H Nebraska Public Power District Alwa,.s there 111/im,au nttd "'
NLS2020060 October 21, 2020 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46
Dear Sir or Madam:
50.54(q) 72.44(f)
The purpose of this letter is to report a change to Emergency Plan Implementing Procedure (EPIP) 5.7.1, Emergency Classification (Revision 66), and provide a summary of the associated 10 CFR 50.54(q) analyses for the changes to the EPIP.
This letter contains no regulatory commitments. If you have any questions regarding this submi
, please contact me at ( 402) 825-5416.
mda ewbirst Regulatory Affairs and Compliance Manager
/bk
Attachment:
Report of Change and Summary of 50.54( q) Analyses Emergency Plan Implementing Procedure 5. 7.1, Revision 66 I
Enclosure:
Emergency Plan Implementing Procedure 5.7.1, Revision 66 cc:
Regional Administrator, w/attachment and enclosure (2)
USNRC - Region IV Director, Division of Fuel Management, w/attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/attachment ( enclosure per controlled distribution)
USNRC-CNS NPG Distribution, w/attachment and w/o enclosure CNS Records, w attachment and w/o enclosure COOPER NUCLEAR STATION PO Box 98 / Brownville, NE 68321-0098 Telephone: (402) B25-38n / Fax: (402) B25-52n wwwnppd com