| {{#Wiki_filter:April 17, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Calculation Proiect lm~lementation Commitment Change POINT EY - BEACH NRC 201 2-0025 | | {{#Wiki_filter:April 17, 2012 EY - |
| | POINT BEACH NRC 2012-0025 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Calculation Proiect lm~lementationCommitment Change |
|
| |
|
| ==References:== | | ==References:== |
| | (1) NextEra Energy Point Beach, LLC letter to NRC, dated September 21, 2011, Calculation Project Schedule Update (MLI 12650313) |
| | Via Reference (I), NextEra Energy Point Beach, LLC (NextEra) committed to implementing 163 safety-related calculations completed during the course of the calculation review and reconstitution project by September 30, 2012. lmplementation of 141 of the 163 safety-related calculations will be completed by the committed date of September 30, 2012. NextEra has determined that additional time is required to implement the remaining 22 safety-related calculations. lmplementation of the remaining calculations into Emergency Operating Procedures (EOPs) will coincide with NextEra's implementation of the Westinghouse Owners Group Emergency Response Guidelines (ERG), Revision 2A guidance. |
| | Annual Operating Exams and Biennial Written Exams will take place at Point Beach Nuclear Plant (PBNP) during the Summer and Fall of 2012 on the current EOPs. To provide sufficient time to update procedures and provide training, implementation of the revised EOPs, including the remaining 22 safety-related calculations and the ERG, Revision 2A guidance, will begin following these 2012 examination periods. Licensed operator training classes for the revised EOPs are scheduled for Spring and Summer of 2013. Therefore, full implementation of the remaining 22 safety-related calculations and the ERG, Revision 2A guidance will occur by September 30, 2013. |
| | Summarv of Reaulatorv Commitments: |
| | The Regulatory Commitment contained in Reference (1) states: |
| | lmplementation of the 163 safety-related calculations completed during the course of the calculation review and reconstitution project will be completed by September 30, 2012. |
| | NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 |
|
| |
|
| (1) NextEra Energy Point Beach, LLC letter to NRC, dated September 21, 201 1, Calculation Project Schedule Update (MLI 1265031 3) Via Reference (I), NextEra Energy Point Beach, LLC (NextEra) committed to implementing 163 safety-related calculations completed during the course of the calculation review and reconstitution project by September 30, 2012. lmplementation of 141 of the 163 safety-related calculations will be completed by the committed date of September 30, 2012. NextEra has determined that additional time is required to implement the remaining 22 safety-related calculations. lmplementation of the remaining calculations into Emergency Operating Procedures (EOPs) will coincide with NextEra's implementation of the Westinghouse Owners Group Emergency Response Guidelines (ERG), Revision 2A guidance.
| | Document Control Desk Page 2 NextEra is modifying this Regulatory Commitment to state: |
| Annual Operating Exams and Biennial Written Exams will take place at Point Beach Nuclear Plant (PBNP) during the Summer and Fall of 2012 on the current EOPs. To provide sufficient time to update procedures and provide training, implementation of the revised EOPs, including the remaining 22 safety-related calculations and the ERG, Revision 2A guidance, will begin following these 2012 examination periods. Licensed operator training classes for the revised EOPs are scheduled for Spring and Summer of 2013. Therefore, full implementation of the remaining 22 safety-related calculations and the ERG, Revision 2A guidance will occur by September 30, 201 3. Summarv of Reaulatorv Commitments:
| | lmplementation of 141 safety-related calculations completed during the course of the calculation review and reconstitution project and not related to the EOPs will be completed by September 30, 2012. |
| The Regulatory Commitment contained in Reference (1) states: lmplementation of the 163 safety-related calculations completed during the course of the calculation review and reconstitution project will be completed by September 30, 2012. -- - - NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 Document Control Desk Page 2 NextEra is modifying this Regulatory Commitment to state: lmplementation of 141 safety-related calculations completed during the course of the calculation review and reconstitution project and not related to the EOPs will be completed by September 30, 2012. NextEra is also adding a Regulatory Commitment to state:
| | NextEra is also adding a Regulatory Commitment to state: |
| lmplementation of the 22 safety-related calculations completed during the course of the calculation review and reconstitution project related to the EOPs will be completed by September 30, 201 3. Very truly yours, NextEra Energy Point Beach, LLC Wsite Vice President cc: Administrator, Region Ill, USNRC NRC Project Manager, Point Beach Nuclear Plant, USNRC NRC Resident Inspector, Point Beach Nuclear Plant, USNRC}} | | lmplementation of the 22 safety-related calculations completed during the course of the calculation review and reconstitution project related to the EOPs will be completed by September 30, 2013. |
| | Very truly yours, NextEra Energy Point Beach, LLC W s i t e Vice President cc: Administrator, Region Ill, USNRC NRC Project Manager, Point Beach Nuclear Plant, USNRC NRC Resident Inspector, Point Beach Nuclear Plant, USNRC}} |
|
---|
Category:Letter type:NRC
MONTHYEARNRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary NRC 2019-0032, CFR 50.59 Evaluation and Commitment Change Summary Report2019-10-18018 October 2019 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2019-0042, NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information2019-10-17017 October 2019 NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information 2023-07-07
[Table view] |
Text
April 17, 2012 EY -
POINT BEACH NRC 2012-0025 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Calculation Proiect lm~lementationCommitment Change
References:
(1) NextEra Energy Point Beach, LLC letter to NRC, dated September 21, 2011, Calculation Project Schedule Update (MLI 12650313)
Via Reference (I), NextEra Energy Point Beach, LLC (NextEra) committed to implementing 163 safety-related calculations completed during the course of the calculation review and reconstitution project by September 30, 2012. lmplementation of 141 of the 163 safety-related calculations will be completed by the committed date of September 30, 2012. NextEra has determined that additional time is required to implement the remaining 22 safety-related calculations. lmplementation of the remaining calculations into Emergency Operating Procedures (EOPs) will coincide with NextEra's implementation of the Westinghouse Owners Group Emergency Response Guidelines (ERG), Revision 2A guidance.
Annual Operating Exams and Biennial Written Exams will take place at Point Beach Nuclear Plant (PBNP) during the Summer and Fall of 2012 on the current EOPs. To provide sufficient time to update procedures and provide training, implementation of the revised EOPs, including the remaining 22 safety-related calculations and the ERG, Revision 2A guidance, will begin following these 2012 examination periods. Licensed operator training classes for the revised EOPs are scheduled for Spring and Summer of 2013. Therefore, full implementation of the remaining 22 safety-related calculations and the ERG, Revision 2A guidance will occur by September 30, 2013.
Summarv of Reaulatorv Commitments:
The Regulatory Commitment contained in Reference (1) states:
lmplementation of the 163 safety-related calculations completed during the course of the calculation review and reconstitution project will be completed by September 30, 2012.
NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
Document Control Desk Page 2 NextEra is modifying this Regulatory Commitment to state:
lmplementation of 141 safety-related calculations completed during the course of the calculation review and reconstitution project and not related to the EOPs will be completed by September 30, 2012.
NextEra is also adding a Regulatory Commitment to state:
lmplementation of the 22 safety-related calculations completed during the course of the calculation review and reconstitution project related to the EOPs will be completed by September 30, 2013.
Very truly yours, NextEra Energy Point Beach, LLC W s i t e Vice President cc: Administrator, Region Ill, USNRC NRC Project Manager, Point Beach Nuclear Plant, USNRC NRC Resident Inspector, Point Beach Nuclear Plant, USNRC