ML13302B869: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 21: Line 21:
FERMI POWER PLANT, UNIT 2 - REQUALIFICATION PROGRAM INSPECTION
FERMI POWER PLANT, UNIT 2 - REQUALIFICATION PROGRAM INSPECTION


==Dear Mr. Plona:==
==Dear M r. Plona:==
In a telephone conversation on October 17
In a telephone conversation on October 17
, 2013, Mr. R. Duke, Operator Requalification Training Supervisor, and Mr. B
, 2013, Mr. R. Duke , Operator Requalification Training Supervisor, and Mr. B
. Palagi, NRC Inspector
. Palagi , NRC Inspector , made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the Licensed Operator Requalification Program at the Fermi Power Plant, Unit 2
, made arrangements for the U.S. Nuclear Regulatory Commission (
NRC) to inspect the Licensed Operator Requalification Program at the Fermi Power Plant, Unit 2
. The inspection is planned for the week of November 4, 2013, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC
. The inspection is planned for the week of November 4, 2013, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC
-approved Requalification Program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit the ir biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations
-approved Requalification Program. In accordance with Titl e 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit the ir biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations
, and operating tests scheduled for the week of the inspection to the NRC by October 28, 2013. Mr. R. Duke has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
, and operating tests scheduled for the week of the inspection to the NRC by October 28, 2013. Mr. R. Duke has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, Control Number 3150
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, Control Number 3150
Line 38: Line 36:
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading
-rm/adams.html.
-rm/adams.html.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9611, or I can be reached at 630
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9 611, or I can be reached at 630
-829-9707. Sincerely,
-829-9707. Sincerely,
 
/RA/
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50
Line 47: Line 44:
-rm/adams.html.
-rm/adams.html.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9611, or I can be reached at 630
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9611, or I can be reached at 630
-829-9707. Sincerely,
-829-9707. Sincerely,
 
/RA/
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50
Line 57: Line 53:


Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME:  Ltr 102913 Fermi Requal Inspection (BBP).docx x Publicly Available
Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME:  Ltr 102913 Fermi Requal Inspection (BBP).docx x Publicly Available
  -Publicly Available x Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE  RIII    RIII    RIII    RIII    NAME  MBielby for BPalagi:bl  HPeterson DATE  10/25/13  10/29/13      OFFICIAL RECORD COPY}}
  -Publicly Available x Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE  RIII    RIII    RIII    RIII    NAME  MBielby for BPalagi: bl  HPeterson DATE  10/25/13  10/29/13      OFFICIAL RECORD COPY}}

Revision as of 20:36, 13 July 2018

Fermi Power Plant, Unit 2 - Requalification Program Inspection
ML13302B869
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/29/2013
From: Hironori Peterson
Operations Branch III
To: Plona J
Detroit Edison, Co
Bruce Palagi
References
Download: ML13302B869 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532

-4352 October 29, 2013 Mr. Joseph Plona Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

FERMI POWER PLANT, UNIT 2 - REQUALIFICATION PROGRAM INSPECTION

Dear M r. Plona:

In a telephone conversation on October 17

, 2013, Mr. R. Duke , Operator Requalification Training Supervisor, and Mr. B

. Palagi , NRC Inspector , made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the Licensed Operator Requalification Program at the Fermi Power Plant, Unit 2

. The inspection is planned for the week of November 4, 2013, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC

-approved Requalification Program. In accordance with Titl e 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit the ir biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations

, and operating tests scheduled for the week of the inspection to the NRC by October 28, 2013. Mr. R. Duke has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, Control Number 3150

-0018. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T

-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555

-0001, or by Internet electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150

-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading

-rm/adams.html.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9 611, or I can be reached at 630

-829-9707. Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50

-341 License No. NPF-43 cc: Distribution via ListServ

Ž In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading

-rm/adams.html.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9611, or I can be reached at 630

-829-9707. Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50

-341 License No. NPF-43 cc: Distribution via ListServ

Ž DISTRIBUTION

Daniel Rich RidsNrrDorlLpl3

-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Cynthia Pederson

Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: Ltr 102913 Fermi Requal Inspection (BBP).docx x Publicly Available

-Publicly Available x Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MBielby for BPalagi: bl HPeterson DATE 10/25/13 10/29/13 OFFICIAL RECORD COPY