Text

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 MINUTES TITLE NUMBER AND 2020NRC-A1a-RO TITLE: Boron Volume Determination REVISION: 0 Examinees Name: ______________________________________________________

Evaluators Name: ______________________________________________________

Date Performed: _______________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: _____________________________________________________

Time to Complete: _______________________________________________________

Comments: _________________________________________________________________

2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO.doc Page 1 of 8

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 2-OHP-4021-005-002 Operation of the Unit 2 Boric Acid Blender K/A Number: 2.1.43 Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc..

K/A Imp.: RO: 4.1 SRO: 4.3 Task Number: 0050080101 Borate the RCS.

TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing Copy of 2-OHP-4021-005-002 Attachment 9 Boron or Dilution Volume Determination Copy of Unit 2 Technical Data Book curves (Sections 4, 5, 6, and 7)

ATTACHMENTS None EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO.doc Page 2 of 8

OPERATIONS JPM SIMULATOR/LAB SETUP None EVALUATOR INSTRUCTIONS

1. Brief the operator (May be performed by giving out Task Briefing Sheet)
2. Announce start of the JPM
3. Perform evolution
4. At completion of evolution, announce the JPM is complete.
5. Document evaluation performance.

TASK BRIEFING You are an extra Control Room Operator on Unit 2.

The Unit Supervisor has directed you to calculate the required Boration or Dilution to restore Tave to program using Attachment 9 of 02-OHP-4021-005-002, Operation of the Unit 2 Boric Acid Blender.

NERDS is NOT available. Engineering has provided the Missing NERD information.

Reactor Power 96.3%

Tave 574.2°F Tref 573°F Boron Concentration 1000 ppm BAST Concentration 6800 ppm Core Burnup 8000 MWD/MTU Effective Fuel Temperature 1179.3°F DTC -2.235 pcm/°F Calculate ONLY the amount of Boron or PW required to be added to the VCT. Another Operator will determine the effects of the fluid within the CVCS piping.

GENERAL STANDARDS/PRECAUTIONS The required Boron Addition has been determined 2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO.doc Page 3 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Determines that section 4.1.1 is not applicable SAT: UNSAT:

2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO.doc Page 4 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Determines that section 4.1.2 is applicable SAT: UNSAT:

STANDARD (CS): Determines that 1.2°F temperature Reduction is required (574.2 - 573 = 1.2)

SAT: UNSAT:

STANDARD: Determines 8000 MWD/MTU is burnup SAT: UNSAT:

2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO.doc Page 5 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Records 1000 ppm from given information.

SAT: UNSAT:

STANDARD (CS): Determines that MTC is -12.8 pcm/°F (Range -12.0 - -

13.0)

SAT: UNSAT:

STANDARD: Determines that the Effective Fuel Temperature is 1179.3°F SAT: UNSAT:

STANDARD: Determines that the DTC is -2.235 pcm/°F SAT: UNSAT:

STANDARD (CS): Determines that TC is -15.035 pcm/°F (-12.8 + -2.235)

(Range -14.235 to 15.235)

SAT: UNSAT:

STANDARD (CS): Determines that PCM change is -18.042 (-15.035 pcm/°F x 1.2°F) ( Range -17.082 to -18.282)

SAT: UNSAT:

STANDARD (CS): Determines that DBW is -8.05 pcm/ppm ( Range -8.0 to -8.1)

SAT: UNSAT:

2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO.doc Page 6 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Determines that Boron change is +2.24 ppm (-18.042 pcm/-8.05 pcm/°F) ( Range +2.12 to +2.27)

SAT: UNSAT:

STANDARD (CS): Determines that Boron change requires +24 gallons of Boric Acid (circle Boric Acid) ( Range 25 +/- 5 gallons)

SAT: UNSAT:

Note: Acceptable range based on graph reading from the lower limit line (20) and mid-scale (30) for the given boron concentration and required ppm change. The calculated limits of 23.92 to 25.66 is included within this range)

TERMINATION CUE: This JPM is complete.

2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO.doc Page 7 of 8

Task Briefing You are an extra Control Room Operator on Unit 2.

The Unit Supervisor has directed you to calculate the required Boration or Dilution to restore Tave to program using Attachment 9 of 02-OHP-4021-005-002, Operation of the Unit 2 Boric Acid Blender.

NERDS is NOT available.

Engineering has provided the Missing NERD information.

Parameter Value Reactor Power 96.3%

Tave 574.2°F Tref 573°F Boron Concentration 1000 ppm BAST Concentration 6800 ppm Core Burnup 8000 MWD/MTU Effective Fuel Temperature 1179.3°F DTC -2.235 pcm/°F Calculate ONLY the amount of Boron or PW required to be added to the VCT. Another Operator will determine the effects of the fluid within the CVCS piping.

Revision: 0 2020NRC-A1.a-RO.doc-RO Page 8 of 8

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 20 Minutes TITLE NUMBER AND 2020NRC-A1.b-RO TITLE: Prepare Valve Stroke Data per 1-OHP-4030- REVISION: 0 114-011-Attachment 1 Examinees Name: ______________________________________________________

Evaluators Name: ______________________________________________________

Date Performed: _______________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: _____________________________________________________

Time to Complete: _______________________________________________________

Comments: _________________________________________________________________

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO.doc Page 1 of 12

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

1-OHP-4030-114-011 Containment Isolation And IST Valve Operability Test, Rev. 36 TDB-1-Fig-19.-1 Power Operated Valve Stroke Time Limits, Rev. 125 NRC KA KA 2.2.12 Knowledge of surveillance procedures. (CFR: 41.10 / 45.13)

RO/SRO Importance 3.7/4.1 TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS PMP-4030-EXE-001, Conduct of surveillance Testing 1-OHP-4030-114-011, Containment Isolation and IST Valve Operability Test, Attachment 1 Copy of TDB Figure 1-19-1 Power Operated Valve Stroke Time limits ATTACHMENTS EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP 2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO.doc Page 2 of 12

OPERATIONS JPM None EVALUATOR INSTRUCTIONS Note: This JPM is based on 1-OHP-4030-114-011, Rev. 36 and TDB-1-Fig-19.-1, Rev. 125. Any subsequent revisions to the procedures will require a review of this JPM to ensure that the content of the JPM is still valid. This JPM may be used without revision if the procedure changes do not affect the JPM.

Give copy of Task Briefing, procedure, and attachments to examinee.

TASK BRIEFING You are the extra operator in Unit 1.

The Unit Supervisor has requested you to prepare the 1-OHP-4030-114-011, Containment Isolation And IST Valve Operability Test Attachment 1 per step 2.4 NOTE Simulator Indications are NOT applicable to this JPM 2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO.doc Page 3 of 12

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard) 2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO.doc Page 4 of 12

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

Cue: Procedure is current revision and pre-test briefing is complete.

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO.doc Page 5 of 12

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS) Operator determines that TDB-1-FIG 19.1 is required for the IST MIN and IST MAX Times SAT: UNSAT:

N/A Supply Copy of TDB-1-FIG 19.1 2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO.doc Page 6 of 12

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO.doc Page 7 of 12

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO.doc Page 8 of 12

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO.doc Page 9 of 12

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO.doc Page 10 of 12

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

TERMINATION CUE: JPM is complete 2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO.doc Page 11 of 12

Task Briefing You are the extra operator in Unit 1.

The Unit Supervisor has requested you to prepare the 1-OHP-4030-114-011, Containment Isolation and IST Valve Operability Test Attachment 1 per step 2.4 2020NRC-A1.b-RO.doc Page 12 of 12

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 Minutes TITLE NUMBER AND 2020NRC-A2-RO TITLE: Calculate QPTR REVISION: 0 Examinees Name: ______________________________________________________

Evaluators Name: ______________________________________________________

Date Performed: _______________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: _____________________________________________________

Time to Complete: _______________________________________________________

Comments: _________________________________________________________________

2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO.doc Page 1 of 16

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

2-OHP-4030-214-032 Quadrant Power Tilt Calculation NRC KA KA 2.17 Ability to evaluate plant performance and make operational judgements based on operating characteristics, reactor behavior, and instrumentation interpretation SYS 015 A1.04 Ability to predict and/or monitor changes in parameters to prevent exceeding design limits associated with operating the NIS controls including: Quadrant Power Tilt Ratio RO/SRO Importance 4.4/4.7 3.5/3.7 TRAINING AIDS/TOOLS/EQUIPMENT Calculator HANDOUTS Task Briefing 2-OHP-4030-214-032 and Data Sheet 2 ATTACHMENTS NI Calibration Data Card N41, N42, N43, and N44 Pictures EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO.doc Page 2 of 16

OPERATIONS JPM SIMULATOR/LAB SETUP None EVALUATOR INSTRUCTIONS

1. Ensure classroom setup is complete
2. Brief the operator (May be performed by giving out Task Briefing Sheet)
3. Announce start of the JPM
4. Perform evolution
5. At completion of evolution, announce the JPM is complete.
6. Document evaluation performance.

TASK BRIEFING You are an extra RO.

The following conditions exist:

  • Unit 2 is currently at 72% power.
  • The Plant Process Computer (PPC) is INOPERABLE The US directs you to perform a manual QPTR calculation per 2-OHP-4030-214-032, Quadrant Power Tilt Calculation.

The NI amp meters are set to display maximum resolution and the fluke readings confirm that the indicators are reading properly.

NOTE Simulator Indications are NOT applicable to this JPM 2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO.doc Page 3 of 16

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

Cue: NI readings will be used for QPTR.

2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO.doc Page 4 of 16

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD Operator determines step 4.1 is N/A as PPC is INOPERABLE SAT: UNSAT:

STANDARD Operator determines step 4.2 is applicable and detector currents will be used.

SAT: UNSAT:

Cue: meter scales are selected for maximum resolution.

STANDARD Operator records Upper & Lower Detector blanks for N-41, 42, 43 and 44 on Data Sheet 2.

SAT: UNSAT:

2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO.doc Page 5 of 16

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD Operator determines step 4.2.2 is N/A as Fluke will not be used.

SAT: UNSAT:

STANDARD Operator enters 120% current values on Data Sheet 2.

SAT: UNSAT:

STANDARD Operator divides respective NI channel with its 120% value SAT: UNSAT:

STANDARD Operator totals the Normalized Values SAT: UNSAT:

STANDARD Operator completes formula calculations to determine QPTR SAT: UNSAT:

STANDARD Operator enters the highest tilt ratio on Data Sheet 2 SAT: UNSAT:

STANDARD Operator determines step 4.2.8 is N/A as PPC is INOP SAT: UNSAT:

2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO.doc Page 6 of 16

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD Operator determines step 4.3 is N/A as all NIs are OPERABLE SAT: UNSAT:

STANDARD Operator determines ACCEPTANCE CRITERIA is NOT MET SAT: UNSAT:

TERMINATION CUE: JPM is complete 2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO.doc Page 7 of 16

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

Expected values 99 135.4 .7311 97.5 134.4 .7106 98 134.4 .7292 97.5 136.7 .7132 2.8841 91.5 135.6 .6748 96 134.7 .7127 99 134.7 .7345 98 136.2 .7195 2.8419 1.014 0

1.034 2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO.doc Page 8 of 16

OPERATIONS JPM 2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO.doc Page 9 of 16

OPERATIONS JPM Acceptable Ranges Based on Scale used on Pictures Detector A (UPPER)

SCALE 5 5 1 1 500 500 100 100 Low High Low High Low High Low High 4.9 5 0.985 0.995 490 500 98.5 99.5 4.75 4.8 0.95 0.96 475 480 95 96 4.9 4.95 0.975 0.985 490 495 97.5 98.5 4.85 4.9 0.97 0.98 485 490 97 98 Using the 100 Scale (UPPER QPTR ranges calculated using combinations of High/Low values above)

Lowest, Lowest, Highest ---- 1.0041 Highest, Lowest, Lowest ----- 1.0241 Detector B (LOWER)

SCALE 5 5 1 1 500 500 100 100 Low High Low High Low High Low High 4.55 4.6 0.91 0.92 455 460 91 92 4.8 4.85 0.955 0.965 480 485 95.5 96.5 4.9 4.95 0.985 0.995 490 495 98.5 99.5 4.9 4.95 0.975 0.985 490 495 97.5 98.5 (LOWER QPTR Ranges Calculated using combinations of High/Low values above)

Highest, Lowest, Highest ---- 1.0244 Lowest, Highest, Lowest ----- 1.0444 2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO.doc Page 10 of 16

OPERATIONS JPM 2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO.doc Page 11 of 16

Task Briefing You are an extra RO.

The following conditions exist:

  • Unit 2 is currently at 72% power.
  • The Plant Process Computer (PPC) is INOPERABLE The US directs you to perform a manual QPTR calculation per 2-OHP-4030-214-032, Quadrant Power Tilt Calculation.

The NI amp meters are set to display maximum resolution and the fluke readings confirm that the indicators are reading properly.

NI CALIBRATION DATA DET A 120% I in µAmps N41 = 135.4 N42 = 136.6 N43 = 134.4 N44 = 136.7 DET B 120% I in µAmps N41 = 135.6 N42 = 133.6 N43 = 134.7 N44 = 136.2 Verified: Print ____John Smithe__

Sign ___ John Smithe _____

Date 5/11/2016____

NOTE Simulator Indications are NOT applicable to this JPM 2020NRC-A2-RO.doc Page 12 of 16

2020NRC-A2-RO.doc Page 13 of 16 2020NRC-A2-RO.doc Page 14 of 16 2020NRC-A2-RO.doc Page 15 of 16 2020NRC-A2-RO.doc Page 16 of 16 OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 20 Minutes TITLE NUMBER AND 2020NRC-A3-RO TITLE: Respond to Failed Radiation Monitor Channel REVISION: 0 Examinees Name: ______________________________________________________

Evaluators Name: ______________________________________________________

Date Performed: _______________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: _____________________________________________________

Time to Complete: _______________________________________________________

Comments: _________________________________________________________________

2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO.doc Page 1 of 10

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

2-OHP-4024-211 Annunciator #211 Response: Delta T 12-OHP-4024-139 Annunciator #139 Response: Radiation NRC KA KA 2.3.15 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc. (CFR: 41.12 / 45.9)

RO/SRO Importance 2.9/3.1 TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS 2-OHP-4024-211 Annunciator #111 Response: Delta T 12-OHP-4024-139 Annunciator #139 Response: Radiation ATTACHMENTS None EVALUATION SETTINGS Simulator EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP Disable emulator for ERS-8306.

2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO.doc Page 2 of 10

OPERATIONS JPM EVALUATOR INSTRUCTIONS Note: This JPM is based on 2-OHP-4024-111, Rev. 25 and 12-OHP-4024-139 Rev. 25. Any subsequent revisions to the procedures will require a review of this JPM to ensure that the content of the JPM is still valid. This JPM may be used without revision if the procedure changes do not affect the JPM.

Give copy of Task Briefing, and attachment 2-OHP-4024-211to examinee.

TASK BRIEFING You are the extra operator in Unit 1.

The Unit Supervisor has requested you to respond to Annunciator Panel 211: Drop 49, identify, and take all actions required.

2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO.doc Page 3 of 10

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard) 2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO.doc Page 4 of 10

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator reviews Drop 49 Probable Causes and automatic actions.

SAT: UNSAT:

STANDARD: Operator determines that 12-OHP-4024-139 is required to be reviewed for channel in alarm.

SAT: UNSAT:

STANDARD: Operator identifies from the RMSAN1 channel in alarm.

SAT: UNSAT:

CUE: Provide copy of 12-OHP-4024-139 for Channel ERA-8300 2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO.doc Page 5 of 10

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator reviews probable causes for channel in WHITE alarm.

SAT: UNSAT:

2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO.doc Page 6 of 10

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

THIS PAGE INCLUDED FOR REFERENCE. NO ACTIONS REQUIRED AS ALARM IS WHITE.

2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO.doc Page 7 of 10

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator identifies channel is Inoperable.

SAT: UNSAT:

CUE: If required, inform the operator it is desired to prevent nuisance alarms.

CUE: RP has been contacted for removing channel from service.

STANDARD (CS): Operator identifies Attachments 1 & 2 are required for removing channel from service.

SAT: UNSAT:

CUE: Only attachment2 will be filled out at this time. Provide Attachment 2 at this time.

2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO.doc Page 8 of 10

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator fills in the required information.

SAT: UNSAT:

NOTE: Only RMS Channel of ERA-8306 (west RHR Pump Room) is required NOTE: Enters channel is in Fail Low Status STANDARD (CS): Operator activates U2 RMS Annunciator Status Tree.

SAT: UNSAT:

STANDARD (CS): Operator unchecks the box next to ERA-8306.

SAT: UNSAT:

CUE: Open Items Log will be filled out by Independent Verifier.

CUE: JPM is Complete 2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO.doc Page 9 of 10

Task Briefing You are the extra operator in Unit 1.

The Unit Supervisor has requested you to respond to Annunciator Panel 211: Drop 49, identify, and take all actions required.

2020NRC-A3-RO.doc Page 10 of 10

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 MINUTES TITLE NUMBER AND 2020NRC-A1.a-SRO TITLE: Review Boron Volume Determination REVISION: 0 Examinees Name: __________________________________________________________

Evaluators Name: ___________________________________________________________

Date Performed: ____________________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: _________________________________________________________

Time to Complete: ___________________________________________________________

Comments: ________________________________________________________________

2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO.doc Page 1 of 8

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 2-OHP-4021-005-002 Operation of the Unit 2 Boric Acid Blender K/A Number: 2.1.43 Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc..

K/A Imp.: RO: 4.1 SRO: 4.3 Task Number: 0050080101 Borate the RCS.

TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing Copy of 2-OHP-4021-005-002 Attachment 9 Boron or Dilution Volume Determination Copy of Unit 2 Technical Data Book curves (Sections 4, 5, 6, and 7)

ATTACHMENTS None EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO.doc Page 2 of 8

OPERATIONS JPM SIMULATOR/LAB SETUP None EVALUATOR INSTRUCTIONS

1. Brief the operator (May be performed by giving out Task Briefing Sheet)
2. Announce start of the JPM
3. Perform evolution
4. At completion of evolution, announce the JPM is complete.
5. Document evaluation performance.

TASK BRIEFING You are unit supervisor in Unit 2.

You have directed the RO to calculate the required Boration or Dilution to restore Tave to program using of 02-OHP-4021-005-002, Operation of the Unit 2 Boric Acid Blender.

NERDS is NOT available. Engineering has provided the Missing NERD information.

Reactor Power 96.3%

Tave 574.2°F Tref 573°F Boron Concentration 1000 ppm BAST Concentration 6800 ppm Core Burnup 8000 MWD/MTU Effective Fuel Temperature 1179.3°F DTC -2.235 pcm/°F He has calculated ONLY the amount of Boron or PW required to be added to the VCT.

Review his calculation for correctness.

GENERAL STANDARDS/PRECAUTIONS The calculation has been reviewed and comments have been provided 2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO.doc Page 3 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Agrees that section 4.1.1 is not applicable SAT: UNSAT:

2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO.doc Page 4 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Agrees that section 4.1.2 is applicable SAT: UNSAT:

STANDARD: Agrees that 1.2°F temperature Reduction is required (574.2

- 573 = 1.2)

SAT: UNSAT:

STANDARD: Agrees 8000 MWD/MTU is burnup SAT: UNSAT:

2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO.doc Page 5 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Agrees 1000 ppm is from given information.

SAT: UNSAT:

STANDARD (CS): Determines that MTC is actually -13.0. (-10.5pcm/°F is from wrong part of curve)(Range -12.5 to -13.5)

SAT: UNSAT:

STANDARD: Agrees that the Effective Fuel Temperature is 1179.3°F SAT: UNSAT:

STANDARD: Agrees that the DTC is -2.235 pcm/°F SAT: UNSAT:

STANDARD (CS): Determines that TC is -15.235 pcm/°F (-12.735 is from incorrect value in d)(Range -14.735 to -15.735)

SAT: UNSAT:

STANDARD (CS): Determines that PCM change is -18.282 (-15.235 pcm/°F x 1.2°F) (-15.282 is from incorrect value in g)(Range -17.682 to -

18.882)

SAT: UNSAT:

STANDARD: Agrees that DBW is -8.05 pcm/ppm (-)

SAT: UNSAT:

2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO.doc Page 6 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Determines that Boron change is +1.9 ppm (-15.282 pcm/-8.05 pcm/°F) ( Range +1.83 to +2.197)

SAT: UNSAT:

STANDARD (CS): Determines that Boron change requires +22.0 gallons of Boric Acid (circle Boric Acid) (Range 20.975 gal to 24.9 gal). Identifies RO used Dilution graph to determine volume.

SAT: UNSAT:

Note: Acceptable range based on graph reading from the lower limit line (20) and mid scale (23.1) for the given boron concentration and required ppm change. The calculated limits of 20.975 to 24.9 is included within this range)

TERMINATION CUE: This JPM is complete.

2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO.doc Page 7 of 8

Task Briefing You are unit supervisor in Unit 2.

You have directed the RO to calculate the required Boration or Dilution to restore Tave to program using Attachment 9 of 02-OHP-4021-005-002, Operation of the Unit 2 Boric Acid Blender.

NERDS is NOT available. Engineering has provided the Missing NERD information.

Parameter Value Reactor Power 96.3%

Tave 574.2°F Tref 573°F Boron Concentration 1000 ppm BAST Concentration 6800 ppm Core Burnup 8000 MWD/MTU Effective Fuel Temperature 1179.3°F DTC -2.235 pcm/°F He has calculated ONLY the amount of Boron or PW required to be added to the VCT.

Review his calculation for correctness.

Revision: 0 2020 NRC A1.a-SRO Page 8 of 8

OPERATIONS JPM TRAINING PROGRAM Initial License Training TIME: 20 Minutes TITLE NUMBER AND 2020NRC-A1.b-SRO TITLE: Review Valve Stroke Data per 1-OHP-4030- REVISION: 0 114-011-Attachment 1 Examinees Name: ____________________________________________________________

Evaluators Name: _____________________________________________________________

Date Performed: ______________________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: ___________________________________________________________

Time to Complete: _____________________________________________________________

Comments: ________________________________________________________________

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO.doc Page 1 of 14

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

1-OHP-4030-114-011 Containment Isolation And IST Valve Operability Test, Rev. 36 TDB-1-Fig-19.-1 Power Operated Valve Stroke Time Limits, Rev. 125 NRC KA KA 2.2.12 Knowledge of surveillance procedures. (CFR: 41.10 / 45.13)

RO/SRO Importance 3.7/4.1 TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS PMP-4030-EXE-001, Conduct of surveillance Testing 1-OHP-4030-114-011, Containment Isolation and IST Valve Operability Test, Attachment 1 ATTACHMENTS None EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP 2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO.doc Page 2 of 14

OPERATIONS JPM None EVALUATOR INSTRUCTIONS Note: This JPM is based on 1-OHP-4030-114-011, Rev. 36 and TDB-1-Fig-19.-1, Rev. 125. Any subsequent revisions to the procedures will require a review of this JPM to ensure that the content of the JPM is still valid. This JPM may be used without revision if the procedure changes do not affect the JPM.

Give copy of Task Briefing and procedure to examinee.

TASK BRIEFING The SM has requested you to review the recently performed 1-OHP-4030-114-011, Containment Isolation And IST Valve Operability Test Attachment 1 NOTE Simulator Indications are NOT applicable to this JPM 2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO.doc Page 3 of 14

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard) 2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO.doc Page 4 of 14

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

Note: Operator verifies prerequisites completed.

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO.doc Page 5 of 14

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator determines that TDB-1-FIG 19.1 is required for the IST MIN and IST MAX Times SAT: UNSAT:

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO.doc Page 6 of 14

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator determine IST MIN and IST MAX Times entered correctly and results are acceptable SAT: UNSAT:

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO.doc Page 7 of 14

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator determine IST MIN and IST MAX Times entered correctly and results are acceptable STANDARD: Operator determine IST MIN and IST MAX Times entered correctly and results are acceptable 2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO.doc Page 8 of 14

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator determines Box not checked and Initials missed SAT: UNSAT:

STANDARD (CS): Operator determines IST MAX Times were incorrectly entered from the limits column SAT: UNSAT:

STANDARD (CS): Operator determines IST MAX Time and LIMIT was exceeded and re-test is NOT allowed SAT: UNSAT:

STANDARD (CS): Operator determines IST MAX Time was exceeded and restest is allowed SAT: UNSAT:

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO.doc Page 9 of 14

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator determines Box not checked and Initials missed SAT: UNSAT:

STANDARD: Operator determine IST MIN and IST MAX Times entered correctly and results are acceptable 2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO.doc Page 10 of 14

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator determine IST MIN and IST MAX Times entered correctly and results are acceptable 2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO.doc Page 11 of 14

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator determines full stroke tests for DCR-207 and DCR-206 were not signed off SAT: UNSAT:

STANDARD (CS): Determine That DCR-205 and DCR-206 were incorrectly tested and should be declared inoperable (DCR-206 could be retested)

SAT: UNSAT:

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO.doc Page 12 of 14

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Determine that Acceptance Criteria was NOT met SAT: UNSAT:

TERMINATION CUE: JPM is complete 2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO.doc Page 13 of 14

Task Briefing The SM has requested you to review the recently performed 1-OHP-4030-114-011, Containment Isolation and IST Valve Operability Test Attachment 1 2020NRC-A1.b-SRO.doc Page 14 of 14

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 20 Minutes TITLE NUMBER AND 2020NRC-A2-SRO TITLE: Review QPTR REVISION: 0 Examinees Name: ______________________________________________________

Evaluators Name: ______________________________________________________

Date Performed: _______________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: _____________________________________________________

Time to Complete: _______________________________________________________

Comments: _________________________________________________________________

2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO.doc Page 1 of 12

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

2-OHP-4030-214-032 Quadrant Power Tilt Calculation NRC KA KA 2.1.7 Ability to evaluate plant performance and make operational judgements based on operating characteristics, reactor behavior, and instrumentation interpretation SYS 015 A1.04 Ability to predict and/or monitor changes in parameters to prevent exceeding design limits associated with operating the NIS controls including: Quadrant Power Tilt Ratio RO/SRO Importance 4.4/4.7 3.5/3.7 Task Number: 0130180201 Perform Quadrant Power Tilt Ratio Calculation TRAINING AIDS/TOOLS/EQUIPMENT Calculator Ruler HANDOUTS Task Briefing Completed 2-OHP-4030-214-032 and Data Sheet 3 ATTACHMENTS NI Calibration Data Card N41, N42, N43, and N44 Pictures EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO.doc Page 2 of 12

OPERATIONS JPM SIMULATOR/LAB SETUP None EVALUATOR INSTRUCTIONS

1. Brief the operator (May be performed by giving out Task Briefing Sheet)
2. Announce start of the JPM
3. Perform evolution
4. At completion of evolution, announce the JPM is complete.
5. Document evaluation performance.

TASK BRIEFING You are the Unit SRO.

The following conditions exist:

  • Unit 2 is currently at 72% power.
  • The Plant Process Computer (PPC) is INOPERABLE The SM directs you to Review the manual 2-OHP-4030-214-032, Quadrant Power Tilt Calculation.

The NI amp meters are set to display maximum resolution.

NOTE Simulator Indications are NOT applicable to this JPM 2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO.doc Page 3 of 12

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS) Operator identifies that values for N42 Upper, N41 Lower and N43 Lower were incorrectly read/entered.

(N42 Upper- 95.5, N41 Lower - 91.5, N43 Lower - 99)

SAT: UNSAT:

If required Direct Operator to makes required corrections and recalculate.

99 135.4 .7311 97.5 134.4 .7254 98 134.4 .7292 97.5 136.7 .7132 2.899 96.5 135.6 .7117 STANDARD (CS) Operator identifies that value was incorrectly calculated.

96 134.7 .7127 Should be 1.034 resulting in excessive QPTR.

98 134.7 .7275 98 136.2 .7195 1.034 (range 1.026 to 1.041) 2.8714 SAT: UNSAT:

1.008 STANDARD (CS) Operator Determines that Acceptance Criteria is NOT Met 8

(QPTR > 1.02) and Notifies SM 1.013 SAT: UNSAT:

2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO.doc Page 4 of 12

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS) Operator Determines that Acceptance Criteria is NOT Met (QPTR > 1.02) and Notifies SM & Reactor Engineering SAT: UNSAT:

CUE: SM Acknowledges that QPTR has Exceeded TS value requests that you review the Required Technical Specification and determine the required Actions.

2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO.doc Page 5 of 12

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

CUE: (If Required) Ask Operator to determine the Technical Specification LCO that applies.

STANDARD (CS) Determines that Power is limited to 3% for each 1%

over 1.00 (3.4 x 3% = 10.2%) per LCO 3.2.4 Action A.1 - (note power limit is from RTP - 89.9% is limit)

(Range of 7.8% to 12.3% reduction with a 92.2% to 87.7% power limit)

SAT: UNSAT:

STANDARD Also Determines that QPTR must be calculated every 12 F F C W (Z ) (Z )

hours, Verify Q is within limit, Verify Q is within limit, &

F N

Verify h is within limits specified in the COLR.

SAT: UNSAT:

2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO.doc Page 6 of 12

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD Identify that safety analyses must be evaluated before raising power above the limit.(92.2% to 87.7% power limit)

SAT: UNSAT:

STANDARD (CS): A.5 & A.6 required if power is raised above the limit.(92.2% to 87.7% power limit)

SAT: UNSAT:

TERMINATION CUE: JPM is complete 2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO.doc Page 7 of 12

Task Briefing You are the Unit SRO.

The following conditions exist:

  • Unit 2 is currently at 72% power.
  • The Plant Process Computer (PPC) is INOPERABLE The SM directs you to Review the manual 2-OHP-4030-214-032, Quadrant Power Tilt Calculation.

The NI amp meters are set to display maximum resolution.

NI CALIBRATION DATA DET A 120% I in µAmps N41 = 135.4 N42 = 136.6 N43 = 134.4 N44 = 136.7 DET B 120% I in µAmps N41 = 135.6 N42 = 133.6 N43 = 134.7 N44 = 136.2 Verified: Print ____John Smithe__

Sign ___ John Smithe _____

Date 5/11/2016____

NOTE Simulator Indications are NOT applicable to this JPM - Use Supplied Pictures for readings.

2020NRC-A2-SRO.doc Page 8 of 12

2020NRC-A2-SRO.doc Page 9 of 12 2020NRC-A2-SRO.doc Page 10 of 12 2020NRC-A2-SRO.doc Page 11 of 12 2020NRC-A2-SRO.doc Page 12 of 12 OPERATIONS JPM TRAINING PROGRAM Initial License Training TIME: 15 Minutes TITLE NUMBER AND 2020NRC-A3-SRO TITLE: Approve a Containment Purge release REVISION: 0 Examinees Name: ____________________________________________________________

Evaluators Name: _____________________________________________________________

Date Performed: ______________________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: ___________________________________________________________

Time to Complete: _____________________________________________________________

Comments: ________________________________________________________________

2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO.doc Page 1 of 9

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

1-OHP-4021-028-005 Operation of the Containment Purge System NRC KA KA 2.3.6 Ability to approve release permits. (CFR: 41.12 / 45.10)

RO/SRO Importance 2.0/3.8 TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS 1-OHP-4021-028-005 data Sheet 1, Containment Purge Release Permit ATTACHMENTS None EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO.doc Page 2 of 9

OPERATIONS JPM SIMULATOR/LAB SETUP None EVALUATOR INSTRUCTIONS Note: This JPM is based on 1-OHP-4030-028-005, Rev. 38. Any subsequent revisions to the procedures will require a review of this JPM to ensure that the content of the JPM is still valid. This JPM may be used without revision if the procedure changes do not affect the JPM.

Give copy of Task Briefing and procedure to examinee.

TASK BRIEFING The Unit has just been tripped and entered Mode 3 for the planned refueling outage.

The SM has requested you to review and approve the Containment Purge Release Permit to allow containment purging for the refueling outage.

2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO.doc Page 3 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard) 2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO.doc Page 4 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator verifies release number entered.

SAT: UNSAT:

STANDARD: Operator verifies Operations signed for initiating release permit.

SAT: UNSAT:

STANDARD (CS): Operator identifies Operations has not designated release method.

SAT: UNSAT:

2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO.doc Page 5 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator identifies approval NOT obtained from Chemistry.

SAT: UNSAT:

STANDARD: Operator verifies Chemistry / RP / Environmental have not signed for NOT approving purge.

SAT: UNSAT:

STANDARD (CS): Operator identifies Authorization of Containment purge NOT permitted.

SAT: UNSAT:

TERMINATION CUE: JPM is complete 2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO.doc Page 6 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

NO ACTIONS CONTAINED ON THIS PAGE 2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO.doc Page 7 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

NO ACTIONS CONTAINED ON THIS PAGE 2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO.doc Page 8 of 9

Task Briefing The Unit has just been tripped and entered Mode 3 for the planned refueling outage.

The SM has requested you to review and approve the Containment Purge Release Permit to allow containment purging for the refueling outage.

2020NRC-A3-SRO.doc Page 9 of 9

OPERATIONS JPM TRAINING PROGRAM Initial License Training TIME: 20 Minutes TITLE NUMBER AND 2020NRC-A4-SRO TITLE: Determine if PAR required and determine PAR REVISION: 0 Examinees Name: ____________________________________________________________

Evaluators Name: _____________________________________________________________

Date Performed: ______________________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: ___________________________________________________________

Time to Complete: _____________________________________________________________

Comments: ________________________________________________________________

2020NRC-A4-SRO Revision: 0 Determine if PAR required and determine PAR 2020NRC-A4-SRO.doc Page 1 of 8

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

PMP-2080-EPP-101 EMERGENCY CLASSIFICATION PMP-2080-EPP-100 EMERGENCY RESPONSE NRC KA KA 2.4.44 Knowledge of emergency plan protective action recommendations.

SRO Importance 4.4 Task Number: EPP0120703 Develop a Protective Action Recommendation TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing sheet Task briefing PMP-2080-EPP-100, Emergency Response, Attachment 1 Protective Action Recommendations PMP-2080-EPP-101, Emergency Plan Classification, Attachment 1 ATTACHMENTS None EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP 2020NRC-A4-SRO Revision: 0 Determine if PAR required and determine PAR 2020NRC-A4-SRO.doc Page 2 of 8

OPERATIONS JPM None EVALUATOR INSTRUCTIONS

1. Brief the operator (May be performed by giving out Task Briefing Sheet)
2. Announce start of the JPM
3. Perform evolution
4. At completion of evolution, announce the JPM is complete.
5. Document evaluation performance.

TASK BRIEFING You are the Shift Manager and had declared a Site area Emergency 20 minutes ago based on Security Hazzard HS1 - HS1 HOSTILE ACTION within the plant PROTECTED AREA based on a report form Security.

You have just upgraded the Emergency level to General Emergency as the hostile forces have detonated explosives on all four U1 4KV Emergency buses. The upgrade was due to Loss of Emerg AC Power - SG1 Prolonged loss of all offsite and all onsite AC power to emergency buses.

You are to determine if a PAR is required and if so what the PAR determination is.

GENERAL STANDARDS/PRECAUTIONS Determine PAR is required and recommends PAR IAW EPP-100 attachment 1.

2020NRC-A4-SRO Revision: 0 Determine if PAR required and determine PAR 2020NRC-A4-SRO.doc Page 3 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard) 2020NRC-A4-SRO Revision: 0 Determine if PAR required and determine PAR 2020NRC-A4-SRO.doc Page 4 of 8

OPERATIONS JPM EVALUATOR NOTE: A General Emergency requires a Protective Action Recommendation (PAR) to be made to the state.

STANDARD (CS): Candidate determines PAR is required.

SAT: UNSAT:

STANDARD (CS): Candidate determines PAR using Initial PAR flowchart. Candidate determines Shelter in Place for Arear 1 and clearing lake area 6 is required.

SAT: UNSAT:

2020NRC-A4-SRO Revision: 0 Determine if PAR required and determine PAR 2020NRC-A4-SRO.doc Page 5 of 8

OPERATIONS JPM STANDARD (CS): Candidate determines this is NOT Rapidly Progressing and a HOSTILE ACTION is occurring.

SAT: UNSAT:

STANDARD (CS): Candidate determines PAR using Initial PAR flowchart. Candidate determines Shelter in Place for Area 1 and clearing lake area 6 is required.

SAT: UNSAT:

Standard: Uses HAB column to determine areas affected and fills in information on step 2. Completion Time _________ (</= 15 minutes)

SAT: UNSAT:

Termination Cue: JPM is complete.

2020NRC-A4-SRO Revision: 0 Determine if PAR required and determine PAR 2020NRC-A4-SRO.doc Page 6 of 8

OPERATIONS JPM 2020NRC-A4-SRO Revision: 0 Determine if PAR required and determine PAR 2020NRC-A4-SRO.doc Page 7 of 8

Task Briefing You are the Shift Manager and had declared a Site area Emergency 20 minutes ago based on Security Hazzard HS1 - HS1 HOSTILE ACTION within the plant PROTECTED AREA based on a report form Security.

You have just upgraded the Emergency level to General Emergency as the hostile forces have detonated explosives on all four U1 4KV Emergency buses.

The upgrade was due to Loss of Emerg AC Power - SG1 Prolonged loss of all offsite and all onsite AC power to emergency buses.

You are to determine if a PAR is required and if so what the PAR determination is.

2020NRC-A4-SRO.doc Page 8 of 8