ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/13/16 thru 6/20/16__
Operating Test No.: __ DB NRC 2016__
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
System / JPM Title Type Code*
Safety Function S1 - (001) / Swap CRD Booster Pumps (Alt Path - Loss of CRDM cooling flow)
(JPM New)
N, A, S 1
S2 - (006) / Transfer LPI Suction to the Emergency Sump (Alt Path - Failure of Permit Interlock)
(JPM 291)
D, A, S, E, EN 2
S3 - (010) / Recover From MU/HPI/PORV Cooling (Alt Path - PORV fails open) (JPM 063)
D, A, S, E 3
S4 - (059) / Main Feed Pump Startup/Transfer to ICS Control (Alt Path - Lube oil failure)
(JPM New)
N, A, S, L 4S S5 - (103) / Establish Containment Closure (JPM 219)
D, S 5
S6 - (063) / Battery Load Shed Actions from the Control Room (JPM New)
D, S, E 6
S7 - (012) / Deenergize Source Range NIs (JPM 185)
D, S, L 7
S8 - (008) / Component Cooling Water Pump Rotation (JPM 018)
D, S 8
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1 - (001) / Trip Reactor From #2 Low Voltage Switchgear Room (JPM 042)
D, E 1
P2 - (039) / Locally Operate Atmospheric Vent Valve ICS11A (JPM 024)
D, E, R 4s P3 - (064) / Energize Station Blackout Diesel Generator Auxiliaries (Alt Path - Cooling Fan Failure)
(JPM 258)
D, A 6
All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1