ML17339A286: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 25: Line 25:


In a telephone conversation on November 21, 2017
In a telephone conversation on November 21, 2017
, between Mr
, between Mr. I. D. Fleetwood, Initial License Training Supervisor, and Mr. C. Zoia , Senior Operations Engineer, arrangements were made for the administration of operator licensing examinations at the Donald C. Cook Nuclear Power Plant, during the week s of July 23 through August 3, 2018
. I. D. Fleetwood, Initial License Training Supervisor, and Mr. C. Zoia, Senior Operations Engineer, arrangements were made for the administration of operator licensing examinations at the Donald C. Cook Nuclear Power Plant, during the week s of July 23 through August 3, 2018
. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of June 25, 201 8. As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 to NUREG
. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of June 25, 2018. As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 to NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors."  The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
-1021, "Operator Licensing Examination Standards for Power Reactors."  The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by February 23, 2018. The NRC staff will provide the written examination outline by January 9, 2018. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by February 23, 2018. The NRC staff will provide the written examination outline by January 9, 2018. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES
-201, will be due by May 9, 2018. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use.
-201 , will be due by May 9, 2018. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use.
We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled.
We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled.
To conduct the requested written examinations and operating tests, it wi ll be necessary for your staff to provide adequate space and accommodations in accordance with ES
To conduct the requested written examinations and operating tests, it wi ll be necessary for your staff to provide adequate space and accommodations in accordance with ES
-402, and to make the simulation facility available on the dates noted above. In accordance with ES
-402, and to make the simulation facility available on the dates noted above. In accordance with ES
-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests, along with any video and audio recordings of the dynamic operating tests, until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests, along with any video and audio recordings of the dynamic operating tests, until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
J. Gebbie Appendix E to NUREG
Appendix E to NUREG
-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150
Line 52: Line 51:
-rm/adams.htm l and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
-rm/adams.htm l and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


J. Gebbie Thank you for your cooperation in this matter. Mr. I. D. Fleetwood has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. C. Zoia at (630) 829-9863 or me at (630) 829-9834. Sincerely,
Thank you for your cooperation in this matter. Mr. I. D. Fleetwood has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. C. Zoia at (630) 829-9863 or me at (630) 829-9834. Sincerely, /RA/  Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50
  /RA/  Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50
-315; 50-316 License Nos. DPR
-315; 50-316 License Nos. DPR
-58; DPR-74 cc: Distribution via LISTSERV D. Emery, Training Manager
-58; DPR-74 cc: Distribution via LISTSERV D. Emery, Training Manager


J. Gebbie Letter to Joel Gebbie from Robert Orlikowski dated December 5, 2017  
Letter to Joel Gebbie from Robert Orlikowski dated December 5, 2017  


==SUBJECT:==
==SUBJECT:==

Revision as of 06:00, 6 July 2018

Ltr 12/05/2017 Donald C. Cook Nuclear Power Plant, Units 1 and 2 - Confirmation of Initial License Examination (Cdz)
ML17339A286
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/05/2017
From: Orlikowski R J
Operations Branch III
To: Gebbie J P
Indiana Michigan Power Co
Zoia C D
Shared Package
ML17164A379 List:
References
Download: ML17339A286 (4)


Text

December 5, 2017 Mr. Joel P. Gebbie Senior VP and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106

SUBJECT:

DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2

- CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Gebbie:

In a telephone conversation on November 21, 2017

, between Mr. I. D. Fleetwood, Initial License Training Supervisor, and Mr. C. Zoia , Senior Operations Engineer, arrangements were made for the administration of operator licensing examinations at the Donald C. Cook Nuclear Power Plant, during the week s of July 23 through August 3, 2018

. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of June 25, 201 8. As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 to NUREG

-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by February 23, 2018. The NRC staff will provide the written examination outline by January 9, 2018. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES

-201 , will be due by May 9, 2018. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use.

We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled.

To conduct the requested written examinations and operating tests, it wi ll be necessary for your staff to provide adequate space and accommodations in accordance with ES

-402, and to make the simulation facility available on the dates noted above. In accordance with ES

-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests, along with any video and audio recordings of the dynamic operating tests, until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.

Appendix E to NUREG

-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150

-0090) at least 60 days before the first examination date (if possible). Contact Mr. C. Zoia to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150

-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.

Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60

-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, "Personal Qualifications Statement

-Licensee," or as directed by Mr. C. Zoia when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.

Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150

-0018. The burden to the public for these voluntary information collections is estimated to average 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T

-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB

-10202, (3150

-0018), Office of Management and Budget, Washington, DC 20503.

Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number

. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading

-rm/adams.htm l and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Thank you for your cooperation in this matter. Mr. I. D. Fleetwood has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. C. Zoia at (630) 829-9863 or me at (630) 829-9834. Sincerely, /RA/ Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50

-315; 50-316 License Nos. DPR

-58; DPR-74 cc: Distribution via LISTSERV D. Emery, Training Manager

Letter to Joel Gebbie from Robert Orlikowski dated December 5, 2017

SUBJECT:

DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2

- CONFIRMATION OF INITIAL LICENSE EXAMINATION STRIBUTION

Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Kenneth O'Brien Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML17339A286 OFFICE RIII RIII RIII RIII NAME CZoia:jw ROrlikowski DATE 12/05/17 12/05/17 OFFICIAL RECORD COPY