| number = ML092670102
| number = ML092670102
| issue date = 10/09/2009
| issue date = 10/09/2009
| title = Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000 and MD8001)
| title = Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade
| author name = Stang J F
| author name = Stang J
| author affiliation = NRC/NRR/DORL/LPLII-1
| author affiliation = NRC/NRR/DORL/LPLII-1
| addressee name = Baxter D
| addressee name = Baxter D
Line 14: Line 14:
| page count = 3
| page count = 3
| project = TAC:MD7999, TAC:MD8000, TAC:MD8001
| project = TAC:MD7999, TAC:MD8000, TAC:MD8001
| stage = Withholding Request
| stage = Withholding Request Acceptance
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 October 9, 2009 Mr. Dave Baxter Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672 SUB..OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE REGARDING REACTOR PROTECTIVE SYSTEM/ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM DIGITAL UPGRADE (TAC NOS. MD7999, MD8000 and MD8001)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 9, 2009 Mr. Dave Baxter Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672 SUB..IECT:      OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE REGARDING REACTOR PROTECTIVE SYSTEM/ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM DIGITAL UPGRADE (TAC NOS. MD7999, MD8000 and MD8001)


==Dear Mr. Baxter:==
==Dear Mr. Baxter:==
By letter dated January 31,2008, Duke Energy Carolinas, LLC, submitted two affidavits dated January 22,2008, executed by Mark J. Burzynski, Manager, Product Licensing, AREVA NP Inc., requesting that the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: AREVA NP Document 51-5055058-06, Dedication Plan for Absopulse Power Supply AREVA NP Document 51-9062468-001, Generic Dedication Task Letter Absopulse AC/DC Power Supply AREVA NP Document 51-9062071  
 
-001, Generic Task Letter for Absopulse Power Supply Module Testing at AREVA NP Document 51-5045374-06, Oconee l\Iuclear Station, Unit RPS/ESFAS Controls Upgrade System AREVA NP Document 51-9029108-003, Oconee Nuclear Station, Units 1, and 3 RPS/ESFAS Controls Upgrade TXS System Description for LAR AREVA I\IP Document 51-9054435-002, Oconee Nuclear Station, Unit RPS/ESFAS Controls Upgrade Software Requirements AREVA NP Document 51-9010419-005, Oconee Nuclear Station Unit RPS/ESFAS Controls Upgrade Software Verification and Validation D. -2Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change Number 2007-09 The affidavits stated that the above documents should be considered exempt from mandatory public disclosure for the following reasons: (a) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service. (b) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA NP. (c) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability.
By letter dated January 31,2008, Duke Energy Carolinas, LLC, submitted two affidavits dated January 22,2008, executed by Mark J. Burzynski, Manager, Product Licensing, AREVA NP Inc., requesting that the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
* AREVA NP Document 51-5055058-06, Dedication Plan for Absopulse AC/DC Power Supply SYS/ARV-4-Q9418
* AREVA NP Document 51-9062468-001, Generic Dedication Task Letter for Absopulse AC/DC Power Supply SYS/PFC-4-Q9418
* AREVA NP Document 51-9062071 -001, Generic Task Letter for Additional Absopulse Power Supply Module Testing at Absopulse
* AREVA NP Document 51-5045374-06, Oconee l\Iuclear Station, Unit I RPS/ESFAS Controls Upgrade System Architecture
* AREVA NP Document 51-9029108-003, Oconee Nuclear Station, Units 1, 2, and 3 RPS/ESFAS Controls Upgrade TXS System Description for LAR Input
* AREVA I\IP Document 51-9054435-002, Oconee Nuclear Station, Unit I RPS/ESFAS Controls Upgrade Software Requirements Specification
* AREVA NP Document 51-9010419-005, Oconee Nuclear Station Unit I RPS/ESFAS Controls Upgrade Software Verification and Validation Plan
 
D. Baxter                                        -2
* Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change Number 2007-09 The affidavits stated that the above documents should be considered exempt from mandatory public disclosure for the following reasons:
(a) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.
(b) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA NP.
(c) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the aforementioned documents marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
Therefore, the aforementioned documents marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
If the need arises, we may send copies of this information to our consultants working in this area.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
 
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
D. Baxter                                    - 3 If you have any questions regarding this matter, I may be reached at 301-415-1345.
D. -If you have any questions regarding this matter, I may be reached at 301-415-1345.
Sincerely,
Sincerely, Stang, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 Distribution via Listserv Mr. Ronnie L. Gardner, Manager Site Operations and Regulatory Affairs AREVA NP Inc. 3315 Old Forest Road Lynchburg, VA 2450 D. -If you have any questions regarding this matter, I may be reached at 301-415-1345.
                                                  ;;~f:J11~
Sincerely, IRA by RMartin fori John F. Stang, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 Distribution via Listserv Mr. Ronnie L. Gardner, Manager Site Operations and Regulatory Affairs AREVA NP Inc. 3315 Old Forest Road Lynchburg, VA 2450 DISTRIBUTION:
                                                ~:1 Stang, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: Distribution via Listserv cc: Mr. Ronnie L. Gardner, Manager Site Operations and Regulatory Affairs AREVA NP Inc.
PUBLIC RidsNrrPMOconee Resource WKemper LPL2-1 R1F RidsNrrDciEicb Resource JStang, NRR RidsAcrsAcnw_MailCTR Resource RidsOgcmailCenter Resource RidsNrrlAMO'Brien Resource RidsNrrDorlLpl2-1 Resource RidsRgn2MailCenter Resource JArce, NRR ADAMS Accession No ML092670102 OFFICE NRRlLPL2-1/PM NRRlLPL2-1/PM NRRlLPL2-1/LA NRRlEICB/BC NRRlLPL2-1/(A)BC NAME JArce UStanq (RMartin for) MO'Brien WKemper UStang DATE 9/30/09 10/6/09 9/29/09 10/08/09 10/9/09 OFFICIAL RECORD COPY}}
3315 Old Forest Road Lynchburg, VA 2450
 
ML092670102 OFFICE     NRRlLPL2-1/PM NRRlLPL2-1/PM         NRRlLPL2-1/LA     NRRlEICB/BC         NRRlLPL2-1/(A)BC NAME       JArce         UStanq (RMartin for) MO'Brien         WKemper             UStang DATE       9/30/09       10/6/09             9/29/09           10/08/09           10/9/09}}

Latest revision as of 22:42, 21 March 2020

Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade
ML092670102
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/09/2009
From: Stang J
Plant Licensing Branch II
To: Baxter D
Duke Energy Carolinas
Arce, Jeannette 415-1596
References
TAC MD7999, TAC MD8000, TAC MD8001
Download: ML092670102 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 9, 2009 Mr. Dave Baxter Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672 SUB..IECT: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE REGARDING REACTOR PROTECTIVE SYSTEM/ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM DIGITAL UPGRADE (TAC NOS. MD7999, MD8000 and MD8001)

Dear Mr. Baxter:

By letter dated January 31,2008, Duke Energy Carolinas, LLC, submitted two affidavits dated January 22,2008, executed by Mark J. Burzynski, Manager, Product Licensing, AREVA NP Inc., requesting that the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:

  • AREVA NP Document 51-5055058-06, Dedication Plan for Absopulse AC/DC Power Supply SYS/ARV-4-Q9418
  • AREVA NP Document 51-9062468-001, Generic Dedication Task Letter for Absopulse AC/DC Power Supply SYS/PFC-4-Q9418
  • AREVA NP Document 51-9062071 -001, Generic Task Letter for Additional Absopulse Power Supply Module Testing at Absopulse
  • AREVA NP Document 51-5045374-06, Oconee l\Iuclear Station, Unit I RPS/ESFAS Controls Upgrade System Architecture
  • AREVA NP Document 51-9029108-003, Oconee Nuclear Station, Units 1, 2, and 3 RPS/ESFAS Controls Upgrade TXS System Description for LAR Input
  • AREVA I\IP Document 51-9054435-002, Oconee Nuclear Station, Unit I RPS/ESFAS Controls Upgrade Software Requirements Specification
  • AREVA NP Document 51-9010419-005, Oconee Nuclear Station Unit I RPS/ESFAS Controls Upgrade Software Verification and Validation Plan

D. Baxter -2

  • Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change Number 2007-09 The affidavits stated that the above documents should be considered exempt from mandatory public disclosure for the following reasons:

(a) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.

(b) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA NP.

(c) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the aforementioned documents marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

D. Baxter - 3 If you have any questions regarding this matter, I may be reached at 301-415-1345.

Sincerely,

~f
J11~

~:1 Stang, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: Distribution via Listserv cc: Mr. Ronnie L. Gardner, Manager Site Operations and Regulatory Affairs AREVA NP Inc.

3315 Old Forest Road Lynchburg, VA 2450

ML092670102 OFFICE NRRlLPL2-1/PM NRRlLPL2-1/PM NRRlLPL2-1/LA NRRlEICB/BC NRRlLPL2-1/(A)BC NAME JArce UStanq (RMartin for) MO'Brien WKemper UStang DATE 9/30/09 10/6/09 9/29/09 10/08/09 10/9/09