H Nebraska Public Powe:r District NLS2018040 July 11, 2018 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Always there when you need us
Subject:
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46
Dear Sir or Madam:
50.54(q)
The purpose of this letter is to report a change to Emergency Plan Implementing Procedure (EPIP)
- 5. 7.11, Early Dismissal/Evacuation of Site Personnel (Revision 19), and provide a summary of the associated 10 CFR 50.54( q) analysis for the change to the EPIP.
This letter contains no commitments. If you have any questions regarding this submittal, please contact me at (402) 825-2788.
Sincerely,
--- ;!?' ~
/,,,-
im Sh w Licensing Manager
/bk
Attachment:
Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5. 7.11, Revision 19
Enclosure:
Emergency Plan Implementing Procedure 5.7.11, Revision 19 cc:
Regional Administrator, w/ attachment and enclosure (2)
USNRC - Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment ( enclosure per controlled document distribution)
USNRC-CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, w/ attachment and w/o enclosure COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com