{{#Wiki_filter: | {{#Wiki_filter:N Nebraska Public Power District Always there when you need us NLS2015 140 December 21, 2015 50.54(q)U.S. Nuclear Regulatory Commission Attention: | ||
Document Control | Document Control Desk Washington, D.C. 20555-0001 | ||
==Subject:== | ==Subject:== | ||
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46 | |||
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46 | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
The purpose of this letter is to transmit the following Emergency Plan Implementing Procedure (EPIP) pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures": | The purpose of this letter is to transmit the following Emergency Plan Implementing Procedure (EPIP) pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures": | ||
EPIP 0-EN-EP-308 Revision 2C | EPIP 0-EN-EP-308 Revision 2C 1 Emergency Planning Critiques In addition, as required by 10 CFR 50. 54(q)(5), attached is the summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.This letter contains no commitments. | ||
attached is the summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.This letter contains no commitments. | If you have any questions regarding this submittal, please contact me at (402) 825-2788.Sincerely,/bk | ||
If you have any questions regarding this submittal, please contact me at (402) 825-2788. | |||
Sincerely, | |||
/bk | |||
==Attachment:== | ==Attachment:== | ||
Line 36: | Line 32: | ||
==Enclosure:== | ==Enclosure:== | ||
Summary of 50.54(q) | Summary of 50.54(q) Analysis -Emergency Plan Implementing Procedure 0-EN-EP-308, Revision 2C1 Emergency Plan Implementing Procedure 0-EN-EP-3 08, Revision 2C 1 COOPER NUCLEAR.STATION P.O. Box 98 / Brownville, NE 68327-0098 Tele phone: (402) 825-3811 / Fax: (402) 825-5211 ww.nppd.com NLS2015 140 Page 2 of 2 cc: Regional Administrator, w/ attachment and enclosure (2)USNRC -Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, wI/attachment (enclosure per controlled document distribution) | ||
Analysis | USNRC -CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, wI/attachment and w/o enclosure N Nebraska Public Power District Always there when you need us NLS2015 140 December 21, 2015 50.54(q)U.S. Nuclear Regulatory Commission Attention: | ||
-Emergency Plan Implementing Procedure 0-EN-EP-308, Revision | Document Control Desk Washington, D.C. 20555-0001 | ||
/ Fax: (402) 825- | |||
USNRC - | |||
Document Control | |||
==Subject:== | ==Subject:== | ||
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46 | |||
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46 | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
The purpose of this letter is to transmit the following Emergency Plan Implementing Procedure (EPIP) pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures": | The purpose of this letter is to transmit the following Emergency Plan Implementing Procedure (EPIP) pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures": | ||
EPIP 0-EN-EP-308 Revision 2C | EPIP 0-EN-EP-308 Revision 2C 1 Emergency Planning Critiques In addition, as required by 10 CFR 50. 54(q)(5), attached is the summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.This letter contains no commitments. | ||
attached is the summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.This letter contains no commitments. | If you have any questions regarding this submittal, please contact me at (402) 825-2788.Sincerely,/bk | ||
If you have any questions regarding this submittal, please contact me at (402) 825-2788. | |||
Sincerely, | |||
/bk | |||
==Attachment:== | ==Attachment:== | ||
Line 59: | Line 48: | ||
==Enclosure:== | ==Enclosure:== | ||
Summary of 50.54(q) | Summary of 50.54(q) Analysis -Emergency Plan Implementing Procedure 0-EN-EP-308, Revision 2C1 Emergency Plan Implementing Procedure 0-EN-EP-3 08, Revision 2C 1 COOPER NUCLEAR.STATION P.O. Box 98 / Brownville, NE 68327-0098 Tele phone: (402) 825-3811 / Fax: (402) 825-5211 ww.nppd.com NLS2015 140 Page 2 of 2 cc: Regional Administrator, w/ attachment and enclosure (2)USNRC -Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, wI/attachment (enclosure per controlled document distribution) | ||
Analysis | USNRC -CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, wI/attachment and w/o enclosure}} | ||
-Emergency Plan Implementing Procedure 0-EN-EP-308, Revision | |||
/ Fax: (402) 825- | |||
USNRC - |
Revision as of 18:06, 8 July 2018
ML15364A016 | |
Person / Time | |
---|---|
Site: | Cooper ![]() |
Issue date: | 12/21/2015 |
From: | Shaw J Nebraska Public Power District (NPPD) |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML16015A030 | List: |
References | |
NLS2015140 | |
Download: ML15364A016 (2) | |
Text
N Nebraska Public Power District Always there when you need us NLS2015 140 December 21, 2015 50.54(q)U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C. 20555-0001
Subject:
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46
Dear Sir or Madam:
The purpose of this letter is to transmit the following Emergency Plan Implementing Procedure (EPIP) pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures":
EPIP 0-EN-EP-308 Revision 2C 1 Emergency Planning Critiques In addition, as required by 10 CFR 50. 54(q)(5), attached is the summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.This letter contains no commitments.
If you have any questions regarding this submittal, please contact me at (402) 825-2788.Sincerely,/bk
Attachment:
Enclosure:
Summary of 50.54(q) Analysis -Emergency Plan Implementing Procedure 0-EN-EP-308, Revision 2C1 Emergency Plan Implementing Procedure 0-EN-EP-3 08, Revision 2C 1 COOPER NUCLEAR.STATION P.O. Box 98 / Brownville, NE 68327-0098 Tele phone: (402) 825-3811 / Fax: (402) 825-5211 ww.nppd.com NLS2015 140 Page 2 of 2 cc: Regional Administrator, w/ attachment and enclosure (2)USNRC -Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, wI/attachment (enclosure per controlled document distribution)
USNRC -CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, wI/attachment and w/o enclosure N Nebraska Public Power District Always there when you need us NLS2015 140 December 21, 2015 50.54(q)U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C. 20555-0001
Subject:
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46
Dear Sir or Madam:
The purpose of this letter is to transmit the following Emergency Plan Implementing Procedure (EPIP) pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures":
EPIP 0-EN-EP-308 Revision 2C 1 Emergency Planning Critiques In addition, as required by 10 CFR 50. 54(q)(5), attached is the summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.This letter contains no commitments.
If you have any questions regarding this submittal, please contact me at (402) 825-2788.Sincerely,/bk
Attachment:
Enclosure:
Summary of 50.54(q) Analysis -Emergency Plan Implementing Procedure 0-EN-EP-308, Revision 2C1 Emergency Plan Implementing Procedure 0-EN-EP-3 08, Revision 2C 1 COOPER NUCLEAR.STATION P.O. Box 98 / Brownville, NE 68327-0098 Tele phone: (402) 825-3811 / Fax: (402) 825-5211 ww.nppd.com NLS2015 140 Page 2 of 2 cc: Regional Administrator, w/ attachment and enclosure (2)USNRC -Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, wI/attachment (enclosure per controlled document distribution)
USNRC -CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, wI/attachment and w/o enclosure