ML17206A083

From kanterella
Jump to navigation Jump to search
Submittal of Change to Emergency Plan Implementing Procedure 5.7.1, Rev. 58
ML17206A083
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/18/2017
From: Shaw J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17206A075 List:
References
NLS2017061
Download: ML17206A083 (1)


Text

H Nebraska Public Power District NLS2017061 July 18, 2017 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Always there when you need us

Subject:

Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46

Dear Sir or Madam:

50.54(q)

The purpose of this letter is to report a change to Emergency Plan Implementing Procedure (EPIP) 5.7.1, Emergency Classification (Revision 58), and provide a summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.

This letter contains no commitments. If you have any questions regarding this submittal, please contact me at ( 402) 825-2788.

/bk

Attachment:

Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.1, Revision 58

Enclosure:

Emergency Plan Implementing Procedure 5.7.1, Revision 58 cc:

Regional Administrator, w/ attachment and enclosure (2)

USNRC - Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment (enclosure per controlled document distribution)

USNRC-CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, w/ attachment and w/o enclosure COOPER NUCLEAR STATION P.O. Box 98 I Brownville, NE 68327-0098 Telephone: (402) 825-3817 /Fax: (402) 825-5211 www.nppd.com