Based on the plant conditions, which ONE of the following identifies the EARLIESTtime the Reactor is required to be tripped in accordance with AOP-017, Loss ofInstrument Air? | Based on the plant conditions, which ONE of the following identifies the EARLIESTtime the Reactor is required to be tripped in accordance with AOP-017, Loss ofInstrument Air? | ||
11071110 1113 | 11071110 1113 1116 A.B.C.D. Friday, October 31, 2014 10:19:17 AM 14 Rev. FINAL 2014 NRC RO Written Exam | ||
: 15. Given the following plant conditions: - A Reactor Trip and Safety Injection have occurred from 100% power | : 15. Given the following plant conditions: - A Reactor Trip and Safety Injection have occurred from 100% power | ||
- The crew has transitioned to EOP-ECA-1.2, LOCA Outside Containment | - The crew has transitioned to EOP-ECA-1.2, LOCA Outside Containment | ||
Line 123: | Line 123: | ||
(2) | (2) | ||
ON ON OFF ON ON OFF OFF | ON ON OFF ON ON OFF OFF OFF A.B.C.D.Friday, October 31, 2014 10:19:17 AM 22 Rev. FINAL 2014 NRC RO Written Exam | ||
: 23. Given the following plant conditions: - The unit was operating at 100% power | : 23. Given the following plant conditions: - The unit was operating at 100% power | ||
- The MCR was evacuated due to a fire | - The MCR was evacuated due to a fire | ||
Line 136: | Line 136: | ||
. (1) 33 (2) accommodate void growth (1) 33 (2) allow accurate monitoring of void growth (1) 41 (2) accommodate void growth (1) 41 (2) allow accurate monitoring of void growth A.B.C.D. Friday, October 31, 2014 10:19:17 AM 24 Rev. FINAL 2014 NRC RO Written Exam | . (1) 33 (2) accommodate void growth (1) 33 (2) allow accurate monitoring of void growth (1) 41 (2) accommodate void growth (1) 41 (2) allow accurate monitoring of void growth A.B.C.D. Friday, October 31, 2014 10:19:17 AM 24 Rev. FINAL 2014 NRC RO Written Exam | ||
: 25. Given the following plant conditions: - EOP-FR-C.2, Response to Degraded Core Cooling is in progress due to anORANGE condition on the Core Cooling CSFST - RCPs 'A' and 'C' are running; RCP 'B' is secured | : 25. Given the following plant conditions: - EOP-FR-C.2, Response to Degraded Core Cooling is in progress due to anORANGE condition on the Core Cooling CSFST - RCPs 'A' and 'C' are running; RCP 'B' is secured | ||
- Both CSIPs are tripped - The crew is about to depressurize all SGs to atmospheric pressureWhich ONE of the following completes the statement below describing the RCPoperational requirement and the EOP basis for RCP operation from this point forwardin EOP-FR-C.2?RCPs are | - Both CSIPs are tripped - The crew is about to depressurize all SGs to atmospheric pressureWhich ONE of the following completes the statement below describing the RCPoperational requirement and the EOP basis for RCP operation from this point forwardin EOP-FR-C.2?RCPs are | ||
.stopped to reduce heat input into the RCS stopped because number 1 seal differential pressure will be lostleft running to provide core cooling until ECCS flow is established left running as long as net positive suction head exists A.B.C.D. Friday, October 31, 2014 10:19:17 AM 25 Rev. FINAL 2014 NRC RO Written Exam | .stopped to reduce heat input into the RCS stopped because number 1 seal differential pressure will be lostleft running to provide core cooling until ECCS flow is established left running as long as net positive suction head exists A.B.C.D. Friday, October 31, 2014 10:19:17 AM 25 Rev. FINAL 2014 NRC RO Written Exam | ||
: 26. Given the following plant conditions: - The plant was operating at 100% power | : 26. Given the following plant conditions: - The plant was operating at 100% power | ||
Line 178: | Line 177: | ||
: 35. Given the following plant conditions: - The unit is operating at 100% power | : 35. Given the following plant conditions: - The unit is operating at 100% power | ||
- The crew is responding to a leaking PRZ Safety valve Time PRT Temp Safety Tailpipe Temp 1000 95°F 145°F 1005 115°F 255°F 1010 122°F 275°F 1015 146°F 403°FWhich ONE of the following is the firs t time that annunciator ALB-009-8-1, PRTHigh-Low Level Press or Temp, will alarm? | - The crew is responding to a leaking PRZ Safety valve Time PRT Temp Safety Tailpipe Temp 1000 95°F 145°F 1005 115°F 255°F 1010 122°F 275°F 1015 146°F 403°FWhich ONE of the following is the firs t time that annunciator ALB-009-8-1, PRTHigh-Low Level Press or Temp, will alarm? | ||
1000) | 1000) 1005 1010 1015 A.B.C.D. Friday, October 31, 2014 10:19:17 AM 35 Rev. FINAL 2014 NRC RO Written Exam | ||
: 36. Given the following plant conditions: - The unit is operating at 30% power | : 36. Given the following plant conditions: - The unit is operating at 30% power | ||
- The 'C' RCP trips due to an electrical faultWhich ONE of the following competes the statement below?As 'C' RCP coasts down, Loops 'A' and 'B' T will (1) and the Loops | - The 'C' RCP trips due to an electrical faultWhich ONE of the following competes the statement below?As 'C' RCP coasts down, Loops 'A' and 'B' T will (1) and the Loops | ||
Line 189: | Line 188: | ||
Pressurizer PORV(s) | Pressurizer PORV(s) | ||
(1) will OPEN and remain OPEN until PRZ pressure reaches (2) | (1) will OPEN and remain OPEN until PRZ pressure reaches (2) | ||
. (1) 1RC-116 and 1RC-118 (2) 1960 psig (1) 1RC-116 and 1RC-118 (2) 2000 psig (1) 1RC-114 (2) 1960 psig (1) 1RC-114 | . (1) 1RC-116 and 1RC-118 (2) 1960 psig (1) 1RC-116 and 1RC-118 (2) 2000 psig (1) 1RC-114 (2) 1960 psig (1) 1RC-114 (2) 2000 psig A.B.C.D. Friday, October 31, 2014 10:19:17 AM 38 Rev. FINAL 2014 NRC RO Written Exam | ||
: 39. Given the following plant conditions: - A startup is in progress with the unit operating at 7% Reactor powerSubsequently Instrument Bus S-I de-energizes.Given the above plant conditions, which ONE of the following will result in a Reactortrip signal being generated? LT-461, PZR Level Channel III, fails highLT-496, 'C' SG Level Channel III, fails lowPT-951, Containment Pressure Channel II, fails highA and C Aux buses are crosstied and breaker 107, Aux Bus A supply, fails open A.B.C.D. Friday, October 31, 2014 10:19:17 AM 39 Rev. FINAL 2014 NRC RO Written Exam | : 39. Given the following plant conditions: - A startup is in progress with the unit operating at 7% Reactor powerSubsequently Instrument Bus S-I de-energizes.Given the above plant conditions, which ONE of the following will result in a Reactortrip signal being generated? LT-461, PZR Level Channel III, fails highLT-496, 'C' SG Level Channel III, fails lowPT-951, Containment Pressure Channel II, fails highA and C Aux buses are crosstied and breaker 107, Aux Bus A supply, fails open A.B.C.D. Friday, October 31, 2014 10:19:17 AM 39 Rev. FINAL 2014 NRC RO Written Exam | ||
: 40. Given the following plant conditions: - The unit is being taken off line in accordance with GP-006, Normal Plant ShutdownFrom Power Operation To Hot Standby - Main Turbine load is being held at 25 DEH units for Trip Status light verificationsIn accordance with GP-006, which ONE of the following completes the statementsbelow?(NOTE: Consider each statement independently) | : 40. Given the following plant conditions: - The unit is being taken off line in accordance with GP-006, Normal Plant ShutdownFrom Power Operation To Hot Standby - Main Turbine load is being held at 25 DEH units for Trip Status light verificationsIn accordance with GP-006, which ONE of the following completes the statementsbelow?(NOTE: Consider each statement independently) | ||
Line 197: | Line 194: | ||
. IF the bistable lights are NOT in the expected condition then a method used to correctthis condition would be to (2) | . IF the bistable lights are NOT in the expected condition then a method used to correctthis condition would be to (2) | ||
. (Trip Status Light Box 4 bistable status lights) - PR P-7/P-10 NC 41M Bistable Light 4 PR P-7/P-10 NC 42M Bistable Light 4-2 | . (Trip Status Light Box 4 bistable status lights) - PR P-7/P-10 NC 41M Bistable Light 4 PR P-7/P-10 NC 42M Bistable Light 4-2 | ||
- PR P-7/P-10 NC 43M Bistable Light 4 PR P-7/P-10 NC 44M Bistable Light 4-4 (1) ON (2) manually insert Control Rods (1) ON (2) reduce Turbine load (1) OFF (2) manually insert Control Rods (1) OFF (2) reduce Turbine load A.B.C.D. Friday, October 31, 2014 10:19:17 AM 40 Rev. FINAL 2014 NRC RO Written Exam | - PR P-7/P-10 NC 43M Bistable Light 4 PR P-7/P-10 NC 44M Bistable Light 4-4 (1) ON (2) manually insert Control Rods (1) ON (2) reduce Turbine load (1) OFF (2) manually insert Control Rods (1) OFF (2) reduce Turbine load A.B.C.D. Friday, October 31, 2014 10:19:17 AM 40 Rev. FINAL 2014 NRC RO Written Exam | ||
: 41. Given the following plant conditions: - An automatic Containment Spray Actuation Signal (CSAS) has occurred | : 41. Given the following plant conditions: - An automatic Containment Spray Actuation Signal (CSAS) has occurred | ||
- Both | - Both Containment Spray pumps have been manually stopped - The CSAS has NOT been resetSubsequently the following occurs: - Containment Pressure is 2.5 psig and rising(Assume no futher operator action)Which ONE of the following describes the operation of the Containment Spray systemas pressure rises above the CSAS setpoint?Containment Spray pumps | ||
Containment Spray pumps have been manually stopped - The CSAS has NOT been resetSubsequently the following occurs: - Containment Pressure is 2.5 psig and rising(Assume no futher operator action)Which ONE of the following describes the operation of the Containment Spray systemas pressure rises above the CSAS setpoint?Containment Spray pumps | |||
but can be manually started do NOT automatically start and cannot be manually started until CSAS has been resetautomatically start when Containment Pressure exceeds 3 psig automatically start when Containment Pressure exceeds 10 psig A.B.C.D. Friday, October 31, 2014 10:19:17 AM 41 Rev. FINAL 2014 NRC RO Written Exam | .do NOT automatically start, but can be manually started do NOT automatically start and cannot be manually started until CSAS has been resetautomatically start when Containment Pressure exceeds 3 psig automatically start when Containment Pressure exceeds 10 psig A.B.C.D. Friday, October 31, 2014 10:19:17 AM 41 Rev. FINAL 2014 NRC RO Written Exam | ||
: 42. Containment Cooling has been placed in Maximum Cooling Mode in accordance withOP-169, Containment Cooling And Ventilation, due to a 1 gpm RCS leak.Which ONE of the following completes the statement below?AH-3 and AH-4, Containment Fan Cooler Units, will be running in (1) speedwith their post-accident dampers (2) | : 42. Containment Cooling has been placed in Maximum Cooling Mode in accordance withOP-169, Containment Cooling And Ventilation, due to a 1 gpm RCS leak.Which ONE of the following completes the statement below?AH-3 and AH-4, Containment Fan Cooler Units, will be running in (1) speedwith their post-accident dampers (2) | ||
. (1) HI (2) OPEN (1) HI (2) SHUT (1) LO (2) OPEN (1) LO (2) SHUT A.B.C.D. Friday, October 31, 2014 10:19:17 AM 42 Rev. FINAL 2014 NRC RO Written Exam | . (1) HI (2) OPEN (1) HI (2) SHUT (1) LO (2) OPEN (1) LO (2) SHUT A.B.C.D. Friday, October 31, 2014 10:19:17 AM 42 Rev. FINAL 2014 NRC RO Written Exam | ||
: 43. Which ONE of the following is required when a loss of the 1A-SA Emergency AC Busoccurs simultaneously with a loss of the DP-1A-SA Emergency DC Bus in accordancewith AOP-025, Loss Of One Emergency AC Bus (6.9KV) Or One Emergency DC Bus(125V)?AFW valves are operated locally until power is restored during plant recovery. The DC load breakers are to remain closed when energizing the DC EmergencyBus during plant recovery.Commence a plant cooldown in accordance with GP-007, Normal Plant Cooldown (Mode 3 to Mode 5).The 1A-SA 6.9-KV AC load breakers are opened locally prior to energizing the ACEmergency Bus. | : 43. Which ONE of the following is required when a loss of the 1A-SA Emergency AC Busoccurs simultaneously with a loss of the DP-1A-SA Emergency DC Bus in accordancewith AOP-025, Loss Of One Emergency AC Bus (6.9KV) Or One Emergency DC Bus(125V)?AFW valves are operated locally until power is restored during plant recovery. The DC load breakers are to remain closed when energizing the DC EmergencyBus during plant recovery.Commence a plant cooldown in accordance with GP-007, Normal Plant Cooldown (Mode 3 to Mode 5).The 1A-SA 6.9-KV AC load breakers are opened locally prior to energizing the ACEmergency Bus. | ||
A.B.C.D. Friday, October 31, 2014 10:19:17 AM 43 Rev. FINAL 2014 NRC RO Written Exam | A.B.C.D. Friday, October 31, 2014 10:19:17 AM 43 Rev. FINAL 2014 NRC RO Written Exam | ||
Line 224: | Line 217: | ||
: 47. Which ONE of the following supplies power to the Turbine-Driven AFW pump steamadmission valves 1MS-70 and 1MS-72?(NOTE: Listed below are the associated valve noun names) | : 47. Which ONE of the following supplies power to the Turbine-Driven AFW pump steamadmission valves 1MS-70 and 1MS-72?(NOTE: Listed below are the associated valve noun names) | ||
TDAFW pump steam admission valves1MS-70, MAIN STEAM B TO AUX FW TURBINE 1MS-72, MAIN STEAM C TO AUX FW TURBINE 1MS-70 1MS-72 1DP-1A-SI 1DP-1A-SIII 1DP-1B-SII 1DP-1A-SIII DP-1A2-SA DP-1B2-SB MCC 1A31-SA MCC 1B31-SB A.B.C.D. Friday, October 31, 2014 10:19:17 AM 47 Rev. FINAL 2014 NRC RO Written Exam | TDAFW pump steam admission valves1MS-70, MAIN STEAM B TO AUX FW TURBINE 1MS-72, MAIN STEAM C TO AUX FW TURBINE 1MS-70 1MS-72 1DP-1A-SI 1DP-1A-SIII 1DP-1B-SII 1DP-1A-SIII DP-1A2-SA DP-1B2-SB MCC 1A31-SA MCC 1B31-SB A.B.C.D. Friday, October 31, 2014 10:19:17 AM 47 Rev. FINAL 2014 NRC RO Written Exam | ||
: 48. Given the following plant conditions: - A plant heat up is in progress in accordance with GP-002, Normal Plant HeatupFrom Cold Solid To Hot Subcritical Mode 5 To Mode 3 - 'A' MDAFW pump is feeding the SGs Subequently the following annunciator alarms: - ALB-017-5-4, Aux Feedwater Pump 'A' Trip Or Close CKT TroubleWhich ONE of the following completes the statements below?SG levels will lower to (1) where the 'B' MDAFW pump will automatically start, to restore SG levels. Entry in to AOP-010, Feedwater Malfunctions, (2) required.(Assume NO Operator actions) (1) 20% (2) is (1) 20% (2) is NOT (1) 25% (2) is (1) 25% | : 48. Given the following plant conditions: - A plant heat up is in progress in accordance with GP-002, Normal Plant HeatupFrom Cold Solid To Hot Subcritical Mode 5 To Mode 3 - 'A' MDAFW pump is feeding the SGs Subequently the following annunciator alarms: - ALB-017-5-4, Aux Feedwater Pump 'A' Trip Or Close CKT TroubleWhich ONE of the following completes the statements below?SG levels will lower to (1) where the 'B' MDAFW pump will automatically start, to restore SG levels. Entry in to AOP-010, Feedwater Malfunctions, (2) required.(Assume NO Operator actions) (1) 20% (2) is (1) 20% (2) is NOT (1) 25% (2) is (1) 25% | ||
(2) is NOT A.B.C.D. Friday, October 31, 2014 10:19:17 AM 48 Rev. FINAL 2014 NRC RO Written Exam | (2) is NOT A.B.C.D. Friday, October 31, 2014 10:19:17 AM 48 Rev. FINAL 2014 NRC RO Written Exam | ||
: 49. Given the following plant conditions: - The unit is operating at 100% power | : 49. Given the following plant conditions: - The unit is operating at 100% power | ||
Line 232: | Line 225: | ||
- Local observation confirms that a ground condition existsWhich ONE of the following completes the statement below concerning this ground?The impact of this condition on the 250 VDC Bus is that (1) | - Local observation confirms that a ground condition existsWhich ONE of the following completes the statement below concerning this ground?The impact of this condition on the 250 VDC Bus is that (1) | ||
. In accordance with APP-ALB-015-3-4, the crew should implement OP-156.06, GroundIsolation and Bus Drop, and (2) | . In accordance with APP-ALB-015-3-4, the crew should implement OP-156.06, GroundIsolation and Bus Drop, and (2) | ||
. (1) the ground could result in the degradation of the DC system reliability (2) energize the 1B 250 VDC Battery Charger then remove the 1A 250 VDCBattery Charger from service (1) the ground could result in the degradation of the DC system reliability (2) open the 1A charger DC output breaker allowing the batteries to power the 250 VDC bus and then place the 1B 250 VDC Battery Charger in service (1) the battery charger will automatically trip on a high ground condition if left inoperation (2) energize the 1B 250 VDC Battery Charger then remove the 1A 250 VDCBattery Charger from service (1) the battery charger will automatically trip on a high ground condition if left inoperation (2) open the 1A charger DC output breaker allowing the batteries to power the 250 VDC bus and then place the 1B 250 VDC Battery Charger in service A.B.C.D. Friday, October 31, 2014 10:19:17 AM 50 Rev. FINAL 2014 NRC RO Written Exam | . (1) the ground could result in the degradation of the DC system reliability (2) energize the 1B 250 VDC Battery Charger then remove the 1A 250 VDCBattery Charger from service (1) the ground could result in the degradation of the DC system reliability (2) open the 1A charger DC output breaker allowing the batteries to power the 250 VDC bus and then place the 1B 250 VDC Battery Charger in service (1) the battery charger will automatically trip on a high ground condition if left inoperation (2) energize the 1B 250 VDC Battery Charger then remove the 1A 250 VDCBattery Charger from service (1) the battery charger will automatically trip on a high ground condition if left inoperation (2) open the 1A charger DC output breaker allowing the batteries to power the 250 VDC bus and then place the 1B 250 VDC Battery Charger in service A.B.C.D. Friday, October 31, 2014 10:19:17 AM 50 Rev. FINAL 2014 NRC RO Written Exam | ||
: 51. Given the following plant conditions: - The EDG 1A-SA is loaded to 6.3 MW from the MCR in accordance OP-155, DieselGenerator Emergency Power System - The crew is preparing to shutdown the EDG Which ONE of the following completes the statement below concerning the continuedshutdown of the EDG in accordance with OP-155?The EDG should be shutdown from 35% load in a maximum of (1) minutes ANDthe impact of this action is it will (2) | : 51. Given the following plant conditions: - The EDG 1A-SA is loaded to 6.3 MW from the MCR in accordance OP-155, DieselGenerator Emergency Power System - The crew is preparing to shutdown the EDG Which ONE of the following completes the statement below concerning the continuedshutdown of the EDG in accordance with OP-155?The EDG should be shutdown from 35% load in a maximum of (1) minutes ANDthe impact of this action is it will (2) | ||
. (1) 5 (2) prevent stator winding overheating (1) 5 (2) minimize carbon buildup (1) 20 (2) prevent stator winding overheating (1) 20 (2) minimize carbon buildup A.B.C.D. Friday, October 31, 2014 10:19:17 AM 51 Rev. FINAL 2014 NRC RO Written Exam | . (1) 5 (2) prevent stator winding overheating (1) 5 (2) minimize carbon buildup (1) 20 (2) prevent stator winding overheating (1) 20 (2) minimize carbon buildup A.B.C.D. Friday, October 31, 2014 10:19:17 AM 51 Rev. FINAL 2014 NRC RO Written Exam | ||
: 52. Which ONE of the following completes the statements below?1CC-23, REM 3501 A CCW Inlet Solenoid Valve, will (1) automatically ifREM-01CC-3501A-SA, CCW Train A, loses power. Upon restoration of power to REM-01CC-3501A-SA, 1CC-23 must be operated locally on the (2) elevation of the RAB. (1) shut (2) 305' (1) shut (2) 236' (1) not shut (2) 305' (1) not shut (2) 236' A.B.C.D. Friday, October 31, 2014 10:19:17 AM 52 Rev. FINAL 2014 NRC RO Written Exam | : 52. Which ONE of the following completes the statements below?1CC-23, REM 3501 A CCW Inlet Solenoid Valve, will (1) automatically ifREM-01CC-3501A-SA, CCW Train A, loses power. Upon restoration of power to REM-01CC-3501A-SA, 1CC-23 must be operated locally on the (2) elevation of the RAB. (1) shut (2) 305' (1) shut (2) 236' (1) not shut (2) 305' (1) not shut (2) 236'A.B.C.D. Friday, October 31, 2014 10:19:17 AM 52 Rev. FINAL 2014 NRC RO Written Exam | ||
: 53. Which ONE of the following sets of components are ALL supplied by the EmergencyService Water system?1. CSIP oil coolers 2. CCW heat exchangers3. Containment fan coil units (AH-37, 38, 39) 1 and 2 ONLY1 and 3 ONLY2 and 3 ONLY 1, 2 and 3 A.B.C.D. Friday, October 31, 2014 10:19:18 AM 53 Rev. FINAL 2014 NRC RO Written Exam | : 53. Which ONE of the following sets of components are ALL supplied by the EmergencyService Water system?1. CSIP oil coolers 2. CCW heat exchangers3. Containment fan coil units (AH-37, 38, 39) 1 and 2 ONLY1 and 3 ONLY2 and 3 ONLY 1, 2 and 3 A.B.C.D. Friday, October 31, 2014 10:19:18 AM 53 Rev. FINAL 2014 NRC RO Written Exam | ||
: 54. Given the following plant conditions: - A loss of Instrument Air is in progress | : 54. Given the following plant conditions: - A loss of Instrument Air is in progress | ||
- Instrument Air header pressure is 88 psig and continuing to lower slowlyWith the current plant conditions, which ONE of the following completes the statementbelow?The current status of 1SA-506, SA Header Isol Valve is (1) | - Instrument Air header pressure is 88 psig and continuing to lower slowlyWith the current plant conditions, which ONE of the following completes the statementbelow?The current status of 1SA-506, SA Header Isol Valve is (1) | ||
. When IA pressurelowers to (2) psig then ALB-002-8-1, Instrument Air Header Low Pressureannunciator will go into alarm. (1) Open (2) 85 (1) Open (2) 75(1) Shut (2) 85 (1) Shut (2) | . When IA pressurelowers to (2) psig then ALB-002-8-1, Instrument Air Header Low Pressureannunciator will go into alarm. (1) Open (2) 85 (1) Open (2) 75(1) Shut (2) 85 (1) Shut (2) 75 A.B.C.D. Friday, October 31, 2014 10:19:18 AM 54 Rev. FINAL 2014 NRC RO Written Exam | ||
: 55. Given the following plant conditions: - RCS Tavg is 124°F | : 55. Given the following plant conditions: - RCS Tavg is 124°F | ||
- A plant heatup is to be commenced in accordance with GP-002, Normal PlantHeatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3Which ONE of the following describes (1) the fan(s) that is (are) required to be placedin service prior to the RCS Tavg exceeding 140°F and (2) the fan's function? (1) Control Rod Drive Mechanism Fans (2) To prevent insulation degradation and subsequent CRDM failure. | - A plant heatup is to be commenced in accordance with GP-002, Normal PlantHeatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3Which ONE of the following describes (1) the fan(s) that is (are) required to be placedin service prior to the RCS Tavg exceeding 140°F and (2) the fan's function? (1) Control Rod Drive Mechanism Fans (2) To prevent insulation degradation and subsequent CRDM failure. (1) Containment Fan Coolers (2) Provides cooling to the RCPs during normal and abnormal operation (1) Primary Shield Cooling Fan (2) To minimize concrete dehydration and subsequent structural damage (1) Containment Fan Coil Units (2) Provides cooling to CNMT during normal and abnormal operation A.B.C.D. Friday, October 31, 2014 10:19:18 AM 55 Rev. FINAL 2014 NRC RO Written Exam | ||
: 56. Which ONE of the following completes the statements below?The main power supply for the Rod Control Logic Cabinet is from (1) | : 56. Which ONE of the following completes the statements below?The main power supply for the Rod Control Logic Cabinet is from (1) | ||
. The output of the Rod Control Logic Cabinet sends multiplexing signals to the (2) | . The output of the Rod Control Logic Cabinet sends multiplexing signals to the (2) | ||
Line 252: | Line 244: | ||
: 58. Which ONE of the following completes the statements below?If a Core Exit Thermocouple fails the RVLIS plasma display panel will read (1) | : 58. Which ONE of the following completes the statements below?If a Core Exit Thermocouple fails the RVLIS plasma display panel will read (1) | ||
.A method to locally obtain Core Exit Thermocouple temperatures at the Train specificpanel OUTSIDE the Control Room is to use the (2) | .A method to locally obtain Core Exit Thermocouple temperatures at the Train specificpanel OUTSIDE the Control Room is to use the (2) | ||
. (1) 50°F (2) CRT monitor and keyboard (1) 50°F (2) thumbwheels set to specific points identified by a legend (1) 2500°F | . (1) 50°F (2) CRT monitor and keyboard (1) 50°F (2) thumbwheels set to specific points identified by a legend (1) 2500°F (2) CRT monitor and keyboard | ||
(1) 2500°F (2) thumbwheels set to specific points identified by a legend A.B.C.D. Friday, October 31, 2014 10:19:18 AM 58 Rev. FINAL 2014 NRC RO Written Exam | (1) 2500°F (2) thumbwheels set to specific points identified by a legend A.B.C.D. Friday, October 31, 2014 10:19:18 AM 58 Rev. FINAL 2014 NRC RO Written Exam | ||
Line 265: | Line 255: | ||
- The Accumulators are being vented in accordance with OP-110, Safety Injection | - The Accumulators are being vented in accordance with OP-110, Safety Injection | ||
- The O 2 concentration outside the restricted area is reported 'low'Subsequently: - The running Containment Pre-Entry Purge fan tripped on motor overload | - The O 2 concentration outside the restricted area is reported 'low'Subsequently: - The running Containment Pre-Entry Purge fan tripped on motor overload | ||
- The crew secured venting the AccumulatorIn accordance with OP-110, which ONE of the following completes the statementsbelow?The | - The crew secured venting the AccumulatorIn accordance with OP-110, which ONE of the following completes the statementsbelow?The O 2 concentration outside the restricted area is required to be above a MINIMUM of (1) | ||
. Prior to recommencing the Accumulator venting the crew is required to (2) | . Prior to recommencing the Accumulator venting the crew is required to (2) | ||
. (1) 23.5% (2) run all standby Containment Fan coolers for a minimum of 4 hours forContainment atmosphere mixing (1) 23.5% (2) ensure the O 2 concentration is restored above the minimum concentrationlevel (1) 19.5% | . (1) 23.5% (2) run all standby Containment Fan coolers for a minimum of 4 hours forContainment atmosphere mixing (1) 23.5% (2) ensure the O 2 concentration is restored above the minimum concentrationlevel (1) 19.5% | ||
(2) run all standby Containment Fan coolers for a minimum of 4 hours forContainment atmosphere mixing (1) 19.5% | (2) run all standby Containment Fan coolers for a minimum of 4 hours forContainment atmosphere mixing (1) 19.5% | ||
(2) ensure the O 2 concentration is restored above the minimum | (2) ensure the O 2 concentration is restored above the minimum concentrationlevel A.B.C.D. Friday, October 31, 2014 10:19:18 AM 60 Rev. FINAL 2014 NRC RO Written Exam | ||
: 61. Given the following plant conditions: - A 20% Turbine load rejection has occurred from 100% power | : 61. Given the following plant conditions: - A 20% Turbine load rejection has occurred from 100% power | ||
- During the transient the Steam Dump control system malfunctioned After the plant stablilized: - Group 1 Steam Dumps indicate dual position on SLB-1 | - During the transient the Steam Dump control system malfunctioned After the plant stablilized: - Group 1 Steam Dumps indicate dual position on SLB-1 | ||
- Reactor power is ~ 7.5% higher than Turbine power | - Reactor power is ~ 7.5% higher than Turbine power | ||
- | - T avg and Tref are matched (Assume no operator action and use THUMBRULE values when determining theanswer)For this condition, which ONE of the following identifies how far the Steam Dumpvalves must be open to cause the current plant conditions?7.5% 25%50%75%A.B.C.D. Friday, October 31, 2014 10:19:18 AM 61 Rev. FINAL 2014 NRC RO Written Exam | ||
: 62. Given the following plant conditions: - The unit is operating at 100% powerSubsequently: - A Turbine Trip signal occurs - One Throttle Valve failed to close | : 62. Given the following plant conditions: - The unit is operating at 100% powerSubsequently: - A Turbine Trip signal occurs - One Throttle Valve failed to close | ||
- All Governor Valves are indicating closedWhich ONE of the following completes the statements below?Assuming NO operator actions have occurred after the Turbine has tripped, SGpressure will (1) immediately following the trip.In accordance with EOP-E-0, Reactor Trip Or Safety Injection, the operator is FIRSTrequired to (2) | - All Governor Valves are indicating closedWhich ONE of the following completes the statements below?Assuming NO operator actions have occurred after the Turbine has tripped, SGpressure will (1) immediately following the trip.In accordance with EOP-E-0, Reactor Trip Or Safety Injection, the operator is FIRSTrequired to (2) | ||
Line 303: | Line 293: | ||
- REM-3502B, Containment Pre-Entry Purge Which ONE of the following describes the effect on these monitors if a ContainmentIsolation Phase 'A' actuation occurs? | - REM-3502B, Containment Pre-Entry Purge Which ONE of the following describes the effect on these monitors if a ContainmentIsolation Phase 'A' actuation occurs? | ||
REM-3502A | REM-3502A REM-3502B remains in service remains in service remains in service is isolated is isolated | ||
REM-3502B remains in service remains in service remains in service is isolated is isolated | |||
remains in service is isolated | remains in service is isolated | ||
Line 329: | Line 317: | ||
- RCS water level continues to lowerWhich ONE of the following is the action required by AOP-020 to mitigate the event?Start the 'B' CSIP with flow through 1SI-3 and 1SI-4, BIT Outlet ValvesStart the 'B' CSIP with flow through 1SI-52, Alternate High Head SI to Cold LegValveAlign 'A' RHR Pump for Low Head SI with flow through 1SI-340, Low Head SI TrainA to Cold Leg ValveAlign 'A' RHR Pump for Low Head SI with flow through 1SI-359, Low Head SITrains A & B to Hot Leg valve A.B.C.D.You have completed the test! Friday, October 31, 2014 10:19:18 AM 75 Rev. FINAL ANSWER KEY REPORTfor 2014 NRC RO Written Exam Test Form: 0 Answers 0#ID12014 NRC RO 1B22014 NRC RO 2C 32014 NRC RO 3A 42014 NRC RO 4D 52014 NRC RO 5A 62014 NRC RO 6A 72014 NRC RO 7C 82014 NRC RO 8D 92014 NRC RO 9A 102014 NRC RO 10C 112014 NRC RO 11D 122014 NRC RO 12A 132014 NRC RO 13D 142014 NRC RO 14D 152014 NRC RO 15D 162014 NRC RO 16A 172014 NRC RO 17B 182014 NRC RO 18A 192014 NRC RO 19A 202014 NRC RO 20A 212014 NRC RO 21B 222014 NRC RO 22D 232014 NRC RO 23D 242014 NRC RO 24D 252014 NRC RO 25B 262014 NRC RO 26A 272014 NRC RO 27C 282014 NRC RO 28D 292014 NRC RO 29C 302014 NRC RO 30B 312014 NRC RO 31C 322014 NRC RO 32C 332014 NRC RO 33B 342014 NRC RO 34A 352014 NRC RO 35C 362014 NRC RO 36D 372014 NRC RO 37D 382014 NRC RO 38B 392014 NRC RO 39B 402014 NRC RO 40D 412014 NRC RO 41B 422014 NRC RO 42A 432014 NRC RO 43D 442014 NRC RO 44B 452014 NRC RO 45C 462014 NRC RO 46A 472014 NRC RO 47CFriday, October 31, 2014 10:28:05 AM 1 | - RCS water level continues to lowerWhich ONE of the following is the action required by AOP-020 to mitigate the event?Start the 'B' CSIP with flow through 1SI-3 and 1SI-4, BIT Outlet ValvesStart the 'B' CSIP with flow through 1SI-52, Alternate High Head SI to Cold LegValveAlign 'A' RHR Pump for Low Head SI with flow through 1SI-340, Low Head SI TrainA to Cold Leg ValveAlign 'A' RHR Pump for Low Head SI with flow through 1SI-359, Low Head SITrains A & B to Hot Leg valve A.B.C.D.You have completed the test! Friday, October 31, 2014 10:19:18 AM 75 Rev. FINAL ANSWER KEY REPORTfor 2014 NRC RO Written Exam Test Form: 0 Answers 0#ID12014 NRC RO 1B22014 NRC RO 2C 32014 NRC RO 3A 42014 NRC RO 4D 52014 NRC RO 5A 62014 NRC RO 6A 72014 NRC RO 7C 82014 NRC RO 8D 92014 NRC RO 9A 102014 NRC RO 10C 112014 NRC RO 11D 122014 NRC RO 12A 132014 NRC RO 13D 142014 NRC RO 14D 152014 NRC RO 15D 162014 NRC RO 16A 172014 NRC RO 17B 182014 NRC RO 18A 192014 NRC RO 19A 202014 NRC RO 20A 212014 NRC RO 21B 222014 NRC RO 22D 232014 NRC RO 23D 242014 NRC RO 24D 252014 NRC RO 25B 262014 NRC RO 26A 272014 NRC RO 27C 282014 NRC RO 28D 292014 NRC RO 29C 302014 NRC RO 30B 312014 NRC RO 31C 322014 NRC RO 32C 332014 NRC RO 33B 342014 NRC RO 34A 352014 NRC RO 35C 362014 NRC RO 36D 372014 NRC RO 37D 382014 NRC RO 38B 392014 NRC RO 39B 402014 NRC RO 40D 412014 NRC RO 41B 422014 NRC RO 42A 432014 NRC RO 43D 442014 NRC RO 44B 452014 NRC RO 45C 462014 NRC RO 46A 472014 NRC RO 47CFriday, October 31, 2014 10:28:05 AM 1 | ||
ANSWER KEY REPORTfor 2014 NRC RO Written Exam Test Form: 0 Answers 0#ID482014 NRC RO 48D492014 NRC RO 49B 502014 NRC RO 50A 512014 NRC RO 51B 522014 NRC RO 52B 532014 NRC RO 53A 542014 NRC RO 54D 552014 NRC RO 55C 562014 NRC RO 56C 572014 NRC RO 57D 582014 NRC RO 58B 592014 NRC RO 59D 602014 NRC RO 60D 612014 NRC RO 61C 622014 NRC RO 62B 632014 NRC RO 63A 642014 NRC RO 64B 652014 NRC RO 65C 662014 NRC RO 66A 672014 NRC RO 67C 682014 NRC RO 68D 692014 NRC RO 69B 702014 NRC RO 70C 712014 NRC RO 71D 722014 NRC RO 72C 732014 NRC RO 73B 742014 NRC RO 74D 752014 NRC RO 75CFriday, October 31, 2014 10:28:05 AM 2 | ANSWER KEY REPORTfor 2014 NRC RO Written Exam Test Form: 0 Answers 0#ID482014 NRC RO 48D492014 NRC RO 49B 502014 NRC RO 50A 512014 NRC RO 51B 522014 NRC RO 52B 532014 NRC RO 53A 542014 NRC RO 54D 552014 NRC RO 55C 562014 NRC RO 56C 572014 NRC RO 57D 582014 NRC RO 58B 592014 NRC RO 59D 602014 NRC RO 60D 612014 NRC RO 61C 622014 NRC RO 62B 632014 NRC RO 63A 642014 NRC RO 64B 652014 NRC RO 65C 662014 NRC RO 66A 672014 NRC RO 67C 682014 NRC RO 68D 692014 NRC RO 69B 702014 NRC RO 70C 712014 NRC RO 71D 722014 NRC RO 72C 732014 NRC RO 73B 742014 NRC RO 74D 752014 NRC RO 75CFriday, October 31, 2014 10:28:05 AM 2 | ||
201 4 NRC RO Question 69 Reference}} |
Revision as of 09:45, 9 July 2018
ML14338A036 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 12/03/2014 |
From: | NRC/RGN-II |
To: | |
References | |
Download: ML14338A036 (78) | |
Text
2014 NRC RO Written Exam
- 1. Which ONE of the following completes the statement below?The response of Reactor power level following a Reactor trip from 100% power ischaracterized by a prompt drop (1)
, followed by a -1/3 DPM startup rate forapproximately (2)
. (1) of approximately 3 decades as indicated on NI-35 and NI-36 (2) 20 minutes (1) to approximately 5% power as indicated on PR-41, PR-42, PR-43 and PR-44 (2) 20 minutes (1) of approximately 3 decades as indicated on NI-35 and NI-36 (2) 3-4 hours (1) to approximately 5% power as indicated on PR-41, PR-42, PR-43 and PR-44 (2) 3-4 hours A.B.C.D. Friday, October 31, 2014 10:19:17 AM 1 Rev. FINAL 2014 NRC RO Written Exam
- 2. Given the following plant conditions: - The unit is operating at 100% powerSubsequently: - A Loss of Offsite Power occurred - ONE PRZ PORV is partially OPEN
- PRZ pressure is 1785 psig
- PRT pressure is 35 psig Which of the following completes the statements below for the current conditions?The temperature indicated on the PRZ PORV Tailpipe Temperature Indicator, TI-463, is (1)
.As PRT pressure continues to rise the rupture discs on the PRT will rupture at (2) psig. (1) 622°F (2) 100 (1) 622°F (2) 150 (1) 280°F (2) 100 (1) 280°F (2) 150 A.B.C.D. Friday, October 31, 2014 10:19:17 AM 2 Rev. FINAL 2014 NRC RO Written Exam
- 3. Given the following plant conditions: - The unit was operating at 100% powerSubsequently the following occurs: - Small Break LOCA - Loss Of Offsite Power Currently: - The crew is implementing EOP-ES-1.2, Post LOCA Cooldown and Depressurization - PRZ level is off scale low - The OATC has been directed to depressurize the RCS to refill the PRZWhich ONE of the following actions will be performed by the OATC to initiate the RCSdepressurization?
OPEN one PRZ PORVOPEN 1CS-487, PRZ Aux Spray valvePlace both PRZ Spray Valves to MANUAL and increase the demand signal toOPEN both valves Place PK-444.1, Master Pressure Controller, to MANUAL and increase the demandsignal to OPEN both PRZ Spray Valves A.B.C.D. Friday, October 31, 2014 10:19:17 AM 3 Rev. FINAL 2014 NRC RO Written Exam
- 4. Given the following plant conditions: - The unit was operating at 100% powerSubsequently a Large Break LOCA has occured.Which ONE of the following describes the characteristics of a design basis Large BreakLOCA one (1) minute into the event in accordance with the FSAR?RCS temperature is approximately (1)
. RCS pressure is stable at approximately (2)
. (1) 538°F (2) 625 psig (1) 538°F (2) 45 psig (1) 292°F (2) 625 psig (1) 292°F (2) 45 psig A.B.C.D. Friday, October 31, 2014 10:19:17 AM 4 Rev. FINAL 2014 NRC RO Written Exam
- 5. Given the following plant conditions: - The unit is in Mode 1
- UAT's are supplying power to the Aux Buses
- Current MCB Bypass Permissive and Trip Status Light Box indicate the following: - P-7 LIT - P-8 EXTINGUISHED
- P-10 LIT
- P-13 EXTINGUISHEDA fault on breaker 108, Unit Aux Xfmr A to Aux Bus A, causes the breaker to open. Which ONE of the following completes the statement below concerning the plantresponse and reason for the current condition?An Auto Reactor trip will (1) because of the status of (2)
. (1) occur (2) P-7 (1) occur (2) P-13 (1) NOT occur (2) P-8 (1) NOT occur (2) P-10 A.B.C.D. Friday, October 31, 2014 10:19:17 AM 5 Rev. FINAL 2014 NRC RO Written Exam
- 6. Given the following plant conditions: - The unit is operating at 100% power
- The following annunciators have just gone into alarm: - ALB-008-5-3, RCP-C Seal #1 Leakoff High Low Flow - ALB-006-1-1, Charging Pumps Disch Header High-Low Flow
- 'A' CSIP pump amps have risen from 54 amps to 60 amps
- PI-121, Charging Header Pressure, lowers from 2400 psig to 2125 psig
- Charging flow controller FK-122.1 demand is rising - RCP seal injection flows are: A RCP = 5.1 gpm B RCP = 5.0 gpm C RCP = 4.9 gpm
Which ONE of the following is the required response to these conditions in accordancewith AOP-018, Reactor Coolant Pump Abnormal Conditions?Stop the running CSIP due to charging leakage and then monitor ASI pumpoperation.Stop the running CSIP due to a shaft shear and then start the standby CSIP.Backflush the seal water injection and return filters due to filter blockage.Trip the Reactor, secure all RCP's and shut all RCP seal water return valves due tofilter blockage.
A.B.C.D. Friday, October 31, 2014 10:19:17 AM 6 Rev. FINAL 2014 NRC RO Written Exam
- 7. Given the following plant conditions: - The plant is in Mode 6 and the core reload is in progress
- The second assembly has been taken from the upender and is on its way to the core - 'A' Train RHR is in service - 'B' Train RHR is under clearance for breaker overhaul and will be returned toservice in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> - Cavity level is 23 feet 4 inches above the Reactor Vessel Flange
- RCS temperature is 80°F Subsequently: - 'A' RHR Pump trips Which ONE of the following is a correct response for the given conditions?Actuate Phase A Isolation. Continue refueling activities for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
Suspend fuel movement immediately.Immediately verify all Containment penetrations closed.
A.B.C.D. Friday, October 31, 2014 10:19:17 AM 7 Rev. FINAL 2014 NRC RO Written Exam
- 8. Given the following plant conditions: - The unit is in Mode 4, performing a cooldown on RHR
- Both trains of CCW are in service
- NSW pump 'A' is operating; NSW pump 'B' is in standbySubsequently the 'A' NSW pump trips on an overcurrent condition.Which ONE of the following completes the statement below?
The ESW pumps will start on a (1) signal to cool (2)
. (1)
(2) breaker trip Train 'A' CCW ONLY low pressure Train 'A' CCW ONLY breaker trip BOTH trains of CCW low pressure BOTH trains of CCW A.B.C.D. Friday, October 31, 2014 10:19:17 AM 8 Rev. FINAL 2014 NRC RO Written Exam
- 9. Which ONE of the following completes the statements below?In accordance with the EOP Basis Document, the reason(s) for tripping the MainTurbine during an ATWS is to prevent (1)
.In accordance with EOP-FR-S.1, Response to Nuclear Power Generation/ATWS, thefirst verification that the Main Turbine has tripped will be to check Turbine (2)
. (1) adding positive reactivity and conserve SG inventory (2) Stop Valve position (on TSLB 2) (1) adding positive reactivity and conserve SG inventory (2) Governor Valve position (on DEH Panel B) (1) pressurized thermal shock (2) Stop Valve position (on TSLB 2) (1) pressurized thermal shock (2) Governor Valve position (on DEH Panel B)
A.B.C.D. Friday, October 31, 2014 10:19:17 AM 9 Rev. FINAL 2014 NRC RO Written Exam
- 10. Given the following plant conditions: - The unit was operating at 100% power, a Reactor Trip and Safety Injection haveoccurred due to a steam line break in Containment on the 'B' SGCurrent plant conditions are as follows:
- Containment pressure is 28 psig
- The crew has transitioned from EOP-E-0, Reactor Trip or Safety Injection and are atstep 1 of EOP-E-2, Faulted Steam Generator Isolation Which ONE of the following identifies the set of valves listed below that are expected tobe in the SHUT position for the current plant conditions?
- 1. All MSIV's 2. 1MS-70, Main Steam B to Aux FW Turbine
- 4. ONLY 'B' MSIV 5. All Blowdown isolation valves 6. 1SI-3, BIT Outlet 1, 2 and 3 4, 5 and 6 1, 3 and 5 2, 4 and 6 A.B.C.D. Friday, October 31, 2014 10:19:17 AM 10 Rev. FINAL 2014 NRC RO Written Exam
- 11. Given the following plant conditions: - The unit has just entered Mode 2
- 1B MFW pump is in operation and trips due to low lubricating oil pressureOne (1) minute later the following plant conditions exist: - Multiple Containment radiation monitors are in alarm - Containment pressure is 13.2 psig and rising
- RCS pressure is 650 psig and lowering
- Tavg is 342°F and lowering
- SG pressures are 1106 psig - SG levels are: 'A' 23% slowly rising 'B' 22% slowly rising 'C' 24% slowly risingGiven the current plant conditions, which ONE of the following completes the statementbelow?The Main Feedwater system
required to maintain a heat sink.continues to operate and is continues to operate but is not has been automatically isolated and AFW ishas been automatically isolated and AFW is not A.B.C.D. Friday, October 31, 2014 10:19:17 AM 11 Rev. FINAL 2014 NRC RO Written Exam
- 12. Given the following plant conditions: - The unit is operating at 100% power
- 1 minute ago the crew completed an ESCW Chiller swap from the 'A' Chiller to the 'B' Chiller Subsequently: - A loss of Off-site power has occurredThe Safeguards Actuation verification is in progress in accordance with EOP-E-0,Reactor Trip or Safety Injection, Attachment 3. Which ONE of the following identifies the current status of ESCW chillers WC-2A andWC-2B?Both will restart via sequencer operation on their respective buses. Both will restart immediately upon restoration of power of their respective bus.Neither will be running but can be manually restarted after the 30 minuteanti-recycle interlock has timed out.Neither will be running but could be manually restarted after verifying Load Block 9was reached on their respective sequencer. A.B.C.D. Friday, October 31, 2014 10:19:17 AM 12 Rev. FINAL 2014 NRC RO Written Exam
- 13. Given the following plant conditions: - The plant is at 100% power
- 'B' Train equipment is in service
- 'A' EDG is running for testingSubsequently the following occurs: - A Normal Service Water System rupture occurs
- 1A-SA ESW Pump tripped one minute ago and cannot be restartedWhich ONE of the following describes a required action and the reason for the action?Isolate Letdown due to loss of 'B' CSIP.Isolate Letdown due to loss of cooling to Letdown Heat Exchanger.Emergency Stop 'A' EDG due to loss of ESW to 'A' EDG Air Compressors.Emergency Stop 'A' EDG due to loss of ESW to 'A' EDG Jacket Water Cooler.
A.B.C.D. Friday, October 31, 2014 10:19:17 AM 13 Rev. FINAL 2014 NRC RO Written Exam
- 14. Given the following plant conditions: - A Reactor and Turbine startup is in progress
- Reactor power is 6% Subsequently a leak has developed in the Instrument Air system and air pressureindications are as follows:
Time IA pressure 1107 76.6 psig 1110 64.2 psig 1113 58.9 psig 1116 34.7 psig
Based on the plant conditions, which ONE of the following identifies the EARLIESTtime the Reactor is required to be tripped in accordance with AOP-017, Loss ofInstrument Air?
11071110 1113 1116 A.B.C.D. Friday, October 31, 2014 10:19:17 AM 14 Rev. FINAL 2014 NRC RO Written Exam
- 15. Given the following plant conditions: - A Reactor Trip and Safety Injection have occurred from 100% power
- The crew has transitioned to EOP-ECA-1.2, LOCA Outside Containment
- 1RH-1 and 1RH-2, RCS Loop A to RHR Pump A-SA, BOTH indicate partially OPENWhich ONE of the following identifies: (1) The action required to ALLOW shutting 1RH-1 and 1RH-2 from the MCB AND (2) The MCB parameter and trend that is used in EOP-ECA-1.2 to determine if thisaction has isolated the break? (1) turn ON the control power switch on the MCB (2) PRZ level rising (1) turn ON the control power switch on the MCB (2) RCS pressure rising (1) CLOSE the breakers for 1RH-1 and 1RH-2 locally (2) PRZ level rising (1) CLOSE the breakers for 1RH-1 and 1RH-2 locally (2) RCS pressure rising A.B.C.D. Friday, October 31, 2014 10:19:17 AM 15 Rev. FINAL 2014 NRC RO Written Exam
- 16. Given the following plant conditions: - The unit was operating at 100% power
- MDAFW pump 'B' is under clearanceSubsequently the following occurs: - A manual Reactor Trip was initiated due to a loss of both MFPs
- The TDAFW pump tripped after starting
- MDAFW flow control valves are full open
- SG NR levels are 43% and lowering
- Containment pressure is 0.5 psigWhich ONE of the following would be the FIRST set of conditions that would requireentry into EOP-FR-H.1, Response to Loss of Secondary Heat Sink?All SG NR levels are (1)
AND total AFW flow is (2)
. (1) 24% (2) 200 KPPH (1) 24% (2) 220 KPPH (1) 39% (2) 200 KPPH (1) 39%
(2) 220 KPPH A.B.C.D. Friday, October 31, 2014 10:19:17 AM 16 Rev. FINAL 2014 NRC RO Written Exam
- 17. Given the following plant conditions: - The unit was operating at 100% power and has experienced a large break LOCA - The RHR system is NOT capable of cold leg recirculation and the crew hastransitioned from EOP-E-1, Loss of Reactor or Secondary Coolant to EOP-ECA-1.1,Loss of Emergency Co olant Recirculation - RWST level is 45%The following conditions exist 15 minutes later: - One Containment Spray pump and two CSIPs and are running
- Containment pressure is 12 psig and lowering - RWST level is 2.7% and loweringWhich ONE of the following identifies the required crew actions for operation of theCSIPs and Containment Spray pumps? Allow CSIPs AND Containment Spray pumps to operateStop CSIPs, allow Containment Spray pumps to operateAllow CSIPs to operate, stop Containment Spray pumpsStop CSIPs AND Containment Spray pumps A.B.C.D. Friday, October 31, 2014 10:19:17 AM 17 Rev. FINAL 2014 NRC RO Written Exam
- 18. Given the following plant conditions: - The unit is operating at 100% power
- The Load Dispatcher reports a large disturbance occurring on the grid The following conditions are observed:
Time Grid Frequency (Hz) 0107 59.6 0110 59.2 0114 58.9 0116 58.7 0119 58.5 0121 58.3
Which ONE of the following describes (1) the EARLIEST time that the Reactor must betripped in accordance with AOP-028, Grid Instability and (2) what is the basis for thatReactor Trip? (1) 0119 (2) Continued operation in this condition could lead to high temperatures in thegenerator and subsequent insulation degradation (1) 0121 (2) Continued operation in this condition could lead to high temperatures in thegenerator and subsequent insulation degradation (1) 0119 (2) Provides core protection against DNB as a result of underfrequency on morethan one RCP (1) 0121 (2) Provides core protection against DNB as a result of underfrequency on more than one RCP A.B.C.D. Friday, October 31, 2014 10:19:17 AM 18 Rev. FINAL 2014 NRC RO Written Exam
- 19. During a plant startup Control Bank D rods B8 and H14 continued to step out afteroutward demand had stopped.Rods were placed to manual and all rod motion stopped.Current Rod Control status is as follows: - Control Bank D group step counter demand is 174 and 173 steps
- DRPI indication for Control Rods B08 and H14 indicate 192 stepsWhich ONE of the following completes the statement below identifying the TechicalSpecification LCO that is NOT met for this condition and the reason why?Technical Specification (1) to ensure that (2)
.(Assume Control Bank D rods remain at the current positions) (1) 3.1.3.1, Movable Control Assemblies - Group Height (2) acceptable power distribution limits are maintained (1) 3.1.3.1, Movable Control Assemblies - Group Height (2) DNBR in the core is
> the design DNBR value (1) 3.1.3.2, Position Indication Systems - Operating (2) acceptable power distribution limits are maintained (1) 3.1.3.2, Position Indication Systems - Operating (2) DNBR in the core is
> the design DNBR value A.B.C.D. Friday, October 31, 2014 10:19:17 AM 19 Rev. FINAL 2014 NRC RO Written Exam
- 20. Given the following plant conditions: - The unit is in Mode 6 with refueling in progress
- A spent fuel assembly is being move d in the Fuel Handling Building (FHB) when it's damaged by contacting a wall of the pool
- Spent Fuel Pool area radiation monitor RM-1FR-3566A-SA is in HIGH alarm - Spent Fuel Pool area radiation monitor RM-1FR-3567B-SB is in ALERTWhich ONE of the following describes the effect on the Fuel Handling HVAC system?ONLY "A" train of Fuel Handling Building Ventilation Emergency Exhaust hasreceived an automatic start signal.BOTH "A" and "B" trains of Fuel Handling Building Ventilation Emergency Exhausthave received automatic start signals.NEITHER train of Fuel Handling Building Ventilation Emergency Exhaust hasreceived an automatic start signal, but manual start is required.NEITHER train of Fuel Handling Building Ventilation Emergency Exhaust hasreceived an automatic start signal, and manual start is NOT required.
A.B.C.D. Friday, October 31, 2014 10:19:17 AM 20 Rev. FINAL 2014 NRC RO Written Exam
- 21. With the unit operating at 100% power a tube leak develops on the 'C' SG Current plant conditions are as follows: - RCS and 'C' SG pressures have been equalized at 980 psig - ERFIS is NOT available - The CRS directs steam to be dumped until the RCS is subcooled by 40°FIn accordance with AOP-016, Excessive Primary Plant Leakage, which ONE of thefollowing completes the statement below?PREFERRED RCS temperature indication will be obtained using (1) and theRCS cooldown will be stopped when the RCS is at (2)
. (1) highest core exit T/C (2) 500°F (1) highest core exit T/C (2) 504°F (1) active loop WR Thot (2) 500°F (1) active loop WR Thot (2) 504°F A.B.C.D. Friday, October 31, 2014 10:19:17 AM 21 Rev. FINAL 2014 NRC RO Written Exam
- 22. Given the following plant conditions: - The plant is operating at 58% power during a Reactor startup in accordance withGP-005, Power OperationSubsequently: - The crew is experiencing Condenser vacuum problems and are implementingAOP-012, Partial Loss of Condenser Vacuum - Load is being reduced in accordance with AOP-038, Rapid DownpowerCurrent Condenser conditions are: - Condenser Zone 1 pressure is 4.9 inches Hg absolute - Condenser Zone 2 pressure is 5.1 inches Hg absoluteWhich ONE of the following completes the statements below?
For the current plant conditions the C-7A status light is (1) and alarmALB-018-1-1, Turbine Trip Condenser Low Vacuum, is (2)
. (1)
(2)
ON ON OFF ON ON OFF OFF OFF A.B.C.D.Friday, October 31, 2014 10:19:17 AM 22 Rev. FINAL 2014 NRC RO Written Exam
- 23. Given the following plant conditions: - The unit was operating at 100% power
- The MCR was evacuated due to a fire
- Off-site power was lost as the crew evacuated the MCRSubsequently: - AOP-004, Remote Shutdown is in progress and transfer to the ACP has just been completedIn accordance with AOP-004, which ONE of the following describes the requiredactions to take for EDG operation?Locally restart and load BOTH EDGs. Locally restart and load ONLY the 'B' EDG.Check ONLY 'B' EDG has energized its emergency bus. 'A' EDG is not required forsafe shutdown.Check that BOTH emergency busses are energized.
A.B.C.D. Friday, October 31, 2014 10:19:17 AM 23 Rev. FINAL 2014 NRC RO Written Exam
- 24. Given the following plant conditions: - The crew is performing EOP-ES-0.4, Natural Circulation Cooldown With SteamVoid In Vessel Without RVLIS Current plant conditions are: - RCS pressure is 1600 psig
- All hot leg temperatures are 449°F and stable
- Pressurizer level is 30%
- Letdown flow is 60 gpm
- Total RCP Seal Return Flow is 8 gpm - Total RCP Seal Injection Flow is 27 gpm - A RCS depressurization to 800 psig is about to be performedWhich ONE of the following completes the statement below?
Charging flow should be adjusted to (1) gpm prior to starting the depressurizationin order to (2)
. (1) 33 (2) accommodate void growth (1) 33 (2) allow accurate monitoring of void growth (1) 41 (2) accommodate void growth (1) 41 (2) allow accurate monitoring of void growth A.B.C.D. Friday, October 31, 2014 10:19:17 AM 24 Rev. FINAL 2014 NRC RO Written Exam
- 25. Given the following plant conditions: - EOP-FR-C.2, Response to Degraded Core Cooling is in progress due to anORANGE condition on the Core Cooling CSFST - RCPs 'A' and 'C' are running; RCP 'B' is secured
- Both CSIPs are tripped - The crew is about to depressurize all SGs to atmospheric pressureWhich ONE of the following completes the statement below describing the RCPoperational requirement and the EOP basis for RCP operation from this point forwardin EOP-FR-C.2?RCPs are
.stopped to reduce heat input into the RCS stopped because number 1 seal differential pressure will be lostleft running to provide core cooling until ECCS flow is established left running as long as net positive suction head exists A.B.C.D. Friday, October 31, 2014 10:19:17 AM 25 Rev. FINAL 2014 NRC RO Written Exam
- 26. Given the following plant conditions: - The plant was operating at 100% power
- A Small Break LOCA has occurred
- FR-P.1, Response to Imminent Pressurized Thermal Shock is in progressSubsequently: - The RCS Tavg cooldown rate was determined to be 240°F in the last hourWhich ONE of the following completes the statement below concerning the MINIMUMRCS soak time requirements and the reason for the soak in accordance with FRP-P.1?A RCS soak period of (1) is required for the current plant conditions to (2)
. (1) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (2) relieve Reactor vessel stress to enhance and maintain vessel integrity (1) 29 hours3.356481e-4 days <br />0.00806 hours <br />4.794974e-5 weeks <br />1.10345e-5 months <br /> (2) allow time for the vessel head to cool to prevent voiding during the subsequentdepressurization (1) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (2) allow time for the vessel head to cool to prevent voiding during the subsequentdepressurization (1) 29 hours3.356481e-4 days <br />0.00806 hours <br />4.794974e-5 weeks <br />1.10345e-5 months <br /> (2) relieve Reactor vessel stress to enhance and maintain vessel integrity A.B.C.D. Friday, October 31, 2014 10:19:17 AM 26 Rev. FINAL 2014 NRC RO Written Exam
- 27. Given the following plant conditions: - A LOCA has occurred - 480V Emergency Bus 1A2-SA de-energized due to a ground fault
- The crew is performing EOP-E-1, Loss Of Reactor Or Secondary Coolant The following conditions exist in Containment: - Containment Pressure is 10.3 psig and rising slowly - Containment Sump Level is 210 inches and rising slowly - High Range Containment Post LOCA Radiation Monitors are in alarmWhich ONE of the following completes the statement below?
Enter (1)
AND sample the (2)
. (1) EOP-FR-Z.1, Response to High Containment Pressure (2) Containment Sumps (1) EOP-FR-Z.1, Response to High Containment Pressure (2) 'A' ESW Return Header (1) EOP-FR-Z.2, Response to Containment Flooding (2) Containment Sumps (1) EOP-FR-Z.2, Response to Containment Flooding (2) 'A' ESW Return Header A.B.C.D. Friday, October 31, 2014 10:19:17 AM 27 Rev. FINAL 2014 NRC RO Written Exam
- 28. Given the following plant conditions: - The unit is operating at 100% power with "A" Train equipment in serviceSubsequently a fault causes 6.9KV Emerg Bus A-SA to Aux Bus D Tie Breaker 105 to open.Plant conditions are as follows: - 'A' EDG has failed to start
- The crew enters AOP-025, Loss of One Emergency AC Bus or One Emergency DCBus and starts 'B' CSIP but the pump immediately trips on overcurrentWhich ONE of the following identifies how RCP seal injection will be restored?RCP seal injection FLOW
.must be manually restored at the ASI System Control Panel by placing the ASIPump switch to "START"must be manually restored at the ASI System Control Panel by selecting 'BYPASS'for both squib valves then manually starting the ASI pump will be restored automatically by the ASI system when the squib valves open andthe pump starts simultaneouslywill be restored automatically by the ASI system when the squib valves open andthe pump starts 15 seconds later A.B.C.D. Friday, October 31, 2014 10:19:17 AM 28 Rev. FINAL 2014 NRC RO Written Exam
- 29. A plant transient resulted in the crew reducing power from 100%
Current plant conditions are as follows:
- Power is stable at 50% - Median Tavg is stable at 572.9°F - PRZ pressure is stable at 2252 psig
- PRZ level is NOT matched with program level and is at 44.2%Based on current plant conditions, which ONE of the following completes thestatements below?Charging flow will (1) to return PRZ level to program. The Pressurizer (2)
. (1) rise (2) Group 'C' heaters will be at minimum (1) rise (2) spray valves will be open (1) lower (2) Group 'C' heaters will be at minimum (1) lower (2) spray valves will be open A.B.C.D. Friday, October 31, 2014 10:19:17 AM 29 Rev. FINAL 2014 NRC RO Written Exam
- 30. Which ONE of the following completes the statements below?During full power operation the CSIP normal miniflow valve (1) to provide lowflow protection.Flow from the miniflow valve returns to the (2)
. (1) is open (2) CSIP suction (1) is open (2) top of the VCT (1) throttles (2) CSIP suction (1) throttles (2) top of the VCT A.B.C.D. Friday, October 31, 2014 10:19:17 AM 30 Rev. FINAL 2014 NRC RO Written Exam
- 31. Given the following plant initial conditions: - The plant is in Mode 4
- RHR Train 'A' is in service - 1RH-20, RHR Heat XCHG A BYP Flow Cont FK-605A1 is in manual with the outputat 40% to maintain 3750 GPM - 1RH-30, RHR Heat XCHG A Out Flow Cont HC-603A1 demand position is set at 30%Plant final conditions:
- The Instrument Air supply line to RHR Heat Exchanger Outlet Valve 1RH-30 has become severed and is completely detachedWhich ONE of the following describes the RHR system parameter changes from theinitial steady state condition to final steady state condition?
FI-605A1 (HX 'A' RHR HDR FLOW) Higher Lower Higher Higher Lower Higher Lower Lower A.B.C.D. Friday, October 31, 2014 10:19:17 AM 31 Rev. FINAL 2014 NRC RO Written Exam
- 32. Given the following plant conditions: - The unit is in Mode 6 with a core reload in progress
- 'A' RHR pump is in operation
- 'B' RHR pump is in standby - Cavity level is 23 feet 3 inches above the Reactor Vessel FlangeThe following occurs: - RP reports to the MCR that a large crack has developed in a pipe in Containment - 'A' RHR pump discharge pressure is lowering
- Refueling Cavity level is very slowly lowering - The Refueling SRO reports that the Containment side upender has an assembly init and the upender will not raise Entry conditions are satisfied for which of the following procedures?
- 1) AOP-013, Fuel Handling Accident 2) AOP-020, Loss of RCS Inventory or Residual Heat Removal While Shutdown 3) AOP-031, Loss of Refueling Cavity Integrity 1 and 2 ONLY 1 and 3 ONLY 2 and 3 ONLY 1, 2 and 3 A.B.C.D. Friday, October 31, 2014 10:19:17 AM 32 Rev. FINAL 2014 NRC RO Written Exam
- 33. Given the following plant conditions: - The unit is operating at 100% power
- At 0300 on 11/4/2014 the current RWST parameters are as follows: Level 91% Temperature 63°F
Which ONE of the following completes the statement below in accordance with Technical Specification 3.5.4, Emergency Core Cooling System - Refueling Water Storage Tank?RWST (1) must be restored to within Technical Specifaction limits by (2) on 11/4/2014. (1) level (2) 0330 (1) level (2) 0400 (1) temperature (2) 0330 (1) temperature (2) 0400 A.B.C.D. Friday, October 31, 2014 10:19:17 AM 33 Rev. FINAL 2014 NRC RO Written Exam
- 34. Which ONE of the following completes the statements below?The 'C' CSIP can be powered from either (1)
.A (2) is a design feature that prevents two CSIPs from being aligned to the same power supply. (1) 6.9 KV Emergency Bus 1A-SA or 6.9 KV Emergency Bus 1B-SB (2) Kirk key operated interlock (1) 6.9 KV Emergency Bus 1A-SA or 6.9 KV Emergency Bus 1B-SB (2) manual transfer switch (1) 480V Emergency Bus 1A2-SA or 480V Emergency Bus 1B2-SB (2) Kirk key operated interlock (1) 480V Emergency Bus 1A2-SA or 480V Emergency Bus 1B2-SB (2) manual transfer switch A.B.C.D. Friday, October 31, 2014 10:19:17 AM 34 Rev. FINAL 2014 NRC RO Written Exam
- 35. Given the following plant conditions: - The unit is operating at 100% power
- The crew is responding to a leaking PRZ Safety valve Time PRT Temp Safety Tailpipe Temp 1000 95°F 145°F 1005 115°F 255°F 1010 122°F 275°F 1015 146°F 403°FWhich ONE of the following is the firs t time that annunciator ALB-009-8-1, PRTHigh-Low Level Press or Temp, will alarm?
1000) 1005 1010 1015 A.B.C.D. Friday, October 31, 2014 10:19:17 AM 35 Rev. FINAL 2014 NRC RO Written Exam
- 36. Given the following plant conditions: - The unit is operating at 30% power
- The 'C' RCP trips due to an electrical faultWhich ONE of the following competes the statement below?As 'C' RCP coasts down, Loops 'A' and 'B' T will (1) and the Loops
'A' and 'B' OTT setpoint will (2)
.(Assume that Reactor power is maintained at 30%) (1) lower (2) rise (1) lower (2) lower (1) rise (2) rise (1) rise (2) lower A.B.C.D. Friday, October 31, 2014 10:19:17 AM 36 Rev. FINAL 2014 NRC RO Written Exam
- 37. Given the following plant conditions: - The unit is operating at 100% power
- ALB-005-6-1, CCW Surge Tank High-Low Level has just alarmed
- CCW Surge Tank level is 39% and lowering Which ONE of the following automatic actions are required to be verified in accordancewith APP-ALB-005-6-1?CCW Makeup valve, DW-15, has openedCCW Drain Tank Transfer Pump has tripped Holdup Tank Transfer Pump has tripped GFFD and Primary Sample Panel have isolated A.B.C.D. Friday, October 31, 2014 10:19:17 AM 37 Rev. FINAL 2014 NRC RO Written Exam
- 38. Given the following plant conditions: - The unit is at 100% powerThe following conditions occur: - PT-445, PRZ Press Control, fails highWhich ONE of the following completes the statement below?
Pressurizer PORV(s)
(1) will OPEN and remain OPEN until PRZ pressure reaches (2)
. (1) 1RC-116 and 1RC-118 (2) 1960 psig (1) 1RC-116 and 1RC-118 (2) 2000 psig (1) 1RC-114 (2) 1960 psig (1) 1RC-114 (2) 2000 psig A.B.C.D. Friday, October 31, 2014 10:19:17 AM 38 Rev. FINAL 2014 NRC RO Written Exam
- 39. Given the following plant conditions: - A startup is in progress with the unit operating at 7% Reactor powerSubsequently Instrument Bus S-I de-energizes.Given the above plant conditions, which ONE of the following will result in a Reactortrip signal being generated? LT-461, PZR Level Channel III, fails highLT-496, 'C' SG Level Channel III, fails lowPT-951, Containment Pressure Channel II, fails highA and C Aux buses are crosstied and breaker 107, Aux Bus A supply, fails open A.B.C.D. Friday, October 31, 2014 10:19:17 AM 39 Rev. FINAL 2014 NRC RO Written Exam
- 40. Given the following plant conditions: - The unit is being taken off line in accordance with GP-006, Normal Plant ShutdownFrom Power Operation To Hot Standby - Main Turbine load is being held at 25 DEH units for Trip Status light verificationsIn accordance with GP-006, which ONE of the following completes the statementsbelow?(NOTE: Consider each statement independently)
The OATC should find the Trip Status Light Box 4 bistable lights (1)
. IF the bistable lights are NOT in the expected condition then a method used to correctthis condition would be to (2)
. (Trip Status Light Box 4 bistable status lights) - PR P-7/P-10 NC 41M Bistable Light 4 PR P-7/P-10 NC 42M Bistable Light 4-2
- PR P-7/P-10 NC 43M Bistable Light 4 PR P-7/P-10 NC 44M Bistable Light 4-4 (1) ON (2) manually insert Control Rods (1) ON (2) reduce Turbine load (1) OFF (2) manually insert Control Rods (1) OFF (2) reduce Turbine load A.B.C.D. Friday, October 31, 2014 10:19:17 AM 40 Rev. FINAL 2014 NRC RO Written Exam
- 41. Given the following plant conditions: - An automatic Containment Spray Actuation Signal (CSAS) has occurred
- Both Containment Spray pumps have been manually stopped - The CSAS has NOT been resetSubsequently the following occurs: - Containment Pressure is 2.5 psig and rising(Assume no futher operator action)Which ONE of the following describes the operation of the Containment Spray systemas pressure rises above the CSAS setpoint?Containment Spray pumps
.do NOT automatically start, but can be manually started do NOT automatically start and cannot be manually started until CSAS has been resetautomatically start when Containment Pressure exceeds 3 psig automatically start when Containment Pressure exceeds 10 psig A.B.C.D. Friday, October 31, 2014 10:19:17 AM 41 Rev. FINAL 2014 NRC RO Written Exam
- 42. Containment Cooling has been placed in Maximum Cooling Mode in accordance withOP-169, Containment Cooling And Ventilation, due to a 1 gpm RCS leak.Which ONE of the following completes the statement below?AH-3 and AH-4, Containment Fan Cooler Units, will be running in (1) speedwith their post-accident dampers (2)
. (1) HI (2) OPEN (1) HI (2) SHUT (1) LO (2) OPEN (1) LO (2) SHUT A.B.C.D. Friday, October 31, 2014 10:19:17 AM 42 Rev. FINAL 2014 NRC RO Written Exam
- 43. Which ONE of the following is required when a loss of the 1A-SA Emergency AC Busoccurs simultaneously with a loss of the DP-1A-SA Emergency DC Bus in accordancewith AOP-025, Loss Of One Emergency AC Bus (6.9KV) Or One Emergency DC Bus(125V)?AFW valves are operated locally until power is restored during plant recovery. The DC load breakers are to remain closed when energizing the DC EmergencyBus during plant recovery.Commence a plant cooldown in accordance with GP-007, Normal Plant Cooldown (Mode 3 to Mode 5).The 1A-SA 6.9-KV AC load breakers are opened locally prior to energizing the ACEmergency Bus.
A.B.C.D. Friday, October 31, 2014 10:19:17 AM 43 Rev. FINAL 2014 NRC RO Written Exam
- 44. Given the following plant conditions: - The plant is operating at 100% power
- 'A' Containment Spray Pump is running on recirculation per OST-1118,Containment Spray Operability Train A Quarterly Interval Modes 1-4Subsequently: - A Large Break LOCA occurs in Containment
- Containment pressure is now 14.8 psig and risingWhich ONE of the following completes the statement below?The 'A' Containment Spray Pump has been tripped by the Containment Phase (1) signal. To place the 'A' CT train in service the operator must reset the (2) then manuallyalign the system. (1) A Isolation (T) (2) Phase 'B' actuation signal (1) A Isolation (T) (2) Containment Spray actuation signal (1) B Isolation (P) (2) Phase 'B' actuation signal (1) B Isolation (P)
(2) Containment Spray actuation signal A.B.C.D. Friday, October 31, 2014 10:19:17 AM 44 Rev. FINAL 2014 NRC RO Written Exam
- 45. Given the following plant conditions: - The unit is operating at 100% power
- A main steam line rupture in the Turbine building has occurred
- The crew has manually tripped the ReactorWhich ONE of the following completes the statement below?The Turbine Ventilating valves 1GS-97, 1GS-98 are expected to (1)
AND theMSR Non-Return valves 1HD-2, 1HD-3, 1HD-302, 1HD-303 are expected to (2)
.(NOTE: Listed below are the associated valve noun names)
Turbine Ventilating valves1GS-97, HP Turbine Vent to Cond (FCV-01TA-0415B)1GS-98, HP Turbine Vent to Cond (FCV-01TA-0415A)
MSR Non-Return valves1HD-2, MSR 1A-NNS Outlet to MSDT 1A-NNS1HD-3, MSRDT 1A-NNS Outlet to 5-1A-NNS1HD-302, MSR 1B-NNS Outlet to MSDT 1B-NNS1HD-303, MSRDT 1B-NNS Outlet to 5-1B-NNS (1) shut (2) shut (1) shut (2) open (1) open (2) shut (1) open (2) open A.B.C.D. Friday, October 31, 2014 10:19:17 AM 45 Rev. FINAL 2014 NRC RO Written Exam
- 46. Given the following plant conditions: - The unit is operating at 84% power Subsequently: - 'A' Main Feedwater pump trips In accordance with AOP-010, Feedwater Malfunctions, which ONE of the followingdescribes (1) the Turbine runback status AND (2) the REQUIRED operator action? (1) Turbine runback is initiated (2) Isolate Steam Generator Blowdown (1) Turbine runback is initiated (2) Trip the Reactor (1) Turbine runback is NOT initiated (2) Isolate Steam Generator Blowdown (1) Turbine runback is NOT initiated (2) Trip the Reactor A.B.C.D. Friday, October 31, 2014 10:19:17 AM 46 Rev. FINAL 2014 NRC RO Written Exam
- 47. Which ONE of the following supplies power to the Turbine-Driven AFW pump steamadmission valves 1MS-70 and 1MS-72?(NOTE: Listed below are the associated valve noun names)
TDAFW pump steam admission valves1MS-70, MAIN STEAM B TO AUX FW TURBINE 1MS-72, MAIN STEAM C TO AUX FW TURBINE 1MS-70 1MS-72 1DP-1A-SI 1DP-1A-SIII 1DP-1B-SII 1DP-1A-SIII DP-1A2-SA DP-1B2-SB MCC 1A31-SA MCC 1B31-SB A.B.C.D. Friday, October 31, 2014 10:19:17 AM 47 Rev. FINAL 2014 NRC RO Written Exam
- 48. Given the following plant conditions: - A plant heat up is in progress in accordance with GP-002, Normal Plant HeatupFrom Cold Solid To Hot Subcritical Mode 5 To Mode 3 - 'A' MDAFW pump is feeding the SGs Subequently the following annunciator alarms: - ALB-017-5-4, Aux Feedwater Pump 'A' Trip Or Close CKT TroubleWhich ONE of the following completes the statements below?SG levels will lower to (1) where the 'B' MDAFW pump will automatically start, to restore SG levels. Entry in to AOP-010, Feedwater Malfunctions, (2) required.(Assume NO Operator actions) (1) 20% (2) is (1) 20% (2) is NOT (1) 25% (2) is (1) 25%
(2) is NOT A.B.C.D. Friday, October 31, 2014 10:19:17 AM 48 Rev. FINAL 2014 NRC RO Written Exam
- 49. Given the following plant conditions: - The unit is operating at 100% power
- An electrical fault occurs on 6.9-kV Aux Bus 1D causing breaker 102, Unit Aux XfmrA to Aux Bus D, to openWhich ONE of the following components is expected to be running after the loss of the 1D bus?Heater Drain Pump 1A Circulating Water Pump 1A Normal Service Water Pump 1A Cooling Tower Makeup Pump 1X A.B.C.D. Friday, October 31, 2014 10:19:17 AM 49 Rev. FINAL 2014 NRC RO Written Exam
- 50. Given the following plant conditions: - 250 VDC Battery Charger 1A is in service
- Annunciator ALB-015-3-4, 250 VDC Bus Trouble has alarmed
- Local observation confirms that a ground condition existsWhich ONE of the following completes the statement below concerning this ground?The impact of this condition on the 250 VDC Bus is that (1)
. In accordance with APP-ALB-015-3-4, the crew should implement OP-156.06, GroundIsolation and Bus Drop, and (2)
. (1) the ground could result in the degradation of the DC system reliability (2) energize the 1B 250 VDC Battery Charger then remove the 1A 250 VDCBattery Charger from service (1) the ground could result in the degradation of the DC system reliability (2) open the 1A charger DC output breaker allowing the batteries to power the 250 VDC bus and then place the 1B 250 VDC Battery Charger in service (1) the battery charger will automatically trip on a high ground condition if left inoperation (2) energize the 1B 250 VDC Battery Charger then remove the 1A 250 VDCBattery Charger from service (1) the battery charger will automatically trip on a high ground condition if left inoperation (2) open the 1A charger DC output breaker allowing the batteries to power the 250 VDC bus and then place the 1B 250 VDC Battery Charger in service A.B.C.D. Friday, October 31, 2014 10:19:17 AM 50 Rev. FINAL 2014 NRC RO Written Exam
- 51. Given the following plant conditions: - The EDG 1A-SA is loaded to 6.3 MW from the MCR in accordance OP-155, DieselGenerator Emergency Power System - The crew is preparing to shutdown the EDG Which ONE of the following completes the statement below concerning the continuedshutdown of the EDG in accordance with OP-155?The EDG should be shutdown from 35% load in a maximum of (1) minutes ANDthe impact of this action is it will (2)
. (1) 5 (2) prevent stator winding overheating (1) 5 (2) minimize carbon buildup (1) 20 (2) prevent stator winding overheating (1) 20 (2) minimize carbon buildup A.B.C.D. Friday, October 31, 2014 10:19:17 AM 51 Rev. FINAL 2014 NRC RO Written Exam
- 52. Which ONE of the following completes the statements below?1CC-23, REM 3501 A CCW Inlet Solenoid Valve, will (1) automatically ifREM-01CC-3501A-SA, CCW Train A, loses power. Upon restoration of power to REM-01CC-3501A-SA, 1CC-23 must be operated locally on the (2) elevation of the RAB. (1) shut (2) 305' (1) shut (2) 236' (1) not shut (2) 305' (1) not shut (2) 236'A.B.C.D. Friday, October 31, 2014 10:19:17 AM 52 Rev. FINAL 2014 NRC RO Written Exam
- 53. Which ONE of the following sets of components are ALL supplied by the EmergencyService Water system?1. CSIP oil coolers 2. CCW heat exchangers3. Containment fan coil units (AH-37, 38, 39) 1 and 2 ONLY1 and 3 ONLY2 and 3 ONLY 1, 2 and 3 A.B.C.D. Friday, October 31, 2014 10:19:18 AM 53 Rev. FINAL 2014 NRC RO Written Exam
- 54. Given the following plant conditions: - A loss of Instrument Air is in progress
- Instrument Air header pressure is 88 psig and continuing to lower slowlyWith the current plant conditions, which ONE of the following completes the statementbelow?The current status of 1SA-506, SA Header Isol Valve is (1)
. When IA pressurelowers to (2) psig then ALB-002-8-1, Instrument Air Header Low Pressureannunciator will go into alarm. (1) Open (2) 85 (1) Open (2) 75(1) Shut (2) 85 (1) Shut (2) 75 A.B.C.D. Friday, October 31, 2014 10:19:18 AM 54 Rev. FINAL 2014 NRC RO Written Exam
- 55. Given the following plant conditions: - RCS Tavg is 124°F
- A plant heatup is to be commenced in accordance with GP-002, Normal PlantHeatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3Which ONE of the following describes (1) the fan(s) that is (are) required to be placedin service prior to the RCS Tavg exceeding 140°F and (2) the fan's function? (1) Control Rod Drive Mechanism Fans (2) To prevent insulation degradation and subsequent CRDM failure. (1) Containment Fan Coolers (2) Provides cooling to the RCPs during normal and abnormal operation (1) Primary Shield Cooling Fan (2) To minimize concrete dehydration and subsequent structural damage (1) Containment Fan Coil Units (2) Provides cooling to CNMT during normal and abnormal operation A.B.C.D. Friday, October 31, 2014 10:19:18 AM 55 Rev. FINAL 2014 NRC RO Written Exam
- 56. Which ONE of the following completes the statements below?The main power supply for the Rod Control Logic Cabinet is from (1)
. The output of the Rod Control Logic Cabinet sends multiplexing signals to the (2)
. (1) a 120 VAC Vital Instrument Bus (2) Power Cabinets (1) a 120 VAC Vital Instrument Bus (2) P-A converter (1) the Rod Drive MG sets through a 5KVA transformer (2) Power Cabinets (1) the Rod Drive MG sets through a 5KVA transformer (2) P-A converter A.B.C.D. Friday, October 31, 2014 10:19:18 AM 56 Rev. FINAL 2014 NRC RO Written Exam
- 57. Given the following plant conditions: - The unit is operating at 100% power
- PRZ level controller LK-459F has failed in auto - The operator is making adjustments for current level errorWhich ONE of the following responses occurs FIRST once the operator places thePRZ Master level controller in MANUAL and depresses the LOWER pushbutton? The PRZ backup heaters energize.The letdown orifice isolation valves close.
1CS-231, FK-122.1 Charging flow valve will OPEN further from its current position.1CS-231, FK-122.1 Charging flow valve will CLOSE further from its current position.
A.B.C.D. Friday, October 31, 2014 10:19:18 AM 57 Rev. FINAL 2014 NRC RO Written Exam
- 58. Which ONE of the following completes the statements below?If a Core Exit Thermocouple fails the RVLIS plasma display panel will read (1)
.A method to locally obtain Core Exit Thermocouple temperatures at the Train specificpanel OUTSIDE the Control Room is to use the (2)
. (1) 50°F (2) CRT monitor and keyboard (1) 50°F (2) thumbwheels set to specific points identified by a legend (1) 2500°F (2) CRT monitor and keyboard
(1) 2500°F (2) thumbwheels set to specific points identified by a legend A.B.C.D. Friday, October 31, 2014 10:19:18 AM 58 Rev. FINAL 2014 NRC RO Written Exam
- 59. Given the following plant conditions: - The unit is operating at 100% power
- The 'B' SG Control and Recorder Selectors are as follows: Subsequently: - The controlling 'B' SG Feed Flow channel fails high
- Annunciator ALB-014-4-1B, SG B FW > STM Flow Mismatch, alarmsWhich ONE of the following completes the statements below?Immediately after the failure the 'B' SG FRV will start to go (1)
. Once 'B' SG level is under operator control, in order to restore 'B' SG automatic waterlevel control the operator will select (2) in accordance with OWP-RP, ReactorProtection. (1) OPEN (2) STM GEN B FW Flow Chan 486 ONLY (1) OPEN (2) STM GEN B FW Flow Chan 486 AND STM GEN B STM Flow Chan 485 (1) CLOSED (2) STM GEN B FW Flow Chan 486 ONLY (1) CLOSED (2) STM GEN B FW Flow Chan 486 AND STM GEN B STM Flow Chan 485 A.B.C.D. Friday, October 31, 2014 10:19:18 AM 59 Rev. FINAL 2014 NRC RO Written Exam
- 60. Given the following plant conditions: - The unit is in Mode 6 with personnel working in Containment
- The Accumulators are being vented in accordance with OP-110, Safety Injection
- The O 2 concentration outside the restricted area is reported 'low'Subsequently: - The running Containment Pre-Entry Purge fan tripped on motor overload
- The crew secured venting the AccumulatorIn accordance with OP-110, which ONE of the following completes the statementsbelow?The O 2 concentration outside the restricted area is required to be above a MINIMUM of (1)
. Prior to recommencing the Accumulator venting the crew is required to (2)
. (1) 23.5% (2) run all standby Containment Fan coolers for a minimum of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> forContainment atmosphere mixing (1) 23.5% (2) ensure the O 2 concentration is restored above the minimum concentrationlevel (1) 19.5%
(2) run all standby Containment Fan coolers for a minimum of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> forContainment atmosphere mixing (1) 19.5%
(2) ensure the O 2 concentration is restored above the minimum concentrationlevel A.B.C.D. Friday, October 31, 2014 10:19:18 AM 60 Rev. FINAL 2014 NRC RO Written Exam
- 61. Given the following plant conditions: - A 20% Turbine load rejection has occurred from 100% power
- During the transient the Steam Dump control system malfunctioned After the plant stablilized: - Group 1 Steam Dumps indicate dual position on SLB-1
- Reactor power is ~ 7.5% higher than Turbine power
- T avg and Tref are matched (Assume no operator action and use THUMBRULE values when determining theanswer)For this condition, which ONE of the following identifies how far the Steam Dumpvalves must be open to cause the current plant conditions?7.5% 25%50%75%A.B.C.D. Friday, October 31, 2014 10:19:18 AM 61 Rev. FINAL 2014 NRC RO Written Exam
- 62. Given the following plant conditions: - The unit is operating at 100% powerSubsequently: - A Turbine Trip signal occurs - One Throttle Valve failed to close
- All Governor Valves are indicating closedWhich ONE of the following completes the statements below?Assuming NO operator actions have occurred after the Turbine has tripped, SGpressure will (1) immediately following the trip.In accordance with EOP-E-0, Reactor Trip Or Safety Injection, the operator is FIRSTrequired to (2)
. (1) RISE (2) manually run back the Turbine (1) RISE (2) manually actuate a Turbine Trip (1) LOWER (2) manually run back the Turbine (1) LOWER (2) manually actuate a Turbine Trip A.B.C.D. Friday, October 31, 2014 10:19:18 AM 62 Rev. FINAL 2014 NRC RO Written Exam
- 63. The unit is operating at 100% power when Main Condenser backpressure begins todegrade.Which ONE of the following completes the statements below?For 'B' Vacuum pump to automatically start the 'A' Vacuum Pump breaker must be (1) .In addition to the breaker position, the setpoint for the Condenser backpressurerequired for auto start of the 'B' Vacuum Pump is (2)
. (Assume NO operator actions) (1) CLOSED (2) 6.5 inches Hg (1) CLOSED (2) 4.0 inches Hg (1) OPEN (2) 6.5 inches Hg (1) OPEN (2) 4.0 inches Hg A.B.C.D. Friday, October 31, 2014 10:19:18 AM 63 Rev. FINAL 2014 NRC RO Written Exam
- 64. Given the following plant conditions:- The unit is operating at 58%, with a plant shutdown in progress
- The following ALB-019 annunciators alarm: 4A, CNDST PUMP A LO FLOW 4B, CNDST PUMP A DISCH LO PRESS 5A, CNDST PUMP A BKR TRIP/TRBL- Indications on the 'A' Condensate Pump are as follows:
- Red light is OFF
- Green light is LIT Which ONE of the following identifies the expected response of the CBPs and MFPs?All CBPs and all MFPs will continue to runThe 'A' CBP and 'A' MFP will both tripOnly the 'A' CBP will tripOnly the 'A' MFP will trip A.B.C.D. Friday, October 31, 2014 10:19:18 AM 64 Rev. FINAL 2014 NRC RO Written Exam
- 65. Given the following plant conditions: - The plant is operating at 100% power
- Treated L&HS Tank 'A' contains radioactive liquid that is required to be released.Which ONE of the following completes the statement below?In accordance with OP-120.10.04,Treated Laundry And Hot Shower Tanks, theTreated L&HS Tank 'A' should be discharged to the (1)
.A new release permit is required if (2) before discharging the remaining contentsof the tank. (1) Waste Neutralization Settling basin (2) a valid High alarm on radiation monitor REM-3540 occurs (1) Waste Neutralization Settling basin (2) the release flow rate on WP Computer point FA809 exceeds 80% of the MaxEffluent Flow Rate (1) Cooling Tower Blowdown line (2) a valid High alarm on radiation monitor REM-3540 occurs (1) Cooling Tower Blowdown line (2) the release flow rate on WP Computer point FA809 exceeds 80% of the MaxEffluent Flow Rate A.B.C.D. Friday, October 31, 2014 10:19:18 AM 65 Rev. FINAL 2014 NRC RO Written Exam
- 66. Which ONE of the following events will REQUIRE normal alarm response protocol tobe suspended, in accordance with AD-OP-ALL-1000, Fleet Conduct of Operations?Power Range N-43 failing high'A' SG Channel 1 Level Indication failing lowPressurizer LT-459 failing low with PRZ Level Selector in 459/460 'A' EDG tripping during the performance of OST-1013, 1A-SA Emergency Diesel Generator Operability Test A.B.C.D. Friday, October 31, 2014 10:19:18 AM 66 Rev. FINAL 2014 NRC RO Written Exam
- 67. Given the following plant conditions: - The unit is in Mode 6
- Core off-load has been suspended due to Source Range NI-31 indication failure
- NI-31 has been declared inoperableBefore fuel movement in Containment can resume, which ONE of the followingdescribes the MINIMUM actions required by GP-009, Refueling Cavity Fill, RefuelingAnd Drain Of The Refueling Cavity Modes 5-6-5? In addition to verifying the audio count rate channel is selected to Source Range NI-32,the operability of
must be verified.both Wide Range Neutron Flux Monitorseither Wide Range Neutron Flux Monitorthe Wide Range Neutron Flux Monitor on the opposite side of the core from NI-32the Wide Range Neutron Flux Monitor on the same side of the core as NI-32 A.B.C.D. Friday, October 31, 2014 10:19:18 AM 67 Rev. FINAL 2014 NRC RO Written Exam
- 68. Given the following plant conditions: - An RCS heatup is in progress
- RCS Tavg is 342°F
- 1A-SA EDG is declared INOPERABLE due to failure of the shutdown relayWhich ONE of the following identifies (1) the current plant OPERATIONAL MODE and (2) the Technical Specification requirements regarding Mode changes? (1) Mode 3 (2) Change to Mode 2 may be performed provided the TS 3.8.1, AC Sources -Operating, Action Statements for 1A-SA EDG inoperability are satisfied. (1) Mode 3 (2) Change to Mode 2 may NOT performed. (1) Mode 4 (2) Change to Mode 3 may be performed provided the TS 3.8.1, AC Sources -Operating, Action Statements for 1A-SA EDG inoperability are satisfied. (1) Mode 4 (2) Change to Mode 3 may NOT performed.
A.B.C.D. Friday, October 31, 2014 10:19:18 AM 68 Rev. FINAL 2014 NRC RO Written Exam
- 69. Which ONE of the following completes the statements below?In accordance with AD-HU-ALL-0004, Procedure And Work Instruction Use And Adherence, the (1) shall be used to verify the current revision of a Control WiringDiagram (CWD). Based on CAR-2166-B-401 Sheet 2309, ESW Aux Resevoir Bay No. 1 TravelingScreen 4A-NNS, the green indicating light will be extinguished and the red indicatinglight will be illuminated when the (2) relay is energized.
(Reference provided) (1) Document Management System, Controlled Documents Module (2) 42-H (1) Document Management System, Controlled Documents Module (2) 42-L (1) Records Management System, Records Retrival Module (2) 42-H (1) Records Management System, Records Retrival Module (2) 42-L A.B.C.D. Friday, October 31, 2014 10:19:18 AM 69 Rev. FINAL 2014 NRC RO Written Exam
- 70. The following radiation monitors are in service: - REM-3502A, Containment RCS Leak Detection
- REM-3502B, Containment Pre-Entry Purge Which ONE of the following describes the effect on these monitors if a ContainmentIsolation Phase 'A' actuation occurs?
REM-3502A REM-3502B remains in service remains in service remains in service is isolated is isolated
remains in service is isolated
is isolated A.B.C.D. Friday, October 31, 2014 10:19:18 AM 70 Rev. FINAL 2014 NRC RO Written Exam
- 71. Which of the following completes the statements below?In accordance with PEP-330, Radiological Consequences, the dose limit for ANYemergency activity NOT involving protecting valuable property or lifesaving activities is (1)
. The dose limit for Lifesaving activities is (2)
. (1) 2 rem (2) 10 rem (1) 2 rem (2) 25 rem (1) 5 rem (2) 10 rem (1) 5 rem (2) 25 rem A.B.C.D. Friday, October 31, 2014 10:19:18 AM 71 Rev. FINAL 2014 NRC RO Written Exam
- 72. With the unit at power, which ONE of the following tasks would require utilization of aSpecific RWP in order for Operations to perform the activity? Entry into a High Radiation Area on the 261' RAB to evaluate boric acid depositsEntry into a Locked High Radiation Area to hang a clearanceEntry into Containment to inspect for RCS leakage in the PRZ cubicle.Entry into an area with loose surface contamination at 2500 dpm/100cm 2 toperform a valve line-up A.B.C.D. Friday, October 31, 2014 10:19:18 AM 72 Rev. FINAL 2014 NRC RO Written Exam
- 73. Given the following plant conditions: - Due to a small break LOCA the crew is implementing EOP-ES-1.2, Post LOCACooldown and Depressurization - A cooldown to Cold Shutdown has been initiated - The first CSIP was just secured - RCS parameter response is as follows:
Time RCS Temperature (°F)
RCS Pressure (psig)
Subcooling (°F) 1400 435 462 27 1402 433 460 29 1404 431 458 30 1406 429 456 32In accordance with guidance provided by the EOP User's Guide, which ONE of thefollowing completes the statement below concerning the RCS evaluation?RCS pressure should be considered
. STABLE because the RCS pressure drop is being controlled STABLE because RCS subcooling is rising LOWERING even though RCS subcooling is rising LOWERING because the RCS pressure drop cannot be controlled A.B.C.D. Friday, October 31, 2014 10:19:18 AM 73 Rev. FINAL 2014 NRC RO Written Exam
- 74. Given the following plant conditions: - The plant was operating at 100% power Subsuquently: - The crew performed a manual Reactor Trip and Safety Injection due to RCSleakage in excess of makeup capability - The crew has transitioned to EOP-ES-1.1, SI Termination, and have secured oneCSIP and realigned the CSIP discharge from the BIT to the normal Charging line Concerning PRZ level control during these conditions, which ONE of the followingcompletes the statement below?EOP-ES-1.1 cautions that Charging flow must NOT exceed (1) gpm to prevent (2)
. (1) 120 (2) exceeding normal VCT makeup capability (1) 120 (2) damage to the Regenerative Heat Exchanger (1) 150 (2) exceeding normal VCT makeup capability (1) 150 (2) damage to the Regenerative Heat Exchanger A.B.C.D. Friday, October 31, 2014 10:19:18 AM 74 Rev. FINAL 2014 NRC RO Written Exam
- 75. Given the following plant conditions: - The plant is operating in Mode 5
- The RCS is in solid plant operation
- Both Trains of RHR are aligned in the Shutdown Cooling ModeSubsequently a large RCS leak has developed. Conditions are as follows: - The crew has aligned flow through the BIT with 'A' CSIP in service as directed byAOP-020, Loss Of RCS Inventory Or Residual Heat Removal While Shutdown - Core Exit Thermocouples continue to rise
- RCS water level continues to lowerWhich ONE of the following is the action required by AOP-020 to mitigate the event?Start the 'B' CSIP with flow through 1SI-3 and 1SI-4, BIT Outlet ValvesStart the 'B' CSIP with flow through 1SI-52, Alternate High Head SI to Cold LegValveAlign 'A' RHR Pump for Low Head SI with flow through 1SI-340, Low Head SI TrainA to Cold Leg ValveAlign 'A' RHR Pump for Low Head SI with flow through 1SI-359, Low Head SITrains A & B to Hot Leg valve A.B.C.D.You have completed the test! Friday, October 31, 2014 10:19:18 AM 75 Rev. FINAL ANSWER KEY REPORTfor 2014 NRC RO Written Exam Test Form: 0 Answers 0#ID12014 NRC RO 1B22014 NRC RO 2C 32014 NRC RO 3A 42014 NRC RO 4D 52014 NRC RO 5A 62014 NRC RO 6A 72014 NRC RO 7C 82014 NRC RO 8D 92014 NRC RO 9A 102014 NRC RO 10C 112014 NRC RO 11D 122014 NRC RO 12A 132014 NRC RO 13D 142014 NRC RO 14D 152014 NRC RO 15D 162014 NRC RO 16A 172014 NRC RO 17B 182014 NRC RO 18A 192014 NRC RO 19A 202014 NRC RO 20A 212014 NRC RO 21B 222014 NRC RO 22D 232014 NRC RO 23D 242014 NRC RO 24D 252014 NRC RO 25B 262014 NRC RO 26A 272014 NRC RO 27C 282014 NRC RO 28D 292014 NRC RO 29C 302014 NRC RO 30B 312014 NRC RO 31C 322014 NRC RO 32C 332014 NRC RO 33B 342014 NRC RO 34A 352014 NRC RO 35C 362014 NRC RO 36D 372014 NRC RO 37D 382014 NRC RO 38B 392014 NRC RO 39B 402014 NRC RO 40D 412014 NRC RO 41B 422014 NRC RO 42A 432014 NRC RO 43D 442014 NRC RO 44B 452014 NRC RO 45C 462014 NRC RO 46A 472014 NRC RO 47CFriday, October 31, 2014 10:28:05 AM 1
ANSWER KEY REPORTfor 2014 NRC RO Written Exam Test Form: 0 Answers 0#ID482014 NRC RO 48D492014 NRC RO 49B 502014 NRC RO 50A 512014 NRC RO 51B 522014 NRC RO 52B 532014 NRC RO 53A 542014 NRC RO 54D 552014 NRC RO 55C 562014 NRC RO 56C 572014 NRC RO 57D 582014 NRC RO 58B 592014 NRC RO 59D 602014 NRC RO 60D 612014 NRC RO 61C 622014 NRC RO 62B 632014 NRC RO 63A 642014 NRC RO 64B 652014 NRC RO 65C 662014 NRC RO 66A 672014 NRC RO 67C 682014 NRC RO 68D 692014 NRC RO 69B 702014 NRC RO 70C 712014 NRC RO 71D 722014 NRC RO 72C 732014 NRC RO 73B 742014 NRC RO 74D 752014 NRC RO 75CFriday, October 31, 2014 10:28:05 AM 2