ML20356A265

From kanterella
Jump to navigation Jump to search
2020 DC Cook Ile As-Administered RO and SRO Admin JPMs
ML20356A265
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/25/2020
From:
Indiana Michigan Power Co
To:
NRC/RGN-III/DRS/OLB
Reeser D
Shared Package
ML19121A512 List:
References
Download: ML20356A265 (100)


Text

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 MINUTES TITLE NUMBER AND 2020NRC-A1a-RO TITLE: Boron Volume Determination REVISION: 0 Examinees Name: ______________________________________________________

Evaluators Name: ______________________________________________________

Date Performed: _______________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: _____________________________________________________

Time to Complete: _______________________________________________________

Comments: _________________________________________________________________

2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO (R3).doc Page 1 of 9

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 2-OHP-4021-005-002 Operation of the Unit 2 Boric Acid Blender K/A Number: 2.1.43 Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc..

K/A Imp.: RO: 4.1 SRO: 4.3 Task Number: 0050080101 Borate the RCS.

TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing Copy of 2-OHP-4021-005-002 Attachment 9 Boron or Dilution Volume Determination Copy of Unit 2 Technical Data Book curves (Sections 4, 5, 6, and 7)

ATTACHMENTS None EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO (R3).doc Page 2 of 9

OPERATIONS JPM SIMULATOR/LAB SETUP None EVALUATOR INSTRUCTIONS

1. Brief the operator (May be performed by giving out Task Briefing Sheet)
2. Announce start of the JPM Information to be provided via Cues:

RCS Boron Concentration 1000 ppm BAST Concentration 6800 ppm Core Burnup 8000 MWD/MTU Effective Fuel Temperature 1179.3°F DTC -2.235 pcm/°F

3. Perform evolution
4. At completion of evolution, announce the JPM is complete.
5. Document evaluation performance.

TASK BRIEFING You are an extra Control Room Operator on Unit 2.

The Unit Supervisor has directed you to calculate the required Boration or Dilution to restore Tave to program.

Nuclear Engineering Reactor Design Summary (NERDS) is NOT available.

Reactor Power 96.3%

Tave 574.2°F Tref 573°F Calculate ONLY the amount of Boron or PW required to be added to the VCT. The previous blender operation was a boration.

GENERAL STANDARDS/PRECAUTIONS The required Boron Addition has been determined 2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO (R3).doc Page 3 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Determines that section 4.1.1 is not applicable SAT: UNSAT:

2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO (R3).doc Page 4 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Determines that section 4.1.2 is applicable SAT: UNSAT:

STANDARD (CS): Determines that 1.2°F temperature change is required (574.2 - 573 = 1.2) NOTE - the dash after (Tavg-Tref) is not a negative sign SAT: UNSAT:

CUE: Provide Core burnup value (8,000 MWD/MTU after candidates explains Reactor Engineering tracks and supplies this number when NERDS is unavailable.

STANDARD: Determines 8000 MWD/MTU is burnup SAT: UNSAT:

2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO (R3).doc Page 5 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

CUE: Provide RCS Boron (1,000 ppm) after candidates explains chemistry supplies this number after sampling and it is logged in the CR logs.

STANDARD: Records 1000 ppm.

SAT: UNSAT:

STANDARD (CS): Determines that MTC is -12.8 pcm/°F (Range -12.5 to -

13.0)

SAT: UNSAT:

CUE: Provide Effective Fuel Temp (1179.3 °F) after candidates explains Reactor Engineering would supply this number when NERDS is unavailable.

STANDARD: Determines that the Effective Fuel Temperature is 1179.3°F SAT: UNSAT:

CUE: Provide Doppler Temperature Coefficient (DTC = - 2.235 pcm/°F) after candidates explains Reactor Engineering would supply this number when NERDS is unavailable.

STANDARD: Determines that the DTC is -2.235 pcm/°F SAT: UNSAT:

(Continued on next page) 2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO (R3).doc Page 6 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

(Continued from previous page)

STANDARD (CS): Determines that TC is -15.035 pcm/°F (-12.8 + -2.235)

(Range -14.735 to -15.235)

SAT: UNSAT:

STANDARD (CS): Determines that PCM change is -18.042 (-15.035 pcm/°F x 1.2°F) (Range -17.682 to -18.282)

SAT: UNSAT:

STANDARD (CS): Determines that DBW is -8.05 pcm/ppm (Range -8.0 to

-8.1)

SAT: UNSAT:

2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO (R3).doc Page 7 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Determines that Boron change is +2.24 ppm (-18.042 pcm/-8.05 pcm/ppm) (Range +2.18 to +2.29)

SAT: UNSAT:

STANDARD (CS): Determines that Boron change requires +24 gallons of Boric Acid (circle Boric Acid) (Range 22 to 26 gallons)

SAT: UNSAT:

Note: Acceptable range based on graph reading from the lower limit line (20) and mid-scale (30) for the given boron concentration and required ppm change. The calculated limits of 23.92 to 25.66 is included within this range)

STANDARD: Determines that section 4.2 is not applicable SAT: UNSAT:

TERMINATION CUE: JPM is complete when completed Attachment 9 is provided to evaluator.

2020NRC-A1a-RO Revision: 0 Boron Volume Determination 2020NRC-A1.a-RO (R3).doc Page 8 of 9

Task Briefing You are an extra Control Room Operator on Unit 2.

The Unit Supervisor has directed you to calculate the required Boration or Dilution to restore Tave to program.

Nuclear Engineering Reactor Design Summary (NERDS) is NOT available.

Reactor Power 96.3%

Tave 574.2°F Tref 573°F Calculate ONLY the amount of Boron or PW required to be added to the VCT. The previous blender operation was a boration.

Revision: 0 2020NRC-A1.a-RO (R3).doc-RO Page 9 of 9

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 20 Minutes TITLE NUMBER AND 2020NRC-A1.b-RO TITLE: Prepare Valve Stroke Data per 1-OHP-4030- REVISION: 0 114-011-Attachment 1 Examinees Name: ______________________________________________________

Evaluators Name: ______________________________________________________

Date Performed: _______________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: _____________________________________________________

Time to Complete: _______________________________________________________

Comments: _________________________________________________________________

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO (R3).doc Page 1 of 11

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

1-OHP-4030-114-011 Containment Isolation And IST Valve Operability Test, Rev. 36 TDB-1-Fig-19.-1 Power Operated Valve Stroke Time Limits, Rev. 125 NRC KA KA 2.2.12 Knowledge of surveillance procedures. (CFR: 41.10 / 45.13)

RO/SRO Importance 3.7/4.1 TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS PMP-4030-EXE-001, Conduct of surveillance Testing 1-OHP-4030-114-011, Containment Isolation and IST Valve Operability Test, Attachment 1 Copy of TDB Figure 1-19-1 Power Operated Valve Stroke Time limits ATTACHMENTS EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO (R3).doc Page 2 of 11

OPERATIONS JPM SIMULATOR/LAB SETUP None EVALUATOR INSTRUCTIONS Note: This JPM is based on 1-OHP-4030-114-011, Rev. 36 and TDB-1-Fig-19.-1, Rev. 125. Any subsequent revisions to the procedures will require a review of this JPM to ensure that the content of the JPM is still valid. This JPM may be used without revision if the procedure changes do not affect the JPM.

Give copy of Task Briefing, procedure, and attachments to examinee.

TASK BRIEFING You are the extra operator in Unit 1.

The Unit Supervisor has requested you to prepare 1-OHP-4030-114-011, Attachment 1 RCDT and Containment Sump Valves Test per step 2.4 of the attachment.

GENERAL STANDARDS/PRECAUTIONS All data has been filled in for the valves to be tested in attachment 1.

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO (R3).doc Page 3 of 11

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

Cue: Procedure is current revision and pre-test briefing is complete.

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO (R3).doc Page 4 of 11

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS) Operator determines that TDB-1-FIG 19.1 is required for the IST MIN and IST MAX Times SAT: UNSAT:

CUE: Have candidate explain where TDB Figure is located / obtained, then Supply Copy of TDB-1-FIG 19.

1 2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO (R3).doc Page 5 of 11

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO (R3).doc Page 6 of 11

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO (R3).doc Page 7 of 11

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO (R3).doc Page 8 of 11

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO (R3).doc Page 9 of 11

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator enters IST MIN and IST MAX Times SAT: UNSAT:

STANDARD (CS): Operator completes entering IST MIN and IST MAX Times for all valves on Attachment #1.

SAT: UNSAT:

TERMINATION CUE: JPM is complete when the examinee provides the filled in Attachment1 to the evaluator.

2020NRC-A1.b-RO Revision: 0 Prepare Valve Stroke Data per 1-OHP-4030-114-011-Attachment 1 2020NRC-A1.b-RO (R3).doc Page 10 of 11

Task Briefing You are the extra operator in Unit 1.

The Unit Supervisor has requested you to prepare 1-OHP-4030-114-011, Attachment 1 RCDT and Containment Sump Valves Test per step 2.4 of the attachment.

2020NRC-A1.b-RO (R3).doc Page 11 of 11

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 Minutes TITLE NUMBER AND 2020NRC-A2-RO TITLE: Calculate QPTR REVISION: 0 Examinees Name: ______________________________________________________

Evaluators Name: ______________________________________________________

Date Performed: _______________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: _____________________________________________________

Time to Complete: _______________________________________________________

Comments: _________________________________________________________________

2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO (R3).doc Page 1 of 10

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

2-OHP-4030-214-032 Quadrant Power Tilt Calculation NRC KA KA 2.2.12 Knowledge of surveillance procedures RO/SRO Importance 3.7/4.1 TRAINING AIDS/TOOLS/EQUIPMENT Calculator Magnifying glass HANDOUTS Task Briefing 2-OHP-4030-214-032 and Data Sheet 2 - N41, N42, N43, and N44 Pictures ATTACHMENTS NI Calibration Data Card - N41, N42, N43, and N44 Pictures EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP 2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO (R3).doc Page 2 of 10

OPERATIONS JPM None EVALUATOR INSTRUCTIONS

1. Ensure classroom setup is complete
2. Brief the operator (May be performed by giving out Task Briefing Sheet)
3. Announce start of the JPM
4. Perform evolution
5. At completion of evolution, announce the JPM is complete.
6. Document evaluation performance.

TASK BRIEFING You are an extra RO.

The following conditions exist:

  • Unit 2 is currently at 72% power.
  • The Plant Process Computer (PPC) is INOPERABLE The US directs you to perform a manual QPTR calculation per 2-OHP-4030-214-032, Quadrant Power Tilt Calculation.

The NI amp meters are set to display maximum resolution (.1 MILLI-APMS on the RANGE selector switches) and the fluke readings confirm that the indicators are reading properly.

NOTE Simulator Indications are NOT applicable to this JPM GENERAL STANDARDS/PRECAUTIONS Candidate correctly calculates QPTR 2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO (R3).doc Page 3 of 10

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

Cue: NI readings will be used for QPTR.

2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO (R3).doc Page 4 of 10

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD Operator determines step 4.1 is N/A as PPC is INOPERABLE SAT: UNSAT:

STANDARD Operator determines step 4.2 is applicable and detector currents will be used.

SAT: UNSAT:

CUE: Meter scales are selected for maximum resolution

(.1 MILLI-AMPS [100 MICRO-AMPS] on the RANGE selector switches).

STANDARD (CS) Using the 0-100 MICROAMPERE scale, the Operator reads and records Upper & Lower Detector blanks currents for N-41, 42, 43 and 44 on Data Sheet 2.

SAT: UNSAT:

2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO (R3).doc Page 5 of 10

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD Operator determines step 4.2.2 is N/A as Fluke will not be used.

SAT: UNSAT:

STANDARD Operator enters 120% current values on Data Sheet 2.

SAT: UNSAT:

STANDARD (CS) Operator divides respective NI channel with its 120%

value SAT: UNSAT:

STANDARD (CS) Operator totals the Normalized Values SAT: UNSAT:

STANDARD (CS) Operator completes formula calculations to determine QPTR SAT: UNSAT:

STANDARD (CS) Operator enters the highest tilt ratio on Data Sheet 2 SAT: UNSAT:

STANDARD Operator determines step 4.2.8 is N/A as PPC is INOP SAT: UNSAT:

2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO (R3).doc Page 6 of 10

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD Operator determines step 4.3 is N/A as all NIs are OPERABLE SAT: UNSAT:

STANDARD (CS) Operator determines ACCEPTANCE CRITERIA is NOT MET SAT: UNSAT:

TERMINATION CUE: JPM is complete when examinee returns the completed surveillance package 2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO (R3).doc Page 7 of 10

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

Expected values 99 135.4 .7311 97.5 134.4 .7254 98 134.4 .7292 97.5 136.7 .7132 2.8990 91.5 135.6 .6748 96 134.7 .7127 99 134.7 .7345 98 136.2 .7195 2.8419 1.009 Range 1.0063 to 1.0165 1.034 Range 1.0265 to 1.0424 1.034 Value is the highest ratio entered in above 2 lines.

N/A 2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO (R3).doc Page 8 of 10

OPERATIONS JPM Acceptable Ranges Based on Scale used on Pictures Detector A (UPPER)

SCALE 5 5 1 1 500 500 100 100 Low High Low High Low High Low High N-41 4.925 4.975 0.985 0.995 493 498 98.5 99.5 N-42 4.85 4.9 0.97 0.98 485 490 97 98 N-43 4.875 4.925 0.975 0.985 488 493 97.5 98.5 N-44 4.85 4.9 0.97 0.98 485 490 97 98 Using the 100 Scale (UPPER QPTR ranges calculated using combinations of High/Low values above)

N41-High (99.5), N42-Low (97), N43-Low(97.5),N44-Low (97) ---- 1.0165 N41-low (98.5), N42-Low (97), N43-Low(97.5),N44-High (98)----- 1.0063 Detector B (LOWER)

SCALE 5 5 1 1 500 500 100 100 Low High Low High Low High Low High N-41 4.55 4.6 0.91 0.92 455 460 91 92 N-42 4.775 4.825 0.955 0.965 478 483 95.5 96.5 N-43 4.925 4.975 0.985 0.995 493 498 98.5 99.5 N-44 4.875 4.925 0.975 0.985 488 493 97.5 98.5 (LOWER QPTR Ranges Calculated using combinations of High/Low values above)

N41-Low (91), N42-Low (95.5), N43-High (99.5),N44-Low (97.5) ---- 1.0424 N41-High (92), N42-High (96.5), N43-Low(98.5),N44-High (97.5)----- 1.0265 2020NRC-A2-RO Revision: 0 Calculate QPTR 2020NRC-A2-RO (R3).doc Page 9 of 10

Task Briefing You are an extra RO.

The following conditions exist:

  • Unit 2 is currently at 72% power.
  • The Plant Process Computer (PPC) is INOPERABLE The US directs you to perform a manual QPTR calculation per 2-OHP-4030-214-032, Quadrant Power Tilt Calculation.

The NI amp meters are set to display maximum resolution and the fluke readings confirm that the indicators are reading properly.

NI CALIBRATION DATA DET A 120% I in µAmps N41 = 135.4 N42 = 134.4 N43 = 134.4 N44 = 136.7 DET B 120% I in µAmps N41 = 135.6 N42 = 134.7 N43 = 134.7 N44 = 136.2 Verified: Print ____John Smithe__

Sign ___ John Smithe _____

Date 5/11/2020____

NOTE Simulator Indications are NOT applicable to this JPM 2020NRC-A2-RO (R3).doc Page 10 of 10

N41 Upper Detector A 1

2020NRC-A2-RO - Attachment 1 (R3).docx

N41 Lower Detector B 2

2020NRC-A2-RO - Attachment 1 (R3).docx

N42 Upper Detector A 3

2020NRC-A2-RO - Attachment 1 (R3).docx

N42 Lower Detector B 4

2020NRC-A2-RO - Attachment 1 (R3).docx

N43 Upper Detector A 5

2020NRC-A2-RO - Attachment 1 (R3).docx

N43 Lower Detector B 6

2020NRC-A2-RO - Attachment 1 (R3).docx

N44 Upper Detector A 7

2020NRC-A2-RO - Attachment 1 (R3).docx

N44 Lower Detector B 8

2020NRC-A2-RO - Attachment 1 (R3).docx

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 Minutes TITLE NUMBER AND 2020NRC-A3-RO TITLE: Respond to Failed Radiation Monitor Channel REVISION: 0 Examinees Name: ______________________________________________________

Evaluators Name: ______________________________________________________

Date Performed: _______________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: _____________________________________________________

Time to Complete: _______________________________________________________

Comments: _________________________________________________________________

2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO (R3).doc Page 1 of 9

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

2-OHP-4024-211 Annunciator #211 Response: Delta T 12-OHP-4024-139 Annunciator #139 Response: Radiation NRC KA KA 2.3.15 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc. (CFR: 41.12 / 45.9)

RO/SRO Importance 2.9/3.1 TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS 2-OHP-4024-211 Annunciator #211 Response: Delta T 12-OHP-4024-139 Annunciator #139 Response: Radiation ATTACHMENTS None EVALUATION SETTINGS Simulator EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP Disable emulator for ERS-8306.

2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO (R3).doc Page 2 of 9

OPERATIONS JPM EVALUATOR INSTRUCTIONS Note: This JPM is based on 2-OHP-4024-211, Rev. 25 and 12-OHP-4024-139 Rev. 25. Any subsequent revisions to the procedures will require a review of this JPM to ensure that the content of the JPM is still valid. This JPM may be used without revision if the procedure changes do not affect the JPM.

Give copy of Task Briefing to examinee. Once examinee has located Annunciator response procedures provide attachment 2-OHP-4024-211 to examinee.

TASK BRIEFING You are the extra operator in Unit 2.

The Unit Supervisor has requested you to respond to Annunciator Panel 211: Drop 49, identify, and take all actions required for Unit 2.

GENERAL STANDARDS/PRECAUTIONS All actions for failed RMS Channel have been completed or identified 2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO (R3).doc Page 3 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator reviews Drop 49 Probable Causes and automatic actions.

SAT: UNSAT:

STANDARD: Operator determines that 12-OHP-4024-139 is required to be reviewed for channel in alarm.

SAT: UNSAT:

STANDARD (CS): Operator identifies from the RMSAN1 channel ERA-8306 in alarm.

SAT: UNSAT:

CUE: Once examinee indicates location of Annunciator Response provide copy of 12-OHP-4024-139 for Channel ERA-8300 2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO (R3).doc Page 4 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

NOTE: Candidate must perform actions from the RMS CT located on the back wall of the simulator.

STANDARD: Operator reviews probable causes for channel in WHITE alarm.

SAT: UNSAT:

2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO (R3).doc Page 5 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

THIS PAGE INCLUDED FOR REFERENCE. NO ACTIONS REQUIRED AS ALARM IS WHITE.

2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO (R3).doc Page 6 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

CUE: Inform the operator the Unit Supervisor has declared the channel Inoperable and it is desired to prevent nuisance alarms.

CUE: RP has been contacted for removing channel from service.

STANDARD (CS): Operator identifies Attachment 2 is required for removing channel from scan on Unit2. (Only identifying Attachment 2 completion is critical and will be completed).

SAT: UNSAT:

CUE: Another operator will complete Attachment 1 to remove the channel from Scan on the Unit 1 PPC.

2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO (R3).doc Page 7 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator fills in the required information.

SAT: UNSAT:

NOTE: Only RMS Channel of ERA-8306 (west RHR Pump Room) is required NOTE: Enters channel is in Fail Status or other description. Exact wording is not required.

STANDARD (CS): Operator activates U2 RMS Annunciator Status Tree.

SAT: UNSAT:

STANDARD (CS): Operator unchecks the box next to ERA-8306.

SAT: UNSAT:

TERMINATION CUE: JPM is Complete when examinee unchecks the box for ERA-8306 to remove it from scan.

2020NRC-A3-RO Revision: 0 Respond to Failed Radiation Monitor Channel 2020NRC-A3-RO (R3).doc Page 8 of 9

Task Briefing You are the extra operator in Unit 2.

The Unit Supervisor has requested you to respond to Annunciator Panel 211: Drop 49, identify, and take all actions required for Unit 2.

2020NRC-A3-RO (R3).doc Page 9 of 9

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 MINUTES TITLE NUMBER AND 2020NRC-A1.a-SRO TITLE: Review Boron Volume Determination REVISION: 0 Examinees Name: __________________________________________________________

Evaluators Name: ___________________________________________________________

Date Performed: ____________________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: _________________________________________________________

Time to Complete: ___________________________________________________________

Comments: ________________________________________________________________

2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO (R3).doc Page 1 of 9

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 2-OHP-4021-005-002 Operation of the Unit 2 Boric Acid Blender K/A Number: 2.1.43 Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc..

K/A Imp.: RO: 4.1 SRO: 4.3 Task Number: 0050080101 Borate the RCS.

TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing Copy of 2-OHP-4021-005-002 Attachment 9 Boron or Dilution Volume Determination Copy of Unit 2 Technical Data Book curves (Sections 4, 5, 6, and 7)

ATTACHMENTS None EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO (R3).doc Page 2 of 9

OPERATIONS JPM SIMULATOR/LAB SETUP None EVALUATOR INSTRUCTIONS

1. Brief the operator (May be performed by giving out Task Briefing Sheet)

Provide the following information as the examinee needs it for review verification:

RCS Boron Concentration 1000 ppm BAST Concentration 6800 ppm Core Burnup 8000 MWD/MTU Effective Fuel Temperature 1179.3°F DTC -2.235 pcm/°F

2. Announce start of the JPM
3. Perform evolution
4. At completion of evolution, announce the JPM is complete.
5. Document evaluation performance.

TASK BRIEFING You are unit supervisor in Unit 2.

You have directed the RO to calculate the required Boration or Dilution to restore Tave to program.

Nuclear Engineering Reactor Design Summary (NERDS) is NOT available.

Reactor Power 96.3%

Tave 574.2°F Tref 573°F He has calculated ONLY the amount of Boron or PW required to be added to the VCT. The blender line is full of acid.

Review his calculation for correctness identifying any errors.

GENERAL STANDARDS/PRECAUTIONS The calculation has been reviewed and incorrect MTC and dilution / boration errors have been identified 2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO (R3).doc Page 3 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Agrees that section 4.1.1 is not applicable SAT: UNSAT:

2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO (R3).doc Page 4 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

CUE: If required, have candidate continue review of attachment after first error is identified.

STANDARD: Agrees that section 4.1.2 is applicable SAT: UNSAT:

STANDARD: Agrees that 1.2°F temperature change is required (574.2 -

573 = 1.2) NOTE - the dash after (Tavg-Tref) is not a negative sign SAT: UNSAT:

CUE: Provide Core burnup value (8,000 MWD/MTU after candidates explains Reactor Engineering tracks and supplies this number when NERDS is unavailable.

STANDARD: Agrees 8000 MWD/MTU is burnup SAT: UNSAT:

2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO (R3).doc Page 5 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

CUE: Provide RCS Boron (1,000 ppm) after candidates explains chemistry supplies this number after sampling and it is logged in the CR logs.

STANDARD: Agrees 1000 ppm is from given information.

SAT: UNSAT:

STANDARD (CS): Determines that MTC is actually -12.8. (-10.5pcm/°F is from wrong part of curve) (Range -12.5 to -13.0)

SAT: UNSAT:

CUE: Provide Effective Fuel Temp (1179.3 °F) after candidates explains Reactor Engineering would supply this number when NERDS is unavailable.

STANDARD: Agrees that the Effective Fuel Temperature is 1179.3°F SAT: UNSAT:

(Continued on next page) 2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO (R3).doc Page 6 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

(Continued from previous page)

CUE: Provide Doppler Temperature Coefficient (DTC = -2.235 pcm/°F) after candidates explains Reactor Engineering would supply this number when NERDS is unavailable.

STANDARD: Agrees that the DTC is -2.235 pcm/°F SAT: UNSAT:

STANDARD: Determines that TC is -15.035 pcm/°F (-12.735 is from incorrect value in d)(Range -14.735 to -15.235)

SAT: UNSAT:

STANDARD: Determines that PCM change is -18.042 (-15.035 pcm/°F x 1.2°F) (Range -17.682 to -18.282)

(-15.282 is from incorrect value in g)

SAT: UNSAT:

STANDARD: Agrees that DBW is -8.05 pcm/ppm (Range -8.0 to -8.1)

SAT: UNSAT:

2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO (R3).doc Page 7 of 9

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Determines that required Boron change is +2.24 ppm

(-18.042 pcm/-8.05 pcm/ppm) (Range +2.18 to +2.29) (1.58 is from incorrect value in g)

SAT: UNSAT:

STANDARD (CS): Determines that Boron change requires +24 gallons of Boric Acid (circle Boric Acid) (Range 22 - 26 gallons). Identifies RO used Dilution graph to determine volume.

SAT: UNSAT:

Note: Acceptable range based on graph reading from the lower limit line (20) and mid-scale (30) for the given boron concentration and required ppm change. The calculated limits of 23.92 to 25.66 is included within this range)

STANDARD: Determines that section 4.2 is not applicable SAT: UNSAT:

TERMINATION CUE: JPM is complete when review of the completed Attachment 9 and any identified errors is provided to evaluator.

2020NRC-A1.a-SRO Revision: 0 Review Boron Volume Determination 2020NRC-A1.a-SRO (R3).doc Page 8 of 9

Task Briefing You are unit supervisor in Unit 2.

You have directed the RO to calculate the required Boration or Dilution to restore Tave to program.

Nuclear Engineering Reactor Design Summary (NERDS) is NOT available.

Reactor Power 96.3%

Tave 574.2°F Tref 573°F He has calculated ONLY the amount of Boron or PW required to be added to the VCT.

Review his calculation for correctness identifying any errors.

Revision: 0 2020 NRC A1.a-SRO Page 9 of 9

OPERATIONS JPM TRAINING PROGRAM Initial License Training TIME: 20 Minutes TITLE NUMBER AND 2020NRC-A1.b-SRO TITLE: Review Valve Stroke Data per 1-OHP-4030- REVISION: 0 114-011-Attachment 1 Examinees Name: ____________________________________________________________

Evaluators Name: _____________________________________________________________

Date Performed: ______________________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: ___________________________________________________________

Time to Complete: _____________________________________________________________

Comments: ________________________________________________________________

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO (R3).doc Page 1 of 13

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

1-OHP-4030-114-011 Containment Isolation And IST Valve Operability Test, Rev. 36 TDB-1-Fig-19.-1 Power Operated Valve Stroke Time Limits, Rev. 125 NRC KA KA 2.2.12 Knowledge of surveillance procedures. (CFR: 41.10 / 45.13)

RO/SRO Importance 3.7/4.1 TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS PMP-4030-EXE-001, Conduct of surveillance Testing 1-OHP-4030-114-011, Containment Isolation and IST Valve Operability Test, Attachment 1 OHI-4016, Conduct of Operations: Guidelines (Available if requested)

ATTACHMENTS None EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP 2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO (R3).doc Page 2 of 13

OPERATIONS JPM None EVALUATOR INSTRUCTIONS Note: This JPM is based on 1-OHP-4030-114-011, Rev. 36 and TDB-1-Fig-19.-1, Rev. 125. Any subsequent revisions to the procedures will require a review of this JPM to ensure that the content of the JPM is still valid. This JPM may be used without revision if the procedure changes do not affect the JPM.

Give copy of Task Briefing and procedure to examinee.

TASK BRIEFING The SM has requested you to perform the SRO Review the recently performed 1-OHP-4030-114-011 , RCDT and Containment Sump Valve Test.

GENERAL STANDARDS/PRECAUTIONS The completed Attachment has been reviewed and any errors have been identified.

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO (R3).doc Page 3 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

Note: Operator verifies prerequisites completed.

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO (R3).doc Page 4 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator determines that TDB-1-FIG 19.1 is required for the IST MIN and IST MAX Times SAT: UNSAT:

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO (R3).doc Page 5 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator determine IST MIN and IST MAX Times entered correctly and results are acceptable SAT: UNSAT:

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO (R3).doc Page 6 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator determine IST MIN and IST MAX Times entered correctly and results are acceptable STANDARD: Operator determine IST MIN and IST MAX Times entered correctly and results are acceptable 2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO (R3).doc Page 7 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator determines Box not checked and Initials missed SAT: UNSAT:

STANDARD (CS): Operator determines IST MAX Times were incorrectly entered from the limits column SAT: UNSAT:

STANDARD (CS): Operator determines IST MAX Time and LIMIT was exceeded and re-test is NOT allowed SAT: UNSAT:

STANDARD (CS): Operator determines IST Limit Time was not exceeded but the IST MAX was exceeded so restest is allowed SAT: UNSAT:

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO (R3).doc Page 8 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator determines Box not checked and Initials missed SAT: UNSAT:

STANDARD: Operator determine IST MIN and IST MAX Times entered correctly and results are acceptable 2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO (R3).doc Page 9 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator determine IST MIN and IST MAX Times entered correctly and results are acceptable 2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO (R3).doc Page 10 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator determines

  • DCR 207 Fail-Safe (not the Full-Stroke test) was not signed off;
  • DCR-205, failed the Stroke-Time test, and was inappropriately re-tested as well as failing the Stroke-Time test on the re-test; and
  • DCR-206 also failed the Stroke-Time test, but should have been re-tested, and the Full-Stroke test was not signed off.

SAT: UNSAT:

STANDARD (CS): Determine That DCR-205 and DCR-206 were incorrectly tested and should be declared inoperable (DCR-206 could be retested)

SAT: UNSAT:

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO (R3).doc Page 11 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

X X 2020567 STANDARD (CS): Determine that Acceptance Criteria was NOT met X

SAT: UNSAT:

STANDARD: examinee signs and dates or explains why he would not sign P. Sanderson 0800 Today the attachment SAT: UNSAT:

TERMINATION CUE: JPM is complete when examinee signs or explains why he would not sign the attachment.

2020NRC-A1.b-SRO Revision: 0 Review Valve Stroke Data 2020NRC-A1.b-SRO (R3).doc Page 12 of 13

Task Briefing The SM has requested you to perform the SRO Review the recently performed 1-OHP-4030-114-011 Attachment 1, RCDT and Containment Sump Valve Test.

2020NRC-A1.b-SRO (R3).doc Page 13 of 13

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 20 Minutes TITLE NUMBER AND 2020NRC-A2-SRO TITLE: Review QPTR REVISION: 0 Examinees Name: ______________________________________________________

Evaluators Name: ______________________________________________________

Date Performed: _______________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: _____________________________________________________

Time to Complete: _______________________________________________________

Comments: _________________________________________________________________

2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO (R3).doc Page 1 of 8

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

2-OHP-4030-214-032 Quadrant Power Tilt Calculation NRC KA KA 2.2.40 Ability to apply Technical Specifications for a system RO/SRO Importance 3.4/4.7 Task Number: 0130180201 Perform Quadrant Power Tilt Ratio Calculation TRAINING AIDS/TOOLS/EQUIPMENT Calculator Ruler Magnifying glass HANDOUTS Task Briefing Completed 2-OHP-4030-214-032 and Data Sheet 2 - N41, N42, N43, and N44 Pictures ATTACHMENTS NI Calibration Data Card - N41, N42, N43, and N44 Pictures EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP 2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO (R3).doc Page 2 of 8

OPERATIONS JPM None EVALUATOR INSTRUCTIONS

1. Brief the operator (May be performed by giving out Task Briefing Sheet)
2. Announce start of the JPM
3. Perform evolution
4. At completion of evolution, announce the JPM is complete.
5. Document evaluation performance.

TASK BRIEFING You are the Unit SRO.

The following conditions exist:

  • Unit 2 is currently at 72% power.
  • The Plant Process Computer (PPC) is INOPERABLE The SM directs you to Review the manual 2-OHP-4030-214-032, Quadrant Power Tilt Calculation.

The NI amp meters are set to display maximum resolution (.1 MILLI-APMS on the RANGE selector switches).

NOTE Simulator Indications are NOT applicable to this JPM GENERAL STANDARDS/PRECAUTIONS Completed QPTR has been reviewed and identifies that values for N42 Upper, N41 Lower and N43 Lower were incorrectly read/entered 2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO (R3).doc Page 3 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS) Operator identifies that values for N42 Upper, N41 Lower and N43 Lower were incorrectly read/entered.

( Correct Values are: N42 Upper- 95.5, N41 Lower - 91.5, N43 Lower - 99)

(Range +/- 0.5 Micro-Amps for all readings)

SAT: UNSAT:

If required Direct Operator to makes required corrections and recalculate.

STANDARD (CS) Operator enters and calculates correct values for:

  • N42 upper 95.5 (95.0 to 96.0) Normalized - .6991 (.6955 to .7028)
  • Upper Total 2.873 (2.869 to 2.876) 99 135.4 .7311 97.5 (95.5) 136.6 .7138 (.6991)
  • N41 Lower 91.5 (91.0 to 92.0) Normalized - .6748 (.6711 to .6785) 98 134.4 .7292
  • N43 Lower 99 (98.5 to 99.5) Normalized - .7350 (.7313 to .7387) 97.5 136.7 .7132
  • Lower Total 2.848 (2.840 to 2.855) 2.887 (2.873)
  • Upper QPTR 1.018 (1.0168 to 1.0194) 96.5 (91.5) 135.6 .7117 (.6748)
  • Lower QPTR 1.032 (1.0244 to 1.040) 96 133.6 .7186 98 (99) 134.7 .7275 (.7350) 98 136.2 .7195 SAT: UNSAT:

2.877 (2.848)

STANDARD (CS) Operator identifies that value was incorrectly calculated.

1.0129 Should be 1.032 resulting in excessive QPTR.

1.032 (range 1.0244 to 1.040) 1.0114 SAT: UNSAT:

1.0129 STANDARD (CS) Operator Determines that Both Upper and Lower are >

Notification Limit N/A SAT: UNSAT:

STANDARD Operator Determines that Acceptance Criteria is NOT Met (QPTR > 1.02)

SAT: UNSAT:

2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO (R3).doc Page 4 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS) Operator Determines that Acceptance Criteria is NOT Met (QPTR > 1.02) and Notifies SM & Reactor Engineering SAT: UNSAT:

CUE: SM Acknowledges that QPTR has Exceeded TS value requests that you review the Required Technical Specification and determine the required Actions.

2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO (R3).doc Page 5 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

CUE: (If Required) Ask Operator to determine the Technical Specification LCO that applies.

STANDARD (CS) Determines that Power is limited to 3% for each 1%

over 1.00 (3.2 x 3% = 9.6%) per LCO 3.2.4 Action A.1 - (note action is met at current power - 90.4% is limit)

(Range of 7.32% to 12.0% reduction with a 92.68% to 88.0% power limit)

SAT: UNSAT:

STANDARD (CS) Determines that QPTR must be calculated every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, SAT: UNSAT:

STANDARD (CS) Verify F is within limit, Verify F C W (Z ) (Z )

Q Q is within limit, & Verify F is within limits specified in the COLR every 7 N

h days SAT: UNSAT:

2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO (R3).doc Page 6 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Identify that safety analyses must be evaluated before raising power above the limit.(90.4% power limit)

SAT: UNSAT:

STANDARD (CS): A.5 & A.6 required prior to raising power above the limit.(90.4% power limit)

SAT: UNSAT:

TERMINATION CUE: JPM is complete when examinee identifies all applicable Tech Spec Required Actions 2020NRC-A2-SRO Revision: 0 Review QPTR 2020NRC-A2-SRO (R3).doc Page 7 of 8

Task Briefing You are the Unit SRO.

The following conditions exist:

  • Unit 2 is currently at 72% power.
  • The Plant Process Computer (PPC) is INOPERABLE The SM directs you to Review the manual 2-OHP-4030-214-032, Quadrant Power Tilt Calculation.

The NI amp meters are set to display maximum resolution.

NI CALIBRATION DATA DET A 120% I in µAmps N41 = 135.4 N42 = 136.6 N43 = 134.4 N44 = 136.7 DET B 120% I in µAmps N41 = 135.6 N42 = 133.6 N43 = 134.7 N44 = 136.2 Verified: Print ____John Smithe__

Sign ___ John Smithe _____

Date 5/11/2016____

NOTE Simulator Indications are NOT applicable to this JPM - Use Supplied Pictures for readings.

2020NRC-A2-SRO (R3).doc Page 8 of 8

N41 Upper Detector A 1

2020NRC-A2-SRO - Attachment 1 (R3).docx

N41 Lower Detector B 2

2020NRC-A2-SRO - Attachment 1 (R3).docx

N42 Upper Detector A 3

2020NRC-A2-SRO - Attachment 1 (R3).docx

N42 Lower Detector B 4

2020NRC-A2-SRO - Attachment 1 (R3).docx

N43 Upper Detector A 5

2020NRC-A2-SRO - Attachment 1 (R3).docx

N43 Lower Detector B 6

2020NRC-A2-SRO - Attachment 1 (R3).docx

N44 Upper Detector A 7

2020NRC-A2-SRO - Attachment 1 (R3).docx

N44 Lower Detector B 8

2020NRC-A2-SRO - Attachment 1 (R3).docx

OPERATIONS JPM TRAINING PROGRAM Initial License Training TIME: 15 Minutes TITLE NUMBER AND 2020NRC-A3-SRO TITLE: Approve a Containment Purge release REVISION: 0 Examinees Name: ____________________________________________________________

Evaluators Name: _____________________________________________________________

Date Performed: ______________________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: ___________________________________________________________

Time to Complete: _____________________________________________________________

Comments: ________________________________________________________________

2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO (R3).doc Page 1 of 8

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

1-OHP-4021-028-005 Operation of the Containment Purge System NRC KA KA 2.3.6 Ability to approve release permits. (CFR: 41.12 / 45.10)

RO/SRO Importance 2.0/3.8 TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS 1-OHP-4021-028-005 data Sheet 1, Containment Purge Release Permit ATTACHMENTS None EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO (R3).doc Page 2 of 8

OPERATIONS JPM SIMULATOR/LAB SETUP None EVALUATOR INSTRUCTIONS Note: This JPM is based on 1-OHP-4030-028-005, Rev. 38. Any subsequent revisions to the procedures will require a review of this JPM to ensure that the content of the JPM is still valid. This JPM may be used without revision if the procedure changes do not affect the JPM.

Give copy of Task Briefing and procedure to examinee.

TASK BRIEFING The Unit was shut down yesterday due to an RCS leak. RCS cooldown is in progress with RCS temperature currently at 425 F.

The SM has requested you to review and approve the Containment Purge Release Permit to allow containment entry for leak location identification.

GENERAL STANDARDS/PRECAUTIONS The Containment Purge Release Permit has been reviewed and identifies Purge cannot be authorized due to incorrect Purge method and <24-hour time requirement has expired.

2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO (R3).doc Page 3 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator verifies release number entered.

SAT: UNSAT:

STANDARD: Operator verifies Operations signed for initiating release permit.

SAT: UNSAT:

STANDARD (CS): Operator identifies incorrect release method has been selected. Full PURGE rate is not allowed as plant is in Mode 3 from conditions given in brief SAT: UNSAT:

2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO (R3).doc Page 4 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Operator identifies > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> has elapsed since Chem, RP, and ENV approved the Purge release.

SAT: UNSAT:

STANDARD (CS): Operator identifies Purge cannot be authorized due to incorrect Purge method and <24 hour time requirement has expired.

SAT: UNSAT:

TERMINATION CUE: JPM is complete when examinee states Purge is not authorized.

2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO (R3).doc Page 5 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

NO ACTIONS CONTAINED ON THIS PAGE 2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO (R3).doc Page 6 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

NO ACTIONS CONTAINED ON THIS PAGE 2020NRC-A3-SRO Revision: 0 Approve a Containment Purge Release 2020NRC-A3-SRO (R3).doc Page 7 of 8

Task Briefing The Unit was shut down yesterday due to an RCS leak. RCS cooldown is in progress with RCS temperature currently at 425 F.

The SM has requested you to review and approve the Containment Purge Release Permit to begin purging containment to allow containment entry for leak location identification.

2020NRC-A3-SRO (R3).doc Page 8 of 8

OPERATIONS JPM TRAINING PROGRAM Initial License Training TIME: 20 Minutes TITLE NUMBER AND 2020NRC-A4-SRO TITLE: Determine if PAR required and determine PAR REVISION: 0 TIME CRITICAL JPM Examinees Name: ____________________________________________________________

Evaluators Name: _____________________________________________________________

Date Performed: ______________________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: ___________________________________________________________

Time to Complete: _____________________________________________________________

Comments: ________________________________________________________________

2020NRC-A4-SRO Revision: 0 Determine if PAR required and determine PAR 2020NRC-A4-SRO (R3).doc Page 1 of 7

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedures:

PMP-2080-EPP-101 EMERGENCY CLASSIFICATION PMP-2080-EPP-100 EMERGENCY RESPONSE NRC KA KA 2.4.44 Knowledge of emergency plan protective action recommendations.

SRO Importance 4.4 Task Number: EPP0120703 Develop a Protective Action Recommendation TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing sheet Task briefing PMP-2080-EPP-100, Emergency Response, Attachment 1 Protective Action Recommendations PMP-2080-EPP-101, Emergency Plan Classification, Attachment 1 EP Binder with full PMP-2080-EPP-100, Emergency Response procedure ATTACHMENTS None EVALUATION SETTINGS Classroom EVALUATION METHOD: PERFORM: SIMULATE:

2020NRC-A4-SRO Revision: 0 Determine if PAR required and determine PAR 2020NRC-A4-SRO (R3).doc Page 2 of 7

OPERATIONS JPM SIMULATOR/LAB SETUP None EVALUATOR INSTRUCTIONS

1. Brief the operator (May be performed by giving out Task Briefing Sheet)
2. Announce start of the JPM
3. Perform evolution
4. At completion of evolution, announce the JPM is complete.
5. Document evaluation performance.

TASK BRIEFING You are the Shift Manager and had declared a Site area Emergency 20 minutes ago based on Security Hazard HS1 - HS1 HOSTILE ACTION within the plant PROTECTED AREA based on a report from Security.

You have just upgraded the Emergency level to General Emergency as the hostile forces have detonated explosives on all four U1 4KV Emergency buses. The upgrade was due to Loss of Emergency AC Power - SG1 Prolonged loss of all offsite and all onsite AC power to emergency buses.

You are to determine if a PAR is required and if so what the PAR determination is.

This is a Time Critical JPM.

GENERAL STANDARDS/PRECAUTIONS Determine PAR is required and recommends PAR IAW EPP-100 attachment 1.

2020NRC-A4-SRO Revision: 0 Determine if PAR required and determine PAR 2020NRC-A4-SRO (R3).doc Page 3 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

EVALUATOR NOTE: A General Emergency requires a Protective Action Recommendation (PAR) to be made to the state.

Start Time: .

STANDARD (CS): Candidate determines PAR is required.

SAT: UNSAT:

STANDARD: Candidate proceeds to Initial PAR flowchart.

SAT: UNSAT:

2020NRC-A4-SRO Revision: 0 Determine if PAR required and determine PAR 2020NRC-A4-SRO (R3).doc Page 4 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS): Candidate determines this is NOT Rapidly Progressing and a HOSTILE ACTION is occurring.

SAT: UNSAT:

STANDARD (CS): Candidate determines PAR using Initial PAR flowchart. Candidate determines Shelter in Place for Area 1 and clearing lake area 6 is required.

SAT: UNSAT:

STANDARD (CS): Uses HAB column to determine areas affected and fills in information on step 2.

SAT: UNSAT:

Termination Cue: JPM is complete when examinee provides recommended PAR.

Completion Time _________ (</= 12 minutes) 2020NRC-A4-SRO Revision: 0 Determine if PAR required and determine PAR 2020NRC-A4-SRO (R3).doc Page 5 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard) 2020NRC-A4-SRO Revision: 0 Determine if PAR required and determine PAR 2020NRC-A4-SRO (R3).doc Page 6 of 7

Task Briefing You are the Shift Manager and had declared a Site area Emergency 20 minutes ago based on Security Hazzard HS1 - HS1 HOSTILE ACTION within the plant PROTECTED AREA based on a report from Security.

You have just upgraded the Emergency level to General Emergency as the hostile forces have detonated explosives on all four U1 4KV Emergency buses. The upgrade was due to Loss of Emergency AC Power - SG1 Prolonged loss of all offsite and all onsite AC power to emergency buses.

You are to determine if a PAR is required and if so what the PAR determination is.

This is a Time Critical JPM.

2020NRC-A4-SRO (R3).doc Page 7 of 7