{{#Wiki_filter:NNebraska Public Power DistrictAlways there when you need usNLS2015 140December 21, 201550.54(q)U.S. Nuclear Regulatory Commission Attention:
{{#Wiki_filter:N Nebraska Public Power District Always there when you need us NLS2015 140 December 21, 2015 50.54(q)U.S. Nuclear Regulatory Commission Attention:
Document Control DeskWashington, D.C. 20555-0001
Document Control Desk Washington, D.C. 20555-0001


==Subject:==
==Subject:==
 
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46  
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46


==Dear Sir or Madam:==
==Dear Sir or Madam:==
The purpose of this letter is to transmit the following Emergency Plan Implementing Procedure (EPIP) pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures":
The purpose of this letter is to transmit the following Emergency Plan Implementing Procedure (EPIP) pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures":
EPIP 0-EN-EP-308 Revision 2C 1Emergency Planning Critiques In addition, as required by 10 CFR 50. 54(q)(5),
EPIP 0-EN-EP-308 Revision 2C 1 Emergency Planning Critiques In addition, as required by 10 CFR 50. 54(q)(5), attached is the summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.This letter contains no commitments.
attached is the summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.This letter contains no commitments.
If you have any questions regarding this submittal, please contact me at (402) 825-2788.Sincerely,/bk  
If you have any questions regarding this submittal, please contact me at (402) 825-2788.
Sincerely,
/bk


==Attachment:==
==Attachment:==
Line 36: Line 32:
==Enclosure:==
==Enclosure:==


Summary of 50.54(q)
Summary of 50.54(q) Analysis -Emergency Plan Implementing Procedure 0-EN-EP-308, Revision 2C1 Emergency Plan Implementing Procedure 0-EN-EP-3 08, Revision 2C 1 COOPER NUCLEAR.STATION P.O. Box 98 / Brownville, NE 68327-0098 Tele phone: (402) 825-3811 / Fax: (402) 825-5211 ww.nppd.com NLS2015 140 Page 2 of 2 cc: Regional Administrator, w/ attachment and enclosure (2)USNRC -Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, wI/attachment (enclosure per controlled document distribution)
Analysis  
USNRC -CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, wI/attachment and w/o enclosure N Nebraska Public Power District Always there when you need us NLS2015 140 December 21, 2015 50.54(q)U.S. Nuclear Regulatory Commission Attention:
-Emergency Plan Implementing Procedure 0-EN-EP-308, Revision 2C1Emergency Plan Implementing Procedure 0-EN-EP-3 08, Revision 2C 1COOPER NUCLEAR.STATION P.O. Box 98 / Brownville, NE 68327-0098 Tele phone: (402) 825-3811  
Document Control Desk Washington, D.C. 20555-0001
/ Fax: (402) 825-5211ww.nppd.com NLS2015 140Page 2 of 2cc: Regional Administrator, w/ attachment and enclosure (2)USNRC -Region IVDirector, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, wI/attachment (enclosure per controlled document distribution)
USNRC -CNSNPG Distribution, w/ attachment and w/o enclosure CNS Records, wI/attachment and w/o enclosure NNebraska Public Power DistrictAlways there when you need usNLS2015 140December 21, 201550.54(q)U.S. Nuclear Regulatory Commission Attention:
Document Control DeskWashington, D.C. 20555-0001


==Subject:==
==Subject:==
 
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46  
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46


==Dear Sir or Madam:==
==Dear Sir or Madam:==
The purpose of this letter is to transmit the following Emergency Plan Implementing Procedure (EPIP) pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures":
The purpose of this letter is to transmit the following Emergency Plan Implementing Procedure (EPIP) pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures":
EPIP 0-EN-EP-308 Revision 2C 1Emergency Planning Critiques In addition, as required by 10 CFR 50. 54(q)(5),
EPIP 0-EN-EP-308 Revision 2C 1 Emergency Planning Critiques In addition, as required by 10 CFR 50. 54(q)(5), attached is the summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.This letter contains no commitments.
attached is the summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.This letter contains no commitments.
If you have any questions regarding this submittal, please contact me at (402) 825-2788.Sincerely,/bk  
If you have any questions regarding this submittal, please contact me at (402) 825-2788.
Sincerely,
/bk


==Attachment:==
==Attachment:==
Line 59: Line 48:
==Enclosure:==
==Enclosure:==


Summary of 50.54(q)
Summary of 50.54(q) Analysis -Emergency Plan Implementing Procedure 0-EN-EP-308, Revision 2C1 Emergency Plan Implementing Procedure 0-EN-EP-3 08, Revision 2C 1 COOPER NUCLEAR.STATION P.O. Box 98 / Brownville, NE 68327-0098 Tele phone: (402) 825-3811 / Fax: (402) 825-5211 ww.nppd.com NLS2015 140 Page 2 of 2 cc: Regional Administrator, w/ attachment and enclosure (2)USNRC -Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, wI/attachment (enclosure per controlled document distribution)
Analysis  
USNRC -CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, wI/attachment and w/o enclosure}}
-Emergency Plan Implementing Procedure 0-EN-EP-308, Revision 2C1Emergency Plan Implementing Procedure 0-EN-EP-3 08, Revision 2C 1COOPER NUCLEAR.STATION P.O. Box 98 / Brownville, NE 68327-0098 Tele phone: (402) 825-3811  
/ Fax: (402) 825-5211ww.nppd.com NLS2015 140Page 2 of 2cc: Regional Administrator, w/ attachment and enclosure (2)USNRC -Region IVDirector, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, wI/attachment (enclosure per controlled document distribution)
USNRC -CNSNPG Distribution, w/ attachment and w/o enclosure CNS Records, wI/attachment and w/o enclosure}}

Revision as of 18:06, 8 July 2018

Cooper - Submittal of Emergency Plan Implementing Procedure, Revision 2C1 to EPIP 0-EN-EP-308, Emergency Planning Critiques
ML15364A016
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/21/2015
From: Shaw J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16015A030 List:
References
NLS2015140
Download: ML15364A016 (2)


Text

N Nebraska Public Power District Always there when you need us NLS2015 140 December 21, 2015 50.54(q)U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C. 20555-0001

Subject:

Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46

Dear Sir or Madam:

The purpose of this letter is to transmit the following Emergency Plan Implementing Procedure (EPIP) pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures":

EPIP 0-EN-EP-308 Revision 2C 1 Emergency Planning Critiques In addition, as required by 10 CFR 50. 54(q)(5), attached is the summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.This letter contains no commitments.

If you have any questions regarding this submittal, please contact me at (402) 825-2788.Sincerely,/bk

Attachment:

Enclosure:

Summary of 50.54(q) Analysis -Emergency Plan Implementing Procedure 0-EN-EP-308, Revision 2C1 Emergency Plan Implementing Procedure 0-EN-EP-3 08, Revision 2C 1 COOPER NUCLEAR.STATION P.O. Box 98 / Brownville, NE 68327-0098 Tele phone: (402) 825-3811 / Fax: (402) 825-5211 ww.nppd.com NLS2015 140 Page 2 of 2 cc: Regional Administrator, w/ attachment and enclosure (2)USNRC -Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, wI/attachment (enclosure per controlled document distribution)

USNRC -CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, wI/attachment and w/o enclosure N Nebraska Public Power District Always there when you need us NLS2015 140 December 21, 2015 50.54(q)U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C. 20555-0001

Subject:

Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46

Dear Sir or Madam:

The purpose of this letter is to transmit the following Emergency Plan Implementing Procedure (EPIP) pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures":

EPIP 0-EN-EP-308 Revision 2C 1 Emergency Planning Critiques In addition, as required by 10 CFR 50. 54(q)(5), attached is the summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.This letter contains no commitments.

If you have any questions regarding this submittal, please contact me at (402) 825-2788.Sincerely,/bk

Attachment:

Enclosure:

Summary of 50.54(q) Analysis -Emergency Plan Implementing Procedure 0-EN-EP-308, Revision 2C1 Emergency Plan Implementing Procedure 0-EN-EP-3 08, Revision 2C 1 COOPER NUCLEAR.STATION P.O. Box 98 / Brownville, NE 68327-0098 Tele phone: (402) 825-3811 / Fax: (402) 825-5211 ww.nppd.com NLS2015 140 Page 2 of 2 cc: Regional Administrator, w/ attachment and enclosure (2)USNRC -Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, wI/attachment (enclosure per controlled document distribution)

USNRC -CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, wI/attachment and w/o enclosure