IR 05000336/2003005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
#REDIRECT [[IR 05000245/2003005]]
{{Adams
| number = ML031040163
| issue date = 04/11/2003
| title = IR 05000336-03-005 & IR 05000423-03-005, on 02/24-28/2003, Millstone Power Station; Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures
| author name = Lanning W
| author affiliation = NRC/RGN-I/DRS
| addressee name = Dodson D, Price J
| addressee affiliation = Dominion Nuclear Connecticut, Inc
| docket = 05000336, 05000423
| license number = DPR-065, NPF-049
| contact person =
| case reference number = TI 2515/148 Rev 1
| document report number = IR-03-005
| document type = Inspection Report, Letter
| page count = 4
}}
 
{{IR-Nav| site = 05000336 | year = 2003 | report number = 005 }}
 
=Text=
{{#Wiki_filter:ril 11, 2003
 
==SUBJECT:==
INSPECTION OF NUCLEAR REACTOR SAFEGUARDS INTERIM COMPENSATORY MEASURES, TEMPORARY INSTRUCTION 2515/148, REVISION 1, INSPECTION REPORT NOS. 50-336/03-005, 50-423/03-005
 
==Dear Mr. Price:==
On February 28, 2003, the U.S. Nuclear Regulatory Commission (USNRC) completed a special inspection at the Millstone Power Station, in accordance with Temporary Instruction 2515/148, Revision 1, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures. The enclosed report documents the inspection findings which were discussed on February 28, 2003, with Mr. Jeffery Campbell, Manager of Security, and other members of your staff.
 
This inspection examined activities conducted under your license as they relate to safety and to compliance with the Commissions rules and regulations, and with the conditions of your license. The specific purpose of this inspection was to verify that Dominion Nuclear Connecticut, Inc. (DNCI) effectively implemented the interim compensatory measures (ICMs)
imposed by the Order Modifying License issued February 25, 2002; and that the ICMs were successfully incorporated into your site physical protection strategy and security program.
 
Additionally, the objective of the inspection was to ensure that relevant procedures were developed and implemented, and that interface agreements with offsite organizations were developed and coordinated, as required. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
Based on the results of this inspection, no findings of significance were identified. The inspection team verified and confirmed that DNCI had effectively implemented the specifications of the Order Modifying License issued February 25, 2002.
 
Mr. J. Alan Price  2 In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, without enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
 
Sincerely,
/RA/
Wayne D. Lanning, Director Division of Reactor Safety Docket Nos. 50-336, 50-423 License Nos. DPR-65, NPF-49 Enclosure: NRC Inspection Report Nos. 50-336/03-005, 50-423/03-005 (CONTAINS (SGI))
cc w/o encl w/o SGI:
D. A. Christian, Senior Vice President - Nuclear Operations and Chief Nuclear Officer W. R. Matthews, Senior Vice President - Nuclear Operations S. E. Scace, Assistant to the Site Vice President G. D. Hicks, Director, Nuclear Station Safety and Licensing A. J. Jordan, Jr., Director - Nuclear Engineering S. P. Sarver, Director, Nuclear Station Operations and Maintenance D. A. Smith, Manager, Licensing P. J. Parulis, Manager, Nuclear Oversight L. M. Cuoco, Senior Counsel V. Juliano, Waterford Library S. Comley, We The People J. Buckingham, Department of Public Utility Control E. Wilds, Director, State of Connecticut SLO Designee First Selectmen, Town of Waterford D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN J. M. Block, Attorney, CAN J. Besade, Fish Unlimited G. Winslow, Citizens Regulatory Commission (CRC)
J. Markowicz, Co-Chair, NEAC
 
Mr. J. Alan Price  3 cc w/o encl w/o SGI: (Contd)
E. Woollacott, Co-Chair, NEAC R. Shadis, New England Coalition Staff W. Meinert, Massachusetts Municipal Wholesale Electric Company C. Brinkman, Manager, Washington Nuclear Operations
 
Mr. J. Alan Price  4 Distribution w/o encl w/o SGI:
H. Miller, RA/J. Wiggins, DRA T. Madden, OCA T. McGinty, OEDO J. Clifford, NRR R. Ennis, PM, NRR G. Wunder, Backup PM, NRR V. Nerses, PM, NRR B. McDermott, DRP K. Jenison, DRP E. Bartels, DRP D. Screnci, PAO Region I Docket Room (with concurrences)
W. Lanning, DRS R. Crlenjak, DRS J. White, DRS D. Silk, DRS A. Blamey, DRS Distribution w/encl w/SGI:
P. Frechette, DRS R. Albert, NSIR S. Schneider - NRC Senior Resident Inspector J. Campbell, Manager of Security, Millstone J. Peralta, NSIR DOCUMENT NAME: A:\MILLSTONETI148.WPD After declaring this document An Official Agency Record it will be released to the Public.
 
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS  RI/DRS  RI/DRS  RI/DRS  HQ/NSIR NAME PFrechette  DSilk  ABlamey  JWhite  JPeralta (BEH for)
DATE 04/02/03  04/02/03  04/09/03  04/11/03  04/10/03 OFFICE RI/DRP  RI/DRS NAME BMcDermott (GTD WLanning for)
DATE 04/09/03  04/11/03 OFFICIAL RECORD COPY
}}

Latest revision as of 22:16, 25 March 2020

IR 05000336-03-005 & IR 05000423-03-005, on 02/24-28/2003, Millstone Power Station; Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures
ML031040163
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/11/2003
From: Lanning W
Division of Reactor Safety I
To: Douglas Dodson, Price J
Dominion Nuclear Connecticut
References
TI 2515/148 Rev 1 IR-03-005
Download: ML031040163 (4)


Text

ril 11, 2003

SUBJECT:

INSPECTION OF NUCLEAR REACTOR SAFEGUARDS INTERIM COMPENSATORY MEASURES, TEMPORARY INSTRUCTION 2515/148, REVISION 1, INSPECTION REPORT NOS. 50-336/03-005, 50-423/03-005

Dear Mr. Price:

On February 28, 2003, the U.S. Nuclear Regulatory Commission (USNRC) completed a special inspection at the Millstone Power Station, in accordance with Temporary Instruction 2515/148, Revision 1, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures. The enclosed report documents the inspection findings which were discussed on February 28, 2003, with Mr. Jeffery Campbell, Manager of Security, and other members of your staff.

This inspection examined activities conducted under your license as they relate to safety and to compliance with the Commissions rules and regulations, and with the conditions of your license. The specific purpose of this inspection was to verify that Dominion Nuclear Connecticut, Inc. (DNCI) effectively implemented the interim compensatory measures (ICMs)

imposed by the Order Modifying License issued February 25, 2002; and that the ICMs were successfully incorporated into your site physical protection strategy and security program.

Additionally, the objective of the inspection was to ensure that relevant procedures were developed and implemented, and that interface agreements with offsite organizations were developed and coordinated, as required. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified. The inspection team verified and confirmed that DNCI had effectively implemented the specifications of the Order Modifying License issued February 25, 2002.

Mr. J. Alan Price 2 In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, without enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Wayne D. Lanning, Director Division of Reactor Safety Docket Nos. 50-336, 50-423 License Nos. DPR-65, NPF-49 Enclosure: NRC Inspection Report Nos. 50-336/03-005, 50-423/03-005 (CONTAINS (SGI))

cc w/o encl w/o SGI:

D. A. Christian, Senior Vice President - Nuclear Operations and Chief Nuclear Officer W. R. Matthews, Senior Vice President - Nuclear Operations S. E. Scace, Assistant to the Site Vice President G. D. Hicks, Director, Nuclear Station Safety and Licensing A. J. Jordan, Jr., Director - Nuclear Engineering S. P. Sarver, Director, Nuclear Station Operations and Maintenance D. A. Smith, Manager, Licensing P. J. Parulis, Manager, Nuclear Oversight L. M. Cuoco, Senior Counsel V. Juliano, Waterford Library S. Comley, We The People J. Buckingham, Department of Public Utility Control E. Wilds, Director, State of Connecticut SLO Designee First Selectmen, Town of Waterford D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN J. Besade, Fish Unlimited G. Winslow, Citizens Regulatory Commission (CRC)

J. Markowicz, Co-Chair, NEAC

Mr. J. Alan Price 3 cc w/o encl w/o SGI: (Contd)

E. Woollacott, Co-Chair, NEAC R. Shadis, New England Coalition Staff W. Meinert, Massachusetts Municipal Wholesale Electric Company C. Brinkman, Manager, Washington Nuclear Operations

Mr. J. Alan Price 4 Distribution w/o encl w/o SGI:

H. Miller, RA/J. Wiggins, DRA T. Madden, OCA T. McGinty, OEDO J. Clifford, NRR R. Ennis, PM, NRR G. Wunder, Backup PM, NRR V. Nerses, PM, NRR B. McDermott, DRP K. Jenison, DRP E. Bartels, DRP D. Screnci, PAO Region I Docket Room (with concurrences)

W. Lanning, DRS R. Crlenjak, DRS J. White, DRS D. Silk, DRS A. Blamey, DRS Distribution w/encl w/SGI:

P. Frechette, DRS R. Albert, NSIR S. Schneider - NRC Senior Resident Inspector J. Campbell, Manager of Security, Millstone J. Peralta, NSIR DOCUMENT NAME: A:\MILLSTONETI148.WPD After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRS RI/DRS RI/DRS HQ/NSIR NAME PFrechette DSilk ABlamey JWhite JPeralta (BEH for)

DATE 04/02/03 04/02/03 04/09/03 04/11/03 04/10/03 OFFICE RI/DRP RI/DRS NAME BMcDermott (GTD WLanning for)

DATE 04/09/03 04/11/03 OFFICIAL RECORD COPY