparator "Upper Section" switch in the PRN-41 position. Channel defeat light on.

Critical Step COMMENTS:

JPM # 21-1A Page 7 of 9 Rev. 0 STEP/STANDARD SAT/UNSAT STEP 7.: 2.3 [4] PLACE ....

- SAT

  • LOWER SECTION

- UNSAT STANDARD: Detector Current comparator "Lower Section" switch in the PRN-41 position. Channel defeat light on.

COMMENTS:

Critical Step STEP 8.: 2.3 [4] PLACE ... - SAT Appropriate ROD STOP BYPASS - UNSAT STANDARD: Rod Stop Bypass switch in "BYPASS PRN-41" position.

COMMENTS:

Critical Step

- SAT STEP 9.: Appropriate Power Mismatch Bypass switch (XX-92-5037)

- UNSAT STANDARD: Power Mismatch Bypass switch in the "Bypass PRN-41" position.

COMMENTS:

Critical Step STEP 10.: 2.3 [5] DEFEAT failed Power Range channel Using Comparator Channel defeat switch: - SAT

  • Comparator and Rate Drawer [M-13, N37] - UNSAT STANDARD: Comparator Channel Defeat switch in the N-41 position. Comparator defeat light on.

COMMENTS: Critical Step

JPM # 21-1A Page 8 of9 Rev. 0 STEP/STANDARD SAT/UNSAT STEP 11.: 2.3 [6] RESTORE T -avg to within 1.5°F of T -ref USING one of the following:

- SAT Cue: CRO will is evaluating Tavg and Tref deviation and restoration.

- Ut:-JSAT STANDARD: Operator acknowledges CRO will perform this step and continues with procedure.

COMMENTS:

STEP 12.: 2.3 [7] ENSURE OPERABLE Power Range channel selected to the following:

  • Nuclear Power Recorder [M4, NR-35]
  • Nuclear Power Recorder [M4, NR-35] (ill) - SAT STANDARD: Operator Uses Touch Screen to ensure the recorder is not selected - UNSAT for PR Channel I or Lli Channel 1. Operator should select the highest operable power range channel.

COMMENTS:

STEP 13.: 2.3 [7] ENSURE RCS Temp LlT recorder (green pen) [M-5, XS68-2B]

- SAT STANDARD: Operator checks position of XS-68-2B. Ensures it is NOT selected for - UNSAT LOOP ONE.

COMMENTS:

STEP 14.: 2.3 [8] RETURN rod control to AUTO if desired.

Cue: CRO will perform this step. - SAT STANDARD: Operator acknowledges this step is being addressed by the CRO and - UNSAT continues with procedure.

COMMENTS:

JPM # 21-1A Page 9 of 9 Rev. 0 STEP/STANDARD SAT/UNSAT STEP 15.: 2.3 [9] CHECK reactor power greater than 75%.

- SAT STANDARD: Operator verifies power less than 75% (current power is - 46%), goes

- UNSAT to RNO and to appropriate step.

COMMENTS:

STEP 16.: 2.3[11] NOTIFY 1M to remove failed power range channel from service USING appropriate Appendix:

- SAT Cue: Role playas MSS or 1M, inform operator that a crew will be to the

- UNSAT MeR within the hour to perform Appendix "A" of AOP-1.01.

STANDARD: Operator communicates with IMs or MSS to request performance of Appendix "A" of AOP-I.01 for removal of N-41 from service.

COMMENTS:

- SAT STEP 17.: NOTIFY SM that N-41 failed, its control functions have been defeated,

- UNSAT IMs have been notified to remove it from service.

STANDARD: Operator informs SM.

COMMENTS:

Stop Time End of JPM

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is operating at -46% reactor power, all controls are in AUTOMATIC.

INITIATING CUES:

1. You are the OATC and are to monitor the control board and respond per licensed duties to operating conditions.
2. You will be required to respond, as a single performer, to any abnormality that occurs.
3. When any required actions/procedures have been completed notify the SM.

JPM # 189AP Page 1 of 9 Rev. 1 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 189AP Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release (Alternate Path)

PREPAREDI REVISED BY: Datel VALIDATED BY:

  • Datel

~==-----------


~-----------

APPROVED BY: Datel (Operations Training Manager)

CONCURRED: ** Datel (Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM # 189AP Page 2 of 9 Rev. 1 NUCLEAR TRAINING REVISION/USAGE LOG REVISION V DATE PAGES PREPARED/

NUMBER AFFECTED REVISED BY:

0 Initial Issue Y 1/19/04 All S. Poteet Revised to update to latest procedure 1

revision Y 12/07/09 ALL M. Hankins v - Specify if the JPM change will require another Validation (Y or N).

See cover sheet for criteria.

JPM # 189AP Page 3 of 9 Rev. 1 SEQUOYAH NUCLEAR PLANT AUOIROISRO JOB PERFORMANCE MEASURE Task:

Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release.

JAiTA TASK #: 0690100104 KIA Ratings:

AA 1.01 (3.5/3.5) 2.3.11 (2.7/3.2) 073 K4.02 (3.3/3.9) 068 K6.1 0 (2.5/2.9)

Task Standard:

The operator completes flushing of 0-RE-90-122 after isolation due to high radiation.

Evaluation Method: Simulator - - - In-Plant _~X_ _

=======================================================================

Performer:

NAME Start Time _ __

Performance Rating: SAT UNSAT Performance Time Finish Time _ __

Evaluator: ------------------------~/_--

SIGNATURE DATE

=======================================================================

COMMENTS

JPM # 189AP Page 4 of 9 Rev. 1 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps identified.
2. Any UNSAT requires comments
3. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Validation Time: CR. Local 30 minutes Tools/Equipment/Procedures Needed 0-SO-77-1 Section 8.2

References:

Reference Title Rev No.

0-SO-77-1 Waste Disposal System 47

=================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. A release from the CDCT has just been initiated using 0-SO-77-1 Waste Disposal System and O-SI-CEM-077 -400.1 Liquid Waste Effluent Batch Release.
2. The calculated high radiation trip setpoint for 0-RM-90-122 is 8.59 E+04 cpm, per O-SI-CEM-077 -400.1, Liquid Waste Effluent Batch Release.
3. A high radiation signal on 0-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release.
4. 0-RCV-77-43 has been verified CLOSED.
5. All Prerequisite Actions are complete (Section 4.0)

INITIATING CUES:

You are the RadWaste AUO and have been directed by the Unit 1 SRO to perform Section 8.2 of 0-SO-77-1 to flush 0-RE-90-122 after the High Radiation Isolation. Inform the Unit 1 SRO when Section 8.2 is complete.

JPM 189AP Page 5 of9 Rev. 1 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 1.: Obtain a copy of the appropriate procedure. - SAT STANDARD: The operator obtains a copy of O-SO-77-1, Section 8.2 - UNSAT Start Time STEP 2.: Section 4.0 Prerequisite Actions Cue: If asked, state all prerequisite actions are complete per initial conditions.

STANDARD Operator may review Prerequisite Actions, but all steps have already been complete.

STEP 3.: [1] ENSURE [0-RCV-77-43J Radiation Control Valve is CLOSED. - SAT Cue: If asked, state O-RCV-77-43 is closed per the Initial Conditions. - UNSAT STANDARD: Operator verifies that valve is closed by reviewing INITIAL CONDITIONS portion of JPM.

STEP 4.: [2] ENSURE [0-77-689Al Radiation Monitor Inlet isolation Valve is - SAT OPEN.

- UNSAT Cue: Inform the operator that the HW for [0-77-689Al is snug.

STANDARD Operator OPENS [0-77-689A] Radiation Monitor Inlet isolation Valve by turning HW in the CCW direction until HW is snug.

STEP 5.: [3] OPEN [0-77-6898] Discharge to FDCT Isolation Valve. - SAT Cue: Inform the operator that the HW for [0-77-68981 moves in the - UNSAT counter clockwise direction until snug.

STANDARD Operator OPENS [0-77-6898] Discharge to FDCT Isolation Valve by Critical Step turning HW in the CCW direction until HW is snug.

STEP 6.: [4] CLOSE [0-77-689C] Radiation Monitor Return to Release Header - SAT Isolation Valve.

- UNSAT Cue: Inform the operator that the HW for [0-77-689C1 moves in the clockwise direction until snug.

STANDARD: Operator CLOSES [0-77-689C] Radiation Monitor Return to Release Critical Step Header Isolation Valve by turning HW in the CW direction until HW is snug.

JPM 189AP Page 6 of9 Rev. 1 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 7.: [5] VERIFY [O-RE-90-122] radiation monitor pump is running. - SAT

- UNSAT Cue: 0-HS-90-1228 RED light ON; GREEN light OFF.

STANDARD: Operator verifies that [0-RE-90-122] radiation monitor pump is running.

STEP 8.: [6] ALLOW [O-RE-90-122] Radiation Monitor to flush to FDCT for - SAT 5 minutes.

- UNSAT Cue: Inform operator that 5 minutes have elapsed.

STANDARD: Operator allows flush for at least 5 minutes prior to proceding to next step.

STEP 9.: [7] OPEN [O-77-689C] - SAT Cue: Inform the operator that the HW for [0-77-689C1 moves in the - UNSAT counter clockwise direction until snug.

STANDARD: Operator OPENS [0-77-689C] Radiation Monitor Return to Release Critical Step Header Isolation Valve by turning HW in the CCW direction until HW is snug.

STEP *10.: [8] CLOSE [0-77-689B] - SAT Cue: Inform the operator that the HW for [0-77-68981 moves in the - UNSAT clockwise direction until snug.

STANDARD: Operator CLOSES [0-77-6898] Discharge to FDCT Isolation Valve by Critical Step turning HW in the CW direction until HW is snug.

STEP 11.: [9] RECORD 0-RE-90-122 reading: - SAT 0-RE-90-122 Reading cpm - UNSAT NOTE: ALTERNATE PATH BEGINS HERE.

Cue: Inform operator that 0-RE-90-122 is reading 9.00 E+04 cpm STANDARD: Operator enters 0-RE-90-122 data.

JPM 189AP Page 70f9 Rev. 1 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP

  • 12.: [10] IF the reading in step [9] is below the trip setpoint. THEN - SAT RETURN to instruction where exited

- UNSAT NOTE: Setpoint was provided in the INITIAL CONDITIONS.

Critical Step STANDARD: Operator determines that the current 0-RE-90-122 reading remained greater than the trip setpoint and continues to step [11]

STEP 13.: [11 ] IF the reading obtained in step [9] is still above the trip setpoint, - SAT THEN PERFORM the following steps to lower the radiation monitoring reading: - UNSAT

[a] CLOSE applicable tank isolation valve from release header.

(N/A tanks not aligned)

Cask Decon Collector Tank Cue: Inform the operator that the HW for [0-77-6791 moves in the clockwise direction until snug.

NOTE: Valve is located in CDCT room Critical Step STANDARD: Operator CLOSES [0-77-679] Cask Decon Collector Tank by turning HW in the CW direction until HW is snug. Operator enters an "N/A" for the Monitor Tank.

STEP14.: [b] OPEN [O-VLV-59-735] Demin Flush To Radwaste Isol. - SAT Cue: Inform the operator that the handle for [0- VL V-59-7351 moves in - UNSAT the counter clockwise direction until handle is in line with pipe.

NOTE: Valve is located in CDCT room Critical Step STANDARD: Operator OPENS [0-VLV-59-735] Demin Flush To Radwaste Isol by turning handle in the CCW direction until handle is in line with pipe.

STEP15.: [c] OPEN [0-77-6898] Discharge to FDCT Isolation Valve. - SAT Cue: Inform the operator that the HW for [0-77-68981 moves in the - UNSAT counter clockwise direction until snug.

STANDARD: Operator OPENS [0-77-6898] Discharge to FDCT Isolation Valve by Critical Step turning HW in theCCW direction until HW is snug.

JPM 189AP Page 8 of 9 Rev. 1 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 16.: [d] CLOSE rO-77-689C] Radiation Monitor Return to Release - SAT Header Isolation Valve.

- UNSAT Cue: Inform the operator that the HW for [0-77-689C1 moves in the clockwise direction until snug.

STANDARD: Operator CLOSES [0-77-689C] Radiation Monitor Return to Release Critical Step Header Isolation Valve by turning HW in the CW direction until HW is snug.

STEP 17.: [e] WHEN count rate on [O-RE-90-122J decreases to its - SAT minimum value, THEN

- UNSAT Cue: 0-R£-90-122 is indicating 8.00 £+02 cpm.

STANDARD: Operator reads count rate on 0-RE-90-122.

STEP 18.: [1] OPEN [O-77-689CJ Radiation Monitor Return to - SAT Release Header Isolation Valve.

- UNSAT Cue: Inform the operator that the HW for [0-77-689C1 moves in the counterclockwise direction until snug.

Critical Step STANDARD: Operator OPENS [O-77-689C] Radiation Monitor Return to Release Header Isolation Valve by turning HW in the CCW direction until HW is snug.

STEP 19.: [2] CLOSE [0-77-68961 Discharge to FDCT Isolation - SAT Valve.

- UNSAT Cue: Inform the operator that the HW for [0-77-68981 moves in the clockwise direction until snug.

Critical Step STANDARD: Operator CLOSES [0-77-6898] Discharge to FDCT Isolation Valve by turning HW in the CCW direction until HW is snug.

JPM 189AP Page 9 of9 Rev. 1 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 20.: [f] CLOSE [O-VLV-59-735] Demin Flush To Radwaste Isol. - SAT Cue: Inform the operator that the handle for [0- VL V-59-7351 moves in - UNSAT the clockwise direction until perpendicular with pipe.

STANDARD: Operator CLOSES [0-VLV-59-735] Demin Flush To Radwaste Isol by Critical Step turning handle in theCCW direction until handle is perpendicular with pipe.

STEP 21.: [g] OPEN Cask Decon Collector tank isolation valve [0-77-679] - SAT Cue: Inform the operator that the HW for [0-77-6791 moves in the - UNSAT counter clockwise direction until snug.

STANDARD: Operator OPENS [0-77-679] Cask Decon Collector Tank by turning Critical Step HW in the CCW direction until HW is snug.

STEP 22.: [h] IF hi radiation alarm will not clear, THEN NOTIFY the - SAT appropriate US/SRO that alarm will not clear.

- UNSAT Cue: 0-RE-90-122 high radiation alarm is clear (Provide appropriate feedback based on method used). If asked, rad monitor 0-RE 122 is still reading B.OO E+2 cpm.

STANDARD: Operator determines that 0-RE-90-122 alarm has cleared by observing NO red lights LIT OR verifying XA-55-L2C Window C-3 DARK in Radwaste AUO shack OR Calling Main Control Room for alarm information.

STEP 23.: [12] RETURN to instruction where exited. - SAT

- UNSAT STANDARD: Operator informs Unit 1 US/SRO that 0-SO-77-1 is complete End Time__

End of JPM

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1 A release from the CDCT has just been initiated using 0-SO-77-1 Waste Disposal System and 0-SI-CEM-077-400.1 Liquid Waste Effluent Batch Release.

2. The calculated high radiation trip setpoint for 0-RM-90-122 is 8.59 E+04 cpm, per 0-SI-CEM-077-400.1, Liquid Waste Effluent Batch Release.
3. A high radiation signal on 0-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release.
4. 0-RCV-77-43 has been verified CLOSED.

5 All Prerequisite Actions are complete (Section 4.0)

INITIATING CUES:

You are the RadWaste AUO and have been directed by the Unit 1 SRO to perform Section 8.2 of 0-SO-77-1 to flush 0-RE-90-122 after the High Radiation Isolation. Inform the Unit 1 SRO when Section 8.2 is complete.

JPM44 Page 1 of 7 REV. 7 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM #44 Venting the A-A RHR Pump due to Cavitation While in Mid-Loop Operation Original Signatures on File PREPARED!

REVISED BY: Date/

VALIDATED BY:

  • Date/

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM44 Page 2 of 7 REV. 7 NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

1 Transfer from WP. Minor enhancements. N 8/31/95 All HJ Birch 2 Incorp prev pen/ink which chgd N 3/5/96 3,4,5 HJ Birch performance time from 20 to 24. AOP-R03 replaced AOI-14. Minor JPM chgs to match new procedure pen/ink AOP-R03 Rev chg. Procedure step 14d N 6/8/96 4,5,8 HJ Birch referenced in JPM became 15d.

pen/ink AOP-R03 Rev chg added train N 2/6/97 4,5 HJ Birch designation to valves. For JPM to save confusion: added a note that valves in ( )

are B Train.

AOP-R03 Rev chg only N 8/12/97 4 HJ Birch penlink requal comment - FCV is normally N 5/13/98 4 HJ Birch blocked. Chg cue to block fell off.

pen/ink AOP R03 revision had no impact. N 8/13/98 All JP Kearney Revised KIA ratings. Reformatted critical steps.

pen/ink AOP-R03 revision had no impact. N 9/25/98 2,4 JP Kearney Updated procedure revision only pen/ink AOP Rev Change only N 9/22/99 4 SR Taylor pen/ink Corrected proceduredstep number N 8/21/00 4,5,8 SR Taylor references in initiating cues and in JPM steps 1 & 14 due to AOP Rev Change and updated rev level.

pen/ink Added item 7 to initial conditions to N 08/02/01 4 WR Ramsey eliminate confusion during performance.

3 Incorporated pen/ink changes; revised per N 8/20/02 4 J P Kearney recent changes to AOP-R03; No impact on JPM flow 4 Updated to current revision. N 9/15/04 All MG Croteau 5 Updated to current revision. N 10/03/05 All MG Croteau 6 Proc chg eliminated several vlv Y 2/9/09 All H J Birch manipulation steps.

7 Update to divide JPM steps to reflect Y 11/3/2009 All M Hankins current procedure revision V - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM44 Page 3 of 7 REV. 7 SEQUOYAH NUCLEAR PLANT AUO/RO/SRO JOB PERFORMANCE MEASURE Task:

Venting the A-A RHR Pump due to Cavitation while in Mid-Loop Operation JAfTA TASK #: 0000830501 (RO) 0050140104 (AUO)

KIA Ratings:

025 AA1.10 (3.1/2.9) 005K2.03 (2.9/3.1 ) 025AA 1.03 (3.4/3.3) 2.1.20 (4.3/4.2) 2.1.23 (3.9/4.0)

Task Standard: The A-A RHR pump is vented in preparation to return to service per AOP-R.03.

Evaluation Method: Simulator -__ -_- In-Plant _--,X,->--_

_ _,-,-X__

=======================================================================

Performer:

NAME Start Time _ __

Performance Rating: SAT UNSAT Performance Time Finish Time ___

Evaluator: --------~--~---~/~--


_/_--

SIGNATURE DATE

=======================================================================

COMMENTS

JPM44 Page 4 of 7 REV. 7 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Any UNSAT requires comments
2. This JPM may be performed on either unit. You MUST clearly specify which unit the task is to be performed on when reading the initial conditions and initiating cues.
3. IF the A train pump room, THEN have operator perform this JPM on train B, numbers in parentheses.
4. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.
5. If a ladder is needed to operate any equipment the trainee should locate a ladder and state that they would use the ladder to operate the valve, it is not necessary to bring the ladder to the work location.

Validation Time: CR. Local 15 mins Tools Needed:

AOP-R.03, Section 2.1 step 14.

Reference Rev No.

AOP-R.03 2

======================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated.

I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1) Unit _ is in Mode 5 following a refueling outage.
2) The RCS is at Mid-loop with the A-A (8-8) RHR pump in service.
3) The 8-8 (A-A) RHR pump is tagged for maintenance on the pump seal package. It is expected to be ready for service within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
4) The block on discharge valve FCV-74-16 (74-32) on the A-A (8-8) RHR Hx fell off and the FCV failed full open, causing vortexing in the RCS loop, resulting in air being drawn into the A-A (8-8) RHR pump suction and pump casing.
5) Rad Con techs are standing by to support the venting operation.
6) The A-A (8-8) RHR pump is in the Pull-to-Lock position.
7) Emergency repairs have been completed on FCV-74-16 (74-32) and the valve is now functional.

INITIATING CUES:

1) The operators in the MCR have unsuccessfully attempted to get the A-A (8-8) RHR pump back in service.
2) You are the Unit_ Aux. 8ldg. AUO. You have been directed to locally vent the A-A (8-8)

RHR pump using AOP-R.03 using Appendix J.

3) When you have completed the local venting notify the CRO on the unit.

JPM44 Page 5 of 7 REV. 7 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT STEP 1.: Obtain a copy of the appropriate procedure - SAT NOTE: After giving operator a copy of the procedure have them - UNSAT explains how and where to obtain the key. Inform him he/she has the key. Start Time_ _

STANDARD: Operator obtains a copy of AOP-R.03, Appendix J STEP 2. OBTAIN M-5 key and radio. - - SAT Cue: After explaining how to obtain M-5 Key and radios, - - UNSAT inform operator that they have both.

STANDARD: Operator explains how to obtain M-5 Key and radios, procedure contains note stating keys may be obtained from AOP-C.04 cabinet, radios made be obtained from AUO work station (OFO), MCR,SM office or MCR.

STEP 3. IDENTIFY applicable unit: - - SAT

  • Unit 1 - -
  • Unit 2 - - - - UNSAT STANDARD: Operator identifies proper unit as determined from the initiating cues STEP 4. IDENTIFY RHR Pump(s) to be vented (specified by MCR). - - SAT
  • Train A - -
  • Train B - - - - UNSAT STANDARD: Operator identifies proper RHR pump as determined from the initiating cues STEP 5.: UNLOCK and CLOSE pump discharge valve on affected - SAT train: [RHR pump Room, 653']
  • 74-520 (Train A) - UNSAT OR
  • 74-521 (Train B)

Critical Step Cue: Lock is removed; HW turned several times in the CW direction and is now snug.

STANDARD: Operator locates VLV-74-520 (74-521), unlocks and turns the HW in the CW direction until snug.

JPM44 Page 6 of 7 REV. 7 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 6.: UNLOCK and OPEN pump discharge vent on affected train: SAT

[RHR pump room]

  • 74-516 (Train A) UNSAT OR
  • 74-517 (Train B)

Critical Step Cue: Lock is removed; HW turned several times in the CCW direction and is now snug.

STANDARD: Operator locates VLV-74-516 (74-517), unlocks and turns the HW in the CCW direction until snug and states that the valve will be open for approximately 10 minutes.

STEP 7.: VENT for 10 minutes. SAT

_UNSAT Cue: 10 minutes have elapsed.

STANDARD: Operator states that once the valve is open they will vent Critical Step for 10 minutes.

STEP 8.: CLOSE RHR pump discharge vent valve on affected train: _SAT

  • 74-516 (Train A)

OR UNSAT

  • 74-517 (Train B)

The HW turned several times in the CW direction and is Critical Step now snug.

STANDARD: Operator locates valve 74-516 (74-517) turns the HW in the CW direction until snug.

STEP 9.: OPEN RHR pump discharge valve on affected train. SAT

  • 74-520 (Train A)

OR UNSAT

  • 74-521 (Train B)

The HW turned several times in the CCW direction and Critical Step is now snug.

STANDARD: Operator locates VLV-74-520 (74-521), turns the HW in the CCW direction until snug.

JPM44 Page 7 of 7 REV. 7 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 10.: FULLY OPEN pressure transmitter instrument drain valve - SAT for 5 minutes on affected train:

[Racks outside RHR pump room] - UNSAT

  • PT-74-13 (Train A)

OR

  • PT-47-26 (Train B) Critical Step Cue: HW turned CCW until snug, 5 minutes have elapsed.

STANDARD: Operator locates drain valve for PT-74-13 (26), turns HW in the CCW direction until snug, leaves open for 5 minutes.

STEP 11.: CLOSE pressure transmitter instrument drain valve on - SAT affected train:

  • PT-74-13 (Train A) - UNSAT OR
  • PT-47-26 (Train B)

Critical Step Cue: HW turned CW until snug.

STANDARD: Operator turns HW in the CW direction until snug.

STEP 12.: NOTIFY MCR that RHR pump Venting is complete on the - SAT affected train.

- UNSAT Cue: Acknowledge report and instruct operator to resume normal duties.

Stop Time_ _

STANDARD: Operator communicates with the UO in the MCR and informs him/her that the A-A (B-B) RHR pump has been vented in accordance with Appendix J of AOP-R.03.

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated.

I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1) Unit _ is in Mode 5 following a refueling outage.
2) The RCS is at Mid-loop with the A-A (B-B) RHR pump in service.
3) The B-B (A-A) RHR pump is tagged for maintenance on the pump seal package. It is expected to be ready for service within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
4) The block on discharge valve FCV-74-16 (74-32) on the A-A (B-B) RHR Hx fell off and the FCV failed full open, causing vortexing in the RCS loop, resulting in air being drawn into the A-A (B-B) RHR pump suction and pump casing.
5) Rad Con techs are standing by to support the venting operation.
6) The A-A (B-B) RHR pump is in the PUIl-to-Lock position.
7) Emergency repairs have been completed on FCV-74-16 (74-32) and the valve is now functional.

INITIATING CUES:

1) The operators in the MCR have unsuccessfully attempted to get the A-A (B-B) RHR pump back in service.
2) You are the Unit_ Aux. Bldg. AUO. You have been directed to locally vent the A-A (B-B)

RHR pump using AOP-R.03 using Appendix J.

4) When you have completed the local venting notify the CRO on the unit.

JPM91AP Page 1 of 14 REV. 1 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 91AP Transfer Controls to the Auxiliary Mode Per Checklist 3 (SD Bd De-Energized)

PREPAREDI REVISED BY: Date/

VALIDATED BY:

  • Date/

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM91AP Page 2 of 14 REV. 1 NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

0 New JPM, SO Bd deenergized requires Y 2/09/09 All HJ Birch operator closure of OG breaker 1 Revised to update steps to latest Y 12/05/09 ALL M Hankins procedure revision, revised steps concerning Time Critical Action Clock starts as addressed AOP-N .01 .

v - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM91AP Page 3 of 14 REV. 1 SEQUOYAH NUCLEAR PLANT AUOIUOISRO JOB PERFORMANCE MEASURE Task:

Transfer Controls to the Auxiliary Mode per Checklist AOP-C.04 checklist 3.

JAITA TASK #: 0000680501 (RO) 0620090104 (AUO)

KIA Ratings:

068AK2.01 (3.9/4.0) 068AK3.09 (3.9/4.4) 068AK3.18 (4.2/4.5) 068AA 1.21 (3.9/4.1) 068AA1.12 (4.4/4.4)

Task Standard: The required controls located on the 480V and 6.9kV Shutdown Boards and the 6.9kV Logic Panels are transferred to the AUXILIARY mode.

Evaluation Method: Simulator _ __ In-Plant X

=======================================================================

Performer:

NAME Start Time _ __

Performance Rating: SAT UNSAT Performance Time Finish Time _ __

Evaluator: -----~~~~~---_/_--


~---_/----

SIGNATURE DATE

=======================================================================

COMMENTS

JPM91AP Page 4 of 14 REV. 1 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Any UNSAT requires comments
2. The SHUTDOWN BOARD LOGIC CABINETS are not locked, it will NOT be necessary to open the cabinet, having the operator locate the correct cabinet and describing his/her actions will suffice.
3. The AOP-C.04 cabinet is locked. It is not necessary to open the cabinet and retrieve the key. Having the operator locate the cabinet and discuss his/her actions will suffice.
4. Get SM permission to enter Trip Hazard Zone while performing JPM.
5. Ensure PPE requirements are met.
6. Timing for Time Critical Actions will start one minute prior to the operator being notified to perform the checklist. Operator should be allowed a few minutes to review checklist prior to checklist performance.
7. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Validation Time: CR. Local 35 minutes Tools Needed:

AOP-C.04 Checklist 3

References:

Reference Title Rev No.

AOP-C.04 Control Room Inaccessibilit 18

==================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated.

WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. DO NOT OPEN ANY COMPARTMENTS. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1) Both units were operating at 100% power when a fire in the spreader room required abandonment of the Main Control Room.
2) Both units were tripped as required by AOP-C.04. The control room has been abandoned.

INITIATING CUES:

1) You are the Control Room AUO. You have been assigned checklist 3.
2) Parts of this checklist are time critical. Timing for Time Critical Actions begins when the decision to enter AOP-C.04, SO from the ACR, is determined in AOP-N.01 Plant Fires.
3) NOTIFY the ACR when control is transferred on Checklist 3.

JPM91AP Page 5 of 14 REV. 1 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT NOTE 1 This checklist has Time Critical Actions. Time limits are identified SAT at applicable steps. All times start from point at which the MCR determines that ay AOP-C.04 entry condition is met. _UNSAT NOTE 2 For JPM performance the timing for Time Critical Actions starts one minute before the operator is notified to perform checklist. Start Time_ _

STEP 1.: Obtain a copy of the appropriate checklist(s).

STANDARD: Operator obtains a copy of AOP-C.04 checklist 3.

STEP 2.: [1] OBTAIN the following from AOP-C.04 Cabinet: _SAT

  • C415A Key UNSAT
  • flashlight STEP 3.: The evaluator may utilize a copy of Checklists 3 to monitor and Record time document the performer's actions. Operator is notified AOP-C.04 AOP-C.04 was has been entered b the MCR, Timing for Time Critical Actions entered in started one minute ago. MCR CUE: Cue OPERA TOR that timing for time Critical Actions started one minute ago. Cue as necessary to give feedback on This time actions taken by the performer. starts the clock for Time STANDARD: N/A. Critical Actions STEP 4. [2] ATTEMPT to STOP both Unit 1 CCPS by ..... (5 minutes) __ SAT
  • PLACE CCP transfer switch in AUX (Lift Lever below switch to break seal and allow transfer switch operation) UNSAT
  • ATTEMPT to STOP CCP using HS on Bkr cmpt 1M CCP Transfer Sw 1-XS-62-108 Critical Step 1M CCP Control Switch 1-HS-62-1 08C 1BB CCP Transfer switch 1-XS-62-1 04 1BB CCP Control Switch 1-HS-62-104C Time CUE: 1st Shutdown Bd -
  • Lever is up and Switch Transferred.
  • Initially CCP has Red Light ON - Green Light OFF. A minutes
  • After operator places HS to Stop Cue: bkr has green light from AOP-C.04 ON Red Light OFF. entry CUE: 2nd Shutdown Bd -
  • Lever is up and Switch Transferred.
  • CCP has Green Light ON - Red Light OFF.

STANDARD: Operator places BOTH Xfr switches in AUX and Ensures BOTH CCP are OFF. Critical time 5 minutes from time given Cklist.

JPM91AP Page 6 of 14 REV. 1 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT STEP 5. [3] ENSURE [0-XS-82-122] GEN 1B-B Transfer switch in AUX - - SAT CONT RM position. [inside SO Bd 1B-B Logic Cabinet panel 4, bottom row] - - UNSAT NOTE: DO NOT ALLOW OPERATOR TO OPEN PANEL DOOR-operator can explain process Critical Step Cue: Switch is in the AUX position STANDARD: Operator places DG 1B-B Transfer Switch to AUX STEP 6. [4] CHECK if 6.9KV Shutdown Board 1B-B is Energized- - - SAT Voltmeter cmpt 12

- - UNSAT CUE: Voltage is as indicated (or cue -7000 V)

STANDARD: Operator checks to see if SO Bd 1B is energized STEP 7. [5] IF6.9KV Shutdown Bd 1B-B is NOT energized ... - - SAT

- - UNSAT STANDARD: Operator will N/A this step.

STEP 8. [6] PLACE the following transfer switches in AUX position on - - SAT 6.9KV Shutdown Bd 1B-B:

- - UNSAT Equipment Compt Switch Position ALT brk 6.9 UB 10 1728 16 1-XS-57-71 AUX Nor Supply Brk 6.0 UB 1C 1726 11 1-XS-57-68 AUX ERCW Pump N-B 9 0-XS-67-452 AUX Critical Step ERCW Pump L-B 8 0-XS-67-440 AUX Emerg Supply Brk 1BB 1914 6 1-XS-57-73 AUX CUE 1: Latch lifted, XS rotated clockwise, and indicates in the AUX.

position.

STANDARD: All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.

JPM91AP Page 7 of 14 REV. 1 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT NOTE The following step ensures one ERCW pump will sequence - SAT on following a blackout. If ERCW pump L-B or N-B is already running (breaker closed), the running pump should be - UNSAT selected.

STEP 9.: [7] PLACE breaker control switch for ERCW pump L-8 OR N-8 in Critical Step START momentarily (18 SD 8D cm pt 8 or 9) [If a pump is running the running pump should be selected CUE: L-B Pump Red Light ON N-B Pump Green Light ON HS for L-B pump has been placed to START and returned to Normal STANDARD: Operator ensures one ERCW pump HS on 18-8 6.9KV shutdown board has been placed to start momentarily. [If N-B pump is started this should be a comment not an Unsat]

STEP 10. [8] CHECK if 6.9KV Shutdown 80ard 18-8 is Energized - - - SAT Voltmeter cmpt 12

- - UNSAT CUE: Voltage is as indicated (-7000 Volts)

STANDARD: Operator checks to see if SD 8d 18 is energized STEP 11. [9] IF 6.9KV Shutdown 8d 18-8 is NOT energized - - SAT

- - UNSAT STANDARD: Operator N/A's this step.

NOTE AUO performing checklist 5 notifies operator performing checklist, - - SAT 3, by face to face communication, that CCP suction is aligned to the RWST. - - UNSAT STEP 12. [10] WHEN Unit 1 CCP suction has been aligned to the RWST, THEN PERFORM the following [13 minutes]

  • IF CCP 1A-A is NOT running THEN START CCP 18-8 CRITICAL

[cmpt 18] STEP Cue 1: AUO with Checklist 5 has opened FCV-62-135 Time NOTE: Operator ensured both CCPs were off earlier and may state this, or may verify 1A-A is not running IJ. minutes Cue 2: If checked - 1A-A CCP Green Light only from AOP-C.04 When Operator goes to "START" with 1B-B HS state Red entry Light ON- Green Light OFF [- 32 Amps indicated]

STANDARD: Operator STARTS 18-8 CCP.

TIME Critical Action 13 minutes

JPM91AP Page 8 of 14 REV. 1 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 13. [11] [a] ENSURE Contmnt Spray pump 1BB STOPPED: - - SAT PLACE 1-XS-72-10, Cntmt Spray pump 1B-B transfer switch in AUX position. [6.9KV Shutdown Bd 1B-B Compt 13 - - UNSAT CUE 1: Latch lifted, XS rotated clockwise, and indicates in the AUX position. Critical Step STANDARD: Operator places 1-XS-72-10 in AUX position STEP 14. [11] [b] ENSURE Cntmt Spray pump 1B-B breaker OPEN [cmpt - - SAT 13]

- - UNSAT Cue: Cntmt Spray Green light ON STANDARD: Operator ensures Cntmt Spay pump 1B-B breaker open STEP 15. [12] PLACE [0-XS-82-121] GEN 1A-A Transfer switch in AUX - - SAT position. [inside SD Bd 1A-A Logic Cabinet panel 4]

- - UNSAT NOTE: DO NOT ALLOW OPERATOR TO OPEN PANEL DOOR-operator can explain process Cue: Switch is in the AUX position Critical Step STANDARD: Operator places DG 1A-A Transfer Switch to AUX STEP 16. [13] PLACE the following transfer switches in AUX position on - - SAT 6.9KV Shutdown Bd 1A-A.

Equipment Compt Switch Position - - UNSAT Emerg Supply Brk from DIG 6 1-XS-57-46 AUX 1M 1912 ERCW Pump J-A 8 0-XS-67-432 AUX ERCW Pump Q-A 9 0-XS-67 -460 AUX Critical Step Nor Supply Brk 6.0 UB 1B 1718 11 1-XS-57-44 AUX ALT Supply Brk 6.0 UB 1A 1716 16 1-XS-57-41 AUX CUE 1: Latch lifted, XS rotated clockwise, and indicates in the AUX position.

STANDARD: All NorlAux switches, addressed, are correctly placed in the Auxiliary position.

JPM91AP Page 9 of 14 REV. 1 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT NOTE: The following step will ensure an ERCW pump starts when - SAT the SDSD is re-energized.

- UNSAT STEP 17.: [14] PLACE breaker control switch for ERCW pump J-A or Q-A in START momentarily (1A SD BD cmpt 8 or 9)

[If a pump is running the running pump should be selected] Critical Step NOTE: For this JPM, 1A-A SDSD is de-energized. This will be checked in the next step.

CUE 1: J-A Pump Green Light ON Q-A Pump Green Light ON CUE 1: If operator tries to start Either ERCW pump state "HS for J-A (Q-A) pump has been placed to START -No breaker closing noise heard - Green light still ON STANDARD: Operator ensures one ERCW pump HS on 1A-A 6.9KV shutdown board has been placed to start momentarily.

STEP 18. [15] CHECK if 6.9KV Shutdown Board 1A-A is Energized - - - SAT Voltmeter cmpt 12

- - UNSAT CUE: Voltage indicated is ZERO STANDARD: Operator checks "NO" for board energized STEP 19. [16] IF 6.9KV Shutdown Bd 1A-A is NOT energized THEN GO TO - - SAT step [19]

- - UNSAT STANDARD: Operator will go to Step [19].

JPM91AP Page 10 of 14 REV. 1 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 20. [19] IF the 6.9 KV SDBD 1M or 1BB is DE-ENERGIZED. - - SAT THEN PERFORM the following to energize the affected board from DIG: - - UNSAT

[a] ENSURE transfer switches on affected 6.9KV Shutdown Board in AUX position:

CUE 1: 1. Cmpts 6,8,9, 11, 16, have previously been transferred. Critical Step CUE operator Switches already in AUX for these Cmpts

2. For other Cmpts: Latch lifted, XS rotated clockwise, and indicates in the AUX. position.

CUE 2: After the operator has described/demonstrated transfer of &

least THREE breakers to Aux control: CUE him/her that the board is complete. This will expedite the JPM.

STANDARD: 1. Operator locates all boards/panels listed.

2. All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.

(A minimum of 3 switches per board have been properly transferred to auxiliary. IF less than 3 switches on the board, then all are required)

STANDARD: Operator ensures the listed transfer switches are in Aux on 6.9KV Shutdown Bd 1A-A (NOTE: 1B-B is not affected and its switches should not be checked at this time).

STEP 21. [b] REMOVE control power fuse blocks for CCP on affected - - SAT board [cmpt 18]

- - UNSAT CUE: fuses removed STANDARD: Operator identifies fuse location (above the bkr) and removes Critical Step fuses STEP 22. [c] ENSURE shutdown board ALTERNATE supply bkr OPEN - - SAT USING control switch on SDBD [cmpt 16]

- - UNSAT CUE: Green light ON - Red Light OFF STANDARD: Operator verifies breaker is Open STEP 23. [d] ENSURE shutdown board NORMAL supply bkr OPEN USING - - SAT control on shutdown board [cmpt 11]

- - UNSAT CUE: Green light ON - Red Light OFF STANDARD: Operator verifies breaker is Open

JPM91AP Page 11 of 14 REV. 1 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 24. [e] IF voltage NOT available from DIG (using voltmeter at Cmpt 6) - - SAT THEN ...

- - UNSAT CUE: Volt meter indicates 6950 volts STANDARD: Operator NIAs this step since voltage is available STEP 25. [f] VERIFY voltage available from DIG [cmpt 6] - - SAT CUE: Volt meter indicates 6950 volts - - UNSAT STANDARD: Operator verifies voltage available from DIG.

STEP 26. [g] CLOSE DIG breaker USING control switch on cmpt 6 door - - SAT CUE: HS go to close, breaker slams, indication goes from Green to - - UNSAT Red.

STANDARD: Operator closes DIG breaker Critical Step STEP 27. [h] VERIFY affected 6.9KV Shutdown Bd Energized [cmpt 12] - - SAT CUE: Volt meter indicates 6950 volts - - UNSAT STANDARD: Operator verifies board is energized STEP 28. [i] ENSURE one ERCW pump on affected board Running - - SAT

[cmpt 8 or 9]

- - UNSAT CUE: Breaker closes - Red Light ON STANDARD: Operator starts one ERCW pump Critical Step STEP 29. mIF any Unit 1 CCP is already running THEN GO TO substep L - - SAT STANDARD: Operator goes to substep L. One CCP was started in an earlier - - UNSAT step Operator MUST NOT start this pump - Critical Step Caution 2 (earlier in procedure) indicates this could result in High suction tem perature.

STEP 30. [I] NOTIFY ACR that affected shutdown board is energized - - SAT

- - UNSAT STANDARD: Operator notifies the ACR

JPM91AP Page 12 of 14 REV. 1 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT STEP 31. [20] CONTACT ACR to determine required AFW pump actions - - SAT CUE: Both MDAFW pumps are running and we wish to keep them - - UNSAT running STANDARD: Operator checks with UO in ACR to determine what should be done with the MDAFW pumps.

NOTE: This will allow the operator to continue on in the procedure, Steps [21] and [22] will be performed when needed and operator is notified by the MCR.

STEP 32. [21] IF ACR directs stopping Unit 1 MD AFW ...... - - SAT STANDARD: Operator N/A's this step. - - UNSAT STEP 33. [22] WHEN ACR directs starting U 1 MDAFW ........ - - SAT STANDARD: Operator continues with procedure and stops pumps when - - UNSAT directed by ACR.

STEP 34. [23] ENSURE the following transfer switches in AUX position on - - SAT 6.9KV Shutdown Bd 1B-B:

Equipment Compt Switch Position - - UNSAT PZR HTR Group 1C 21 1-XS-68-341 H AUX PZR HTR Group 1BB 20 1-XS-68-341 D AUX Safety Injection Pump 1 BB 15 1-XS-63-15 AUX Critical Step RHR pump 1BB 14 1-XS-74-20 AUX AFWP 1BB 10 1-XS-3-128 AUX CUE: Latch lifted, XS rotated clockwise, and indicates in the AUX position.

STANDARD: 1. Operator locates all boards/panels listed.

2. All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.

JPM91AP Page 13 of 14 REV. 1 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 35. [24] ENSURE the following transfer switches in AUX position on - - SAT 6.9KV Shutdown Bd 1A-A:

- - UNSAT Equipment Compt Switch Position AFWP 1AA 10 1-XS-3-118 AUX RHRj)ump RHR pump 1AA 14 1-XS-74-10 AUX Critical Step Safety Injection Pump 1AA 15 1-XS-63-10 AUX PZR HTR Group 1AA 20 1-XS-68-341 A AUX PZR HTR Group 1D 21 1-XS-68-341 F AUX NOTE: Operator may state that these switches were previously placed in AUX position in step 19 (procedure) step 20 (JPM)

CUE 1: Latch lifted, XS rotated clockwise, and indicates in the AUX.

position.

STANDARD: 1. Operator locates all boards/panels listed.

2. All Nor/Aux switches, addressed, are correctly placed in the Auxiliary position.

STEP 36. [25] IF smoke is entering Shutdown Board room area - - SAT CUE: NO smoke can be seen in the area - - UNSAT STANDARD: Operator will N/A step.

STEP 37.: [26] ENSURE the following transfer switches in AUX position: - SAT CCS pump 1AA Compt 6 1-XS-70-46 AUXon 480 V SDBD 1A1A - UNSAT CUE: XS rotated clockwise, and indicates in the AUX. position.

Critical Step STANDARD: Nor/Aux switch is correctly placed in the Auxiliary position.

STEP 38.: [27] IF CCS pump 1AA is Stopped - SAT THEN ATTEMPT to start CCS pump 1AA USING 1-HS-70-46C - UNSAT

[480V SDBD 1A1A Compt 6]

CUE: When HS is placed to start, tell operator pump started, red light illuminated, green light dark.

STANDARD: Operator starts 1AA CCS pump.

JPM91AP Page 14 of 14 REV. 1 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT STEP 39.: [28] ENSURE the following transfer switches in AUX position:

480V SDBD 1A2A AA Fire/Flood Mode Pmp Compt 6 0-XS-26-1 - SAT 480V SDBD 1B2B BB CCS Pmp Compt 6 0-XS-70-38

- UNSAT CUE: XS rotated clockwise, and indicates in the AUX. position.

STANDARD: Nor/Aux switch is correctly placed in the Auxiliary position.

- SAT STEP 40.: [29] IF CCS pump 1BB is STOPPED THEN ATTEMPT to start CCS pump 1BB USING - UNSAT 1-HS-70-38C

[480V SDBD 1B1 B Compt 6]

CUE: When HS is placed to start, tell operator pump started, red light illuminated, green light dark.

STANDARD: Operator starts 1BB CCS pump

- SAT STEP 41.: [30] ENSURE the following transfer switches in AUX position:

480V SDBD 1B2B MT TGOP Compt 6 1-XS-47-61 - UNSAT 480V SDBD 1B2B SDBD Water Chiller PKG BB compt 6 0-XS-31 C-338 CUE: XS rotated clockwise, and indicates in the AUX. position.

STANDARD: Nor/Aux switch is correctly placed in the Auxiliary position.

STEP 42.: [31] NOTIFY ACR that control is transferred on Checklist 3. - SAT CUE: If operator continues in Checklist 3, state that another AUO - UNSAT will perform the remainder of the checklist STANDARD: Operator calls ACR and reports status.

End of JPM

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated.

WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. DO NOT OPEN ANY COMPARTMENTS. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1) Both units were operating at 100% power when a fire in the spreader room required abandonment of the Main Control Room.
2) Both units were tripped as required by AOP-C.04. The control room has been abandoned.

INITIATING CUES:

1) You are the Control Room AUO. You have been assigned checklist 3.
2) Parts of this checklist are time critical. Timing for Time Critical Actions begins when the decision to enter AOP-C.04, SO from the ACR, is determined in AOP-N.01 Plant Fires.
3) NOTIFY the ACR when control is transferred on Checklist 3.