Line 3: | Line 3: | ||
| issue date = 03/28/2011 | | issue date = 03/28/2011 | ||
| title = Notification of Inspection - (Inspection Report 05000416-11-004) and Request for Information | | title = Notification of Inspection - (Inspection Report 05000416-11-004) and Request for Information | ||
| author name = Farnholtz T | | author name = Farnholtz T | ||
| author affiliation = NRC/RGN-IV/DRS/EB-1 | | author affiliation = NRC/RGN-IV/DRS/EB-1 | ||
| addressee name = Douet J | | addressee name = Douet J | ||
| addressee affiliation = Entergy Operations, Inc | | addressee affiliation = Entergy Operations, Inc | ||
| docket = 05000416 | | docket = 05000416 | ||
Line 14: | Line 14: | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000416/2011004]] | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSIOI"..J | |||
REGION IV | |||
612 EAST LAMAR BLVD, SUITE 400 | |||
ARliNGTON, TEXAS 76011-4125 | |||
March 28, 2011 | |||
OF INSPECTION (INSPECTION | James R. Douet | ||
REPORT 05000416/2011004) | Site Vice President Operations | ||
AND REQUEST FOR INFORMATION | Entergy Operations, Inc. | ||
Dear Mr. Douet: On June 27,2011, the NRC will begin the on-site portion of the Gas Accumulation | Grand Gulf Nuclear Station | ||
Management | P.O. Box 756 | ||
in Emergency | Port Gibson, MS 39150 | ||
Core Cooling, Decay Heat Removal, and Containment | SUBJECT: GRAND GULF NUCLEAR STATION- NOTIFICATION OF INSPECTION | ||
Spray Systems Temporary | (INSPECTION REPORT 05000416/2011004) AND REQUEST FOR | ||
Instruction | INFORMATION | ||
at your Grand Gulf Nuclear Station. These inspections | Dear Mr. Douet: | ||
will be performed | On June 27,2011, the NRC will begin the on-site portion of the Gas Accumulation Management | ||
in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Temporary | |||
with NRC Temporary' | Instruction at your Grand Gulf Nuclear Station. These inspections will be performed in | ||
Instruction (TI) 2515/177. | accordance with NRC Temporary' Instruction (TI) 2515/177. | ||
Experience | Experience has shown that this inspection is resource intensive, both for the NRC inspectors | ||
has shown that this inspection | and your staff. In order to minimize the impact to your onsite resources and to ensure a | ||
is resource intensive, both for the NRC inspectors | productive inspection, we have enclosed a request for documents needed for this inspection. | ||
and your staff. In order to minimize the impact to your onsite resources | The documents have been divided into two groups. | ||
and to ensure a productive | * The first group iists information necessary for our initial inspection scoping and in-office | ||
inspection, we have enclosed a request for documents | preparation activities. This information should be separated by information request number, | ||
needed for this inspection. | especially if provided electronically (e.g., folder with the information request number). This | ||
The documents | information should be available to the inspector no later than June 20, 2011. Upon review of | ||
have been divided into two groups. * The first group iists information | these documents, the inspectors will select additional documentation for review upon arrival. | ||
necessary | By June 23, 2011, the inspector will communicate the initial selected samples. | ||
for our initial inspection | * The second group of documents requested is needed to support our onsite inspection | ||
scoping and in-office | activities. This set of documents shouid be avaiiabie to the inspector on june 27, 20;;. it is | ||
preparation | also requested that corrective action documents and responses to questions developed | ||
activities. | during the inspection be provided to the inspector as the documents are generated. | ||
This information | We have discussed the schedule for these inspection activities with your staff and understand | ||
should be separated | that our regulatory contact for this inspection will be Mike Larson of your licensing organization. | ||
by information | If there are any questions about this inspection or the material requested, please contact the | ||
request number, especially | inspector, Wayne Sifre, at 817-860-8193 or by email at =~~:.:..==.:.;~= | ||
if provided electronically (e.g., folder with the information | This letter does not contain new or amended information collection requirements subject to the | ||
request number). This information | Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | ||
should be available | requirements were approved by the Office of Management and Budget, control number | ||
to the inspector | 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, | ||
no later than June 20, 2011. Upon review of these documents, the inspectors | |||
will select additional | Operations, Inc. -2- | ||
documentation | a request for information or an information collection requirement unless the requesting | ||
for review upon arrival. By June 23, 2011, the inspector | document displays a currently valid Office of Management and Budget control number. | ||
will communicate | In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of | ||
the initial selected samples. * The second group of documents | Practice, a copy of this letter and its enclosure will be available electronically for public | ||
requested | inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) | ||
is needed to support our onsite inspection | component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web | ||
activities. | site at (the Public Electronic Reading Room). | ||
This set of documents | Sincerely, | ||
shouid be avaiiabie | -I.(?(2 | ||
to the inspector | Thomas R. Farnholtz, Chief | ||
on june 27, 20;;. it is also requested | Engineering Branch 1 | ||
that corrective | Division of Reactor Safety | ||
action documents | Docket: 50-416 | ||
and responses | License: NPF-29 | ||
to questions | Enclosure: MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, | ||
developed | DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS | ||
during the inspection | TEMPORARY INSTRUCTION DOCUMENT REQUEST | ||
be provided to the inspector | cc w/encl: | ||
as the documents | Distribution via ListServ for Grand Gulf Nuclear Station | ||
are generated. | |||
We have discussed | MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY | ||
the schedule for these inspection | CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION | ||
activities | DOCUMENT REQUEST | ||
with your staff and understand | Inspection Report: 05000416/2011004 | ||
that our regulatory | Inspection Dates: June 27-July 1, 2011 | ||
contact for this inspection | Inspection Procedure: TI 2515/177, "Management of Gas Accumulation in Emergency | ||
will be Mike Larson of your licensing | Core Cooling, Decay Heat Removal, and Containment Spray | ||
organization. | Systems" | ||
If there are any questions | Inspector: Wayne C. Sifre, Senior Reactor Inspector | ||
about this inspection | (817) 860-8193 | ||
or the material requested, please contact the inspector, Wayne Sifre, at 817-860-8193 | The following information should be sent to the Region IV office in hard copy or electronic | ||
or by email at | format (ims.certrec.com or compact disc, preferred), in care of Wayne Sifre, to facilitate the | ||
This letter does not contain new or amended information | selection of specific items that will be reviewed during the onsite inspection week. The | ||
collection | inspector will select specific items from the information requested below and then request from | ||
requirements | your staff additional documents needed during the onsite inspection weeks. Also, we request | ||
subject to the Paperwork | that you categorize the documents in your response with the numbered list below. Please | ||
Reduction | provide requested documentation electronically if possible. If requested documents are large | ||
Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | and only hard copy formats are available, please inform the inspector(s), and provide subject | ||
collection | documentation during the first day of the onsite inspection. If you have any questions regarding | ||
requirements | this information request, please call the inspector as soon as possible. | ||
were approved by the Office of Management | I. Information Requested By June 20, 2011 | ||
and Budget, control number 3150-0011. | 1. List of corrective action program documents (with a short description) associated with | ||
The NRC may not conduct or sponsor, and a person is not required to respond to, | GL 2008-01, voids in piping, and pressure transients for the previous three years. | ||
Operations, Inc. -2 -a request for information | 2. List of changes (with a short description and tracking number) to the final safety | ||
or an information | evaluation report (FSAR), technical specifications, technical specification bases, and | ||
collection | technical requirement manual associated with the resolution of GL 2008-01. | ||
requirement | 3. List of calculations associated with GL 2008-01, including calculations that have been | ||
unless the requesting | changed or created in response to GL 2008-01 (with a short description of the | ||
document displays a currently | calculation and the change). | ||
valid Office of Management | 4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the | ||
and Budget control number. In accordance | affected system locations (e.g. identify the source, conditions, and expected void | ||
with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure | locations). | ||
will be available | 5. List of the suction piping sections identified as susceptible to gas accumulation (the list | ||
electronically | should identify the corresponding system). | ||
for public inspection | - 1- Enclosure | ||
in the NRC Public Document Room or from the Publicly Available | |||
Records (PARS) component | MANAGEMENT ACCUMULATION IN EMERGENCY COOLING, DECAY | ||
of NRC's document system (ADAMS). ADAMS is accessible | REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION | ||
from the NRC Web site at (the Public Electronic | DOCUMENT REQUEST | ||
Reading Room). Sincerely, -I.(?(2 Thomas R. Farnholtz, Chief Engineering | 6. List of the discharge piping sections identified as susceptible to gas accumulation (the | ||
Branch 1 Division of Reactor Safety Docket: 50-416 License: NPF-29 Enclosure: | list should identify the corresponding system). | ||
7. Copies of isometric drawings of the High Pressure Core Spray, Low Pressure Core | |||
OF GAS ACCUMULATION | Spray, and Residual Heat Removal systems (hard-copies are preferred). | ||
IN EMERGENCY | 8. Copies of piping and instrumentation diagrams (P&IDs) of the High Pressure Core | ||
CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT | Spray, Low Pressure Core Spray, and Residual Heat Removal systems (hard-copies are | ||
SPRAY SYSTEMS TEMPORARY | preferred). | ||
INSTRUCTION | 9. Copies of program documents and procedures developed to implement the resolution of | ||
DOCUMENT REQUEST Distribution | GL 2008-01. | ||
via ListServ for Grand Gulf Nuclear Station | 10. List of actions that were completed in response to GL 2008-01. | ||
MANAGEMENT | 11. Copies of the modification packages for hardware modifications as part of the resolution | ||
OF GAS ACCUMULATION | of GL 2008-01. | ||
IN EMERGENCY | 12. Design basis documents of the High Pressure Core Spray, Low Pressure Core Spray, | ||
CORE COOLING, DECAY | and Residual Heat Removal systems. | ||
13. Design basis documents of keep-full systems of the High Pressure Core Spray, Low | |||
Pressure Core Spray, and Residual Heat Removal systems. | |||
14. System vvalkdovvn reports associated Vvith the resolution of GL 2008-01. | |||
15. If applicable, provide a list of inaccessible locations where plant walkdowns of the High | |||
Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems | |||
SPRAY SYSTEMS TEMPORARY | have not been completed. Include an explanation of why each area is considered | ||
INSPECTION | inaccessible. | ||
DOCUMENT REQUEST 05000416/2011004 | 16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the | ||
June 27-July 1, 2011 TI 2515/177, "Management | results of the last two surveillances for the High Pressure Core Spray, Low Pressure | ||
of Gas Accumulation | Core Spray, and Residual Heat Removal systems. | ||
in Emergency | 17. Copies of procedures used for detecting and determining void volumes. | ||
Core Cooling, Decay Heat Removal, and Containment | 18. Copies of procedures used for filling and venting. | ||
19. Copies of trends of periodic venting results. | |||
(817) 860-8193 The following | 20. Copies of the engineering evaluations performed for all identified voids. | ||
information | -2- Enclosure | ||
should be sent to the Region IV office in hard copy or electronic | |||
format (ims.certrec.com | MANAGEMENT GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY | ||
or compact disc, preferred), in care of Wayne Sifre, to facilitate | HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS | ||
DOCUMENT REQUEST | |||
of specific items that will be reviewed during the onsite inspection | 21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the | ||
week. The inspector | justification for any deviation from the void acceptance criteria established by the Office | ||
will select specific items from the information | of Nuclear Reactor Regulation (NRR). | ||
requested | 22. Copy of any void transport analyses. | ||
below and then request from your staff additional | 23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01. | ||
documents | 24. Copies of self-assessments associated with the implementation of the GL 2008-01 | ||
needed during the onsite inspection | program. | ||
weeks. Also, we request that you categorize | II. Information Requested By June 27, 2011 | ||
the documents | 25. Copies of the selected corrective action program documents. | ||
in your response with the numbered list below. Please provide requested | 26. Copies of the selected licensing and design basis document changes. | ||
documentation | 27. Copies of the selected calculations. | ||
electronically | 28. Copies of training documents that ensure that personnel are aware of gas-related | ||
if possible. | concerns. | ||
If requested | t:-v * .....,vtJ1""'...., "f | ||
documents | ?Q r"n;Q'" V I I""rrQI"ti\lQ | ||
are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation | V V I 1 _ _ "-. W - ~I"t;"n | ||
during the first day of the onsite inspection. | """"...., nr"f"Ir~m | ||
If you have any questions | ... I V ' I 1"'" _~I _ I I I imnlQmQntinf"l | ||
regarding | I I I I t - ' , _ I I I _ I .".1 ':::1 nrnl"""r!llr""c: | ||
this information | f""" _____ * _ v . | ||
request, please call the inspector | 30. Electronic copies of the current technical specifications, technical specification bases, | ||
as soon as possible. | final safety analysis report, and technical report manual. | ||
I. Information | Inspector Contact Information: | ||
Requested | US NRC Region IV | ||
By June 20, 2011 1. List of corrective | LH+n' \I\I",\/no. | ||
action program documents (with a short description) | /\1.1.11. | ||
associated | Qifro. | ||
VVCA]I''''''' \..,1111"" | |||
for the previous three years. 2. List of changes (with a short description | 612 E. Lamar Blvd., Suite 400 | ||
and tracking number) to the final safety evaluation | Arlington, TX 76011-4125 | ||
report (FSAR), technical | -3- Enclosure | ||
specifications, technical specification | |||
bases, and technical | |||
requirement | |||
manual associated | |||
with the resolution | |||
of GL 2008-01. 3. List of calculations | |||
associated | |||
with GL 2008-01, including | |||
calculations | |||
that have been changed or created in response to GL 2008-01 (with a short description | |||
of the calculation | |||
and the change). 4. List (with a short description) | |||
of gas intrusion | |||
mechanisms | |||
that apply to the plant and the affected system locations (e.g. identify the source, conditions, and expected void locations). | |||
5. List of the suction piping sections identified | |||
as susceptible | |||
to gas accumulation (the list should identify the corresponding | |||
system). -1 -Enclosure | |||
MANAGEMENT | |||
ACCUMULATION | |||
IN EMERGENCY | |||
COOLING, DECAY REMOVAL, AND CONTAINMENT | |||
SPRAY SYSTEMS TEMPORARY | |||
INSPECTION | |||
DOCUMENT REQUEST 6. List of the discharge | |||
piping sections identified | |||
as susceptible | |||
to gas accumulation (the list should identify the corresponding | |||
system). 7. Copies of isometric | |||
drawings of the High Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems (hard-copies | |||
are preferred). | |||
8. Copies of piping and instrumentation | |||
diagrams (P&IDs) of the High Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems (hard-copies | |||
9. Copies of program documents | |||
and procedures | |||
developed | |||
to implement | |||
the resolution | |||
in response to GL 2008-01. 11. Copies of the modification | |||
packages for hardware modifications | |||
as part of the resolution | |||
of GL 2008-01. 12. Design basis documents | |||
of the High Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems. 13. Design basis documents | |||
of keep-full | |||
systems of the High Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems. 14. System vvalkdovvn | |||
reports associated | |||
Vvith the resolution | |||
of GL 2008-01. 15. If applicable, provide a list of inaccessible | |||
locations | |||
where plant walkdowns | |||
of the High Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems have not been completed. | |||
Include an explanation | |||
of why each area is considered | |||
inaccessible. | |||
16. Copies of surveillance | |||
procedures | |||
associated | |||
with the resolution | |||
of GL 2008-01 and the results of the last two surveillances | |||
for the High Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems. 17. Copies of procedures | |||
used for detecting | |||
and determining | |||
void volumes. 18. Copies of procedures | |||
used for filling and venting. 19. Copies of trends of periodic venting results. 20. Copies of the engineering | |||
evaluations | |||
performed | |||
for all identified | |||
voids. -2 -Enclosure | |||
MANAGEMENT | |||
GAS ACCUMULATION | |||
IN EMERGENCY | |||
CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT | |||
SPRAY SYSTEMS DOCUMENT REQUEST 21. Basis for the void acceptance | |||
criteria (e.g. calculation). | |||
If applicable, provide the justification | |||
for any deviation | |||
from the void acceptance | |||
criteria established | |||
by the Office of Nuclear Reactor Regulation (NRR). 22. Copy of any void transport | |||
analyses. | |||
23. Copy of vortexing | |||
calculations | |||
associated | |||
with systems under the scope of GL 2008-01. 24. Copies of self-assessments | |||
associated | |||
with the implementation | |||
of the GL 2008-01 program. II. Information | |||
Requested | |||
By June 27, 2011 25. Copies of the selected corrective | |||
action program documents. | |||
26. Copies of the selected licensing | |||
and design basis document changes. 27. Copies of the selected calculations. | |||
28. Copies of training documents | |||
that ensure that personnel | |||
are aware of gas-related | |||
concerns. | |||
?Q r"n;Q'" | |||
.".1 ':::1 f""" _____ * | |||
copies of the current technical | |||
specifications, technical | |||
specification | |||
bases, final safety analysis report, and technical | |||
report manual. Inspector | |||
Contact Information: | |||
US NRC Region IV LH+n' \I\I",\/no. | |||
VVCA]I''''''' | |||
\..,1111"" 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 -3 -Enclosure | |||
}} | }} |
Latest revision as of 02:32, 13 November 2019
ML110880669 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 03/28/2011 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Douet J Entergy Operations |
References | |
IR-11-004 | |
Download: ML110880669 (5) | |
See also: IR 05000416/2011004
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSIOI"..J
REGION IV
612 EAST LAMAR BLVD, SUITE 400
ARliNGTON, TEXAS 76011-4125
March 28, 2011
James R. Douet
Site Vice President Operations
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150
SUBJECT: GRAND GULF NUCLEAR STATION- NOTIFICATION OF INSPECTION
(INSPECTION REPORT 05000416/2011004) AND REQUEST FOR
INFORMATION
Dear Mr. Douet:
On June 27,2011, the NRC will begin the on-site portion of the Gas Accumulation Management
in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Temporary
Instruction at your Grand Gulf Nuclear Station. These inspections will be performed in
accordance with NRC Temporary' Instruction (TI) 2515/177.
Experience has shown that this inspection is resource intensive, both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
The documents have been divided into two groups.
- The first group iists information necessary for our initial inspection scoping and in-office
preparation activities. This information should be separated by information request number,
especially if provided electronically (e.g., folder with the information request number). This
information should be available to the inspector no later than June 20, 2011. Upon review of
these documents, the inspectors will select additional documentation for review upon arrival.
By June 23, 2011, the inspector will communicate the initial selected samples.
- The second group of documents requested is needed to support our onsite inspection
activities. This set of documents shouid be avaiiabie to the inspector on june 27, 20;;. it is
also requested that corrective action documents and responses to questions developed
during the inspection be provided to the inspector as the documents are generated.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mike Larson of your licensing organization.
If there are any questions about this inspection or the material requested, please contact the
inspector, Wayne Sifre, at 817-860-8193 or by email at =~~:.:..==.:.;~=
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
Operations, Inc. -2-
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget control number.
In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of
Practice, a copy of this letter and its enclosure will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web
site at (the Public Electronic Reading Room).
Sincerely,
-I.(?(2
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket: 50-416
License: NPF-29
Enclosure: MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING,
DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS
TEMPORARY INSTRUCTION DOCUMENT REQUEST
cc w/encl:
Distribution via ListServ for Grand Gulf Nuclear Station
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
DOCUMENT REQUEST
Inspection Report: 05000416/2011004
Inspection Dates: June 27-July 1, 2011
Inspection Procedure: TI 2515/177, "Management of Gas Accumulation in Emergency
Core Cooling, Decay Heat Removal, and Containment Spray
Systems"
Inspector: Wayne C. Sifre, Senior Reactor Inspector
(817) 860-8193
The following information should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com or compact disc, preferred), in care of Wayne Sifre, to facilitate the
selection of specific items that will be reviewed during the onsite inspection week. The
inspector will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection weeks. Also, we request
that you categorize the documents in your response with the numbered list below. Please
provide requested documentation electronically if possible. If requested documents are large
and only hard copy formats are available, please inform the inspector(s), and provide subject
documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the inspector as soon as possible.
I. Information Requested By June 20, 2011
1. List of corrective action program documents (with a short description) associated with
GL 2008-01, voids in piping, and pressure transients for the previous three years.
2. List of changes (with a short description and tracking number) to the final safety
evaluation report (FSAR), technical specifications, technical specification bases, and
technical requirement manual associated with the resolution of GL 2008-01.
3. List of calculations associated with GL 2008-01, including calculations that have been
changed or created in response to GL 2008-01 (with a short description of the
calculation and the change).
4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the
affected system locations (e.g. identify the source, conditions, and expected void
locations).
5. List of the suction piping sections identified as susceptible to gas accumulation (the list
should identify the corresponding system).
- 1- Enclosure
MANAGEMENT ACCUMULATION IN EMERGENCY COOLING, DECAY
REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
DOCUMENT REQUEST
6. List of the discharge piping sections identified as susceptible to gas accumulation (the
list should identify the corresponding system).
7. Copies of isometric drawings of the High Pressure Core Spray, Low Pressure Core
Spray, and Residual Heat Removal systems (hard-copies are preferred).
8. Copies of piping and instrumentation diagrams (P&IDs) of the High Pressure Core
Spray, Low Pressure Core Spray, and Residual Heat Removal systems (hard-copies are
preferred).
9. Copies of program documents and procedures developed to implement the resolution of
10. List of actions that were completed in response to GL 2008-01.
11. Copies of the modification packages for hardware modifications as part of the resolution
of GL 2008-01.
12. Design basis documents of the High Pressure Core Spray, Low Pressure Core Spray,
and Residual Heat Removal systems.
13. Design basis documents of keep-full systems of the High Pressure Core Spray, Low
Pressure Core Spray, and Residual Heat Removal systems.
14. System vvalkdovvn reports associated Vvith the resolution of GL 2008-01.
15. If applicable, provide a list of inaccessible locations where plant walkdowns of the High
Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems
have not been completed. Include an explanation of why each area is considered
inaccessible.
16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the
results of the last two surveillances for the High Pressure Core Spray, Low Pressure
Core Spray, and Residual Heat Removal systems.
17. Copies of procedures used for detecting and determining void volumes.
18. Copies of procedures used for filling and venting.
19. Copies of trends of periodic venting results.
20. Copies of the engineering evaluations performed for all identified voids.
-2- Enclosure
MANAGEMENT GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS
DOCUMENT REQUEST
21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the
justification for any deviation from the void acceptance criteria established by the Office
of Nuclear Reactor Regulation (NRR).
22. Copy of any void transport analyses.
23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01.
24. Copies of self-assessments associated with the implementation of the GL 2008-01
program.
II. Information Requested By June 27, 2011
25. Copies of the selected corrective action program documents.
26. Copies of the selected licensing and design basis document changes.
27. Copies of the selected calculations.
28. Copies of training documents that ensure that personnel are aware of gas-related
concerns.
t:-v * .....,vtJ1""'...., "f
?Q r"n;Q'" V I I""rrQI"ti\lQ
V V I 1 _ _ "-. W - ~I"t;"n
""""...., nr"f"Ir~m
... I V ' I 1"'" _~I _ I I I imnlQmQntinf"l
I I I I t - ' , _ I I I _ I .".1 ':::1 nrnl"""r!llr""c:
f""" _____ * _ v .
30. Electronic copies of the current technical specifications, technical specification bases,
final safety analysis report, and technical report manual.
Inspector Contact Information:
US NRC Region IV
LH+n' \I\I",\/no.
/\1.1.11.
Qifro.
VVCA]I'' \..,1111""
612 E. Lamar Blvd., Suite 400
Arlington, TX 76011-4125
-3- Enclosure