ML16217A225: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1   Facility:               Davis Besse Date of Examination:
{{#Wiki_filter:ES-301                                   Administrative Topics Outline                             Form ES-301-1 Facility:           Davis Besse                                           Date of Examination: __6/13/16 thru 6/20/16 __
__6/1 3/1 6 thru 6/2 0/1 6 __ Examination Level SRO                   Operating Test Number DB NRC 201 6  Administrative Topic (See Note)
Examination Level SRO                                                   Operating Test Number         DB NRC 2016 Administrative             Type                                    Describe activity to be performed Topic                 Code*
Type Code* Describe activity to be performed Conduct of Operations (SRO A1.1)  N, R 2.1.37 (4.6) Knowledge of procedures, guidelines, or limitations associated with reactivity management.
(See Note)
JPM New Identify level of reactivity event and required notifications Conduct of Operations (SRO A1.2)  D, R 2.1.7   (4.7) Ability to evaluate plant performance and make operational judgements based on operating characteristics, reactor behavior, and instrument interpretation.
Conduct of                     N, R         2.1.37           (4.6)
JPM 299 Review SC3166 Hot Leg Channel Check Equipment Control (SRO A2)  D, R 2.2.2 1    (4.1) Knowledge of pre
Operations Knowledge of procedures, guidelines, or limitations associated with reactivity (SRO A1.1)                                  management.
- and post-maintenance operability requirements.
JPM New             Identify level of reactivity event and required notifications Conduct of                     D, R         2.1.7             (4.7)
JPM 2 12  Review PMT requirements Radiation Control (SRO A3)  D, R   2.3.6     (3.8) Ability to approve release permit
Operations Ability to evaluate plant performance and make operational judgements (SRO A1.2)                                  based on operating characteristics, reactor behavior, and instrument interpretation.
: s. JPM 175 Approve a Waste Gas Release Permit Emergency Plan (SRO A4) D, R 2.4.40     (4.5) Knowledge of SRO responsibilities in emergency plan implementation.
JPM 299           Review SC3166 Hot Leg Channel Check Equipment Control             D, R         2.2.21              (4.1)
JPM 102 Upgrade an event and perform notifications NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all 5 items). *Type Codes & Criteria (C)ontrol Room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs;  
(SRO A2)                                    Knowledge of pre- and post-maintenance operability requirements.
< 4 for SROs
JPM 212            Review PMT requirements Radiation Control               D, R         2.3.6             (3.8)
& RO retakes)
(SRO A3)                                    Ability to approve release permits.
      (N)ew or (M)odified from bank (> 1)     (P)revious 2 exams (< 1; randomly selected)}}
JPM 175             Approve a Waste Gas Release Permit Emergency Plan                 D, R         2.4.40             (4.5)
(SRO A4)                                    Knowledge of SRO responsibilities in emergency plan implementation.
JPM 102           Upgrade an event and perform notifications NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all 5 items).
*Type Codes & Criteria                         (C)ontrol Room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams (< 1; randomly selected)}}

Latest revision as of 15:32, 30 October 2019

ES-301-1 SRO
ML16217A225
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/02/2016
From:
Operations Branch III
To:
FirstEnergy Nuclear Operating Co
Shared Package
ML15274A353 List:
References
L-16-044
Download: ML16217A225 (1)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Davis Besse Date of Examination: __6/13/16 thru 6/20/16 __

Examination Level SRO Operating Test Number DB NRC 2016 Administrative Type Describe activity to be performed Topic Code*

(See Note)

Conduct of N, R 2.1.37 (4.6)

Operations Knowledge of procedures, guidelines, or limitations associated with reactivity (SRO A1.1) management.

JPM New Identify level of reactivity event and required notifications Conduct of D, R 2.1.7 (4.7)

Operations Ability to evaluate plant performance and make operational judgements (SRO A1.2) based on operating characteristics, reactor behavior, and instrument interpretation.

JPM 299 Review SC3166 Hot Leg Channel Check Equipment Control D, R 2.2.21 (4.1)

(SRO A2) Knowledge of pre- and post-maintenance operability requirements.

JPM 212 Review PMT requirements Radiation Control D, R 2.3.6 (3.8)

(SRO A3) Ability to approve release permits.

JPM 175 Approve a Waste Gas Release Permit Emergency Plan D, R 2.4.40 (4.5)

(SRO A4) Knowledge of SRO responsibilities in emergency plan implementation.

JPM 102 Upgrade an event and perform notifications NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all 5 items).

  • Type Codes & Criteria (C)ontrol Room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (> 1)

(P)revious 2 exams (< 1; randomly selected)