{{#Wiki_filter:FNP LAR AUDIT PRESENTATION March19, 2013Session5-Monitoring Session 5 Monitoring Chip Westberry Monitoring Overview*Provides means to ensure Assumptions remain Valid Valid-Process Defined in FAQ 10-059 Scoping*Scoping*ScreeningBiM-Bi g M-Little m*Target Value Determination*Monitoring Implementation Slide 2 Monitoring ScopingPer FAQ 59, we are scoping 6 categories of SSCs:
NSCA-NSCA-FPRA-NPO-Rad. Release-FP Systems and features-Programmatic Elements Slide 3 Monitoring Screening*Risk CriteriaRAW>20-RAW > 2.0 AND-CDF>1E-6 ORLERF>1E-7 CDF> 1E 6  OR LERF > 1E 7*Screened in gets Big M treatment using a monitoring p ro g ram meetin g the re quirements of section 2.6 of pggq NFPA 805.*Screened out gets Little m treatment using existing system and program health processes.*Corrective Action Program is used to document issues andissueresolution and issue resolution
.Slide 4 Monitoring Targets
*UsesIPEandFPRAreliabilityandavailability
*Uses IPE and FPRA reliability and availability data*EPRI TR 1006756 report for baseline data*Surveillance Optimization is being committed to in Attachment S as implementation item 1.
Slide 5 Monitoring Commitments*Attachment S commitments for Monitoring:Themonitoringprogramwillbeimplementedafterthe
-The monitoring program will be implemented after the safety evaluation issuance as part of the fire protection program transition to NFPA 805. A Monitoring Program Engineering Evaluation will be developed during implementation.
Slide 6 QUESTIONS?
QUESTIONS ?Slide 7}}

Revision as of 09:59, 18 July 2018

03/19/2013-03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 5 (3/19)
ML13078A251
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/19/2013
From: Westberry C
Southern Co, Southern Nuclear Operating Co
To:
Division of Operating Reactor Licensing
Brown E A
Shared Package
ML13078A284 List:
References
Download: ML13078A251 (7)


Text

FNP LAR AUDIT PRESENTATION March19, 2013Session5-Monitoring Session 5 Monitoring Chip Westberry Monitoring Overview*Provides means to ensure Assumptions remain Valid Valid-Process Defined in FAQ 10-059 Scoping*Scoping*ScreeningBiM-Bi g M-Little m*Target Value Determination*Monitoring Implementation Slide 2 Monitoring ScopingPer FAQ 59, we are scoping 6 categories of SSCs:

NSCA-NSCA-FPRA-NPO-Rad. Release-FP Systems and features-Programmatic Elements Slide 3 Monitoring Screening*Risk CriteriaRAW>20-RAW > 2.0 AND-CDF>1E-6 ORLERF>1E-7 CDF> 1E 6 OR LERF > 1E 7*Screened in gets Big M treatment using a monitoring p ro g ram meetin g the re quirements of section 2.6 of pggq NFPA 805.*Screened out gets Little m treatment using existing system and program health processes.*Corrective Action Program is used to document issues andissueresolution and issue resolution

.Slide 4 Monitoring Targets

  • UsesIPEandFPRAreliabilityandavailability
  • Uses IPE and FPRA reliability and availability data*EPRI TR 1006756 report for baseline data*Surveillance Optimization is being committed to in Attachment S as implementation item 1.

Slide 5 Monitoring Commitments*Attachment S commitments for Monitoring:Themonitoringprogramwillbeimplementedafterthe

-The monitoring program will be implemented after the safety evaluation issuance as part of the fire protection program transition to NFPA 805. A Monitoring Program Engineering Evaluation will be developed during implementation.

Slide 6 QUESTIONS?