ML24256A173

From kanterella
Jump to navigation Jump to search
Form 5.1-1 Post Examination Check Sheet (Dcc Ile 2024)
ML24256A173
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/12/2024
From:
NRC/RGN-III/DORS/OB
To:
Indiana Michigan Power Co
Travis Iskierka-Boggs
Shared Package
ML22335A449 List:
References
Download: ML24256A173 (1)


Text

Form 5.1-1 Post examination Check Sheet

Post examination Check Sheet

Facility: DC Cook Dates of Examination: 07/22/2024 - 07/26/2024

Activity Description Date Complete

1. *Received post examination package from facility licensee and 08/02/2024 verified complete. (ES-4.4)
2. *Reviewed and incorporated any necessary facility and applicant N/A written examination comments. NRC grading of written examination completed. (ES-4.4)
3. *Reviewed and incorporated any necessary facility and applicant N/A operating test comments. NRC grading of operating test completed.

(ES-3.6)

4. *Completed NRC chief examiner review of operating test and written08/07/2024 examination grading. (ES-3.6 and ES -4.4)
5. Completed licensing official review. 08/13/2024
6. Mailed licenses, preliminary results, and pass letters. 08/23/2024

08/08/2024

7. Notified facility licensee of results.
8. Issued the examination report (refer to Operator Licensing Manual 09/06/2024 Chapter (OLMC) 510, Operator Licensing Examination Reports).
9. Returned reference material after final resolution of any informal 08/08/2024 NRC staff reviews, hearing demands, or both.
10. Performed examination recordkeeping activities (refer to OLMC 520, 09/12/2024 Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.