IR 05000266/2015406: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 24: Line 24:


SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
  - NRC SECURITY BASELINE INSPECTION REPORT 05000 266/2015406; 05000301/2015406 Dear Mr. McCartney
  - NRC SECURITY BASELINE INSPECTION REPORT 05000 266/201 5 40 6; 05000 301/201540 6
: On October 2 2, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant, Units 1 and The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Proces The enclosed inspection report documents the inspection results, which were discussed on October 2 2, 2015, with you, and other members of your staf The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations
 
, and with the conditions of your licens The inspector reviewed selected procedures and records, observed activities, and interviewed personne The NRC inspector did not identify any findings or violation In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy  
==Dear Mr. McCartney:==
On October 2 2, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 2 2, 2015, with you , and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations
, and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
 
The NRC inspector did not identify any findings or violations.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy  


of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
Line 33: Line 41:
However, the material enclosed herewith contains Security
However, the material enclosed herewith contains Security
-Related Information in accordance with 10 CFR 2.390(d)(1)
-Related Information in accordance with 10 CFR 2.390(d)(1)
and its disclosure to unauthorized individuals could present a security vulnerabilit Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAM If you choose to provide a response and Security
and its disclosure to unauthorized individuals could present a security vulnerability.
 
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security
-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
-Related Information
-Related Information
-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your respons Enclosure contains Sensitive Unclassified Non
-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Enclosure contains Sensitive Unclassified Non
-Safeguards Informatio When separated from enclosure, this transmittal document is decontrolle E. McCartney
-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
-2- Should you have any questions concerning this inspection, we will be pleased to discuss them with yo


Sincerely,/RA Joseph Maynen Acting for/
Sincerely,/RA Joseph Maynen Acting for/
Line 44: Line 53:


===Enclosure:===
===Enclosure:===
IR 05000266/2015406; 05000301/2015406
IR 05000 266/201 5 40 6; 05000 301/201540 6


===w/Attachment:===
===w/Attachment:===
Supplemental Information cc w/encl:
Supplemental Information cc w/encl:
B. Kopetsky, Security Manager M. Millen, Licensing Manager M. Nazar, Executive Vice President, Nuclear Division and Chief Nuclear Officer
cc w/o encl:
Distribution via LISTSERV
}}
}}

Revision as of 20:44, 8 July 2018

IR 05000266/2015406; 05000301/2015406; on 10/13/2015 - 10/22/2015; Point Beach Nuclear Plant, Units 1 and 2; Routine Security Baseline Inspection - (Cover Letter Only)
ML15321A051
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/16/2015
From: Orth S K
Plant Support Branch II
To: McCartney E
Point Beach
References
IR 2015406
Download: ML15321A051 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532

-4352 November 16, 2015 Mr. Eric McCartney Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road

Two Rivers, WI 54241

SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2

- NRC SECURITY BASELINE INSPECTION REPORT 05000 266/201 5 40 6; 05000 301/201540 6

Dear Mr. McCartney:

On October 2 2, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 2 2, 2015, with you , and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations

, and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

The NRC inspector did not identify any findings or violations.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security

-Related Information in accordance with 10 CFR 2.390(d)(1)

and its disclosure to unauthorized individuals could present a security vulnerability.

Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security

-Related Information is necessary to provide an acceptable response, please mark your entire response "Security

-Related Information

-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Enclosure contains Sensitive Unclassified Non

-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA Joseph Maynen Acting for/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No s. 50-266; 50-301 License No s. DPR-24; DPR-27 Nonpublic

Enclosure:

IR 05000 266/201 5 40 6; 05000 301/201540 6

w/Attachment:

Supplemental Information cc w/encl:

B. Kopetsky, Security Manager M. Millen, Licensing Manager M. Nazar, Executive Vice President, Nuclear Division and Chief Nuclear Officer

cc w/o encl:

Distribution via LISTSERV