ML16217A212

From kanterella
Jump to navigation Jump to search
ES-301-1 RO
ML16217A212
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/02/2016
From:
Operations Branch III
To:
FirstEnergy Nuclear Operating Co
Shared Package
ML15274A353 List:
References
L-16-044
Download: ML16217A212 (1)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Davis Besse Date of Examination: __6/13/16 thru 6/20/16 __

Examination Level RO Operating Test Number DB NRC 2016 Administrative Type Describe activity to be performed Topic Code*

(See Note)

Conduct of N, R 2.1.25 (3.9)

Operations Ability to interpret reference materials, such as graphs, curves, tables, (RO A1.1) etc.

JPM New Calculate time to uncover fuel upon loss of Shutdown Cooling Conduct of D, R 2.1.23 (4.3)

Operations Ability to perform specific system and integrated plant procedures during (RO A1.2) all modes of plant operation.

JPM 216 RPS Daily Heat Balance Check per DB-NE-03230 Equipment Control D, S 2.2.12 (3.7)

(RO A2) Knowledge of surveillance procedures.

JPM 229 Perform Post-Accident Monitoring Instrumentation Check Radiation Control 2.3.7 (3.5)

(RO A3 Ability to comply with radiation work permit requirements during normal or D, R abnormal conditions.

JPM 298 Complete EAL Release Limit Worksheet Emergency Plan Not Evaluated NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all 5 items).

  • Type Codes & Criteria (C)ontrol Room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (> 1)

(P)revious 2 exams (< 1; randomly selected)