NLS2016071, Submittal of Changes in the Emergency Plan Implementing Procedures

From kanterella
Jump to navigation Jump to search
Submittal of Changes in the Emergency Plan Implementing Procedures
ML16348A420
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/05/2016
From: Shaw J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2016071
Download: ML16348A420 (2)


Text

H Nebraska Public Power District NLS2016071 December 5, 2016 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Always there when you need us

Subject:

Emergency Plan Implementing Procedures Cooper Nuclear Station, Docket No. 50-298, DPR-46

Dear Sir or Madam:

50.54(q)

The purpose of this letter is to report a change to the following Emergency Plan Implementing Procedures (EPIP) and provide a summary of the associated 10 CFR 50.54(q) analyses for the changes to the EPIPs:

EPIP 5.7.l Revision 56 Emergency Classification EPIP 5.7.16 Revision 26 Release Rate Determination EPIP 5.7.17 Revision 46 CNS-DOSE Assessment EPIP 5.7.17.1 Revision 1 Dose Assessment (Manual)

EPIP 5.7ENS Revision 9 ENS Communicator This letter contains no commitments.

If you have any questions regarding this submittal, please contact me at ( 402) 825-2788.

Sincerely, O~w~

Licensing Manager

/bk COOPER NUCLEAR STATION P.O. Box 98 /Brownville, NE 68321-0098 l.i Telephone: (402) 825-3811 I Fax: (402) 8-ff-5211 l i www.nppd.com I

NLS2016071 Page 2 of2 Attachments: 1. Report of Change and Summary of 50.54( q) Analysis - Emergency Plan Implementing Procedure 5.7.1, Revision 56

2. Report of Change and Summary of 50.54( q) Analysis - Emergency Plan Implementing Procedure 5.7.16, Revision 26
3. Report of Change and Summary of 50.54(q) Analysis - Emergency Plan Implementing Procedure 5. 7.17, Revision 46
4. Report of Change and Summary of 50.54( q) Analysis - Emergency Plan Implementing Procedure 5.7.17.1, Revision 1
5. Report of Change and Summary of 50.54( q) Analysis - Emergency Plan Implementing Procedure 5.7ENS, Revision 9

Enclosures:

1. Emergency Plan Implementing Procedure 5. 7.1, Revision 56
2. Emergency Plan Implementing Procedure 5. 7.16, Revision 26
3. Emergency Plan Implementing Procedure 5. 7.17, Revision 46
4. Emergency Plan Implementing Procedure 5.7.17.1, Revision 1
5. Emergency Plan Implementing Procedure 5.7ENS, Revision 9 cc:

Regional Administrator, w/ attachments and enclosures (2)

USNRC - Region IV Director, Spent Fuel Project Office, w/ attachments and enclosures Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachments (enclosures per controlled document distribution)

USNRC-CNS NPG Distribution, w/ attachments and w/o enclosures CNS Records, w/ attachments and w/o enclosures